Loading...
HomeMy WebLinkAboutWPO201500034 Review Comments WPO VSMP 2015-07-08Review Comments WPO201600034 Project Name: denmore Section K2B Date Completed: Nednesday, July 06, 2015 Reviewer: ,Michelle Reberge Department'DivisioniAgency: Engineering Reviews Comments: II Here are my final comments: Stream Buffer Mitigation Plan 0 F u 1) Revise the riser structure in SB_ It appears to be embedded in embankment. Also see how perforated pipe detail will be affected. 2) Remove the safety fence in for SB -1 during erosion control plans only- 3) The emergency spillway should be lined with stone (to the toe )_ Check E&S and SWIM plans to ensure this_ I believe all basins are showing earthen access road for emergency spillway on SWIM plans_ 4) Label the underdrain under SB -1m 5) In S' IVI Facility #1, show outlet protection for culvert into forebay_ 6) Just include sheet 5 and 10 from the previously approved plan_ This will cover all culverts and ditches for the area_ Review Status: See Recommendations F-1 Page: County of Albemarle Printed On: 07120120'15