HomeMy WebLinkAboutWPO201500034 Review Comments WPO VSMP 2015-07-08Review Comments
WPO201600034
Project Name: denmore Section K2B
Date Completed: Nednesday, July 06, 2015
Reviewer: ,Michelle Reberge
Department'DivisioniAgency: Engineering
Reviews Comments:
II Here are my final comments:
Stream Buffer Mitigation Plan 0
F
u
1) Revise the riser structure in SB_ It appears to be embedded in embankment. Also see how
perforated pipe detail will be affected.
2) Remove the safety fence in for SB -1 during erosion control plans only-
3) The emergency spillway should be lined with stone (to the toe )_ Check E&S and SWIM plans
to ensure this_ I believe all basins are showing earthen access road for emergency spillway on SWIM
plans_
4) Label the underdrain under SB -1m
5) In S' IVI Facility #1, show outlet protection for culvert into forebay_
6) Just include sheet 5 and 10 from the previously approved plan_ This will cover all culverts and
ditches for the area_
Review Status: See Recommendations F-1
Page: County of Albemarle Printed On: 07120120'15