HomeMy WebLinkAboutWPO201500022 Review Comments WPO VSMP 2016-01-25COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit plan review Project title: State Farm Blvd & South Pantops Drive Sidewalk Project Project file number: WP0201500022 Plan preparer: Kimley Horn & Assoc, Inc. Owner or rep.: Frank Pohl [fpohl@albemarle.org] Plan received date: 3 April 2015 Rev. 29 June 2015 Rev. 21 December 2015 Date of comments: 29 April 2015 Rev. 22 July 2015 Rev. 25 January 2016 Reviewers: Max Greene County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. Albemarle County SWPPP simple form: http://www.albemarle.org/upload/images/forms_center/departments/Community Development/forms /En ing eering and _WPO _Forms/Stormwater Pollution _Prevention _ Plan_ SWPPP_template.doc 1. SWPPP has not been signed by owner or designated operator. Please have all documents signed in the SWPPP prior to final approval. The "operator" is generally the owner of the project for the approval process and then can be transferred at any time after approval with the "delegation of authority" form. Comment appears adequately addressed at this time. 2. The SWPPP Construction Site Notice form is incorrect and states the site drains into Meadow Creek. This site drains into the Rivanna River. Comment appears adequately addressed at this time. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. PPP Plan was not included in submittal package. Please see Albemarle County forms: http://www.albemarle.org/upload/images/forms center/departments/Community_ Development/fo rms/Engineering and _WPO _Forms/Stormwater_Pollution _Prevention _ Plan_ SWPPP_template.d oc Engineering Review Comments Page 2 of 3 PPP Plan has been included with SWPPP but does not show the proposed locations for any of the items listed in the listed in the PPP document. Please show locations on PPP for: 1. Solid Waste Disposal, 2. Sanitary Facilities, 3. Water Source, 4. Stockpile locations, 5. Equipment cleaning, maintenance, and repair, 6. Concrete wash down areas. Comments appear adequately addressed at this time. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. The purchase of Credits will need to be approved by the County Attorney's Office. Please contact Ana Kilmer akilmergalbemarle.org for required information and documentation for credit purchases prior to finalizing the purchase. Item still pending. Item still Pending. Please submit copy of purchase/affidavit for file. D. Erosion and Sediment Control Plan (ESOP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is approved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. Please show the E&SC protection measures on the grading plan for adequate review. The E&SC plan and the Grading plan are at different scales and could not be overlaid for review. 2. Phase 2 E&SC plan does not appear to have any E&SC measures shown. Please explain or remove from submittal. The Silt fence shown down slope is a Diversion and will need a catchment at the bottom of the diversion to capture sediment and dissipate energy. This office recommends showing Right of Way Diversions across the proposed disturbance in a manner that will direct the stormwater flows into the grass areas for filtering. The Check dam locations should suffice for right of way locations 3. Please show the staging, stockpile and parking areas for equipment, supplies and employees. Plan approval will require the staging, stockpile and parking areas for equipment, supplies and employees. Please have responsible party submit plans as soon as possible. 4. Please show limits of disturbance and state the area of disturbance on the plan. Limits of disturbance could not be found on the plan submittal, narrative states the total area for this project is 0.75. The staging and stockpile areas may increase the limits of disturbance and will need to be corrected. Consultant proposes the site contractor will be responsible for submitting VSMP amendment plans for additional areas of disturbance for staging, stockpiling and parking for employees, supplies and equipment not included with this package. Additional areas of disturbance (VSMP amendment plan) will need to be approved prior to site expansion. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to Engineering Review Comments Page 3 of 3 discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/deptfonns.asp?departrnent=cdengLypo File: CDDE1_vsmp_review _State Farm Blvd & South Pantops Drive Sidewalk Project_ wpo201500022.docx I Al �1RGINl�' COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 VSMP Permit plan review Project title: State Farm Blvd & South Pantops Drive Sidewalk Project Project file number: WP0201500022 Plan preparer: Kimley Horn & Assoc, Inc. Owner or rep.: Frank Pohl [fpohl @albemarle.org] Plan received date: 3 April 2015 Rev. 29 June 2015 Date of comments: 29 April 2015 Rev. 22 July 2015 Reviewers: Max Greene County Code section 17 -410 and Virginia Code §62.1- 44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17 -401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. Albemarle County SWPPP simple form: http:// www.albemarle.org/upload/images /forms center/ departments /Community_ Development /forms /Engineering _ and WPO_Forms /Stormwater Pollution Prevention Plan SWPPP_template.doc 1. SWPPP has not been signed by owner or designated operator. Please have all documents signed in the SWPPP prior to final approval. The "operator" is generally the owner of the project for the approval process and then can be transferred at any time after approval with the "delegation of authority" form. Comment appears adequately addressed at this time. 2. The SWPPP Construction Site Notice form is incorrect and states the site drains into Meadow Creek. This site drains into the Rivanna River. Comment appears adequately addressed at this time. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17 -404. 1. PPP Plan was not included in submittal package. Please see Albemarle County forms: http:// www .albemarle.org/upload/images/ forms _center /departments /Community Development /fo rms /En in - �g_and_WPO_Forms /Stormwater_ Pollution_ Prevention_ Plan_ SWPPP_template.d oc PPP Plan has been included with SWPPP but does not show the proposed locations for any of the items listed in the listed in the PPP document. Please show locations on PPP for: Engineering Review Comments Page 2 of 3 1. Solid Waste Disposal, 2. Sanitary Facilities, 3. Water Source, 4. Stockpile locations, 5. Equipment cleaning, maintenance, and repair, 6 Concrete wash down areas. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17 -403. 1. The purchase of Credits will need to be approved by the County Attorney's Office. Please contact Ana Kilmer akilmer&albemarle.org for required information and documentation for credit purchases prior to finalizing the purchase. Item still pending. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17 -402. 1. Please show the E &SC protection measures on the grading plan for adequate review. The E &SC plan and the Grading plan are at different scales and could not be overlaid for review. 2. Phase 2 E &SC plan does not appear to have any E &SC measures shown. Please explain or remove from submittal. The Silt fence shown down slope is a Diversion and will need a catchment at the bottom of the diversion to capture sediment and dissipate energy. This office recommends showing Right of Way Diversions across the proposed disturbance in a manner that will direct the stormwater flows into the grass areas for filtering. The Check dam locations should suffice for right of way locations 3. Please show the staging, stockpile and parking areas for equipment, supplies and employees. Plan approval will require the staging, stockpile and parking areas for equipment, supplies and employees. Please have responsible party submit plans as soon as possible. 4. Please show limits of disturbance and state the area of disturbance on the plan. Limits of disturbance could not be found on the plan submittal, narrative states the total area for this project is 0.75. The staging and stockpile areas may increase the limits of disturbance and will need to be corrected. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re- submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2 -4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The Engineering Review Comments Page 3 of 3 County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference. Applicants will need to complete the request for a pre - construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; hllp://www.albemarle.ora/deptforms.asp?department=cdengMTo Filc: CDDE1 vsmp_rcvicw Statc Farm BINd & South Pantops Drivc Sidewalk Project_wpo201500022.docx Al f. �S COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project title: Project file number: Plan preparer: Owner or rep.: Plan received date: Date of comments: Reviewers: VSMP Permit plan review State Farm Blvd & South Pantops Drive Sidewalk Project WP0201500022 Kimley Horn & Assoc, Inc. Frank Pohl [fpohl @albemarle.org] 3 April 2015 29 April 2015 Max Greene County Code section 17 -410 and Virginia Code §62.1- 44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17 -401. A. Stormwater Pollution Prevention Plan ( SWPPP) The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. Albemarle County SWPPP simple form: http:// www.albemarle.org/upload/images /forms center/ departments /Community_ Development /forms /Engineering and _WPO_Forms/Stormwater Pollution _ Prevention _ Plan _SWPPP _template.doc 1. SWPPP has not been signed by owner or designated operator. Please have all documents signed in the SWPPP prior to final approval. The "operator" is generally the owner of the project for the approval process and then can be transferred at any time after approval with the "delegation of authority" form. 2. The SWPPP Construction Site Notice form is incorrect and states the site drains into Meadow Creek. This site drains into the Rivanna River. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17 -404. 1. PPP Plan was not included in submittal package. Please see Albemarle County forms: httD:// www.albemarle.org /uDload/imaiies /forms center /departments /Community Development /forms /Engineering and WPO Forms / Stormwater Pollution Prevention Plan SWPPP temDlate.doc C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17 -403. 1. The purchase of Credits will need to be approved by the County Attorney's Office. Please contact Engineering Review Comments Page 2 of 3 Ana Kilmer akilmergalbemarle.org for required information and documentation for credit purchases prior to finalizing the purchase. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17 -402. 1. Please show the E &SC protection measures on the grading plan for adequate review. The E &SC plan and the Grading plan are at different scales and could not be overlaid for review. 2. Phase 2 E &SC plan does not appear to have any E &SC measures shown. Please explain or remove from submittal. 3. Please show the staging, stockpile and parking areas for equipment, supplies and employees. 4. Please show limits of disturbance and state the area of disturbance on the plan. Please review these links to Albemarle County Design checklists and notes for plan approval. http:// www.albemarle.orgLupload/images/ forms_ center / departments / Communiky Development/forms/En ineerin and WPO Forms/Eneineerine Review Erosion Control Plan Checklist 1Dec2014.1)df htW:/ /www.albemarle.orgLupload/images /forms center/departments/Community y Development/forms/En ine eerin and WPO Forms/Eneineerine Plan Review General Notes Feb2014.1)df htW:/ /www.albemarle.orgLupload/images /forms center/departments/Communityy Development /forms /Engineering and _WPO _ Forms /Engineering Review_ Drainage Plans_ Checklist_1Dec2014.pdf The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re- submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2 -4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves Engineering Review Comments Page 3 of 3 the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference. Applicants will need to complete the request for a pre - construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/deptforms.asp?department=cdengwpo File: CDDE1 vsmp_ review _State Farm Blvd & South Pantops Drive Sidewalk Project wpo20l500022.docx