Loading...
HomeMy WebLinkAboutWPO201500041 Review Comments WPO VSMP 2015-07-24�pF A vt�r�1Q COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project title: Project file number: Plan preparer: Owner or rep.: Plan received date: Date of comments: Reviewers: VSMP Permit plan review 511, Street Stockpile WP0201500041 Shimp Engineering [Justin @shimp - engineering.com] GAMBIT LLC & SNOW PAWS LLC [estimating @digsinc.com] 30 June 2015 24 July 2015 Max Greene County Code section 17 -410 and Virginia Code §62.1- 44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17 -401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. A SWPPP is required for all land disturbance permits. Please use the Albemarle County template to expedite approval. http: / /www.albemarle .org/upload/images /forms_center /departments /Community Development /forms/ Engineering and _ WPO_Forms /Stormwater_ Pollution _ Prevention _ Plan_ SWPPP_template.docx There is a site plan submittal currently being reviewed for these parcels. Additional proposed work on these properties will require a SWPPP Modification form unless this project is completed and bond returned to the property owner. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17 -404. 1. A PPP is required and is Section #6 of the Albemarle County SWPPP template. http: / /www.albemarle .org/upload/images /forms_center /departments /Community Development/forms / Engineering and _WPO_Forms /Stormwater Pollution _ Prevention _ Plan_ SWPPP_template.docx C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17 -403. The VRRM spread sheet for this project does not appear to match the information shown on the plans. The following list may not be comprehensive: Engineering Review Comments Page 2 of 3 a. Hazel loam soils are type C soils. b. Limits of disturbance 6.25 acres. c. Drainage area 8.31 acres. d. Water Quality Compliance page is missing from submittal. Please submit the entire VRRM Spread sheet for review. Due to the unknown nature of the fill material, worst case scenario is recommended for approval. 2. Show SWM basin design to scale. VRRM spread sheet claims a Bio- retention #2 (spec. #9) D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17 -402. hitp:// www .albemarle.org/upload/images/ forms _center /departments /Community Development/for ms/Engineering and _WPO_Forms/En Forms/Engineering Review _ Erosion _ Control_ Plan_ Checklist_1Dec2 014.pdf 1. Existing topography does not match field conditions. A house has been removed and a large stockpile has been constructed in its place. Please have the topography updated to the current conditions. As stated above, there is a site plan currently being reviewed for these parcels and the current topography will need to match on the site plan prior to final site plan approval. INS recommended the final topography be surveyed once this waste area plan is completed to expedite the site plan approval. 2. VDOT approval for temporary entrance location is required. Please submit conformation VDOT will approve entrance location. 3. Albemarle County "temporary paved construction entrance" detail is required on plan for approval. Stone construction entrance can be discussed during the pre - construction meeting with the contractor. 4. Please show dewatering snout on the E &SC basin detail. 5. Trash rack appears to be buried into the embankment. Please correct this design so inflow is not partially blocked by embankment. 6. Top width of dam should be 8' for embankments 10' — 14' in height. 7. Please distinguish between the "Managed" and "Preserved" critical slopes on the plan sheet. The preserved slopes cannot be disturbed and the area of disturbance should be relocated to exclude the preserved slopes. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re- submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2 -4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner Engineering Review Comments Page 3 of 3 and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference. Applicants will need to complete the request for a pre - construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; hllp://www.albemarle.ory/deptfon-ns.asp?department--cdena3Wo File: E1 vsmp review projectname.doc