HomeMy WebLinkAboutWPO201000068 Inspection 2015-07-27 (3)0� A
`fRGjf}1A
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
EROSION CONTROL RE- INSPECTION INVOICE
DATE: January 24, 2013
INVOICE TO: Uptown Village LLC & Route 29, LLC
c/o Hunter Wood
2315 Seminole Trail, Suite 200
Charlottesville, VA 22901
RE: Hollymead Town Center Borrow Area ECP
W PO- 2010 -00068
Erosion Control Violation — Stop Work Order
DATE OF RE- INSPECTION: 1/4/2013
RE- INSPECTION FEE: $250.00
By February 24, 2013 you should forward the re- inspection fee of $250.00 to continue your
project. To pay the re- inspection fee, please send a check payable to the County of Albemarle
to my attention along with the enclosed copy of this invoice.
If you should have any questions, please do not hesitate to contact me.
Sincerely
Ana D. Kilmer
Management Analyst
Administration
ADK/
Enclosure
] iDEPTNUair nni[y Develop"whMAdminiYration DivisiOTAKiimeASOPS for Billing Reinspeclion fe invoict.doc
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
January 2, 2013
Uptown Village LLC & Route 29 LLC
C/o Mr. Hunter Wood
2315 Seminole Trail Suite 200
Charlottesville, VA 2290
RE: Hollymead Town Center Borrow Area ECP
WPO 2010 -00068
Erosion Control Violation
STOP WORK ORDER
Dear Mr. Wood:
Under § 17 -214 of the Albemarle County Code, you are hereby notified to immediately cease all land
disturbing activities on the above referenced property (STOP WORK) with the exception of work to
address the installation of erosion control measures, soil stabilization, and any necessary drainage
corrections as approved by the County. This STOP WORK ORDER shall remain in place for seven (7)
days from the date of receipt. If satisfactory repairs have not been made within seven (7) days, the County
may elect to issue another Stop Work Order, and/or petition the Circuit Court for penalties and relief with
regard to this violation.
Required Correction(s):
1. Remove Sediment Basin in accordance with MS -18. Seed and straw mulch any denuded areas from
removal. Remove any sediment deposits from stream utilizing hand tools.
Please contact either Kenny Thacker or Ray Lilly at 434 -296 -5832 should you have questions regarding
this matter.
Sincerely,
yy i
R I XKen Thacker Glenn Brooks, P.E.
Ser 'or Engineering Inspector Erosion Control Officer County Engineer
Program Administrator
RWL/
Attachment
Copy: Mark Graham, Albemarle County, Director of Community Development
91 7108 2133 3937 4223 6183
�� OF A�
J$
�'jRGII`n�`
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434)972 -4126
VSMP/VESCP RE- INSPECTION INVOICE #2
DATE: July 27, 2015
INVOICE TO: Cascadia Development LLC
170 South Pantops Dr.
Charlottesville, VA 22911
RE: Notice To Comply
W130201300032; Cascadia
.. DATE OF RE- INSPECTION: June 16, 2015
RE- INSPECTION FEE: $250.00
By August 27, 2015 Albemarle County must receive the re- inspection fee of $250.00 to
continue your project. This fee is required per sections 17 -207 and 17 -208 of the County Code.
To pay the re- inspection fee, please send a check payable to the County of Albemarle to my
attention along with the enclosed copy of this invoice. If the re- inspection fee is not paid within
30 days, interest charges will be applied to the past due amount per the Albemarle County
Water Protection Ordinance. (Sec. 17 -210)
If you should have any questions, please do not hesitate to contact me.
Sincerely
Todd Shifflett
Engineering Division
VTS/
Enclosure
Revised — 7/13/2015
OFA
`� `IRGINLP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
7 May 2015
Cascadia Development LLC
170 South Pantops Dr
Charlottesville VA 22911
Hand delivered
RE: WP0201300032
Cascadia
NOTICE TO COMPLY
Dear Sirs;
Under section 17 -900 of the Albemarle County Code, this is your NOTICE TO COMPLY with
the requirements of the Erosion and Sediment Control Plan for the referenced property and to
immediately take corrective measures that address the following;
The approved plan is taking far too long to implement, and the site is inadequately
protected and does not meet code in the interim. The site began construction in January, with
a permit issuance date of 1/7/2015. It is now 4 months later, and the basic sediment trapping
measures shown on the plan have not been installed. 9VAC25- 850 -40 Minimum Standards
number 4 requires sediment basins and traps, dikes, and other measures to be installed as a first
step in any land disturbance, and they must be made functional before upslope land disturbance
takes place. This is a clear and ongoing violation. While some leeway is tolerated for
construction purposes on many jobs, this project has gone beyond any reasonable timeframe.
1) Sediment is being diverted to the existing pond, and it has not been fitted for sediment
control. This needs to be converted, and the dam and outlet works cleaned up so they can
be inspected completely.
2) Sediment Basin 2 was started late, it has not been installed, and excavation work has hit
rock. This basin has proven too large to install in a reasonable amount of time, and the
entire area draining to it should not have been disturbed. Provide an interim plan to
implement.
3) Sediment Basin 4 has not been installed. There is a haul road to SB -2 in this location.
Install the basin and reroute the haul road.
4) Sediment Basin 3 has been installed incorrectly. The side slopes are too steep, the riser
crooked and too short, there is no base, the dewatering device is placed incorrectly, the
5)
6)
Notice To Comply
7 May 2015
floor of the basin is incorrect, the barrel is too steep, the stream bank has been disturbed,
and the outlet placed too low. The spillway is not dimensioned correctly, and fabric not
placed correctly. There is nothing about this that follows the plan. Correct to follow plans
or revise plans with the interim plan.
Sediment Trap 3 is installed incorrectly. Sides are too steep, dimensions are incorrect,
spillway is incorrect, etc. The fill and pad placed upslope of the trap is not per plans and
must be removed. Correct the trap to follow plans.
Two interim sediment basins /traps and stone weirs have been installed in place of SB -2
which are not adequate to contain the flow. These need to be engineered per code and
redone with the interim plan.
7) The entrance wash rack is set up incorrectly, with a garden hose. The plan calls for a 1" tap
and 1.5" hose. Install per plan.
Provide an acceptable interim Erosion and Sediment Control Plan which meets code, with
immediate corrective measures as stated above, and a schedule to implement the interim and
overall plan. This must be provided within 7 days.
Unless subsequently amended in writing by this office, it is expected all of these corrective
measures will be completed by May 14th, 2015. If an acceptable plan and path forward.-cannot be
found which meets state requirements, we must assume that the current plan was impossible to
implement, at which point work needs to stop and the site needs to be stabilized until a plan can be
approved which it is possible to implement in a reasonable amount of time.
If corrective action is not taken as given above, your grading or other permits may be revoked, and you
will be deemed in violation. Re- inspection of this notice to verify corrective measures will incur a $250
fee.
Sincerely,
c
Glenn Brooks, P.E.
County Engineer
VSMP Program Administrator
UZ
U
e
Erosion Control Officer
err V
Jeremy Glode,
Engineering Inspector II�a *.;
F