Loading...
HomeMy WebLinkAboutWPO201000068 Inspection 2015-07-27 (3)0� A `fRGjf}1A COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 EROSION CONTROL RE- INSPECTION INVOICE DATE: January 24, 2013 INVOICE TO: Uptown Village LLC & Route 29, LLC c/o Hunter Wood 2315 Seminole Trail, Suite 200 Charlottesville, VA 22901 RE: Hollymead Town Center Borrow Area ECP W PO- 2010 -00068 Erosion Control Violation — Stop Work Order DATE OF RE- INSPECTION: 1/4/2013 RE- INSPECTION FEE: $250.00 By February 24, 2013 you should forward the re- inspection fee of $250.00 to continue your project. To pay the re- inspection fee, please send a check payable to the County of Albemarle to my attention along with the enclosed copy of this invoice. If you should have any questions, please do not hesitate to contact me. Sincerely Ana D. Kilmer Management Analyst Administration ADK/ Enclosure ] iDEPTNUair nni[y Develop"whMAdminiYration DivisiOTAKiimeASOPS for Billing Reinspeclion fe invoict.doc COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 January 2, 2013 Uptown Village LLC & Route 29 LLC C/o Mr. Hunter Wood 2315 Seminole Trail Suite 200 Charlottesville, VA 2290 RE: Hollymead Town Center Borrow Area ECP WPO 2010 -00068 Erosion Control Violation STOP WORK ORDER Dear Mr. Wood: Under § 17 -214 of the Albemarle County Code, you are hereby notified to immediately cease all land disturbing activities on the above referenced property (STOP WORK) with the exception of work to address the installation of erosion control measures, soil stabilization, and any necessary drainage corrections as approved by the County. This STOP WORK ORDER shall remain in place for seven (7) days from the date of receipt. If satisfactory repairs have not been made within seven (7) days, the County may elect to issue another Stop Work Order, and/or petition the Circuit Court for penalties and relief with regard to this violation. Required Correction(s): 1. Remove Sediment Basin in accordance with MS -18. Seed and straw mulch any denuded areas from removal. Remove any sediment deposits from stream utilizing hand tools. Please contact either Kenny Thacker or Ray Lilly at 434 -296 -5832 should you have questions regarding this matter. Sincerely, yy i R I XKen Thacker Glenn Brooks, P.E. Ser 'or Engineering Inspector Erosion Control Officer County Engineer Program Administrator RWL/ Attachment Copy: Mark Graham, Albemarle County, Director of Community Development 91 7108 2133 3937 4223 6183 �� OF A� J$ �'jRGII`n�` COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434)972 -4126 VSMP/VESCP RE- INSPECTION INVOICE #2 DATE: July 27, 2015 INVOICE TO: Cascadia Development LLC 170 South Pantops Dr. Charlottesville, VA 22911 RE: Notice To Comply W130201300032; Cascadia .. DATE OF RE- INSPECTION: June 16, 2015 RE- INSPECTION FEE: $250.00 By August 27, 2015 Albemarle County must receive the re- inspection fee of $250.00 to continue your project. This fee is required per sections 17 -207 and 17 -208 of the County Code. To pay the re- inspection fee, please send a check payable to the County of Albemarle to my attention along with the enclosed copy of this invoice. If the re- inspection fee is not paid within 30 days, interest charges will be applied to the past due amount per the Albemarle County Water Protection Ordinance. (Sec. 17 -210) If you should have any questions, please do not hesitate to contact me. Sincerely Todd Shifflett Engineering Division VTS/ Enclosure Revised — 7/13/2015 OFA `� `IRGINLP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 7 May 2015 Cascadia Development LLC 170 South Pantops Dr Charlottesville VA 22911 Hand delivered RE: WP0201300032 Cascadia NOTICE TO COMPLY Dear Sirs; Under section 17 -900 of the Albemarle County Code, this is your NOTICE TO COMPLY with the requirements of the Erosion and Sediment Control Plan for the referenced property and to immediately take corrective measures that address the following; The approved plan is taking far too long to implement, and the site is inadequately protected and does not meet code in the interim. The site began construction in January, with a permit issuance date of 1/7/2015. It is now 4 months later, and the basic sediment trapping measures shown on the plan have not been installed. 9VAC25- 850 -40 Minimum Standards number 4 requires sediment basins and traps, dikes, and other measures to be installed as a first step in any land disturbance, and they must be made functional before upslope land disturbance takes place. This is a clear and ongoing violation. While some leeway is tolerated for construction purposes on many jobs, this project has gone beyond any reasonable timeframe. 1) Sediment is being diverted to the existing pond, and it has not been fitted for sediment control. This needs to be converted, and the dam and outlet works cleaned up so they can be inspected completely. 2) Sediment Basin 2 was started late, it has not been installed, and excavation work has hit rock. This basin has proven too large to install in a reasonable amount of time, and the entire area draining to it should not have been disturbed. Provide an interim plan to implement. 3) Sediment Basin 4 has not been installed. There is a haul road to SB -2 in this location. Install the basin and reroute the haul road. 4) Sediment Basin 3 has been installed incorrectly. The side slopes are too steep, the riser crooked and too short, there is no base, the dewatering device is placed incorrectly, the 5) 6) Notice To Comply 7 May 2015 floor of the basin is incorrect, the barrel is too steep, the stream bank has been disturbed, and the outlet placed too low. The spillway is not dimensioned correctly, and fabric not placed correctly. There is nothing about this that follows the plan. Correct to follow plans or revise plans with the interim plan. Sediment Trap 3 is installed incorrectly. Sides are too steep, dimensions are incorrect, spillway is incorrect, etc. The fill and pad placed upslope of the trap is not per plans and must be removed. Correct the trap to follow plans. Two interim sediment basins /traps and stone weirs have been installed in place of SB -2 which are not adequate to contain the flow. These need to be engineered per code and redone with the interim plan. 7) The entrance wash rack is set up incorrectly, with a garden hose. The plan calls for a 1" tap and 1.5" hose. Install per plan. Provide an acceptable interim Erosion and Sediment Control Plan which meets code, with immediate corrective measures as stated above, and a schedule to implement the interim and overall plan. This must be provided within 7 days. Unless subsequently amended in writing by this office, it is expected all of these corrective measures will be completed by May 14th, 2015. If an acceptable plan and path forward.-cannot be found which meets state requirements, we must assume that the current plan was impossible to implement, at which point work needs to stop and the site needs to be stabilized until a plan can be approved which it is possible to implement in a reasonable amount of time. If corrective action is not taken as given above, your grading or other permits may be revoked, and you will be deemed in violation. Re- inspection of this notice to verify corrective measures will incur a $250 fee. Sincerely, c Glenn Brooks, P.E. County Engineer VSMP Program Administrator UZ U e Erosion Control Officer err V Jeremy Glode, Engineering Inspector II�a *.; F