Loading...
HomeMy WebLinkAboutWPO201500042 Review Comments WPO VSMP 2015-07-28�pF A COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 VSMP Permit plan (Amendment) review Project: Old Trail Village Block 27 —WPO Amendment Plan preparer: Chris Mulligan, Bill Ledbetter, Raleigh Davis — Roudabush, Gale & Assoc, Inc 914 Monticello Road, Charlottesville, VA 22902, cmulligan(a),roudabush.com, bledbetternroudabush.com, rdavis a,roudabush.com Owner or rep.: March Mountain Properties LLC [1005 Heathercroft Circle, Suite 100] Dave Brockman, davegoldtrailvilla eg com Plan received date: 6 Jul 2015 Date of comments: 28 Jul 2015 Reviewer: John Anderson A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Registration Statement submitted with block 27 is identical with the registration statement submitted to DEQ last spring (7 -May 2014). It is not immediately clear whether a registration statement is required, since this block is covered under VAR100043. Reviewer has left message with DEQ to advise on question of registration statement requirements for this (and future) block/s. In any case, please leave registration item #2 blank. 2. Once WP0201400042 is approved, update SWPPP to include Approved block 27 ESCP and SWMP. 3. TMDL: Update SWPPP to reflect DEQ, p. -1, 15- Aug -14 VPDES CGP coverage letter (VAR100043): DEQ staff has determined that the proposed land- disturbing activity will discharge to a surface water identified as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of the general permit for (i) sediment or a sediment - related parameter or (ii) nutrients. Therefore, the following general permit (Part 1.B.4) and SWPPP requirements (Part II.A.5) must be implemented for the land- disturbing activity, • Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after final grade is reached on any portion of the site; • Nutrients (e.g., fertilizers) shad be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; • Inspections shall be conducted at a frequency of (i) at least once every four (4) business days or (ii) at least once every (5) business days and no later than 48 hours following a measurable storm event. in the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and • Representative inspections used by utility line installation, pipeline construction. or other similar linear construction activities shall inspect all outfalls. 4. Alb. County recommends Applicant/Permittee periodically review and update VAR] 00043 SWPPP. B. VSMP: SWPPP: Stormwater Management Plan (WP0201500042) — AMENDMENT To WP0201400004 VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved. The stormwater management plan content requirements can be found in County Code section 17 -403. Engineering Review Comments Page 2 of 5 1. WPO201400004 indicates water quality /quantity compliance —TITLE SHEET statement to this effect may be helpful. 2. Review ISP comments, SDP201500015, 20 -May 2015, items 8, 9, 12, 13, 15, 17, 21. Revise accordingly. Also, RP comments, item #4 (SUB201500123). 3. RP comment #4: Critical: Sheets 4, 6, 9 (Utility plan, Grading plan, Storm profile: Ex. #144 - #230 (outfall)) reflect a post - construction stabilized condition by proposing removal of Ex. Sediment basin. This is problematic. There is possibility future development of blocks 7, 6, 26, or 35 will require trap/basin in similar location (sheets 3, 9, 10). Construction of structures between inlet #223 and UBP (outfall) is contingent upon complete upslope stabilization of all areasiblocks draining to Str. #223 to ensure negligible sediment -laden runoff reaches Str. #223. Str. #223 makes direct connection with UBP, an aesthetic amenity that provides habitat and quality /quantity Mgmt. (4 X WQV) for 43± on- site /110± off -site Ac. (sheets 9, 10; WPO201400004). Revise site, road, and VSMP plans using notes, labels, details, and sequence to state that until all upslope areas requiring ESC control are stabilized ([control] via Ex. Sediment basin approved under WPO201400004 /proposed to be modified under WPO201500042), only pipe #223A may be shown as an outfall from Str. #223 (sheet 3). Str. #223A is proposed to replace Ex. Str. 156A. Note: This topic was discussed in detail in email (J. Anderson, 5/21/2015 6:46 AM) and Initial Site Plan comments, SDP201500015, 20 -May 2015, items 8, 9, 12, 13, 15, 17, 21. There is no discernible response to ISP comments on this point. Please review ISP comments (SDP201500015) and 5/21/2015 email, and revise VSMP/WPO plan accordingly. Please call if any questions. 4. Reconcile storm sewer profile Ex. 4144 - #230 (outfall) with plan view. In profile view, please revise to show riprap outfall protection above rather than below Upper Ballard Pond Normal WSE = 672.60' —and ending at water's edge. 5. Ref. Final Site Plan comments, SDP201500035. Revise design accordingly. C. VSMP: SWPPP: Erosion Control Plan (WPO201500042) Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved for reasons provided in comments below. The erosion control plan content requirements can be found in County Code section 17 -402. Copy profile, Ex. Sediment basin, from WPO201400004 to this plan (partial image, below). MMM M1 in m oil . . . . . . . . . . . ......... Engineering Review Comments Page 3 of 5 2. Provide plan/profile of proposed modified Ex. Sediment basin, similar to images below (unrelated project). SEDIMENT BASIN #3 6 "70PSOIL NTS DUSTINGGRONNO 23" HIGH,aEGAGETEMPORARYCMP T'OPOFDAMELEV. p64' I TRASH RACK DEVICE '51". STORM id MIN. EMERGENCYSPYLWAY ..._. ELE1.32475f CRFSTELEV.•3,4.75 u' RISER TOP ELEV MIN E" A, CL Ili RCP RISER DRY VOLUMP ELEV. - Y5CARIFTEO KEY FOR REQUIRED =3235 dA OEWATMM SOILCOHESIDN DEVICE, ELEV. -3-" INV. OUT • 3:L51y BOTTOM OF 9FSI UP6TREAMTOE OF DAM MSTING GROUND N EV ELEV•3t9.5v EI.'32950 .�-..s CONCRETE FOI —TKN WTFRCK7 "DIA., RISER OUTLETPROTECTLON EMBEDDED Ir INTO THCCONCRETE7 CLAY BRED DAM KEYED INTO THE d06TWG GROI IM1YV. IN= p&# 2r CL IE RCP W31 X }1GALV. STEEL LENGTHgR' - ANTHSEEPCOLLARS SLOPE.s % SEDIMENT BASIN #3 PROFILE (SCALE"=40) 315 OP PROPOSED 24 "CL. III RCPRIS12RSTRU URE ,ROPOSED01C LAIRUBARREL72Lf; DAM - 326.00' RISER RIM ELEVATION= 323.755• INVERT IN= 336.72'iINVERTOiTf 3m6m 3gD 'IF Xi INGGRADE � r s .R O N OD d Q, vR N ED N O # tIl .Y ryCry�L O+Sa 2 +DO 2 +50 2+00 2 +2S SEDIMENT BASIN #3 DETAIL Iu.LFa r � � PRDAdSF J 0MR PACTECT 107EXNLT FILTER UNDERULYMEW l lb0 65Ey6Ya6r e3 AGGREF:ATG _�rLITE[TIDN wJ ' , 'WIDP OFD_l�_ LEVATF/ a' E [LEFB N NERM 1w1, N1•i75', W25', 1K2' 101N.11 PROPOSED 6{g'O..R� RPOSED EL, T2lA INVERT INw3s6 72'L- - INVERT OUTyA, m' _ [t�1TkA[T[R $HALL NQ7�' -" DISTURBWETLAND6LTYP. }­-, 1 3. Recommend additional contour labels. PJtCPOS EE /�VADEGII MUNEDEMEI(GENCY; / / SPILLWAY CREST ELEVATION.y4.75 ` j PN() DV� COARSE AGGIEEGA �... " //'$ /// �IZ PRD=DNwJGEOIERBE FILTER FABRIC // / Engineering Review Comments Page 4of5 4. Sheet 5 — Provide yard inlet /s in open space to protect dwellings against peak storm runoff events. 5. Sheet 7 — Revise text: a. Project Description: Although the existing sediment basin was "sized to accommodate all of the western area development," it is proposed to be modified, and then removed in Phase II. This circumstance is addressed at length in RP comments. Revise narrative description to at least be consistent with Sequence of Construction Item #3 (Ex. Basin to be regraded). Consider effect of basin regrading. b. Sequence of Construction i. RGA/PE and contractor shall verify functionality of existing sediment basin. ii. Revise item #3 consistent with plan sheet 3, which states Str. #156A will be replaced, not extended. Plan view shows replacement, not extension. Also, #165A, typo. iii. Revise sequence item #7 to read "Upon site stabilization of all upslope areas, including future blocks, draining to Str. #223, install permanent outfall into Upper Ballard Pond." iv. Move revised item #7 to later point in sequence of construction. v. Revise item #8 to read: "Permanent soil stabilization shall be applied to all denuded areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be..." vi. Include description of ESC measures designed to prevent impact to UBP during installation of outfall to UBP. c. Calculations — Revise text. No water quality calculations are included or required with application. (WP0201400004 indicates water quality compliance — statement to this effect may be helpful.) 6. Sheet 7 — Remove inlet schedule. Remove storm sewer schedule. 7. Provide data for proposed modified Ex. Sediment basin, similar to data in chart-table below: Sediment Basin 93 design dralrrage.area (acresj 6.34 arsasx wcx werEx basin w&rrres: (using 2' contour intervals) t25 -1R, M. ren atevaticn (ftj cortinur area (sf} volurne (W) w Al 9:50 41220 0 + 320 -00 44500 79.4 rw 'ern • smwr;E + - -_ nr or= u 32ZOO S843.D 4£9.4 _ 324M 7359.0 947.3 re • sm — 326:0A BBOQ.O 1569.4 - -- r gar�qrF�u�! �YY@t 5tOf862. - -. t rimtstoreigerequlred (Vy). {67TAI 424.8 design high:waler.tM 32'4.35 tlEwa>s*rIN arlfiiee eleveEaz 00 321.82 ko 6F din yo MOO WA Awage prMod:atfts ale atiaa(rY) 424.8 h* WA :d darn aiaiiN6e iRia fiCeclearaoSilicYj (34*DA) 215.6 bC9bMpfb"h -(ft) 39£ clearxxd dv tion {ft). 320.70 apprmx botion1 c$rneT.Aons: 40'433` distatim Ron 1) 1:1 upsvenrnfece aloe: 24 (JrV STOrS¢e: dvvrFStream slope: '�^?. dryFe9sle..(ey1C+'] 424.8 battles: y porfelple MA* cred ot) 82a.75' IWO, of LM 8Y dry. :Wrage pre eided'at thi (4 ) 4t31 � ehFec[<aeiy�i `VTB { &3 ?&. diameter of devntsNng ar+fi4to (in) ti L/ Vie .(mss trot reared if ? -4 9.2 tiaCreter in flemtle hibing (in)(adfis6W) t3 depth of water at spilNUay crass {)1} 4.25 (S? Engineering Review Comments Page 5 of 5 8. Future block 7 development has been discussed with County Engineer. Please anticipate trap or basin measures with future block 7, with ESC measures located outside buffers, without runoff release to storm inlets /pipes, with emergency spillway or weir (trap) that releases peak runoff event at non - erosive velocity at a point at least 100' from UBP. D. VSMP: Mitigation Plan The mitigation plan requirements can be found in County Code section 17 -406. 1. Sheet 3 —Label stream buffer, Upper Ballard Pond. 2. Show, calculate, and propose Mitigation for stream buffer impact associated with outfall constr. to UBP. 3. Provide mitigation at 2:1 ratio. Engineering plan review staff are available from 2 -4 PM on Thursdays, should you wish to discuss this review. Plan review staff are also available at 434 - 296 -5832 (- 0069) should you have questions. Process: After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, the County can hold a pre - construction conference. Applicants will need to request a pre - construction conference by completing a form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; htt2://www.albemarle.orWdeptforms.asp?departrnent--cdengmMo Thank you - 434.296 -5832 —x3069 File: WP0201500042 Old Trail -block 27 072715