Loading...
HomeMy WebLinkAboutSUB201400197 Bond Estimates 2015-07-29Subdivision Name: Road Plan Amendment for Hyland Ridge Subdivision (Phase 4) Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201400197 Item No. Unit Unit Cost Cost installed % compete cost remaining Road Name: Hyland Ridge Drive station 10 +00 to 38 +35 road length 2835.0 ft aggregate base 6.0 in d 2835.0 ft L 28.0 ft W 2778.3 ton $25.00 $69,457.50 0% $69,457.50 blotted or prime &double seal 2835.0 ft L 0.0 ft W 0.0 sy $10.00 $0.00 0% $0.00 asphalt base 3.0 in d 2835.0 ft L 28.0 ft W 1458.6 tons $84.58 $123,369.02 0% $123,369.02 asphalt surface 1.5 in d 2835.0 ft L 28.0 ft W 729.3 tons $91.34 $66,614.60 0% $66,614.60 curb CG -2 0.0 ft $13.00 $0.00 0% $0.00 curb CG -6 5670.0 ft $15.00 $85,050.00 0% $85,050.00 sidewalk, concrete (6) 5670.0 ft $17.00 $96,390.00 0% $96,390.00 ramp CG -12 0 ft $350.00 $0.00 0% $0.00 street name sign 1 each $200.00 $200.00 0% $200.00 traffic control sign 3 each $200.00 $600.00 0% $600.00 Street Landscape 112 Each 112 each $150.00 $16,800.00 0% $16,800.00 guardrail 0 ES C 3000 0.0 ft $17.00 $0.00 0% $0.00 drop inlet or grate 31 each $3,500.00 $108,500.00 0% $108,500.00 standard manhole frame top (not inlet) 5 each $500.00 $2,500.00 0% $2,500.00 manhole structure (per ft. rise) 570 ft $450.00 $256,500.00 0% $256,500.00 pipe, rcp, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 0 EC -1 871.0 ft $35.00 $30,485.00 0% $30,485.00 pipe, rcp, cmp (15 to 48 ") 18.0 in d 0 ES -1,2 0 EC -1 231.0 ft $40.00 $9,240.00 0% $9,240.00 pipe, rcp, cmp (15 to 48 ") 24.0 in d 0 ES -1,2 0 EC -1 129.0 ft $50.00 $6,450.00 0% $6,450.00 pipe, rcp, cmp (15 to 48 ") 36.0 in d 1 ES -1,2 1 EC -1 1486.0 ft $70.00 $105,020.00 0% $105,020.00 rip -rap, placed 0.0 ft d 0.0 ft L 0.0 ft W 0.0 ton $60.00 $0.00 0% $0.00 matting, EC -2 or 3 0.0 ft L 0.0 ft W 0.0 sy $2.00 $0.00 0% $0.00 clear and grub (for wooded sites) 0.0 ft L 0.0 ft W 0.0 acre $24,000.00 $0.00 0% $0.00 cut grading 0.0 cy $4.00 $0.00 0% $0.00 fill grading 0.0 cy $9.00 $0.00 0% $0.00 as -built drawings (1k + price per 0.1 mi.) 2835.0 ft L 0.53693 mi. 6 Isum $2,000.00 $13,000.00 0% $13,000.00 survey and layout (price per 0.1 mi.) 2835.0 ft L 0.53693 mi. 6 Isum $2,000.00 $13,000.00 0% $13,000.00 mobilization 0Isum $500.00 $0.00 0% $0.00 materials testing 2835.0 ft L 5.67 inc of 500' 7 each $200.00 $1,340.00 0% $1,340.00 compaction testing 2835.0 ft L 5.67 inc of 500' 7 each $200.00 $1,340.00 0% $1,340.00 CBR tests (1 every 0.1 mi. per road) 2835.0 ft L 5.67 inc of 500' 7 each $200.00 $1,340.00 0% $1,340.00 stone depth inspections 2835.0 ft L 5.67 inc of 500' 7 each $200.00 $1,340.00 0% $1,340.00 pavement inspections 2835.0 ft L 5.67 inc of 500' 7 each $200.00 $1,340.00 0% $1,340.00 pipe and drainage video inspections 0 ft $2.00 $0.00 0% $0.00 VDOT surety (1lane) 2835.0 ft L 0.53693 mi. 2 Lanes $2,000.00 $21,477.27 0% $21,477.27 VDOT maintenance fee (1 In rd, 1 yr) 2835.0 ft L 0.53693 mi. 2 Lanes $150.00 $1,610.80 0% $1,610.80 VDOT admin. Cost recovery fee(1 lane) 2835.0 ft L 0.53693 mi. 2 Lanes $100.00 $1,323.86 0% $1,323.86 cost sum $1,034,288.06 $1,034,288.06 proj mgmt $155,143.21 $155,143.21 contingency $118,943.13 $118,943.13 Total $1,308,380 $1,308,380 C:\ Users \mgreene \DocumentsVW_Review Comment letters \Hyland Ridge Phase 2 & 4 - Road Plan \RP_ bond _est_Phase 4 only 27July2015.xlsx 7/29/2015 Subdivision Name: Road Plan Amendment for Hyland Ridge Subdivision (Phase 4) Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201400197 Item Road Name: Hyland Ridge Drive No. Unit Unit Cost Cost (installed) % compete cost remaining C:\ Users \mgreene \Documents \A_Review Comment letters \Hyland Ridge Phase 2 & 4 - Road Plan \RP_bond_est_Phase 4 only 27July2015.xlsx 7/29/2015