Loading...
HomeMy WebLinkAboutSP201500024 Review Comments Special Use Permit 2015-07-31p� 4L �IRGi;31� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 July 31, 2015 Kelly Strickland 201 E. Main Street Suite M Charlottesville, VA 22902 kelly @shimp- engineering.com RE: SP 201500024 The Field School of Charlottesville Dear Mr. Strickland: Staff has reviewed your initial submittal for the request for a special use permit for a private school in the Rural Areas zoning district. We have a few questions and comments which we believe should be resolved before your proposal goes to public hearing. We would be glad to meet with you to discuss these issues. Planning Comments (Rachel Falkenstein) Please note that, as with any special use permit in the Rural Area, this request will be evaluated based on its appropriateness under the County's Rural Area land -use goals in the Comprehensive Plan (with priority given to resource conservation, agriculture, forestry, and open -space uses) and on its impacts (safety, traffic, noise, etc.) for the surrounding area. Application Narrative 1. Building footprint • Include more information about the proposed building(s). Are multiple buildings anticipated? • Provide the maximum total footprint and maximum height /number of stories for the school buildings. 2. Well and septic o The proposed school should be able to operate on this site without access to public water and sewer. Future approval of a jurisdictional boundary amendment for public water is not guaranteed. Staff will not recommend approval of the SP unless it is determined that the site can support an adequate onsite sewage disposal system and has access to safe drinking water. o Provide more information regarding sewage disposal and onsite water quality for Health Department review (see comments below from Virginia Department of Health). 3. Vegetated buffer o Provide more information about the 75 foot landscaped buffer along Barracks Road. Existing vegetation should be preserved where possible within the buffer and areas without existing vegetation should be replanted with native species and in accordance with ARB guidelines. 4. Clarify what the "summer school options" will be. Will these follow the same hours as the regular school day? 5. Will there be any outdoor amplified sound associated with the use? Concept Plan 1. Entrances • Two entrances are shown on the concept plan, yet the existing conditions sheet says the western most entrance will be removed. If existing entrance is to be removed it should not be shown on the concept plan. • It would be a good idea to determine at the SP stage if turn lanes are needed and if the proposed entrance meets sight distance requirements. Entrances and turn lanes might have impacts to the proposed buffer and the critical slopes on the site (see attached VDOT comments). 2. Critical slopes • If disturbances to critical slopes are anticipated, a critical slopes waiver should be submitted and reviewed with the SP request in accordance with Section 4.2.5. • Areas of critical slopes to be disturbed should be shown on the concept plan. 3. Boundary Line o Show the location of the proposed boundary line between the school site and the single family residential site. 4. Site vegetation • In addition to the 75 foot vegetated buffer along Barracks Road, there should be a vegetated buffer providing screening between the school site and residential /Rural Area parcels. The buffers should consist of existing vegetation and be replanted with native species where existing vegetation does not exist. The buffer should be maintained outside of the pond as well as between the proposed residential lot and school site. • Do you intend to maintain the 75 foot buffer along Barracks Road in front of the future residential lot as shown? o Existing vegetation on site should be preserved wherever possible. The concept plan should show the future tree line after construction. Show the existing tree 2 line on the existing conditions sheet and the proposed tree line on the concept plan sheet. 5. Stream Buffer o The concept plan shows a proposed picnic pavilion within the stream buffer. A picnic pavilion may be possible here, depending the size, materials, area outside of disturbance, etc. Provide more details about the pavilion for engineering staff to review or consider locating the pavilion outside of the stream buffer. 6. Septic field o As stated above the location of the septic field should be reviewed by the Health Department with the SP request. The approved location should be shown on the concept plan. Zoning Comments (Francis MacCall) Please see attached memo Architectural Review Board Comments (Marearet Maliszewski 1. Provide additional detail and a note on the application plan to more fully describe the intent and character of the 75' landscape buffer along Barracks Road. The buffer is referred to as "maintaining vegetative screening" and "matching the frontage with existing characteristics ". Confirm that a combination of existing and new landscaping is the proposal for the buffer. What are the existing characteristics along Barracks Road that will be matched in the new buffer? If turn lanes are required, how will they impact the buffer? (Will they occupy part of the 75' or would the buffer begin outside the turn lanes? What activities are allowed within the buffer? Clarify that the buffer is to extend along the full frontage of the property. 2. Note that the landscape buffer along Barracks Road can help mitigate the impact of the stormwater management area on the EC. Any part of the stormwater management area that is expected to be visible from the EC will need to have the appearance of a landscape feature that is fully integrated with the overall site. 3. There are "proposed boundary line" notes and arrows on the application plan, but the arrows don't appear to point to anything specific. Please clarify. 4. Please provide additional detail (a description in text form) on the type, quantity, size and character of buildings and structures planned for the new campus to assist in determining potential impacts to the Entrance Corridor (EC). 3 Engineering Comments (John Anderson) 1. Show proposed boundary line between 6 Ac. and 25 Ac. parcels. 2. Provide narrative and basic calculations that link % Ac. proposed SWM area to proposed Field School. 3. Avoid and minimize impact to critical slopes. 4. Reference ITE Code 534 in design. 5. Avoid stream buffers. Virginia Department of Transportation Comments (Troy Austin) Please see attached comment letter. Virginia Department of Health Comments (Josh Kirtley) 1. Based upon my review of the submittal, the applicant fails to address the sewage disposal and drinking water needs for the proposed project. At this time, I am unable to definitively say whether or not the proposal is feasible due a lack of information. At the time of this email, they haven't submitted anything to this office for review. 2. VDH staff has requested that you contact them to discuss the project and the work that may be done. Action after Receipt of Comments After you have read this letter, please take one of the actions identified on "Action after Receipt of Comment Letter" which is attached. Resubmittal If you choose to resubmit, please use the attached form. There is no fee for the first resubmittal. The resubmittal date schedule is provided for your convenience. Notification and Advertisement Fees Prior to scheduling a public hearing with the Planning Commission, payment of the following fees is needed: $123.05 Cost for newspaper advertisement $200.00 Cost for notification of adjoining owners (minimum $200 + actual postage /$1 per owner after 50 adjoining owners) $323.05 Total amount due prior to Planning Commission public hearing Prior to the Board of Supervisor's public hearing, payment of the newspaper advertisement for the Board hearing is needed: $123.05 Additional amount due prior to Board of Supervisors public hearing 4 $446.10 Total amount for all notifications Fees may be paid in advance. Payment for both the Planning Commission and Board of Supervisors public hearings may be paid at the same time. Additional notification fees will not be required unless a deferral takes place and adjoining owners need to be notified of a new date. Feel free to contact me if you wish to meet or need additional information. I can be reached at rfalkenstein @albemarle.org or 434 - 296 -5832, ext. 3272. Sincerely, W Rachel Falkenstein Senior Planner Planning Division 5 DEPARTMENT OF COMMUNITY DEVELOPMENT f �'rRG1^11�` ACTION AFTER RECEIPT OF COMMENT LETTER Within 30 days of the date of this letter, please do one of the following: (1) Resubmit in response to review comments (2) Request indefinite deferral (3) Request that your Planning Commission public hearing date be set (4) Withdraw your application (1) Resubmittal in Response to Review Comments If you plan to resubmit within 30 days, make sure that the resubmittal is on or before a resubmittal date as published in the project review schedule. The full resubmittal schedule may be found at www.albemarle.org in the "forms" section at the Community Development page. Be sure to include the resubmittal form on the last Daee of vour comment letter with vour submittal. The application fee which you paid covers staff review of the initial submittal and one resubmittal. Each subsequent resubmittal requires an additional fee. (See attached Fee Schedule.) (2) Request Indefinite Deferral If you plan to resubmit after 30 days from the date of the comment letter, you need to request an indefinite deferral. Please provide a written request and state your justification for requesting the deferral. (Indefinite deferral means that you intend to resubmit /request a public hearing be set with the Planning Commission after the 30 day period.) (3) Request Planning Commission Public Hearing Date be Set At this time, you may schedule a public hearing with the Planning Commission. However, we do not advise that you go directly to public hearing if staff has identified issues in need of resolution that can be addressed with a resubmittal. After outstanding issues have been resolved and /or when you are ready to request a public hearing, staff will set your public hearing date for the Planning Commission in accordance with the Planning Commission's published schedule and as mutually agreed by you and the County. M. The staff report and recommendation will be based on the latest information provided by you with your initial submittal or resubmittal. Please remember that all resubmittals must be made on or before a resubmittal date. By no later than twenty -one (21) days before the Planning Commission's public hearing, a newspaper advertisement fee and an adjoining owner notification fee must be paid. (See attached Fee Schedule) Your comment letter will contain the actual fees you need to pay. Payment for an additional newspaper advertisement is also required twenty -two (22) days prior to the Board of Supervisors public hearing. These dates are provided on the attached Legal Ad Payments for Public Hearings form. Please be advised that, once a public hearing has been advertised, only one deferral prior to the Planning Commission's public hearing will be allowed during the life of the application. The only exception to this rule will be extraordinary circumstances, such as a major change in the project proposal by the applicant or more issues identified by staff that have not previously been brought to the applicant's attention. As always, an applicant may request deferral at the Planning Commission meeting. (4) Withdraw Your Application If at any time you wish to withdraw your application, please provide your request in writing. Failure to Respond If we have not received a response from you within 30 days, we will contact you again. At that time, you will be given 10 days to do one of the following: a) request withdrawal of your application, b) request deferral of your application to a specific Planning Commission date as mutually agreed to with staff, or c) request indefinite deferral and state your justification for requesting the deferral. If none of these choices is made within 10 days, staff will schedule your application for a public hearing based on the information provided with your original submittal or the latest submittal staff received on a resubmittal date. Fee Payment Fees may be paid in cash or by check and must be paid at the Community Development Intake Counter. Make checks payable to the County of Albemarle. Do not send checks directly to the Review Coordinator. 7 FEE SCHEDULE FOR ZONING APPLICATIONS A. For a special use permit: Extend existing special use permit; application and first resubmission 1. Additional lots under section 10.5.2.1; application and first resubmission Fee............................................................................ ............................... ......................$1,000.00 Fee............................................................................ ............................... ......................$1,000.00 Each additional resubmittal ....................................... ............................... ........................$500.00 Each additional resubmittal ....................................... ............................... ........................$500.00 7. 2. Public utilities; application and first resubmission Fee............................................................................ ............................... ......................$2,000.00 Fee............................................................................ ............................... ......................$1,000.00 Each additional resubmittal ........................................................... ............................... Each additional resubmittal ....................................... ............................... ........................$500.00 8. 3. Day care center; application and first resubmission Fee............................................................................. ............................... ........................$180.00 Fee............................................................................ ............................... ......................$1,000.00 B. For amendment to text of zoning ordinance: Each additional resubmittal ....................................... ............................... ........................$500.00 Fee................................................................................... 4. Home occupation Class B; application and first resubmission C. Amendment to the zoning map: Fee............................................................................ ............................... ......................$1,000.00 Less than 50 acres; application and first resubmission Each additional resubmittal ....................................... ............................... ........................$500.00 Fee............................................................................ ............................... ......................$2,500.00 5. 5. Amend existing special use permit; application and first resubmission Less than 50 acres; each additional resubmission Fee............................................................................ ............................... ......................$1,000.00 Fee............................................................................ ............................... ......................$1,250.00 Each additional resubmittal ....................................... ............................... ........................$500.00 50 acres or greater; application and first resubmission 6. Extend existing special use permit; application and first resubmission Fee............................................................................ ............................... ......................$1,000.00 Each additional resubmittal ....................................... ............................... ........................$500.00 7. All other special use permits; application and first resubmission Fee............................................................................ ............................... ......................$2,000.00 Each additional resubmittal ........................................................... ............................... $1,000.00 8. Deferral of scheduled public hearing at applicant's request Fee............................................................................. ............................... ........................$180.00 B. For amendment to text of zoning ordinance: Fee................................................................................... ............................... .......................$1000.00 C. Amendment to the zoning map: 1. Less than 50 acres; application and first resubmission Fee............................................................................ ............................... ......................$2,500.00 2. Less than 50 acres; each additional resubmission Fee............................................................................ ............................... ......................$1,250.00 3. 50 acres or greater; application and first resubmission Fee............................................................................ ............................... ......................$3,500.00 4. 50 acres or greater; each additional resubmission Fee............................................................................ ............................... ......................$1,750.00 5. Deferral of scheduled public hearing at applicant's request Fee............................................................................. ............................... ........................$180.00 D. Board of Zoning Appeals: 1. Request for a variance or sign special use permit Fee............................................................................. ............................... ........................$500.00 2. For other appeals to the board of zoning appeals (including appeals of zoning administrator's decision) — Fee (to be refunded if the decision of the zoning administrator is overturned) .......$240.00 N. Required notice: 1. Preparing and mailing or delivering up to fifty (50) notices: Fee............................................................................. ............................... ........................$200.00 plus the actual cost of first class postage 2. Preparing and mailing or delivering, per notice more than fifty (50): Fee............................................................................... ............................... ..........................$1.00 plus the actual cost of first class postage 3. Published notice: Fee.............................................................................. ............................... .........................Actual cost M FOR cmu um D1LY SP 0 or &U -N p4a Amn-wt S -- 'Resubmiftal information for Spedal Use Penxit or = Zoning Map Amendment. TROUCrNMIBEPU _5 oo0 MOB=NAMF4 7 �.Pj 1 C 6G KC+.C- 1Z. jLR€uhmittKl Fft is ReqtllrW Per quasst uhn ittal Fee is NlYt RegOmd Eanrmunit Dewlapm tPnojeo-tCn=diaWDr NamecfApp Barn PhamsW=bsr agna0tu�e L "Eye Signature - Y'S vlivritttrl fees for original Special 1lae permit tee of 31,M00 ❑ ]ih�treeulorniasion �.�� ' �j $achasddhignasl7esubtnissioa -. $Sllll Resubmittal fees for original Spedal Use Permit f�e of 3;000 _ - TW resuinnlssLott -- - YM Jr.] Eat �.d4i5wnil- csubrmiasior. T1,004 oesubmitt9al ices for (Frigfaal Zoning flap Ameadm� flee of 72,500 FirsC iesutuniawD Paah 3ddi5Dwa rawub Wioa . , ' ,S1,231} = Rembmiit#al fees for orlglul Zoniag1►bp $men -dm erit ire of 53,500 �"� FirsLresaibmisa3an FREE F )Each ad ltbnel raubmiss:mr �. � $1:,750 . 0 ]3Ei:eK:�1 of s:�hGdaled public Luariug xC�rlxl,iiraxnt'f re.Tuest•, Ad�}lnotea5e ie� NiEI beTr�quired _ I 5180 To be pn iii 0 hr staff mylew for piLbllc noliee: Most yppilcatlons for 5perhal TlmNrmltsand Zuio mg MFip Amendments rtgaifomr INSC Drat pub& hmring by thePLaonmg Commission and one. puWic Muhl by to Beard of '* erMsart, VjNLTLLa Silts Cade requires that nofice far public heerlrags• Ge -mad t by puhIbidag a Negaladvaartieernentho. the nowsp?perand bynrdlllLn� letiamte adjacentproperty owners. Therdf tm At imst two iaxs for publlcnotloe are requiood baz&m a Spsdal [iarPcrmit -or ZanirLtMop hmenda wtIna y ba:heard by the Board of Snparviscm. The Cotailm kU public motiee will he provided is the appiirant after the tinai coat is determin -ad and must he pal4l befom the apPbeatian ie hmna by a po'hllo batlp, : MAiC11f;1fECSS7i'DLF7T.'f^ l_Q Ar,BE kf RT,FraAYi4 EXTATCOhff4iURITYDEVELOTWENT COI.h -rFR ?reprFlig and uud" i ?r dcaivu tii V w frfw (SO) v4ah; $20p+ uwA coat nr fm+-4"' S "w Prtpaaria3 aldmidlipls Wdellueela5gara&MVd.ac 0=15ft (50) SLAO fbr etch o&L15onaLno6c: +wtuil east ofthm -clm pil" I.fp-] giver iscrwnt (patbBshed tw+lm ht tb6wwspaM for aach pulilie hearing) Aa:to.1 coat 1miuvaum od V- 0 Rw tcrtal of A 7aHi Ell * Cownty afAlbmrc 'Dcparm�t (if CrowmnntyDevelapwcltt 401 Scafire ad Gbnrlvt�i;, - - -- TA 22902 Vafae: (434) 296.5832 Fay: (434) 97 n6 p] 2015 Submittal and Review Schedule Special Use Permits and Zoning Map Amendments Reaubmittal Schedule Written Comments -and Earliest Planning Commission Public Hearing Resubmittal Dates Comments to applicant for decision on whether to proceed to Public Hearing "t Regrlest f(,r PC Public Hearing, Legal Ad Payment Due Planning Commissim PLlblic Hearing No sooner thYl' COB Auditor 1um Monday Wednesday Monday Tuesday Nov 03 Dec 83 Dec 22 Jan 13 Nov17 Uecl/ an 05 Jan Dec O1 Tue Dec 30 Jan 05 Jan 27 Dec15 an 14 Feb e Jan 0:5 Feb 04 Feb 09 Mar 03 ue Jan = I-eb U Feb r Fels 02 Mar 04 Mar 16 Ur 07 Tue Feb 17 Mar 18 Mar 30 Apr2l Mar -02 AprOl Apr 13 may 05 Mar 16 Apr 15 Apr 27 may 19 Apr 06 may 06 UN 1'1 Jun 02 r 20 may 20 May 2:5 Jun 16 JLII1 03 Jun 22 A14 Ma 18 Jun 17 Jun 22 Jul 14 Jun U1 Jul u u Jun '15 Jul 15 Jul 27 Au 18 Ju106 Aug Aug Jep 01 Jul 20 Auc 19 Tue .Se 01 Sep 22 u SepO2 Sep14 Oct Au '17 Sep 16 Sep 28 Oct 20 ire ct ,113 Nov Se '14 Oct 14 Oct 26 Nov 17 ck Ub NovO4 ov DecOB Oct 19 Nov 18 Nov 23 Dec 15 Nov 02 Dec O2 Dec 21 Jan 12 2016 ov Dec 1fi Dec 21 Jan 12 2016 Dec 07 Jan 06 Jan 112016 Fels 02 2016 Dec2l Jan 20 2016 Feb 012016 Feb 23 2016 Jan 04 2016 Feb 03 2016 Feb O8 2016 fear 01 2016 BoldiraUcs = stibonktaYmeeiing day is drfferenIt dire to a hofida . Dales vAth shaded backgmLindare not 2816 dates are tentative. 'The reviewing plawff wi wrrt3ot applicant to disa,ss cornnhenin of reviewers and adoise that changes that are Feecec a— significant enough to wararrt an additional submittal ar adMise&Wthethe project is ready fora public hearirg. If changes needed are m hor, the planner WII adw5e that the prajeat ga to public hearing- - The legal ad deadine i s the last date at which an appkant can decide wrhether w restdxn k or g3 to public hearing. IF an applicant decides to go to public hearing against the advice of the rekiewing plLmou, a tecornmerndation for denial WN likely result. Generally, the applicatrtwill Kill have only one opportunkyw defer the PC pu6ohearing for the project once it has been adwertised for public hearing. Additional deferrals wi not be allowed except n extraordinary ciratffnrtances such as a major change in the prcWw proposal by the applicarrt arrnow issues identfied by Staff that have not prevkxnly been brought to the applicant's attention. 10