Loading...
HomeMy WebLinkAboutARB201500055 Review Comments Final Site Plan and Comps. 2015-08-05• ^�- 11�illr IlIIf1.�• COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 August 5, 2015 Daniel R Hines c/o Bohler Engineering 29 Blackwell Park Lane, Suite 201 Warrenton VA 20186 RE: ARB201500055 Fifth Street Station Dear Daniel, I have reviewed your recent submittal (site plan with revision date of 7/16/13( ?) and architectural elevations dated 6/12/15) and I have the following comments, based on the ARB action of June 15, 2015. 1. In response to comment 10 in the ARB action letter, the photometric plan has been revised to use an LLF of 1.0. However, spillover at the property line exceeds .5 fc in several locations and the fixture locations are hard to see on the plan. Please revise the plans to eliminate spillover in excess of .5 fc and to make the fixture locations more easily legible. 2. Comment 13 in the ARB action letter required an update to the retaining wall details and landscape plan to address the plants proposed to be used on the wall (not at the top of the wall, but on the face of the wall). A mix of plants was recommended. There appears to be no detail for the living retaining wall and no revision to the landscape plan to identify the plants to be used on the wall. Please revise the plans accordingly. 3. In response to comment 13 in the ARB action letter, your July 16 response letter states that Sheet 13G has been reivsed to indicate that the living retaining wall will be irrigated. The information does not appear on the plan. Please revise the plan to clearly show that the living retaining wall will be irrigated. Please provide: 1. One set of revised drawings addressing each of these conditions. Include updated revision dates on each drawing. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staff s review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, feel free to contact me. Sincerely, Margaret Maliszewski Principal Planner cc: 5th Street Station Ventures LLC, 5 West Broad Street, Ste B, Fairburn GA 30213 COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: Margaret Maliszewski DATE: PROJECT NAME: ARB201500055 Fifth Street Station Submittal Type Requiring Revisions ( ) indicates submittal Cade County Project Number # Copies Erosion & Sediment Control Plan (E &S) # Copies Distribute To: Mitigation Plan (MP) 1 Margaret Maliszewski Waiver Request WR Stormwater Management Plan (SWMP) Road Plan (RP) Private Road Request, with private /public comparison (PRR) Private Road Request — Development Area (PRR -DA Preliminary Site Plan (PSP) Final Site Plan or amendment FSP Final Plat (FP) Preliminary Plat PP Easement Plat (EP) Boundary Adjustment Plat BAP Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB201500055 Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 1 Margaret Maliszewski