HomeMy WebLinkAboutWPO201500040 Review Comments Mitigation Plan 2015-08-07�pF A
vt�r�1Q
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project title:
Project file number:
Plan preparer:
Owner or rep.:
Plan received date:
Date of comments:
Reviewers:
VSMP Permit plan review
Moore's Creek Bank Stabilization
WP0201500040
Koth Consulting, P.C. [lance @koth.cc]
5TH STREET STATION VENTURES LLC [email]
23 June 2015
7 August 2015
Max Greene
County Code section 17 -410 and Virginia Code §62.1- 44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is denied. The
rationale is given in the comments below. The application may be resubmitted for approval if all
of the items below are satisfactorily addressed. The VSMP application content requirements can
be found in County Code section 17 -401. A Mitigation plan Checklist can be found on this link:
httns:// ia2010. albemarte. orL-/ CDD/ Ena/ EnaineerinL% 2OTemDlates %20and %2OChecklists /Ena Re
v Miti ag t�_Plan_Checklist_17Feb2014.doc
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must
contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1. The existing SWPPP will be updated to include this project upon approval.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17 -404.
1. This plan will be incorporated into the existing PPP portion of the SWPPP on site.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is approved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17 -403.
1. Not required with this stream mitigation plan.
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is disapproved, and the reasons are provided in the comments below. The erosion control
plan content requirements can be found in County Code section 17 -402.
1. The existing topography does not appear to accurately depict the site conditions.
a. The basin next to the bridge appears to have been destroyed several years ago and mud is
Engineering Review Comments
Page 2 of 3
flowing into the stream via the eroded channel through the basin. (Page 2 of 4)
b. There is a wide walking trail that has been graded into the top of bank that traps water and
has collected lots of trash and debris. The trail is also a vehicle access path, may be
sanitary sewer access /maintenance road. (Page 3 of 4)
c. The existing pipe under the path is shown in the wrong location. (page 3 of 4)
d. Lots of erosion is present on the County side of the project, especially around the existing
pipe labeled "to be abandoned in place ". (page 3 of 4)
i. The pipe is hanging many feet out of the stream bank erosion and should be
removed before it falls into the creek.
ii. The pipe will need to be filled with flowable fill material, or crushed to prevent
future problems if it is to be left in place.
2. Please clarify what is existing and what is proposed with this project. The plan appears to show a
mixture of both with no clear distinction between them.
3. Please show stream access points on the plan. How will the contractor access the stream bed? The
stream bank is so incised that roads may need to be cut down to the stream for access.
4. Please show the limits of work area the contractor is to work within. The Limits of Disturbance
should encompass the entire area needed to complete this project.
5. Please label the 100' stream buffer limits.
6. Please include a maintenance narrative and schedule on plan, including a completion date.
7. Please list the acreages for each area and total proposed disturbance. State requires the localities to
report total annual acres of disturbances for each locality.
The VSMP permit application and all plans may be resubmitted for approval when all comments have
been satisfactorily addressed. For re- submittals please provide 2 copies of the complete permit package
with a completed application form.
Engineering plan review staff are available from 2 -4 PM on Thursdays, should you require a meeting to
discuss this review.
Process;
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate
request form and fee to the Department of Community Development. One of the plan reviewers will
prepare estimates and check parcel and easement information based on the approved plans. The County's
Management Analyst will prepare bond agreement forms, which will need to be completed by the owner
and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need
to be approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to
obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded.
The County's Management Analyst or other staff will prepare the forms and check for ownership and
signature information. The completed forms will need to be submitted along with court recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
database for state application processing. DEQ will review the application information based on local
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
Engineering Review Comments
Page 3 of 3
After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference.
Applicants will need to complete the request for a pre - construction conference form, and pay the remainder
of the application fee. The form identifies the contractor and responsible land disturber, and the fee
remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction
conference will be scheduled with the County inspector. At the pre - construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
County forms can be found on the county website forms center under engineering;
hltp://www.albemarle.org/deptforms.asp?department--cdenMo
File: CDDE1 vsmp rcvicw Moores Crcck Bank Stabilization wpo201500040.doc