Loading...
HomeMy WebLinkAboutWPO201400097 Bond Estimates 2015-08-12 (3)Project Name: University of Virginia Physicians Group, Northridge Medical Center WPO file number: WP0201400097 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed stablization (PS, TS) 0.74 acres $5,000.00 $3,700.00 silt fence (SF) 260 ft $5.00 $1,300.00 stone inlet protection (IP) 4 $200.00 $800.00 construction entrance (CE) 1 $2,000.00 $2,000.00 wash rack 1 $2,000.00 $2,000.00 survey and layout (price per 0.1 mi.) acres 0.74 traps and basins 0 $370.00 mobilization $500.00 cost sum $14,170.00 proj mgmt $2,125.50 contingency $1,629.55 Total $17,930 8/12/2015 Approximate Earthwork computations for sed Assumes all cut and fill slopes are 2:1 for simplicty .y Height of Fill at Face I h1 Cut at High Side h2 transitic w h1 Width of Cut Cut at Fa Fill area above transition = h1(2h1) + h1(w) Fill area below transition; total width of fill (dam) = 2h1 + w + 2h2 height below transition = h2 -h1, area = (width *height)12 - height x height Length of Cut liment traps and basins Width ►n point Height of Dam at Toe h2 ice Volume = Length of Fill x Fill Area Cut Areas and Volume is the same as fill but using the cut dimensions Fill for Dam (imately)