Loading...
HomeMy WebLinkAboutWPO201400097 Bond Estimates 2015-08-12Project Name: University of Virginia Physicians Group, Northridge Medical Center WPO file number: WP0201400097 Stormwater Management Plan Bond Estimate Item Item Number earthwork for trap /basin $18,001.00 proj mgmt $2,700.15 height of dam at toe 0.5 ft cut at high side 0 ft height of fill at face 0 ft cut at face 5.5 ft length of dam 20 ft length of cut 90 ft top width 3 ft width of cut 10 ft (area above transition 0 sf (area below transition 5.o sr (total width of dam) 1 ft (total width of cut) 21 ft (height below transitioi 0.5 ft (depth below transitio -5.5 ft (area below transition) 0 sf (area above transitior -88 sf (total fill volume) 0.0 cy (total fill volume) 91.7 cy length of spillway 0 ft JOAL CY estimate) 92 cy width of spillway 0 ft (spillway stone tons) 0 tons structures for basin riser height 3.5 ft riser diameter 24 in (riser unit price) $50.00 barrel length 69 ft base plate or fdn 1 barrel diameter 15 in (barrel unit price) $35.00 barrel collars 0 baffle length 0 ft shrubs seed lings /g rou ndcover underdrain (LF) biofilter soil mix (CY) rip -rap, placed depth 1.5 ft length 10.0 ft width 6.0 (tons) 6.75 survey and layout (price per 0.1 mi.) acres 0.74 basins 1 mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractor's price as a base) No. Unit Unit Cost Cost installed 38 ea 48 ea 30 ft 25 cy $13.00 $1,196.00 $50.00 $0.00 $200.00 $200.00 $50.00 $50.00 $5.00 $5.00 $38.00 $60.00 1 ea $2,000.00 1 ea $2,000.00 1 ea $5,000.00 $175.00 $200 $2,415.00 $0 $0 $1,900.00 $240.00 $150.00 $950.00 $405.00 $870.00 $500.00 $2,000.00 $2,000.00 $5,000.00 $0.00 cost sum $18,001.00 proj mgmt $2,700.15 contingency $2,070.12 Total $22,780 8/12/2015