HomeMy WebLinkAboutSDP200600037 Review Comments Letter of Revision 2 2015-08-21pY AL13�,2r
IH[;Stit
County of Albemarle
Department of Community Development
401 McIntire Road,
Charlottesville, VA, 22902
Phone 434 - 296 -5832
Memorandum
To: Jo Higgins (musxit @aol.com)
From: Rachel Falkenstein, Senior Planner
Division: Planning
Date: August 21, 2015
Subject: SDP 2006 -37 Charlottesville Self Storage — LOR #2
In order for the letter of revision to be approved the following revisions are required:
Fax 434 - 972 -4126
1. For ease of review and consistency, show all improvements on one plan sheet if possible.
2. Clarify the dimensions of the ramp on the west side (front) of building C and make this consistent on
all documents. The letter and one sheet list it as 15x50. The E &S sheet shows it as 10x48 feet.
3. The ramp location and dimensions on the north side of building C are still not clear. Provide more
information about proposed ramp (materials, dimensions, etc.)
4. Are trees going to be removed with the relocation of the fuel tanks pad? If so, show where trees will
be relocated.
5. Provide width of proposed parking spaces.
6. Engineering and Building Inspections reviews of the LOR are still pending. Comments, if any, will be
forwarded upon receipt.
Please contact Rachel Falkenstein in the Planning Division by using rfalkenstein @albemarle.org or 434 -296-
5832 ext. 3272 for further information.