Loading...
HomeMy WebLinkAboutARB201500080 Action Letter 2015-08-26Lrf2C;l1�ZA COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 August 26, 2015 David Timmerman 112 4th St Charlottesville, Va 22902 RE: ARB201500080 Riverside Medical Dear Mr. Timmerman, The Albemarle County Architectural Review Board reviewed the above noted item at its meeting on Monday, August 17, 2015. The Board, by a vote of 3:0 approved the request, pending staff administrative approval of the following conditions: 1. Indicate the color of the spandrel glass proposed for the storefront facing the EC and provide a sample for review. 2. Clarify on the plan that the existing ground -mounted mechanical units located adjacent to the EC elevation will be removed. 3. Submit a photometric plan with all related details for review. 4. Revise the plan to show the locations of the proposed bollards, and identify the intensity of their metal halide lamps. 5. Identify on the plan the quantity of seat wall fixtures proposed. 6. Include the LED downlight cut sheet on the site plan. Identify on the plan options regarding wattage and intensity. 7. Clarify the intensity of the illumination on the building walls. Show that the building will not be over -illuminated. 8. Provide documentation that VDOT has approved the grading, boulders and landscaping in the right-of-way. 9. Provide documentation that easement holders do not object to the proposed planting in the easements. 10. Provide on the plan information to clarify how the landscape will be handled when trees are lost due to utility/right-of-way work. 11. Signs require separate sign applications. If the proposed sign does not meet the requirements of the approved comprehensive sign plan for this shopping center, the sign application should propose revised criteria. 12. Provide additional material samples of plant material and boulders as well as more detail on the placement of the boulders to ensure an appropriate appearance. Please provide: 1. Two full sets of revised drawings addressing each of these conditions. Include updated ARB revision dates on each drawing. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staff's review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Margaret Maliszewski Principal Planner Cc: Jefferson Equity Partners Llc & Oak Hill Partners LLC C/O NT Brinkman PMB 344, 977 Seminole Trl Charlottesville Va 22901 COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: Margaret Maliszewski DATE: PROJECT NAME: ARB -2015-80: Riverside Medical Center Submittal Type Requiring Revisions () indicates submittal Cade County Project Number # Copies Erosion & Sediment Control Plan (E&S) Mitigation Plan (MP) Waiver Request WR Stormwater Management Plan (SWMP) Road Plan RP Private Road Request, with private/public comparison (PRR) Private Road Request — Development Area (PRR-DA Preliminary Site Plan (PSP) Final Site Plan or amendment FSP Final Plat (FP) Preliminary Plat PP Easement Plat (EP) Boundary Adjustment Plat BAP Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D-GWMP) Final Groundwater Management Plan (F-GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB2015-80 Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 2 Margaret Maliszewski