Loading...
HomeMy WebLinkAboutWPO201500025 Review Comments WPO VSMP 2015-08-27Engineering Review Comments Page 1 of 2 f,l pF Al k7n v�RG1131�' COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 VSMP Permit plan review / Approval Project title: CMA Properties Project file number: WP0201500025 Plan preparer: Collins Engineering Owner or rep.: CMA PROPERTIES INC Plan received date: 20 April 2015 (Rev. 1) 7 Jul 2015 (Rev. 2) 21 Aug 2015 Date of comments: 4 Jun 2015 (Rev. 1) 13 Aug 2015 (Rev. 2) 27 Aug 2015 —VSMP Approved Reviewers: Max Greene, Michelle Roberge (Rev. 1/2) John Anderson [email] [pborches@,cmacars. com] A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. Comments addressed, with this or prior revision. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17 -404. Comments addressed, with this or prior revision. B. VSMP: SWPPP: Stormwater Management Plan (WP0201500025) VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a SWMP. This plan is approved. Comments addressed, with this or prior revision. C. VSMP: SWPPP: Erosion Control Plan (WP0201500025) Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is approved. Comments addressed, with this or prior revision. Process: After approval, plans will need to be bonded. Applicant has requested (and provided) bond estimates. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be Engineering Review Comments Page 2 of 2 approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. (Project is covered under General VPDES Permit No. VAR10C895.) After bonding and agreements are complete, the County can hold a pre - construction conference. Applicants will need to request a pre - construction conference by completing a form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; htlp://www.albemarle.orWdeptforms.asp?department--cdengmmo Thank you 434.296 -5832 —0069 WPO201500025_CMA Properties 082715 -rev2