Loading...
HomeMy WebLinkAboutSDP201500019 Review Comments Final Site Plan and Comps. 2015-08-30�pF A vt�r�1Q COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Faith Christian Center International —Final Site Plan Plan preparer: Brian Smith; Brian P. Smith, PE, Civil Engineering [4835 Three Chopt Road, Troy, VA 22974 — b]2spena embargmail.com] Owner or rep.: Faith Christian Center International, Inc - Pastor Wayne Frye [P. O. Box 2306, Charlottesville, VA 22902] Plan received date: 8 Apr 2015 (Rev. 1) 13 Aug 2015 Date of comments: 24 Apr 2015 (Rev. 1) 30 Aug 2015 Reviewer: John Anderson Plan Coordinator: Rachel Falkenstein A. Final Site Plan (SDP201500019) 1. Coordinate review of slight increase in critical slope impacts with Planning Division. This increase is driven by Albemarle County Fire and Rescue access requirements, and does not affect Engineering Site Plan review comments. Also, see VSMP plan review comments dated 4/8/15 (VSMP Application to amend VPDES CGP VAR10G420). 2. Extend existing contours at least 50 -11 beyond each PL boundary. [18- 32.5.2.d.] (Rev. 1) Contours sufficient. 3. Sheet C7.0 — Revise pavement design, per VDOT Pavement Design Guide /2009. If ADT =685, and SSV =4, DR = 13.44. Thickness equivalence for Asphalt concrete SM -9.5A =1.67. This means VDOT #21A base stone depth should be 10" minimum /maximum. Pavement Design Guide, App. I, II, III available (contact reviewer). (Rev. 1) Addressed. 4. Sheet C7.0 —Show typical site pavement section in its entirety: back of curb to back of curb with gutter sub -base (stone) material (VDOT 21 -A); link: htW://www.extranet.vdot.state.va.us/LocDes/Electronic Pubs/2008 Standards /Section 100/ 108_0 l .p df (ref, images be' ; revl - images deleted). VDOT #21A base stone should extend beneath gutter — include details on sheet C7.0. (Rev. 1) Addressed. 5. Consider plantings /shrub barriers beyond curb, front/rear parking lots and steep portions of fill slope E of travelway as visual barriers to discourage pedestrians or vehicles from crossing curbs. Curb blocks are not required at any location where currently provided. If installed, these blocks may limit parking spaces to the point that aisles between spaces are less than design width. Recommend eliminate curb blocks, and instead, provide plantings as visual barriers beyond curbs east of front and rear parking lots, and downslope of main entrance travelway. (Rev. 1) Addressed. 6. Ensure 3 -ft min radius curbs (2' radius /C3.1). Label all curb radii (C3.0/3.1/3.2) .. [rev.2- image deleted] (Rev. 1) Addressed. 7. Show bedding details for force main between church and septic field. This is a Site Plan element. Septic field details (Drawing by Old Dominion Engineering) are not required to be included with Site Plan, but septic line profile with bedding detail between church and septic field is required. (Rev. 1) Withdrawn. JA Email, June 23, 2015 8:22:08 AM, "Email from Mr. Craun is helpful. I withdraw 24 -Apr site plan review comment request for septic line profile between the church and septic field." -Also, sheet 7.0, Sanitary Trench Detail. Engineering Review Comments Page 2 of 2 8. Publish conditions or exemptions granted by critical slopes waiver on plans —title sheet or elsewhere. (Rev. 1) Withdrawn. 9. Retaining wall (Rev. 1) Partially addressed. a. C3.1 —Show 1.26' batter, plan view (wall highest point sta. 96 +00). (Rev. 1) Withdrawn. As follow-up recommend NOTE stating: At Max. Wall height =19.0' back face of block at TOW is offset 1.33' from back face of block, BOW. (batter = 0.56" / 8 -in Wall height) b. Restate preliminary comment: Provide landscape cluster plantings at each end of wall, in addition to plantings shown on sheet L5.0, to discourage access. Wall is 18' H in places. (Rev. 1) Addressed. c. Restate preliminary Site Plan comment: Provide at least 18 -24" separation between concrete flume and back of retaining wall. Re£ fence post with sleeve -it detail, RW 1.0. (Rev. 1) Withdrawn. —Email (JA -Dr. W. Frye, June 08, 2015 8:44 AM): "Fence post with sleeve -it detail shows how fence post (safety railing) concrete embedment can work with channel at top of wall. 18 -24" separation element of comment withdrawn." d. Revise concrete flume detail (RW 1.0) consistent with channel detail, sheet C7.0. (Rev. 1) Addressed. e. Add NOTE explaining sleeve -it fence post detail without concrete flume applies to last 14- 15' retaining wall only. Add stationing information to this retaining wall detail. (Rev. 1) Not Addressed. Add note explaining sleeve -it fence post detail without concretes flume gpplies sta. 265 to 277 only. f. Examine and revise PVC Coated Cantilever Base design which appears unworkable with fence post sleeve -it cylinder form. (Rev. 1) Not Addressed. Please call to discuss. g. Provide appropriate inspection Notes —for example, these notes taken from a separate Approved project: (Rev. 1) Addressed. RETAINING WALL NOTES i. SEE SHEETS 17& 18 FOR RETAINING WALL DESIGN & RELATED DETAILS COMPLETED BY CIRCEO ENGINEERING. z. THE OWNER SHALL ENGAGE INSPECTION AND TESTING SERVICES (QUALITY CONTROL) DURING CONSTRUCTION TO ENSURE PROJECT DESIGN REQUIREMENTS ARE MET; THE LACK OF QUALITY CONTROL BY THE OWNER DOES NOT RELIEVE THE CONTRACTOR OF THESE REQUIREMENTS. 3. QUALITY CONTROL SHALL INCLUDE BUT NOT BE LIMITED TO: FOUNDATION SOIL INSPECTION, VERIFICATION OF GEOTECHNICAL DESIGN PARAMETERS, AND VERIFICATION THAT CONSTRUCTION IS IN GENERAL COMPLIANCE WITH THE DESIGN DRAWINGS. y. ONLY QUALIFIED AND EXPERIENCED TECHNICIANS SHALL PERFORM TESTING AND INSPECTION SERVICES. NOTE SEE STRUCTURAL ENGINEERING PLANS BY CIRCED GEOTECHN ICAL ENGINEERING, SHEETS i7 &i8 FOR FINAL DESIGN OF RETAINING WALL SYSTEM. 10. Sheet C3.0 —Label CG -6, rear lot. (Rev. 1) Addressed. 11. Sheet C3.1 —Label CG -6, rear lot. (Rev. 1) Addressed. 12. Sheet C3.1 —May eliminate curb blocks. —Also, item #5, above. (Rev. 1) NA. 13. Sheet C3.1/3.2 — Revise labels that refer to "New Filterra unit details on sheet C9.0/9.1" to include explicit reference to VSMP/WPO 201500009. Sheets C9.0/9.1 are not included with Site Plan. (Rev. 1) Addressed. 14. At entrance (Rte. 250), provide grass Swale or paved flume or riprap channel extending downslope of storm drain inlet A2 to riprap outfall of new 24" DIA storm line at church entrance. (Rev. 1) Addressed. 15. Sheets 8.0/8.1/8.2 —If these sheets remain, include Note: "NOT construction drawings. FOR INFORMATION ONLY. Ref. VSMP /WP0201500009 for stormwater management and erosion and sediment control construction details." These three sheets may be removed from Final Site Plan. (Rev. l) Addressed. Please feel free to call 434.296 -5832 -0096 to discuss this project. File: SDP201500019 -Faith Christian Center International FSP 083015revl