HomeMy WebLinkAboutSDP201500019 Review Comments Final Site Plan and Comps. 2015-09-03l:ummuNwtAu H of vIRyINIA
VI•Pmmrm=Ri uF rrct.9sK-jRPAd0I9
150-. Orange Road
Colp.Ar, Mp9ini. 22701
%Rarles H. RllpairlcR, P.r.
CUM ... la36'cr
September 3, 2015
Ms. Rachel Falkenstein
Senior Plarwje,
County of Albemarle
Department of Cummunity Development
zF0 i ivicimire Road
Charlu«esville_ VA 22902
Re: SDP - 2015 -00019 Faith Christian, C,r„ ter International
Dear ivis. r alkenstein.
We have,eviewed the dual site plan for Faith Christian Center International dated 517/14 with
,cvi3iuns dated 5/27/14, 7121/14, 8/1 L14, 1!14!15_ and 813A5 as submitted by Brian P. Smith
and offer tnu rullowing com„tent3:
1. As previously commented, both Sides of the proposed entrance shouI5 ue offset 127. On
sheet C3.3_ it appears that the west side of the entrance is not offset 12'.
2. A3 previously %v„nnented, the edge of pavement of the tapeis should tie back into the
ed,e ur pa, anent of Route 250. On Sheet C3.4, the tape, appears to step shot t of Route
250.
3. As previously commented, the proposed guard rail should not extend raaiully along the
entrance as shown on sheet C3.4. Also_ a GR -9 end treatment should be added to the
gumd rail at the ellt,a,tce.
4. As rrevic;uziy lZquested, the 24" ent,tt,,zc culvert shoulq be shown in the CutranCe
profile.
5. On sheet C3.3 the match Iine reference is to C2.zF when it appears that it 3nu.ld be to
C3.4.
if you need additional *=Tz.zA rn concerning tni3 p,Ejeet, please &-, not hesitate to contact me at
(434) 422 -9782.
J,1,4e,ely,
7
Troy ustu,_ P.E.
At ea La„d Use E„gi„ee,
Culpeper Di3trict
WE RITP ORGIAIH M100MG