Loading...
HomeMy WebLinkAboutSDP201500019 Review Comments Final Site Plan and Comps. 2015-09-03l:ummuNwtAu H of vIRyINIA VI•Pmmrm=Ri uF rrct.9sK-jRPAd0I9 150-. Orange Road Colp.Ar, Mp9ini. 22701 %Rarles H. RllpairlcR, P.r. CUM ... la36'cr September 3, 2015 Ms. Rachel Falkenstein Senior Plarwje, County of Albemarle Department of Cummunity Development zF0 i ivicimire Road Charlu«esville_ VA 22902 Re: SDP - 2015 -00019 Faith Christian, C,r„ ter International Dear ivis. r alkenstein. We have,eviewed the dual site plan for Faith Christian Center International dated 517/14 with ,cvi3iuns dated 5/27/14, 7121/14, 8/1 L14, 1!14!15_ and 813A5 as submitted by Brian P. Smith and offer tnu rullowing com„tent3: 1. As previously commented, both Sides of the proposed entrance shouI5 ue offset 127. On sheet C3.3_ it appears that the west side of the entrance is not offset 12'. 2. A3 previously %v„nnented, the edge of pavement of the tapeis should tie back into the ed,e ur pa, anent of Route 250. On Sheet C3.4, the tape, appears to step shot t of Route 250. 3. As previously commented, the proposed guard rail should not extend raaiully along the entrance as shown on sheet C3.4. Also_ a GR -9 end treatment should be added to the gumd rail at the ellt,a,tce. 4. As rrevic;uziy lZquested, the 24" ent,tt,,zc culvert shoulq be shown in the CutranCe profile. 5. On sheet C3.3 the match Iine reference is to C2.zF when it appears that it 3nu.ld be to C3.4. if you need additional *=Tz.zA rn concerning tni3 p,Ejeet, please &-, not hesitate to contact me at (434) 422 -9782. J,1,4e,ely, 7 Troy ustu,_ P.E. At ea La„d Use E„gi„ee, Culpeper Di3trict WE RITP ORGIAIH M100MG