Loading...
HomeMy WebLinkAboutWPO201500040 Bond Estimates 2015-09-23Project Name: Moores's Creek Bank Stabilization - 5th St. Station WPO file number: wpo201500040 Stream Restoration and Mitigation Plan Item Unit Amount Unit Cost Subtotal Root Wads Installed Linear Foot 600 10 6000 Live Stakes Linear Foot 360 20 7200 Rip Rap Linear Foot 360 110 39600 Access road into Stream Linear Foot 300 15 4500 Cost Sum 57300.00 proj mgmt 8595.00 contingency 6589.50 Tota 1 72490.00