Loading...
HomeMy WebLinkAboutWPO201500046 Bond Estimates 2015-09-24 (3)Project Name: Westminster - Canterbury Final Site Plan Amendment WPO file number: WP0201500046 Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DD, FD, RWD) temporary slope drain (TSD) pipe length 0 ft pipe diameter 0 in earthwork for trap /basin 0 ft width 0 ft height of dam at toe 0 ft cut at high side 0 ft height of fill at face 0 ft cut at face 0 ft length of dam 0 ft length of cut 0 ft top width 0 ft width of cut 0 ft (area above transition) 0 sf (area below transition) sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transition) 0 ft (depth below transitior 0 ft (area below transition) 0 sf (area above transition 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway 0 ft (TOAL CY estimate) 0 cy width of spillway 0 ft (spillway stone tons) 0 tons structures for basin riser height 0 ft riser diameter 0 in (riser unit price) $0.00 barrel length 0 ft base plate or fdn ' 0 barrel diameter 0 in (barrel unit price) $0.00 barrel collars 0 baffle length 0 ft silt fence inlet protection (I P) stone inlet protection (IP) outlet protection (OP) length 0 ft width 0 ft channel (SCC, matted) length 0 ft width 0 ft check dam depth in channel 0 ft channel width 0 ft construction entrance (CE) $800.00 0 $0.00 $0.00 wash rack $0.00 0 $0.00 $0.00 paved construction entrance $4,000.00 2 $2,000.00 $4,000.00 rip -rap, placed depth 0 ft length 0 ft width 0 (tons) survey and layout (price per 0.1 mi.) acres 0 traps and basins 0 mobilization stream crossing (computed independently) No. Unit Unit Cost Cost installed 1.71 acres $5,000.00 $8,550.00 1500 ft $5.00 $7,500.00 0 ft $5.00 $0.00 18 ft $13.00 $234.00 $0.00 $0.00 $13.00 $0.00 $50.00 $0.00 $0.00 $500.00 $0.00 cost sum $0.00 $200.00 $0 contingency $0.00 $200.00 $0 $50.00 $0 0 $100.00 $0.00 4 $200.00 $800.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 2 $2,000.00 $4,000.00 2 $2,000.00 $4,000.00 0 $3,500.00 $0.00 $60.00 $0.00 $0.00 $500.00 $0.00 cost sum $25,584.00 proj mgmt $3,837.60 contingency $2,942.16 Total $32,370 9/24/2015 Project Name: Westminster - Canterbury Final Site Plan Amendment WPO file number: WPO201500046 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 9/24/2015 Approximate Earthwork computations for sed Assumes all out and fill slopes are 2:1 for simplicty .., Height of Fill at Face I h1 Cut at High Side h2 transitic w h1 Width of Cut Cut at Fa Fill area above transition = hl(2h1) + hl(w) Fill area below transition; total width of fill (dam) = 2h1 + w + 2h2 height below transition = h2 -h1, area = (width *height) /2 - height x height Length of Cut liment traps and basins Width m point \ Height of Dam at Toe h2 ice Volume= Length of Fill x Fill Area Cut Areas and Volume is the same as fill but using the cut dimensions Fill for Dam (imately)