Loading...
HomeMy WebLinkAboutWPO201500046 Bond Estimates 2015-09-24Project Name: Westminster- Canterbury Final Site Plan Amendment WPO file number: WP0201500046 Stormwater Management Plan Bond Estimate Item Item Number permanent diversion or ditch standard manhole frame top (not inlet) drop inlet or grate manhole structure (per ft. rise) pipe, rcp, cmp (15 to 48 ") aggregate base or drainage stone earthwork for trap /basin structures for basin 36.0 in d Unit Cost 0 ES -1,2 0 EC -1 15.0 in d $0.00 80.0 ft L 5.0 ft w height of dam at toe 0 ft cut at high side 0 ft height of fill at face 0 ft cut at face 0 ft length of dam 0 ft length of cut 0 ft top width 0 ft width of cut 0 ft (area above transition 0 sf (area below transition a sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transitioi 0 ft (depth below transitio 0 ft (area below transition) 0 sf (area above transitior 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway 0 ft (TOAL CY estimate) 0 cy width of spillway 0 ft (spillway stone tons) 0 tons riser height 0 ft riser diameter 0 in (riser unit price) $0.00 barrel length 0 ft base plate orfdn 0 barrel diameter 0 in (barrel unit price) $0.00 barrel collars 0 baffle length 0 ft trees shrubs seedlings underdrain (LF) biofilter soil mix (CY) trash rack/ anti vortex devices maintenance access road (LF) rip -rap, placed depth 0.5 ft length width 6.0 (tons) survey and layout (price per 0.1 mi.) acres 1.71 basins mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractor's price as a base) 20.0 ft 4.5 4 No. Unit Unit Cost Cost $2,855.00 installed $0.00 0 ft $13.00 $0.00 2 ea $500.00 $1,000.00 1 ea $3,500.00 $3,500.00 16 ft $450.00 $7,200.00 100.0 ft $70.00 $7,000.00 35.0 ton $35.00 $1,225.00 $60.00 $13.00 $0.00 $2,855.00 $50.00 $0.00 4 ea $2,000.00 $8,000.00 $0.00 $8,000.00 $200.00 $0 $0.00 $0.00 $200.00 $0 $50.00 $0 8 ea $150.00 $1,200.00 1 ea $50.00 $50.00 0 ea $5.00 $0.00 200 ft $5.00 $1,000.00 60 cy $38.00 $2,280.00 0 ft $1,500.00 $0.00 0 ft $50.00 $0.00 $60.00 $270.00 $2,855.00 $500.00 4 ea $2,000.00 $8,000.00 4 ea $2,000.00 $8,000.00 4 ea $5,000.00 $20,000.00 $0.00 costsum $64,080.00 proj mgmt $9,612.00 9/24/2015 Project Name: Westminster- Canterbury Final Site Plan Amendment WPO file number: WP0201500046 Stormwater Management Plan Bond Estimate Item Item Number No. Unit Unit Cost Cost (installed) contingency $7,369.20 Total $81,070 9/24/2015