HomeMy WebLinkAboutSP201500027 Correspondence 2015-09-28Christopher Perez
From: Schweller, Lori H. < Lori.Schweller @leclairryan.com>
Sent: Friday, September 25, 2015 5:08 PM
To: Christopher Perez
Cc: Scott Clark; Margaret Maliszewski; Stephen Waller (stephen.waller @gdnsites.com)
Subject: Red Hill Verizon Wireless site
Hi Chris,
We would like to ask to defer our presentation to the Agricultural Forestal Committee, currently scheduled for Monday,
September 28t ". When Steve Waller revisited the site with the engineer to work on the road route corrections, they
found other discrepancies that need to be corrected. We do not want to go before the Committee until our drawings
are correct. We understand that this delay will shift our approval process and so request that the "shot clock" be tolled
until we resubmit the corrected drawings.
Please don't hesitate to call with questions.
Thank you,
Lori
Lori H. Schweller
Attorney at Law
LECLAIRRYAN
123 East Main Street, Eighth Floor
Charlottesville, Virginia 22902
(434) 245 -3448 Direct
(434) 296 -0905 Fax
(804) 248 -8700 Mobile
Lori. SchwelIeraleclairrvan.com
http://www.leclairryan.com
Linkedln
Please consider the environment before printing this email.
* This e -mail may contain confidential or privileged information. If you are not the intended recipient, please
notify the sender immediately by return e -mail with a copy to emailadministrator @leclairryan.com and delete
this e -mail and all copies and attachments.