Loading...
HomeMy WebLinkAboutWPO201500060 Review Comments WPO VSMP 2015-09-29COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper, Virginia 22701 -3819 Charles A. Kilpatrick, P.E. Commissioner September 29, 2015 Mr. John Anderson County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Re: WPO -2015 -00060 Town & Country Shopping Center Dear Mr. Anderson, We have reviewed the WPO Plan for Town & Country Shopping Center, as submitted by Balzer and Associates, dated August 31, 2015 and we have no objection to the plan as submitted. If you need further information concerning this project please do not hesitate to contact me at (434) 422 -9894. Sincerely, Shelly A. Plaster Land Development Engineer Culpeper District WE KEEP VIRGINIA MOVING John Anderson From: John Anderson Sent: Monday, September 28, 2015 6:19 PM To: 'Kent O'Donohue' Subject: Planning Application Review for WP0201500060 Town &Country Shopping Center- VSMP. The Review for the following application has been completed: Application Number=WP0201500060 Reviewer=John Anderson Review Status = Denied Completed Date =09/28/2015 Thanks for your patience, Kent. The e-mails sent last week were very helpful. CV Comments/All Minor—would like to discuss SWPPP/requires revision. '' 1. Title sheet: Revise PLAN title to include: VSMP/WPO201500060. 2. Title sheet: Revise General Note 5 to include ref.to: WP0200400011 (Approved)and WPO201300026 (Inactive/Related). 3. Title sheet: Revise index—mark through sheets C10,C l 1, C12, C13. 4. Revise plans—remove sheets C10, C11, C12, C13. 5. C2—Revise sediment trap schedule: wet storage Elev. =438;outlet/dry storage Elev. =439;top of berm Elev. =440. (ref. sediment trap detail/C7) 6. C8—Storm 12-1: Revise Str#1, DI-1 profile—revise one INV IN=437.03 to read INV OUT(Existing) =437.03 7. SWPPP—please contact reviewer to discuss: a. Sec. 3 —Describe project(1-2 sentence); ESC sequence does not identify project. b. Sec. 5—Remove Layout& Utility Plan sheet—use text reference to WP0200400011. c. Sec. 6—Provide/complete items: A, B, D, E, F, and G. d. Sec. 8—List individual by name. e. Sec. 9—Sign/date SWPPP Certification. 8. Note: Two shrubs in storm easement at M20 on landscape plan: location is acceptable. (response to Kent O'Donohue,Jr./Balzer&Assoc./Wed 9/23/2015 4:11 PM email) Please send .PDF(preview)prior to print submittal, if you like. Will be glad to preview. Thanks, again- 434.296-5832—x3069 1 Albemarle County Service Autherity Serving 41 Conserving December 21, 2015 Balzer&Associates, Inc. Attn: William S. Moore, PE 1561 Commerce Road Suite 401 Verona, VA 24482 Re: Town and Country Shopping Center Dear Mr. Moore: The plan, entitled "Town and Country Shopping Center" dated July 26, 2010, last revised December 9, 2015, is hereby approved for construction. One set of the approved plan is enclosed for your records. Any previously approved plans are voided with this approval. This approval is for basic compliance with the General Water & Sewer Construction Specifications of the Albemarle County Service Authority (ACSA) and does not relieve the contractor from responsibility for his work as it relates to the plan and specifications. The ACSA requires that a copy of the approved construction plan be on the job site. The contractor is responsible for marking up a copy of the approved construction plan showing as-built information and providing this data to your client at the completion of utility installation. The final as-built plan shall be submitted in a format of one paper copy and one mylar copy. A preconstruction conference shall be scheduled with the project manager to ensure coordination and answer any questions. This will be a short meeting to review the project, materials, test methods and schedule, in order to expedite construction. Please have the proper party call me at 977-4511 to schedule the meeting. All offsite easements must be acquired before a preconstruction conference will be scheduled. This approval is valid for a period of 18 months from this date. If construction is not in progress at the end of this time period, the approval shall be void. The pressure for water may exceed 80 psi at some meter locations. The contractor shall be responsible to comply with the no-lead regulation regarding brass fittings that is effective on January 4, 2014 (Senate Bill 3874 which amends the Safe Drinking Water Act). The contractor shall also be required to comply with the ACSA's Approved Products List. The most current version of this list can be found on the ACSA's website at www.serviceauthority.org/Specs/ApprovedProductsList.pdf. 168 Spotnap Road • Charlottesville, VA 22911 • Tel (434) 977-4511 • Fax (434) 979-0698 www.serviceauthority.org '44owr Noe If you have any questions or if we can be of assistance, please give us a call at (434) 977-4511. Sincerely, Alexander J. Morrison, PE Civil Engineer cc: Tap Investment, LLC (2903 N. Augusta Street Staunton, VA 24401) ACSA, Alexander J. Morrison State Health Department Va. DEQ Current Development, Bill Fritz Bldg. Codes &Zoning Services Soil Erosion Inspector RECEIVED JAN - 7 2016 CUMM UNITY DEVELOPMENT