Loading...
HomeMy WebLinkAboutARB201500117 Review Comments Miscellaneous Submittal 2015-10-07� I . � lili flfl COUNTY OF i , Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone 434 296 -5532 Fax 434 972 -4176 October 7, 2015 Doug Stemler Hightech Signs 2165 Seminole Trail Charlottesville, VA 22901 RE: ARB- 2015 - 117: ABC Supply Co. Signs Dear Doug, I have reviewed the above - referenced sign application and discussed it with Zoning and the Building Official. Zoning does not consider the decorative fascia panel a part of the sign, but the Building Official has determined that a building permit is required to attach the metal fascia panels to the building. As such, all parts of your proposal are subject to ARB review and approval. Regarding the sign proposal, the following revisions are needed to make the sign design consistent with the Entrance Corridor Sign Guidelines: 1. Revise the shade of red to Pantone 186 or 187. 2. Indicate on the drawing the Sunbrella color /number for the blue awning. Matching Pantone 280 blue (the color used in the channel letter sign) is recommended. The color is subject to review. Regarding the decorative fascia panels, the following revisions are needed to make the fascia panel design consistent with the Entrance Corridor Design Guidelines: 1. The striped panel at the top of the building is not appropriate for the EC. A single -color panel, however, could improve the scale and could result in a more coordinated appearance for this part of the building. A panel in a dark blue shade that matches the sign and awning is recommended. 2. A building permit application is required for the decorative fascia panels. Please respond within 15 days of the date of this letter whether you will or will not proceed with revisions addressing the issues listed above. Your decision to make the revisions will suspend the 60 -day review period associated with your original submittal. If you choose to complete the revisions, please email the revised drawings to me. If you choose not to proceed with these revisions, staff will be unable to approve your application. Failure to respond to this letter shall be presumed to be a request to proceed to action on the application without further revisions. Sincerely, r Margaret Maliszewski Principal Planner cc: ARB- 2015 -117 COUNTY OF ALBEMARLE Department of Community Development REAZSED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. , TO: DATE: PROJECT NAME: ARB -201 5 -117 Submittal Type Requiring Revisions () indicates Submittal Code County Project Number # Copies � Erosion & Sediment Control Plan (E &S) ARB 1 M. Maliszew-ski Mitigation Plan (?1IP Waiver Request " «-R) Stormwater Management Plan (SWMP f Road Plan Private Road Request, with private /public comparison PRR j Private Road Request — Development Area PRR -DA Preliminar<� Site Plan (PSP ) �. Final Site Plan or amendment) (FSP ) '• Final Plat (FP)I Prelimin Plat (PP) Easement Plat P Boundaa Adjustment Plat BAP Rezoning Plan REZ) Special Use Permit Concept Plan (SP-CP) Reduced Concept Plan R -CP Proffers P Bond Estimate Request ER Draft Groundwater Management Plan D -GWMP Final Groundwater Management Plan F -GWMP Aquifer Testing Work Plan (_AT`N-P Groundwater Assessment Report (GWAR ' Architectural Review Board (AR13) ARB- 2015 -117 1 Other: Please explain (For staff use only Submittal Code # Copies ' Distribute To: Submittal Code # Copies ', Distribute To: ARB 1 M. Maliszew-ski