October 7, 2015
Doug Stemler
Hightech Signs
2165 Seminole Trail
Charlottesville, VA 22901
RE: ARB- 2015 - 117: ABC Supply Co. Signs
Dear Doug,
I have reviewed the above - referenced sign application and discussed it with Zoning and the Building Official. Zoning does
not consider the decorative fascia panel a part of the sign, but the Building Official has determined that a building permit is
required to attach the metal fascia panels to the building. As such, all parts of your proposal are subject to ARB review and
approval.
Regarding the sign proposal, the following revisions are needed to make the sign design consistent with the Entrance
Corridor Sign Guidelines:
1. Revise the shade of red to Pantone 186 or 187.
2. Indicate on the drawing the Sunbrella color /number for the blue awning. Matching Pantone 280 blue (the color
used in the channel letter sign) is recommended. The color is subject to review.
Regarding the decorative fascia panels, the following revisions are needed to make the fascia panel design consistent with
the Entrance Corridor Design Guidelines:
1. The striped panel at the top of the building is not appropriate for the EC. A single -color panel, however, could
improve the scale and could result in a more coordinated appearance for this part of the building. A panel in a dark
blue shade that matches the sign and awning is recommended.
2. A building permit application is required for the decorative fascia panels.
Please respond within 15 days of the date of this letter whether you will or will not proceed with revisions addressing the
issues listed above. Your decision to make the revisions will suspend the 60 -day review period associated with your
original submittal. If you choose to complete the revisions, please email the revised drawings to me. If you choose not to
proceed with these revisions, staff will be unable to approve your application. Failure to respond to this letter shall be
presumed to be a request to proceed to action on the application without further revisions.
Sincerely,
r
Margaret Maliszewski
Principal Planner
cc: ARB- 2015 -117
COUNTY OF ALBEMARLE
Department of Community Development
REAZSED APPLICATION SUBMITTAL
This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated
below what they think will be required as a resubmission of revisions. If you need to submit additional information please
explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in
order to be accepted for submittal. ,
TO:
DATE:
PROJECT NAME: ARB -201 5 -117
Submittal Type Requiring Revisions () indicates Submittal
Code
County Project Number
# Copies �
Erosion & Sediment Control Plan (E &S)
ARB 1
M. Maliszew-ski
Mitigation Plan (?1IP
Waiver Request " «-R)
Stormwater Management Plan (SWMP
f Road Plan
Private Road Request, with private /public comparison
PRR
j
Private Road Request — Development Area PRR -DA
Preliminar<� Site Plan (PSP )
�.
Final Site Plan or amendment) (FSP )
'•
Final Plat (FP)I
Prelimin Plat (PP)
Easement Plat P
Boundaa Adjustment Plat BAP
Rezoning Plan REZ)
Special Use Permit Concept Plan (SP-CP)
Reduced Concept Plan R -CP
Proffers P
Bond Estimate Request ER
Draft Groundwater Management Plan D -GWMP
Final Groundwater Management Plan F -GWMP
Aquifer Testing Work Plan (_AT`N-P
Groundwater Assessment Report (GWAR
'
Architectural Review Board (AR13)
ARB- 2015 -117
1
Other: Please explain
(For staff use only
Submittal Code # Copies
' Distribute To:
Submittal Code
# Copies ', Distribute To:
ARB 1
M. Maliszew-ski