HomeMy WebLinkAboutWPO201500072 Review Comments WPO VSMP 2015-10-09�pF A
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
VSMP Permit plan review - Approved
Project:
Bridlespur Farm
Project Number:
WP0201500072
Owner:
BSP Farm LLC, c/o R C Holsinger, Wexford, PA 15090
BSP Farms, LLC —c /o Fritz and Claudine Kundrun
P.O. Box 787, Kewick, VA 22947
Owner Rep.:
Gretchen Yahn, Castlerock Enterprises, Inc. -P. O. Box 333
Hume, VA 22639 [gretchen(&ceicountr o ]
Plan Preparer:
Carol Schumacher, Carson Ashley -45 Main Street, 1St Floor
Warrenton, VA 20186 [cschumacher(acarson- ashley.com ]
Plan received date:
17 Sep 2015
(Rev. 1)
6 Oct 2015
Date of comments:
1 Oct 2015
(Rev. 1)
9 Oct 2015 - Approved
Reviewer:
John Anderson
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must contain (1)
a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
SWPPP — Provide 11" X 17" Exhibit. Recommend ESC Plan as template. Show solid/non- hazardous waste
dumpster; sanitary facilities (port-a john); solvent -paint storage; concrete wash -out; on -site fuel storage.
DEQ, during periodic inspections of active projects, instructs on importance of an Exhibit that shows
location of these features. All should drain to containment. For example, silt fence downstream of port-a-
john. Concrete wash -out, dumpster draining to trapping device (lined, in case of concrete wash -out). On-
site fuel storage berm with 10ml liner, sized to hold fuel volume + 2 yr. storm event. .PDF samples
available. Exhibit is not intended as a detailed design, but to show containment and locations which may
change over time. Exhibit is a construction aid and resource protection/inspection management tool. (Rev.
1) Addressed.
B. VSMP: SWPPP: Stormwater Management Plan (WP0201500072)
VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a SWMP. This plan is
approved.
1. Title — Include reference to VSMP WP0201500072. (Rev. 1) Addressed.
2. Title —Add SWM Plan sheet to index. (Rev. 1) Addressed.
3. Create SWM Plan sheet. Remove ESC measures, and highlight roof leaders to cistern, 8' grass channel,
and permeable /open pavers. (Rev. 1) Addressed.
4. On this SWMP, confirm that permeable /open pavers are IP (interlocking pavers). Label IP. (Rev. 1)
Design revised (permeable pavement no longer proposed). Comment NA.
Engineering Review Comments
Page 2 of 4
5. Permeable /open pavers: Show where underdrain daylights /plan view. Provide underdrain INV out. (Rev.
1) Design revised. Comment NA.
6. Permeable /open paver calculations: Ref. Table 7.4, VA DEQ Stormwater Design Specification No. 7,
which outlines different design requirements for three scales of permeable pavement. Project proposes
9,467 SF (3,685 + 47'x 123'). Table. 7.4 requires two soil tests per practice for small -scale pavement.
Provide field- verified infiltration rates. Text, p. 11, indicates testing is required for design without an
underdrain. If infiltration/drain field data is available, use measured infiltration rates. If not available,
please furnish at least one test in proposed permeable /open pavement location. (Rev. 1) Design revised.
Comment NA.
7. Revise Eq. 7. 1, sheet 10, using Field- verified infiltration rate, variable i ( ft/day). (Rev. 1) Design revised.
Comment NA.
8. Revise Eq. 7.2, sheet 10, using Field- verified infiltration rate, variable i (ft /day). (Rev. 1) Design revised.
Comment NA.
9. Revise Eq. 7.3, sheet 10: use k =100 ft/day (BMP assumed value). (Rev. 1) Design revised. Comment
NA.
10. Equation 7.4 - recalculate depth of reservoir layer (ft.) to reflect revised Eq. 7.1, 7.2, 7.3. (Rev. 1) Design
revised. Comment NA.
11. Revise open paver cross - section to reflect items 6 -10, above. (Rev. 1) Design revised. Comment NA.
12. Provide observation well. Ref. p. 14, Spec. No. 7. Also Table. 7.5. (Rev. 1) Design revised. Comment
NA.
13. Revise open paver cross - section (sheet 10) bedding course to specify 2 in. depth of No. 8 stone over 3 to 4
inches of No. 57. (Spec. No. 7, Table 7.5) (Rev. 1) Design revised. Comment NA.
14. Open paver cross - section: Revise leader line arrow for perforated pipe so that it points to perforated pipe.
(Rev. 1) Design revised. Comment NA.
15. 8' Grass channel: Provide cross - section on SWM Plan sheet. (Rev. 1) Addressed.
16. Recommend pretreatment for 8' grass channel. Ref. p. 13, Sec. 6.3, VA Stormwater Design Spec. No. 3.
(Rev. 1) Addressed.
17. Provide (transfer critical) installation and maintenance information to plan to aid construction and periodic
inspection. Ref. DEQ Stormwater Design Specification No. 3, Sec. 8, Sec. 9. (Rev. 1) Addressed.
18. Cistern: Provide plan/profile (not overly detailed). Show depth/relationship to roof runoff collection. (Rev.
1) Addressed.
19. Cistern: Provide system installation and maintenance information to aid construction and inspection. (Also,
item 17, above) (Rev. 1) Addressed.
20. Pavers: Provide Clearinghouse installation and maintenance information to aid construction and periodic
inspection. (Also, item 17, above) (Rev. 1) Design revised. Comment NA.
21. Sheet 5 (on SWMP): Label area (SF) stable & equestrian barn roof that will drain to the cistern. (Rev. 1)
Addressed.
22. Sheet 5 (on SWMP): Label length of 47' wide permeable open pavers. (Rev. 1) Design revised.
Comment NA.
23. Sheet 5 (on SWMP): Label length of proposed 8' wide swale (grass channel). (Rev. 1) Addressed.
24. Sheet 5: Provide cross - section for proposed 6' drainage swale, depth/slope. (Rev. 1) Addressed.
25. Sheet 5: Show cross - section detail for proposed San. Line pipe encasement at stream crossing. Spec.
encasement. (Rev. 1) Addressed.
26. Sheet 5: Remove 458' contour on 47' wide pavers. Spot elevations indicate paver Elev. < 458'. (Rev. 1)
Design revised. Comment NA.
27. Sheet 6: Misprint at proposed Culv. Calc: Q 10 per pipe = 42.3/2 =21.15 cfs, should read Q_2. (Rev. 1)
Addressed.
28. Sheet 7: Revise CN worksheets: 2.75 Ac. C soils, 25.25 Ac. B soils. [ref. email: 9/30/2015 4:13 PM] (Rev. 1)
Addressed.
29. Sheet 7: Revise Scale in Feet (1" = 400'). Plan scale is 1" =200'. (Rev. 1) Addressed.
Engineering Review Comments
Page 3 of 4
30. Sheet 9: P1, P2, P10, Charlottesville, VA: 3.0, 3.7, and 5.6. Revise TR -55 Calculations. (Rev. 1)
Addressed. [ http: // hdsc. nws. noaa. gov /hdsc /pfds /pfds_map cont.html ?bkmrk =va ]
C. VSMP: SWPPP: Erosion Control Plan (WPO201500072)
Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is
M12roved.
1. Sheet 5: Label Area to be Disturbed, =3.00 Ac. (General VPDES Permit Registration) (Rev. 1) Addressed.
2. Sheet 3: Add Albemarle County General Construction Notes (1. -9.); General Construction Notes for ESC
Plans (1. -20.) (Rev. 1) Addressed. Attached Link:
https: / /www.,google.com/url ?q= http:// www.albemarle.org /uploadJimages /forms_ center /departments /Communityy Devel
opment/forms/Engineering and WPO Forms/En ing eering_Plan Review General Notes Feb20l4.pdf &sa= U &ved =0
CAQQFjAAahUKEwjlu4i36J IAhUBMz4KHflZWBxM &client = intemal -uds-
cse &usg= AFQjCNFIgT4j S4rxYj 8edBJdRKOWGPh2vw
D. VSMP: Mitigation Plan
The mitigation plan requirements can be found in County Code section 17 -406
1. Sheet 11: Avoid San. Line to drain field. Provide clearance between Mitigation plantings and San. Line.
(Rev. 1) Addressed.
2. Sheet 12/Understory Evergreen table: 6" high should read 4' high. —Ref. Restoration Establishment Table
B. Attached. (Rev. 1) Addressed.
Process:
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request
form (complete) and fee to the Department of Community Development. One of the plan reviewers will prepare
estimates (complete) and check parcel and easement information based on the approved plans. The County's
Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and
submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be
approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to obtain all the correct
signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The
County's Management Analyst or other staff will prepare the forms and check for ownership and signature
information. The completed forms will need to be submitted along with court recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ database
for state application processing. DEQ will review the application information based on local VSMP authority
approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest
processing, this is done electronically with the emails provided on the application. DEQ should notify applicants
with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter.
This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference. Applicants
will need to request a pre - construction conference by completing a form, and pay the remainder of the application
fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be
checked by county staff, and upon approval, a pre - construction conference will be scheduled with the County
inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading
permit will be issued by the County so that work may begin.
Engineering Review Comments
Page 4 of 4
County forms can be found on the county website forms center under engineering;
hllp://www.albemarle.orp-/deptforms.asp?dei2artment--cdengmTo
Thank you - 434.296 -5832 —0069
File: WPO201500072 Bridlespur FarmVSMP 100915rev1 Approv
�pF A
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
VSMP Permit plan review
Project:
Bridlespur Farm
Project Number:
WP0201500072
Owner:
BSP Farm LLC, c/o R C Holsinger, Wexford, PA 15090
BSP Farms, LLC —c /o Fritz and Claudine Kundrun
P.O. Box 787, Kewick, VA 22947
Owner Rep.:
Gretchen Yahn, Castlerock Enterprises, Inc. -P. O. Box 333
Hume, VA 22639 [gretchen(&ceicountr o ]
Plan Preparer:
Carol Schumacher, Carson Ashley -45 Main Street, 1St Floor
Warrenton, VA 20186 [cschumacher(acarson- ashley.com ]
Plan received date:
17 Sep 2015
Date of comments:
1 Oct 2015
Reviewer:
John Anderson
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must contain (1)
a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
SWPPP — Provide 11" x 17" Exhibit. Recommend ESC Plan as template. Show solid/non- hazardous waste
dumpster; sanitary facilities (port-a john); solvent -paint storage; concrete wash -out; on -site fuel storage.
DEQ, during periodic inspections of active projects, instructs on importance of an Exhibit that shows
location of these features. All should drain to containment. For example, silt fence downstream of port-a-
john. Concrete wash -out, dumpster draining to trapping device (lined, in case of concrete wash -out). On-
site fuel storage berm with 10ml liner, sized to hold fuel volume + 2 yr. storm event. .PDF samples
available. Exhibit is not intended as a detailed design, but to show containment and locations which may
change over time. Exhibit is a construction aid and resource protection/inspection management tool.
B. VSMP: SWPPP: Stormwater Management Plan (WP0201500072)
VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a SWMP. This plan is
disapproved for reasons provided in comments below. The stormwater management plan content requirements can be
found in County Code section 17 -403.
1. Title — Include reference to VSMP WP0201500072.
2. Title —Add SWM Plan sheet to index.
3. Create SWM Plan sheet. Remove ESC measures, and highlight roof leaders to cistern, 8' grass channel,
and permeable /open pavers.
4. On this SWMP, confirm that permeable /open pavers are IP (interlocking pavers). Label IP.
5. Permeable /open pavers: Show where underdrain daylights /plan view. Provide underdrain INV out.
6. Permeable /open paver calculations: Ref. Table 7.4, VA DEQ Stormwater Design Specification No. 7,
which outlines different design requirements for three scales of permeable pavement. Project proposes
Engineering Review Comments
Page 2 of 3
9,467 SF (3,685 + 47'x 123'). Table. 7.4 requires two soil tests per practice for small -scale pavement.
Provide field- verified infiltration rates. Text, p. 11, indicates testing is required for design without an
underdrain. If infiltration/drain field data is available, use measured infiltration rates. If not available,
please furnish at least one test in proposed permeable /open pavement location.
7. Revise Eq. 7. 1, sheet 10, using Field- verified infiltration rate, variable i (ft/day).
8. Revise Eq. 7.2, sheet 10, using Field- verified infiltration rate, variable i (ft/day).
9. Revise Eq. 7.3, sheet 10: use k =100 ft/day (BMP assumed value).
10. Equation 7.4 - recalculate depth of reservoir layer (ft.) to reflect revised Eq. 7.1, 7.2, 7.3.
11. Revise open paver cross - section to reflect items 6 -10, above.
12. Provide observation well. Ref. p. 14, Spec. No. 7. Also Table. 7.5.
13. Revise open paver cross - section (sheet 10) bedding course to specify 2 in. depth of No. 8 stone over 3 to 4
inches of No. 57. (Spec. No. 7, Table 7.5)
14. Open paver cross - section: Revise leader line arrow for perforated pipe so that it points to perforated pipe.
15. 8' Grass channel: Provide cross - section on SWM Plan sheet.
16. Recommend pretreatment for 8' grass channel. Ref. p. 13, Sec. 6.3, VA Stormwater Design Spec. No. 3.
17. Provide (transfer critical) installation and maintenance information to plan to aid construction and periodic
inspection. Ref. DEQ Stormwater Design Specification No. 3, Sec. 8, Sec. 9.
18. Cistern: Provide plan/profile (not overly detailed). Show depth/relationship to roof runoff collection.
19. Cistern: Provide system installation and maintenance information to aid construction and inspection. (Also,
item 17, above)
20. Pavers: Provide Clearinghouse installation and maintenance information to aid construction and periodic
inspection. (Also, item 17, above)
21. Sheet 5 (on SWMP): Label area (SF) stable & equestrian barn roof that will drain to the cistern.
22. Sheet 5 (on SWMP): Label length of 47' wide permeable open pavers.
23. Sheet 5 (on SWMP): Label length of proposed 8' wide Swale (grass channel).
24. Sheet 5: Provide cross - section for proposed 6' drainage swale, depth/slope.
25. Sheet 5: Show cross - section detail for proposed San. Line pipe encasement at stream crossing. Spec.
encasement.
26. Sheet 5: Remove 458' contour on 47' wide pavers. Spot elevations indicate paver Elev. < 458'.
27. Sheet 6: Misprint at proposed Culy. Calc: Q 10 per pipe = 42.3/2 =21.15 cfs, should read Q2.
28. Sheet 7: Revise CN worksheets: 2.75 Ac. C soils, 25.25 Ac. B soils. [ref. email: 9/30/2015 4:13 PM]
29. Sheet 7: Revise Scale in Feet (1" = 400'). Plan scale is 1" =200'.
30. Sheet 9: P1, P2, P10, Charlottesville, VA: 3.0, 3.7, and 5.6. Revise TR -55 Calculations.
[ http:// hdsc. nws.noaa.gov/hdsc /pfds /pfds_map cont.html ?bkmrk =va ]
C. VSMP: SWPPP: Erosion Control Plan (WP0201500072)
Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved
for reasons provided in comments below. The erosion control plan content requirements can be found in County Code
section 17 -402.
1. Sheet 5: Label Area to be Disturbed, =3.00 Ac. (General VPDES Permit Registration)
2. Sheet 3: Add Albemarle County General Construction Notes (1. -9.); General Construction Notes for ESC
Plans (1. -20.) Attached Link:
hgps:// www. google. com/ url? q= ha:// www.albemarle.org /ui)load/images /forms_ center /departments /Communiiy Devel
opment/forms/En ineering_and_WPO_Forms/En ineering_Plan_ Review_ General_ Notes_ Feb20l4.pdf &sa= U &ved =0
CAOOFjAAahUKEwjlu4i36J IAhUBMz4KHfRWBxM &client= internal -uds-
cse &usg= AFQjCNFIgT4j S4rxYj 8edBJdRKOWGPh2vw
Engineering Review Comments
Page 3 of 3
D. VSMP: Mitigation Plan
The mitigation plan requirements can be found in County Code section 17 -406
1. Sheet 11: Avoid San. Line to drain field. Provide clearance between Mitigation plantings and San. Line.
2. Sheet 12/Understory Evergreen table: 6" high should read 4' high. —Ref. Restoration Establishment Table
B. Attached.
Engineering plan review staff are available from 2 -4 PM on Thursdays, should you require a meeting to discuss
this review. Plan review staff available at 434 - 296 -5832 (- x3069) should you have questions.
Process:
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request
form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and
check parcel and easement information based on the approved plans. The County's Management Analyst will
prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash,
certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County
Attorney and County Engineer. This may take 2 -4 weeks to obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The
County's Management Analyst or other staff will prepare the forms and check for ownership and signature
information. The completed forms will need to be submitted along with court recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ database
for state application processing. DEQ will review the application information based on local VSMP authority
approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest
processing, this is done electronically with the emails provided on the application. DEQ should notify applicants
with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter.
This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference. Applicants
will need to request a pre - construction conference by completing a form, and pay the remainder of the application
fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be
checked by county staff, and upon approval, a pre - construction conference will be scheduled with the County
inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading
permit will be issued by the County so that work may begin.
County forms can be found on the county website forms center under engineering;
http://www.albemarle.org/deptforms.asp?department--cdengMTo
Thank you - 434.296 -5832 —x3069
File: WP0201500072— Bridlespur Farm _VSMP-100115
Short Review Comments Report for:
WPO201500072
SubApplication Type:
Bridlespur Farm
Stormwater Management/BMP Plan
Erosion and Sediment Control Plan
Stream Buffer Mitigation Plan
Date Completed:10/01/2015
Reviewer:John Anderson Engineering
Review Status:Denied
Reviews Comments:
Division:
Date Completed:10/07/2015
Reviewer:John Anderson Engineering
Review Status:Pending
Reviews Comments:Estim on Local C:\
janderson2 10/7/2015 6:48 PM
Division:
Date Completed:10/09/2015
Reviewer:John Anderson Engineering
Review Status:Approved
Reviews Comments:prior comments addressed -janderson2 10/9/2015 4:25 PM
Division:
Date Completed:10/27/2015
Reviewer:Ana Kilmer
Review Status:Approved
Reviews Comments:10/27/2015 - swa recorded at clerks office. deed book 4689, page 128
Division:
Page: 1 of 1 County of Albemarle Printed On: June 14, 2016