Loading...
HomeMy WebLinkAboutSDP201500051 Action Letter 2015-10-15 (2)�s COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 October 15, 2015 Marcia Joseph 481 Clarks Tract Keswick VA 22947 RE: ARB201500012 All Saint's Chapel Dear Marcia, I have reviewed your recent resubmittal for the above - referenced project (including elevation drawings ofthe easternmost stone pier dated 10/5/2015; architectural plans dated 8 -7 -15, no revision date; and site plan revised 10/5/2015). The revision included in these drawings resolve the outstanding conditions of ARB approval. You may consider this Ietter your Certificate of Appropriateness. This approval is predicated on the fact that the design and materials, as proposed and exhibited for review, will be used. The acceptance of approval implies that the applicant has agreed to execute the design as indicated on the site plan, attachments, materials, samples, and other submittal items presented. Any change in the approved design or materials will require an amendment to the plan and must be reviewed and approved by the Architectural Review Board. Please note the following: 1. This application is approved with the condition that mechanical equipment shall not be visible from the Entrance Corridor. 2. Certificates of Appropriateness are valid for the same period that the corresponding site plan is valid. If there is no site plan required for the proposed work, the Certificate of Appropriateness is valid for 3 years. Applicants requesting an extension of the period of validity must do so in writing. The letter must be received by the Director of Planning prior to the expiration date. If you have any questions concerning any of the above, please feel free to call me. Sincerely, Margaret Maliszewski Principal Planner cc: ARB- 2015 -12