Loading...
HomeMy WebLinkAboutWPO201500054 Approval - County 2015-10-16�pF A COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 VSMP Permit plan review — Approved Project: Virginia Wineworks —VSMP Project File No.: WP0201500054 Plan preparer: David M. Jensen, PE/WW Associates, Inc -3040 Avemore Square Place Charlottesville, VA 22911; diensen(&wwassociates.net Owner or rep.: Virginia Wineworks, LLC -1781 Harris Creek Way, Charlottesville, VA 22902 Plan received date: 14 Aug 2015 (Rev. 1) 28 Sep 2015 (Rev. 2) 16 Oct 2015 Date of comments: 21 Sep 2015 (Rev. 1) 14 Oct 2015 — see CV comments (Rev. 2) 16 Oct 2015 —Approve Reviewer: John Anderson A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Please complete /submit attached 17 p. County SWPPP template (please notify if overlooked/misplaced, etc.) (Rev. 2) Addressed. B. VSMP: SWPPP: Stormwater Management Plan (WP0201500054) VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a SWMP. This plan is approved. — Comments below addressed with Rev. 1. Sheet 7 1. Label bioretention spillway /weir width (2'), consistent with Hydralflow Pond report, sheet 10. 2. Label bioretention facility floor dimensions (L x W). 3. Label bioretention facility forebay floor dimensions (L x W). 4. Label length/slope underdrain outfall pipe to aid construction inspection ( >0.5% slope). 5. Label bioretention underdrain cleanout, which appears to be shown. 6. Show private SWM facility easement. 7. Provide SWM facility easement. Sheet 9 8. Provide RV pre- /post - development calculations — genesis of energy balance values is unclear. 9. Provide data /calculations or details to explain/clarify `Volume reduced by upstream BMP =277 cuff' 10. Show simple disconnect in plan view, if proposed. VaRRM .xls excerpts are confusing. Please confirm that two VA DEQ BMPs are proposed (simple disconnection to AB soils; bioretention/Level 1) 11. If two VA DEQ BMPs are proposed, provide VaRRM .xls excerpt for bioretention. 12. Provide VaRRM .xls Water Quality Compliance tab data that confirms BMPs achieve total phosphorus load reduction required =0.15 lb. Engineering Review Comments Page 2 of 3 13. Recommend email VaRRM .xls to plan reviewer, which may help address comments directly. 14. Revise Bioretention planting specifications, which are difficult to read, if not unreadable. Level 1 Bioretention Facility Section (NTS) 15. Modify profile to show existing grade to facilitate bond estimate (Earthwork). 16. Include observation well -ref. VA DEQ Stormwater Design Specification No. 9 .PDF, bottom p. 25. 17. Label bioretention floor Elev. (Appears to be 990.83') 18. Label top of mulch Elev. (Appears to be 994.00') 19. Show observation well. 20. Show underdrain cleanout. C. VSMP: SWPPP: Erosion Control Plan (WPO201500054) Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is approved. — Comments below addressed with Rev. I 1. Sheet 3: Confirm soil types. Soil types 23C, 71D shown on plans do not appear as local soils on NRCS soil map. Please confirm hydrologic soil group `B'. Ref. NRCS websoil survey soil map image,belo P Lat./Lon. - 37.9 N 78.58 W — Link: http:// websoilsurvey. sc. egov .usda.goy /App/WebSoilSurvey.aspx Sheet 4 2. Label area of disturbance; should match General VPDES Registration statement, block 9 = 0.72 Ac. 3. Confirm that no Additional impervious ground cover, beyond existing gravel /Access, is proposed. 4. Label ST floor dimensions in plan view to facilitate construction, inspection, bond estimate (36' X 7.8'). 5. Dimension sediment trap (ST) outfall riprap to facilitate construction, inspection, and bond estimate. 6. If ELS is VaRRM BMP associated with disconnection, please ref. Min. ELS L =13 ft. Revise as necessary. 7. If ELS is VaRRM BMP associated with disconnection, show in plan view on sheet 7 as well as sheet 4. D. VSMP: Mitigation Plan -NA The mitigation plan requirements can be found in County Code section 17 -406. Process: After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. A private SWM facility easement is required. A SWM Access easement is required (existing gravel suitable). After bonding and agreements are complete, the County can hold a pre - construction conference. Applicant will need to request a pre - construction conference by completing a form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/deptforms.asp?department--cdengmTo Engineering Review Comments Page 3 of 3 Thank you 434.296 -5832 —0069 File: WPO201500054 Virginia Wineworks_VSMP_101615Approv