Loading...
HomeMy WebLinkAboutWPO201400095 Plan - Stormwater 2015-06-03GENERAL NOTES OWNER: PIEDMONT NEIGHBORHOODS, LP EXISTING CONDITIONS 11111 SUNSET HILLS ROAD, SUITE 200 EROSION & SEDIMENT CONTROL NARRATIVE RESTON, VA 20190 DEVELOPER: SM CHARLOTTESVILLE, LLC PHASE II EROSION & SEDIMENT CONTROL PLAN 11111 SUNSET HILLS ROAD, SUITE 200 EROSION & SEDIMENT CONTROL DETAILS RESTON, VA 20190 ENGINEER: COLLINS ENGINEERING POST - DEVELOPMENT STORMWATER MANAGEMENT PLAN 200 GARRETT STREET, SUITE K OVERALL POST - DEVELOPMENT STORMWATER MANAGEMENT PLAN CHARLOTTESVILLE, VA 22902 NO. CONTACT: SCOTT COLLINS, PE BENCH MARK 434.293.3719 TAX PARCEL #: 00940 -00 -00 -01600 (DB 4498, PG 207) TOTAL ACREAGE: 36.70 AC. ZONING: PLANNED RESIDENTIAL DEVELOPMENT PROPOSED USE: RESIDENTIAL - 26 SINGLE FAMILY DETACHED LOTS HEIGHT: DO NOT EXCEED 2.5 STORIES DRAINAGE DISTRICT: RIVANNA RIVER WATERSHED: MIDDLE RIVANNA RIVER TOPOGRAPHY: JAMES H BELL JR, PC (USGS DATUM) DATE OF PHOTOGRAPHY - FEBRUARY 22, 1998 PROPOSED PAVEMENT DATE OF COMPILATION - MARCH 12, 1998 VDOT STANDARD STOP SIGN ROUDABUSH, GALE & ASSOCIATES AS -BUILT CONDITIONS FROM GLENMORE PERIMETER ROAD AS -BUILD ROAD AND UTILITY EC -3A DITCH PLANS - CARROLL CREEK ROAD AND FARRINGDON ROAD PLANS DATED APRIL 4, 2008. — EXISTING CONTOUR TOPOGRAPHY VERIFIED WITH FIELD SURVEY ON JULY 7, 2014 BY ROUDABUSH, GALE & 6» ASSOCIATES. DATUM: NAVD 29 BENCHMARK: EXISTING SANITARY MANHOLE TC 7 -A TOP= 278.17 CRITICAL SLOPES: MANAGED & PRESERVED CRITICAL SLOPES ARE SHOWN ON THE ALBEMARLE COUNTY 240.55 CRITICAL SLOPE OVERLAY. FLOODPLAIN: A PORTION OF THIS PROJECT IS LOCATED WITHIN ZONE 'A' AS SHOWN ON FLOOD INSURANCE RATE MAP COMMUNITY PANEL NUMBERS 51003CO450D AND 51003CO475D. g" EFFECTIVE DATE: FEBRUARY 4, 2005. ALL LOTS CONTAIN A BUILDING SITE THAT COMPLIES WITH SECTION 4.2.1 OF THE ALBEMARLE COUNTY ZONING ORDINANCE. NO EVIDENCE OF A BURIAL SITE WAS FOUND ON THIS PARCEL. THIS SITE IS NOT LOCATED WITHIN AN AGRICULTURAL - FORESTRAL DISTRICT. THIS SITE IS NOT LOCATED WITHIN A WATER SUPPLY WATERSHED. THERE WILL BE NO OUTDOOR LIGHTING ABOVE 3.000 LUMENS. THE STREAM BUFFER SHOWN HEREON SHALL BE MANAGED IN ACCORDANCE WITH THE ALBEMARLE COUNTY WATER PROTECTION ORDINANCE OPEN SPACE SHALL BE OWNED AND MAINTAINED BY GLENMORE HOMEOWNERS ASSOCIATION. EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT PLAN SCOTTSVILLE DISTRICT ALBEMARLE COUNTY, VIRGINIA SHEET LAYOUT SCALE: 1" = 100' lot4 i.. 4 ;�b CARR EEK RD VICINITY MAP SCALE: 1" = 2000' SHEET INDEX TITLE SHEET COVER SHEET LEGEND EXISTING CONDITIONS 2 EROSION & SEDIMENT CONTROL NARRATIVE EXISTING CULVERT EARTH DITCH PHASE II EROSION & SEDIMENT CONTROL PLAN CUL VERT EROSION & SEDIMENT CONTROL DETAILS 6 PRE - DEVELOPMENT STORMWATER MANAGEMENT PLAN DROP INLET & STRUCTURE POST - DEVELOPMENT STORMWATER MANAGEMENT PLAN DRI VEWA Y CUL VERT OVERALL POST - DEVELOPMENT STORMWATER MANAGEMENT PLAN 0 NO. 10 BENCH MARK 11 CURB CLEARING LIMITS CURB & GUTTER PROPOSED PAVEMENT T VDOT STANDARD STOP SIGN -- EC -3A DITCH —200— — EXISTING CONTOUR 6» DEPTH OF EC -3A DITCH PROPOSED CONTOUR 200 EC -2 DI TCH 240.55 PROPOSED SPOT ELEVA T70N ./ TRC DENOTES TOP /BACK OF CURB g" DEPTH OF EC -2 DITCH T/B DENOTES TOP OF BOX SHEET INDEX TITLE SHEET COVER SHEET 1 EXISTING CONDITIONS 2 EROSION & SEDIMENT CONTROL NARRATIVE 3 PHASE I EROSION & SEDIMENT CONTROL PLAN 4 PHASE II EROSION & SEDIMENT CONTROL PLAN 5 EROSION & SEDIMENT CONTROL DETAILS 6 PRE - DEVELOPMENT STORMWATER MANAGEMENT PLAN 7 POST - DEVELOPMENT STORMWATER MANAGEMENT PLAN 8 OVERALL POST - DEVELOPMENT STORMWATER MANAGEMENT PLAN 9 STORMWATER MANAGEMENT DETAILS 10 STORMWATER MANAGEMENT NOTES & DETAILS 11 by n, TOTAL SHEETS 11 ,VTH 0� SCOTT R. COLLINS'–;" ,T-/ No. 35791 ti z O a v w D Z O Ln w me U) z oW a U) H W ce Ln Ln C) m —4 N Ln UJ z o 0 O a 03 0 N UO V Z a i� �: Z) Z) wO E o w w w w w CL a 0 Q w w (n V) H H W W w ce n un M Ln l0 L9 0 r M ® M 0 N tt cy) d' N 0 N N W J .■.ry J L9U) w O LLJ U i ul F- w � /D v / F— w wA' F- U) F_ Jw Q 00 0 z CL 0 1 u N N oC ° z W� OoL c; V �z u sW � L W �U c Z O 7 � O V � O W L � 3 m C C u C c (i N ] r O 3 G � O � Qi O G � N O N C L z aY ° �y W o3 z� w� w� Z Z z u z _. U L C '6-, r o a o � a o W a f-' m I-i Z.2 O W F— W y W c U O U a Ui O O JOB NO. 142109 ° 0 �o SCALE a c _ AS SHOWN ° .N O C 0C SHEET NO. o a. 1 ° y � S L F- 3 ONE / 48-66AC C) Z ,z CIWN�: §AN��b= L P RL ONINO: AA u-2 -LOT 15 VACANT lu CL JOB NO. SCALE GRAPHIC 30 go 120 60 24Q' SCALE It SHEET NO. LEGEND GENERAL NOTES EROSION CONTROL NOTES DESCRIPTION OF EROSION & SEDIMENT EROSION CONTROL NOTES & NARRATIVE IMMEDIATELY. BE REMOVED WHEN THE LEVEL OF SEDIMENT DEPOS177ON REACHED HALF WAY TO CONTROL MEASURES. NO ITEM SHALL BE REMOVED UNLESS THE UPSTREAMAREASARESTABiIIZEDANO THE INSPECTOR GIVES ES -1: UNLESS OTHERWISE INDICATED, ALL VEGETA77VE AND STRUCTURAL EROSION CONTROL MEASURES. PROJECT DESCRIPTION. ROADS 1. THE OWNER /CLIENT OF THIS PROPERTY IS: AND SEDIMENT CONTROL PRACTICES WILL BE CONS7RUCTFD AND d. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND THE PURPOSE OF THIS LAND - DISTURBING ACTIVITY IS TO DEVELOP THE PROPERTY FOR A 26 LOT SINGLE FAMIL Y DEVELOPMENT, WITH LOTS -= �-1 EXISTING CULVERT PIEDMONT NEIGHBORHOODS, LP 11111 SUNSET HILLS ROAD, SUITE 200 MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICA 77ONS OF EROSION AND SEDIMENT CONTROL MEASURES, • GENERALLY 1/2 ACRE IN SIZE. INCLUDED IN THE LAND DISTURBANCEACTIVITYIS THE ROAD, UTILITY, AND STORMWA TER MANAGEMENT 21. THIS PLAN SHALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMIT W177-IIN 1 YEAR OF 774E DATE OF APPROVAL. WATER PR07EC77ON ORDINANCE SEC77ON 17 -204G. { ) RESTON, VA 20190 THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625 -02 -00 EROSION AND SEDIMENT CONTROL IT IS ANTICIPATED TED THAT A CONSTRUCTION ENTRANCE, CONSTRUC7ON ROAD INFRASTRUCTURE FOR THE DEVELOPMENT. THIS PLAN SHALL BE UTILIZED FOR THE DEVELOPMENT OF THE 26 LOTS THE PROPERTY IS A TOTAL CUL VERT 2. THE DEVELOPER OF THIS PROPERTY IS,* REGULA TIONS. STABILIZA 77ON, TEMPORARY DIVERSION DIKES, RIGHT OF WAY DIVERSION, OF 36.70 ACRES AND THE TOTAL LAND DISTURBANCE FOR THE PROJECT IS 20.2 ACRES. 0 DROP INLET & STRUCTURE NO. SM CHARLOTTESVILLE, LLC 200 ES -2: 77-IE PLAN APPROVING AUTHORITY MUST BE N077FIED ONE WEEK PRIOR TO SEDIMENT 7RAPS AND BASINS, OUTLET PROTECTION, INLET PROTECTION, CULVERT SEDIMENTATION. ENOUGH TO ALLOW THE MAJORITY OF 774E SEDIMENT TO SETTLE OUT USE BELOW DISTURBED 11111 SUNSET HILLS ROAD, SUITE THE PRE- CONS7RUC77ON CONFERENCE, ONE WEEK PRIOR TO THE INLET PROTECTION, AND SILT FENCE WILL BE INSTALLED TO CONTROL SURFACE EXISTING SITE CONDITIONS: CURB RESTON, VA 20190 COMMENCEMENT OF LAND DIS77JRBING AC7T V7TY, AND ONE WEEK PRIOR TO DRAINAGE. TEMPORARY SEEDING WILL BE USED IMMEDIA TEL Y FOLLOWING ALL THE ENTIRE SITE IS CURRENTLY WOODED. THEACCESS TO THE PROPERTY IS FROM CARROLL CREEK DRIVE, WHICH IS LOCATED TO THE EAST CONSTRUCTION AC71V/77ES, ALL AREAS WILL RECEIVE' A PERMANENT VEGETATIVE COVER. J. THESE PLANS HAVE BEEN PREPARED BY. THE FINAL INSPECTION. __m OF THE SITE. CARROLL CREEK RUNS THROUGH THE WESTERN PART OF THE SITE, AND THERE IS A 100 YR FLOODPLAIN AND STREAM BUFFER CURB &GUTTER COLLINS ENGINEERING, INC ES -3.• ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR LAND DISTURBANCE AC77V777ES. TEMPORARY STOCKPILE AREAS WILL BE ON THE PROPERTY FROM THE CREEK. THE SITE DRAINS TOWARD C4RROLL CREEKKK, PROPOSED PAVEMENT 200 GARRETT STREET, SU17E K TO OR AS THE FIRST STEP IN CLEARING. MAINTAINED FROM TOPSOIL THAT WILL BE S7RIPPED FROM AREAS TO BE GRADED A TEMPORARY BARRIER OR DAM KITH A CONTROLLED STORMWATER RELEASE STRUCTURE AR BROWN SILT LOAM ABOUT 8" THICK, UPPER SURFACE LAYER IS DARK , CHARLOTTESVILLE, VA 22902 ES-4:A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL AND STORED FOR LATER SPREADING. STOCKPILE LOCATIONS SHALL BE ON S17E ADJACENTAREAS: r- - - EC -3A DITCH TELEPHONE. (434) 293 -3719 FACSIMILE. (434) 293 -2813 4. SOURCE OF TOPO & SURVEY- TOPOGRAPHY COMPILED FROM SURVEY BY A BE MAINTAINED ON THE SITE AT ALL TIMES. ES -5: PRIOR TO COMMENCING LAND DISTURBING AC77V/77ES IN AREAS 077-IER THAN AND SHALL BE STABILIZED WITH A TEMPORARY VEGETA77VE COVER. PERMANENT THE PROPERTY FOR THIS DEVELOPMENT 15LOCA TED WITHIN THE OVERALL GLENMOREDEVELOPMENT. THERE ARE LARGE RURAL SINGLE BROWN AND LIGHT YELLOWISH BROWN SILT LOAM AND SILTY CLAY LOAM COMBINA 77ON OF JAMES H BELL JR, PC IN MARCH 1998 AND ROUDABUSH, GALE /INDICATED ON THESE PLANS (INCLUDING BUT NOT LIMITED OFF -SITE SEEDING WILL BE PERFORMED FOR ALL AREAS WHICH WILL NO LONGER BE FAMIILY LOTS ACROSS CARROLL CREEK DRIVE TO THE EAST OF THE PROPERTY. THE GLENMORE GOLF COURSE 15 LOCATED TO THE SOUTH OF WITH LIGHT GRAY MOTTLES, LOWER PART OF SUBSOIL TO A DEPTH OF 6" DEPTH OF EC -3A DITCH AND ASSOCIATES IN APRIL 2008. TOPOGRAPHY VERIFIED WITH FIELD SURVEY IN I BORROW OR WASTE AREAS), CONTRACTOR SHALL SUBMIT A EXCAVATED AND WHERE CONSTRUCTION AC770TIES HAVE CEASED. PERMANENT THE PROPERTY, ALONG WITH ANOTHER WOODED UNDEVELOPED AREA (ALSO PART OF THE FUTURE DEVELOPMENT OF GLENMORE). ACROSS THE VELOCITY OF OVERLAND FLOW. TO FOSTER THE GROWTH OF VEGETATION BY INCREASING GREATER THAN THREE ACRES THERE MUST BE SUFFICIENT SPACE AND APPROPRIATE JUL Y 2014 BY ROUDABUSH, GALE, AND ASSOCIATES. TR SUPPLEMENTARY EROSION CONTROL PLAN TO 774E OWNER FOR REVIEW AND SEEDING SHALL ALSO BE PERFORMED FOR ALL DENUDED AREAS WHICH WILL BE CARROLL CREEK TO THE WEST OF THE PROPERTYARE EXISTING SINGLE FAMILY HOMES, AND TO THE NORTH OF THE PROPERTY IS ALSO A = - __ EC -2 DITCH 5. ZONING: PLANNED RESIDENTIAL DEVELOPMENT APPROVAL BY THE PLAN APPROVING AUTHORITY. LEFT DORMANT FOR A YEAR OR MORE. SELEC77ON OF SEED MIXTURE WILL COUPLE OF LARGER SINGLE FAMILY LOTS. 6. TAX MAP AND PARCEL NUMBER: 09400 -00 -00 -01600 ES -6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLA77ON OF ANY ADDITIONAL DEPEND ON THE TIME OF YEAR APPLIED. TEMPORARY SEEDING WILL BE Annual Ryegrass 6" DEPTH OF EC -2 DITCH 7. USGS DATUM: NA VD 29 8. LOCA770N ADDRESS OF PROJECT CARROLL CREEK ROAD / EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND PERFORMED FOR ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE OFFSITE LAND DISTURBANCE: EA DITCH SEDIMENTA770N AS DETERMINED BY 174E PLAN APPROVING AUTHORITY 1 ALL THE CONNECTIONS TO THE EXISTING SANITARYSEWER FOR THIS DEVELOPMENT WILL OCCUR WITHIN THE LIMITS OF THE PROPERTY. THE ... -...- - 9. TOTAL ACREAGE OF SITE. 36.70 ACRES ES -7.• ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL THAN SEVEN DAYS. THESE AREAS SHALL BE SEEDED WITH FAST GERMINA77NG EXISTING SANITARYSEVVER IS LOCATED ON THE PROPERTY TO THE EAST OF CARROLL CREEK. THE WATERLINE FOR THE PROJECT WILL BE DRIVEWAY CULVERT 10. TOTAL ACREAGE OF DISTURBANCE. • 19.3 ACRES MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING VEGETA 77ON IMMEDIA TEL Y FOLLOWING GRADING OF THOSE AREAS. SELECTION OF EXTENDED ALONG CARROLL CREEK DRIVE TO THE PROPERTY FOR WATER SERVICE TO THE DEVELOPMENT. THAT IS THE ONLY OFFSITE PORTION 11. PUBLIC U77L177ES• CONNECT TO EXISTING PUBLIC SEWER AND WATER SITE DEVELOPMENT UNTIL FINAL STABILIZATI0N IS ACHIEVED. SEED MIXTURE WILL DEPEND ON THE TIME OF YEAR APPLIED. OF THE PROPERTY BENCH MARK ES -8: DURING DEWA TERING OPERA PONS, WA TER WILL BE PUMPED INTO AN + * COLLINS ENGINEERING SHALL NOT HAVE AUTHORITY OVER CONTRACTORS WORK, APPROVED WATER FILTERING DEVICE. SAFETY PRECAUTIONS, SCHEDULES, OR COMPLIANCE WITH LAWS AND REGULA7ONS ES -9: 7HE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES 3.01 SAFETY FENCE - SAFETY FENCE WILL BE INSTALLED AROUND ALL CRITICAL AREAS: _ - _ _ _ CLEARING LIMITS WE SHALL NOT ASSUME RESPONSIBILITY FOR ANY CONSTRUCTION STARTED PRIOR TO PERIODICALLY AND AFTER EACH RUNOFF - PRODUCING RAINFALL EVENT. PROPOSED SEDIMENT BASINS AND SEDIMENT TRAPS. CRITICAL AREAS ON THE SITE WILL BE PROTECTED DURING THIS LAND D/STURB/NGACTIVITY CARROLL CREEK SHALL BE PROTECTED FROM ANY PLAN APPROVAL. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFEC77VENESS 3.02 CONS7RUC770N ENTRANCE - ONE CONSTRUCTION ENTRANCE SHALL BE EROSION ENTERING THE CREEK FROM THE DEVELOPMENT OF THE PROPERTY. IT WILL BE PROTECTED WITH DIVERSION DITCHES, SILT FENCE, -s VDOT STANDARD STOP SIGN OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. INSTALLED AT THE ENTRANCE TO THE SITE OFF CARROLL CREEK DRIVE. THIS AND SEDIMENT BASINS A ND TRAPS. ADDITIONALLY, THERE A RE A NUMBER OF STEEP SL OPES LEADING DO WN TO THE STREAM ON THE - - - - 200 - - - - EXIS77NG CONTOUR EROSION CONTROL NOTES WILL BE THE ONLY POINT OF INGRESS AND EGRESS TO THE SITE. CARE WILL BE PROPERTY THAT WILL BE MAINTAINED AND PRESERVED. CARE MUST BETAKEN WHEN INSTALLING UTILITIES /N CLOSE PROXIMITY OF THE SLOPES AND CREEKS TO ENSURE THAT THE SEDIMENT DOES NOT REACH THE STREAM FROM THE CONSTRUCTION ACTIVITY. TAKEN TO PR07ECT ADJACENT ROADWAYS FROM TRANSFER OF SEDIMENT. 20o PROPOSED CONTOUR 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE 3.03 CONSTRUCTION ROAD STABILIZATION - CRS WILL BE INSTALLED ALONG THE SOILS: PRE- CONS7RUCT7ON CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND CONSTRUCTION STAGING AREA. SEE SOIL SCHEDULE ON THIS SHEET AND THE PLAN SHEET FOR THE LOCATION OF THE SOILS. 240.55 PROPOSED SPOT ELEVAT70N EROSION & SEDIMENT CONTROL DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL NSPECRON. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED 3.05 SILT FENCE- SILT FENCE WILL BE PLACED ON THE DOWNSTREAM SIDE OF �/�- TBC DENOTES TOP /BACK OF CURB ACCORDING MINIMUM STANDARDS AND SPE THE VIRGINIA EROSION AND L T/B DENOTES TOP OF BOX MEASURES. EGUL 77ON V SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULA770NS vR 625 -02 -00 EROSION AND N J.07 STORM DRAINRINLET PROTECTION- P WILL BE INSTALLED ON EACH 1. N07/FYALBEMARLECCOUNTYTO SCHEDULEA PRE- CONSTRUCTION MEETING AS REQUIRED. * VIRGINIA EROSION & SEDIMENT CONTROL I SEROSION SEDIMENT CONTROL REGULATIONS 3 ALL MEASURES ARE To BE PLACED PRIOR TO OR AS PROPOSED INLET AS SHOWN ON THE PLANS. 2. NO EROSION CONTROL MEASURES MAYBE REMOVED DURING THE CONSTRUCTION PROCESS WITHOUT THEAPPROVAL FROM THE EROSION CON TROL SPECIFICA7)ON NUMBER WITH THE VIRGINEROSION A AND SEDIMENT CONTROL HANDBOOK. STRUCTURAL 7HE FIRST STEP IN CLEARING.CONTROL 3.08 CULVERT INLET PR07EC770N - CIP SHALL BE APPLIED TO THE INLET OF INSPECTOR ON THE PROJECT. * PRAC7ICES USED IN THIS SEC77ON CONSIST OF THE FOLLOWING: 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE THE PROPOSED CULVERTS ALONG CARROLL CREEK DRIVE AS NECESSARY 3• CONTRACTOR SHALL INSTALL TREE PROTECTION FENCING BEFOREANYSITE DISTURBANCE SHALL TAKE PLACE. CONTRACTOR SHALL USE MAINTAINED ON THE S17E AT ALL 77MES DOWNSTREAM OF THE PROPERTY TREE PROTECTION FENCING TO STAKEOUT THE LIMITS OF CLEARING AND DISTURBANCE ON -SITE. CONTRACTOR SHALL ENSURE THAT a r�r7� STRAW BAIL BARRIER 3.04 3.01 SAFETY FENCE 5. PRIOR TO COMMENCING LAND DISTURBING ACT7VI77ES IN AREAS 07HER THAN INDICATED TREES TO BE SAVED ARE FLAGGED ALONG THE LIMITS OF CLEARING TO ENSURE THE PROPOSED TREE PRESERVATION ACREAGE IS MET. ODD TEMPORARY DIVERSION DIKE 3.09 A PR07EC77VE BARRIER INSTALLED TO PREVENT ACCESS TO AN EROSION CONTROL MEASURE. TO PROHIBIT THE UNDESIRABLE USE OF AN EROSION CONTROL MEASURE BY 7HE PUBLIC. ON 7HESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO 3.09 TEMPORARY Di VERSION DIKE- DIVERSION DIKES WILL BE USED AROUND THE PERIMETER OF SITE DISTURBANCE WHERE SHOWN ON THE PLANS TO DIRECT DISTURBANCE OUTSIDE OF THE LIMITS OF CLEARING IS SOLELYPERMITTED FOR THE INSTALLATION OF THE EQUESTRIAN TRAILWAYAND SHALL BE INSTALLED WITHOUTANYCLEAR/NG OF EXISTING TREES. NOTE THAT THEREAREALSO AREAS TO BE FLAGGED ON THE APPLICABLE TO ANY CONTROL MEASURE OR SERIES OF MEASURES WHICH CAN BE CONSIDERED 7HE OWNER FOR REVIEW AND APPROVAL BY 7HE PLAN APPROVING AUTHORITY. RUNOFF TO ON -S17E SEDIMENT CONTROL FACILITIES. PROPERTY FOR SELECT TREE CLEARING. THE CLEARING AND LAND DISTURBANCE FOR THESE AREAS ARE INCLUDED /N THE OVERALL ST MOO V.'. TEMPORARY SEDIMENT TRAP 3.13 UNSAFE BY V1R7UE OF POT EN77AL ACCESS BY THE PUBLIC. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLA 77ON OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTA77ON AS 3.13 TEMPORARY SEDIMENT TRAP- TEMPORARY SEDIMENT TRAPS WILL BE DISTURBED AREA FOR THE DEVELOPMENT; HOWEVER, SELECT CLEARING SHALL BE PERFORMED BY THE OWNER AND CONTRACTOR FOR 3.02 CONSTRUCTION ENTRANCE, DETERMINED BY THE PLAN APPROVING AUTHORITY. INSTALLED WHERE SHOWN ON THE PLANS. THE DEVELOPMENT OF THE LOTS. THE TREES IN THESE AREAS ARE NOT REQUIRED TO BE SAVED OR MAINTAINED, BUT IN AN EFFORT TO & SEDIMENT BASIN 3.14 A STABILIZED PAVED CONSTRUCTION ENTRANCE W1774 A WASH RACK LOCATED AT POINTS OF 7. ALL D1S7URBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT 3.14 TEMPORARY SEDIMENT BASIN- TEMPORARY SEDIMENT BASINS WILL BE CREATE BETTER LOTS, THE OWNER AND CONTRACTOR SHALL PERFORM SELECT CLEARING AND GRADING WITHIN THESEAREAS FOR THE VEHICULAR INGRESS AND EGRESS ON A CONS7RUC77ON SITE TO REDUCE 774E AMOUNT OF ALL 77MES DURING LAND DISTURBING AC77W77ES AND DURING S17E DEVELOPMENT UN77L INSTALLED WHERE SHOWN ON THE PLANS DEVELOPMENT OF THE LOTS AND HOUSES THESE AREAS SHALL BE FLAGGED /NA DIFFERENT TREE PROTECT /ON TAPE SO THAT THE a �INLET PROTECTION 3.07 MUD TRANSPORTED ONTO PAVED PUBLIC ROADS BY MOTOR 11•H /CLES OR RUNOFF. CONSTRUCTION ENTRANCES SHALL BE INSTALLED AS SHOWN ON THE PLANS TO REDUCE THE FINAL STABILIZA 77ON IS ACHIEVED. & DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING 3.18 OUTLET PROTECTION- TO BE PROVIDED AT THE OUTFALL OF DRAINAGE CONTRACTORAND/ NSPECTORCAND/ STI NGUI SHTHESEAREASFROMTHEOVERALLLI MI TSOFDISTURBANCEFORTHEDEVELOPMENTOF AMOUNT SEDIMENT 7RANSPOR7ED ONTO PUBLIC ROADWAYS. DEVICE. PIPES WHERE SHOWN ON PLANS THE PROPERTY. SF SILT FENCE 3.05 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND 3.19 RIPRAP- RIPRAP SHALL BE INSTALLED AS OUTLET PROTECTION WHERE 4. INSTALL THE PAVED CONSTRUCTION ENTRANCE WITH WASH RACKAS SHOWN ON THE PLANS. CONSTRUCTION ENTRANCE TO BE INSTALLED ,x,03 CONS7RUC710N ROAD STABlL1ZA770N: AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR WHERE CONSTRUCTION VEHICLE ROUTES INTERSECT PAVED PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF THE TEMPORARY STABILIZATION OF ACCESS ROADS, SUBDIVISION ROADS, PARKING AREAS, AND CLEANUP TO MAINTAIN THE EFFEC77VENESS OF 7HE EROSION CON7ROL DEVICES SHALL BE SHOWN ON THE PLANS SEDIMENT BY (VEHICULAR) TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PUBLIC ROAD SURFACE, CE CONSTRUCTION ENTRANCE 3.02 OTHER SITE VEHICLE 7RANSPORTA 17074 ROUTES W17N STONE IMMEDIA 7FL Y AFTER GRADING. TO REDUCE EROSION OF TEMPORARY ROADBEDS BY CONS7RUC770N TRAFFIC DURING WET WEATHER MADE IMMEDtA7FL Y. 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 3.31 TEMPORARY SEEDING - TEMPORARY SEEDING SHALL BE APPLIED WHERE SHOWN ON THE PLANS THE ROAD SHALL BE CLEANED THOROUGHLYAT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BYSHOVELING AND TO REDUCE EROSION AND SUBSEQUENT REGARDING OF PERMANENT ROADBEDS BETWEEN 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL OR SWEEPING AND TRANSPORTING TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLYAFTER CD , CHECK DAM 3.20 774E 77ME OF 1N177AL GRADING AND FINAL STABILIZA RON. USE WHEREVER STONE -BASE ROADS OR PARKING AREAS ARE CQNSIRUC7FD, WHETHER PERMANENT OR TEMPORARY, FOR USE BY SHALL BE INERT MA 7ERIALS ONLY, FREE OF ROOTS, S7UMPS, WOOD, RUBBISH, AND 07HER DEBRIS. 3.32 PERMANENT SEEDING- PERMANENTLY SEEDING SHALL BE APPLIED WHERE SHOWN ON THE PLANS SEDIMENT IS REMOVED IN THIS MANNER. INSTALL THE WASH RACK UPHILL FROM PROPOSED SEDIMENT TRAP #1. ACSA WILL DETERMINE THEAPPROPR /ATE METHOD OF SUPPLYING THE WASH RACK. INSTALL THEACCESS FROM CARROL CREEK DRIVE AND THE PARKING AND CONSTRUCTION TRAFFIC 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLE7ON PER ZONING ORDINANCE SECTION 5.1.28. 3.35 MULCHING - MULCHING SHALL BE APPLIED TO ANY SEEDED AREA AS STAGING AREA WITH CONSTRUCTION ROAD STABILIZATION. CONSTRUCTION ROAD STAB ILIZATION SHALL CONSIST OF 4" OF 21A GRAVEL IN I., 3.10 3.05 SILT FENCE: 13. ALL INERT MA7ERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SEC77ON 13 -301 OF DEEMED NECESSARY FOR STABILIZA 77ON AND GROWTH. THE PARKING AREA, AND 8" OF 21A GRAVEL IN ANY PORTION OF THE CONSTRUCTION ENTRANCE WHICH IS UNPAVED. PARK /NG AND TEMPORARY FILL DI VERSION a A TEMPORARY SEDIMENT BARRIER CONSlS77NG OF A S1TlI74E77C FILTER FABRIC STRETCHED THE CODE OF ALBEMARLE. 3.36 SOIL STABILlZA770N BLANKETS AND MATTING BIM SHALL BE EMPLOYED CONSTRUCTION ENTRANCE AREAS SHALL BE CLEARED OFALL VEGETATION, ROOTS, OR OTHER OBJECTIONABLE MATERIALS BEFORE ACROSS AND ATTACHED TO SUPPOR77NG POSTS AND ENTRLNCHED, TO INTERCEPT AND DETAIN 14. BORROW, FILL OR WASTE AC77V7TY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7.• ROAM TO 9: OOPM. WHEREVER SHOWN ON THE PLANS OR WHERE SLOPES EXCEED J. 1 SLOPE. CONSTRUCTION ROAD STABILIZATION IS INSTALLED. DV - ` ----�- DIVERSION 3.72 SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS DURING CONSTRUC7ON OPERATIONS IN ORDER TO PREVENT SEDIMENT FROM LEAVING THE S17E", AND TO DECREASE 7HE VELOCITY OF 15. BORROW, FILL OR WASTE- AC77WTY SHALL BE CONDUCTED IN A SAFE MANNER THAN 3.38 TREE PRESERVATION AND PROTECTION- TREE PRESERVATION FENCING 5. INSTALL THE INITIAL PERIMETER CONSTRUCTION MEASURES AS SHOWN ON THE PHASE/ EROSION CONTROL PLAN SHEETS. THIS INCLUDES - SHEET FLOWS AND LOW TO- MODERATE LEVEL CHANNEL FLOWS. 174E SILT FENCE BARRIERS MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, SHALL BE INSTALLED WHERE SHOWN ON THE PLANS NO TREES SHALL BE 2 SEDIMENT BASINS AND 2 SEDIMENT TRAPS. SILT FENCE AND D /VERB /074 DIKES SHALL ALSO BE INSTALLED AT TH15 TIME STABILIZATION SHALL BE INSTALLED DOWN SLOPE OF AREAS WITH MINIMAL GRADES TO RL7FR SEDIMENT PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY HARMED OUTSIDE OF THE LIMITS OF TREE PR07EC77ON FENCING. MEASURESSHALL BEAPPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES, AND DIVERS IONS IMMEDIA TEL YAFTER INSTALLATION. a PS PERMANENT SEEDING 332 LADEN RUNOFF FROM SHEET FLOW AS INDICATED. THEY SHALL BE INSPECTED IMMEDIATELY PUBLIC STREET BECAUSE 0 SLIDES, SINKING, OR COLLAPSE. MEASURESI NTENDEDTOTRAPSEDI MENTSHALLBECONSTRUCTEDASAFIRSTSTEPWI THANYLANDD ISTURBANCEACTIVITYANDSHALL AFTER EACH RAINFALL AND MAINTAINED IN ACCORDANCE W17H 774E VIRGINIA EROSION & 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT 3.39 DUST CONTROL- DUST CONTROL SHALL BE APPLIED THROUGHOUT THE S17F BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. TO TO TOPSOlLING 3.30 SEDIMENT CON 1ROL HANDBOOK (VESCH). TO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, WHERE SHOWN ON THE PLANS. 6. INSTALL ANY REMAINING EROSION CONTROL ITEMS AS SHOWN ON THE PHASE/ EROSION CONTROL PLAN. 7. ONCE ALL THE EROSION CONTROL ITEMS HAVE BEEN INSTALLED AS SHOWN ON THE PHASE/ EROSION CONTROL PLAN AND THE UNIT, BUILDING OR 07HER PORTION OF THE PROPERTY 3.07 STORM DRAIN INLET PROTECTION.• 17. TEMPORARY STABILIZA 77ON SHALL BE 7EMPORARY SEEDING AND MULCHING SEEDING IS TO STORM WA TER MANAGEMENT INSPECTOR HAS APPROVED THE EROSION CONTROL MEASURES, THE CONTRACTOR BEGIN GRADING OPERATIONS. /-� ClP iI CULVERT INLET PROTECTION J. A SEDIMENT FILTER OR AN EXCAVATED IMPOUNDING AREA AROUND A STORM DRAIN DROP DRAINAGE SYSTEMS INLET OR CURB INLET. TO PREVENT SEDIMENT FROM ENTERING STORM DRA! •-i �• F s P c B T^ "ARY v CONSIST A BE AT �5 LBS ACRE, AND 1111 THE MON774 O E M ER / O FEBRUARY 50150 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO THROUGH - -- S TORMWA IFFY RUNOFF QUANTITY WILL BE TREATED D ON -SITE THE USE T �^ r r 1 r & ROUGH GRADE THE SITE TO THE CON, BURS SHOWN ON THE HE EROSION .CONTROL PLAN. ENSURE THAT , ,YE D, VE,4SION DIKES MAIN, AIN A TO TO THE SEDIMENT TRAPS AND BASINS, AS SHOWN ON BOTH PHASE 1 AND PHASE// OF THE PRIOR TO PERMANENT STABILIZATION OF THE DISTURBED AREA. INLET PROTECTION APPLIES OF BIOFIL7ERS. SEE STORMWATER MANAGEMENT PLAN SHEETS POSITIVE SLOPE DIVERT ALL RUN -OFF WHERE STORM DRAIN INLETS ARE TO BE MADE OPERA77ONAL BEFORE PERMANENT CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. EROSION AND SEDIMENT CONTROL PLAN. OC DC --► DUST CONTROL 3.39 STABILIZA77ON OF THE CORRESPONDING DISTURBED DRAINAGE AREA. STRAW MULCH IS TO BE APPLIED AT 80LBS /t00SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 9. PERMANENTOR TEMPORARY SOIL STAB IL IZAT ION SHALL BE APPLIED TODENUDEDAREASWITHIN SEVEN DAYS AFTER FINAL GRADES REACHED ON ANY PORTION OF THE SITE. TEMPORARYSOILSTABI LI ZATI ONSHALLBEAPPLI EDWITHINSEVENDAYSTODENUDEDAREAS 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTIL /ZER, PERMANENT SEEDING, AND MAINTENANCE.' 3.08 C ULVERT INLET PROTECTION: A SEDIMENT FILTER LOCATED AT THE INLET TO STORM SEWER CULVERTS. TO PREVENT MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS 11000SF, IN GENERAL, DURING CONS7RUC170N THE RLD OR CONTRACTOR ON -SITE WILL CHECK THAT MAY NOT BEATF /NAL GRADE BUT WILL REMAIN DORMANT ( UND ISTURBED) FOR LONGER THAN 30DAYS. PERMANENT TSD I --- TEMPORARY SLOPE DRAIN 3.15 O SEDIMENT FROM EN7ERING, ACCUMULATING IN AND BEING TRANSFERRED BY A CULVERT AND INCORPORATED INTO THE TOP 4 -6 INCHES OF SOIL. FER77LIZER SHALL BE APPLIED AT ALL EROSION AND SEDIMENT CONTROL MEASURES DAILY AND AFTER EACH STABILIZATION SHALL BEAPPLIED TO AREAS THA TARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. ASSOCIATED DRAINAGE SYSTEM PRIOR TO PERMANENT STABILIZA7ION OF A DISTURBED 1000LBS /ACRE AND CONSIST OF A 10 -20 -10 NUTRIENT MIX. PERMANENT SEEDING SHALL SIGNIFICANT RAINFALL. MONITORING REPORTS WLL BE REQUIRED FROM THE RLD IF 10. INSTALL THE CONSTRUCTION MEASURES AS SHOWN ON THE PHASE H EROSION CONTROL PLAN SHEETS. MEASURES INTENDED TO TRAP PROJECT AREA. TO PROVIDE EROSION CONTROL AT CULVERT INLETS DURING THE PHASE OF A BE APPLIED AT 180LBS /ACRE AND CONSIST OF 95X KENTUCKY 31 OR TALL FESCUE AND NEEDED. SPECIFIC AT7EN770N WILL BE GIVEN TO THE FOLLOWING !TAMS. SEDIMENTSHALL BE CONSTRUCTED ASA FIRSTSTEP WITH ANY LAND DISTURBANCEACTIVITYAND SHALL BE MADE FUNCTIONAL BEFORE SA 6�588� SAFETY FENCE 3.01 PROJECT WHERE ELEVATION AND DRAINAGE PATTERNS CHANGE, CAUSING ORIGINAL CONTROL REMOVAL. WHERE CULVERT AND ASSOClATED 0 -57 PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS S7RAW MULCH IS TO BE APPLIED AT ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION a. SEDIMENT BASINS AND OR TRAPS WILL BE CLEANED AND MAINTAINED IN UPSLOPE LAND DISTURBANCE TAKES PLACE. MEASURES TO BE INEFFECTIVE OR IN NEED OR ACCORDANCE KITH THE VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK. 11. INSTALL THE UTILITIES AND ROADS. INLETPROTECTION SHALL BE INSPECTED AFTER EACH RAINFALL EVENTANDREPA /RS SHALL BE MADE DRAINAGE SYSTEM /S TO BE MADE OPERATIONAL PRIOR TO PERMANENT STABILIZA 77ON OF THE DISTURBED AREA. TROL INSPECTOR. CONTROL INSPECTOR. 19. MA1N7ENANCE.• ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH & ALL INLET PROTECTION AND GRAVEL OUTLETS WILL BE CHECKED REGULARLY FOR AS NEEDED. IF THE STONE FILTER BECOMES CLOGGED WITH SEDIMENT SO THAT IT NO LONGER ADEQUATELY PERFORMS ITS FUNCTION, >�■ R �� TEMPORARY RIGHT -OF -WAY 3.11 RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES 1S TO BE REPAIR SEDIMENT BUILDUP THAT WILL PREVENT PROPER DRAINAGE. IF THE GRAVEL IS THE STONE MUST BE PULLED AWAYAND CLEANED AND /OR REPLACED. INSTALL ANY REMAINING EROSION CONTROL ITEMS AS SHOWN ���✓✓✓ DIVERSION 3.09 7E-MPORARYDIVERSION DIKE: IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 5OX OF THE WET STORAGE VOLUME CLOGGED BY SEDIMENT, THE GRAVEL WILL BE REMOVED AND CLEANED, OR IT WILL ON THE PHASE II EROSION CONTROL PLAN. A TEMPORARY RIDGE OF COMPACTED SOIL CONSTRUCTED AT THE TOP OR BASE OF A SLOPING IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY BE REPLACED. 12 ONCE PHASE ll OF CONSTRUCTION IS COMPLETE AND WITHIN 30 DA YS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY TO ACHIEVE A GOOD STAND OF GRASS SILT FENCE AND DIVERSION DYKES WHICH ARE Source: Va. DSWC DISTURBED AREA. TO DIVERT STORM RUNOFF FROM UPSLOPE DRAINAGE AREAS AWAY FROM UNPROTECTED DISTURBED AREAS AND SLOPES TO A STABILIZED OUTLET. TO DIVERT COLLEC77NG SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED C. ALL ,>1L.1 FENCE BARRIERS WLL BE CHECKED REGULARLY FOR UNDERMINING OR DETERIORA77ON OF THE FABRIC AND REPAIRED AS REQUIRED. SEDIMENT SHALL MEASURES ARE NO LONGER NEEDED, AND ONCE THE INSPECTOR HAS GIVEN APPROVAL, THE CONTRACTOR CAN REMOVE THE EROSION SEDIMENT -LADEN RUNOFF FROM A DISTURBED AREA TO A SEDIMENT - TRAPPING FACILITY SUCH IMMEDIATELY. BE REMOVED WHEN THE LEVEL OF SEDIMENT DEPOS177ON REACHED HALF WAY TO CONTROL MEASURES. NO ITEM SHALL BE REMOVED UNLESS THE UPSTREAMAREASARESTABiIIZEDANO THE INSPECTOR GIVES AS A SEDIMENT TRAP OR SEDIMENT BASIN. USE WHEREVER STORMWATE-R RUNOFF MUST BE 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED THE TOP OF THE BARRIER. PERMISSION. TEMPORARILY DIVERTED TO PROTECT DISTURBED AREAS AND SLOPES OR RETAIN SEDIMENT ON WITHIN 30 DAYS OF FINAL S17E STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, d. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND 13. MAINTAIN ALL EROSION CONTROL MEASURES AS SPECIFIED IN THE VIRGINIA ER05I ON AND SEDIMENT CONTROL HANDBOOK, REMOVING SITE DURING CONSTRUCTION. THESE STRUCTURES GENERALLY HAVE A LIFE EXPECTANCY OF 18 SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. IS MAINTAINED. AREAS SHOULD BE FERTILIZED AND RESEEDED AS NEEDED. ONLY WHEN APPROVED BY THE LOCAL PROGRAM ADMINISTRATOR IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT MON774S OR LESS, WHICH CAN BE PROLONGED WITH PROPER MAINTENANCE. 21. THIS PLAN SHALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMIT W177-IIN 1 YEAR OF 774E DATE OF APPROVAL. WATER PR07EC77ON ORDINANCE SEC77ON 17 -204G. { ) IN CASE OF EMERGENCY, THE PRIMARY CONTACT FOR THE PROJECT WILL BE THE RLD CONTROL HANDBOOK. 3.13 TEMPORARY SEDIMENT TRAP: 22. PERMANENT VEGETATION SHALL BE INSTALLED ON ALL DENUDED AREAS WITHIN NINE (9) OR CONTRACTOR ON -SITE. THE CONTRACTOR WILL BE DETERMINED A T 774E 77ME THE 14. UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM ADMINISTRATOR. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS A TEMPORARY PONDING AREA FORMED BY CONS7RUC77NG AN EARTHEN EMBANKMENT WITH A MONTH S AFTER THE DATE THE LAND DISTURBING ACTIVITY COMMENCED. (WATER CONTRACT IS AWARDED. IN ADDITION THE OWNER MAY BE CONTACTED, MR. ALAN T EROSION RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY S A BILIZED TO PREVENT FURTHER HE AND STONE OUTLET. TO DETAIN SEDIMENT -LADEN RUNOFF FROM SMALL DISTURBED AREAS LONG PROTECTION ORDINANCE SEC77ON 17 -207B) TAYLOR. UPON COMPLETION OF THE PROJECT, THE OWNER WILL BE RESPONSIBLE SEDIMENTATION. ENOUGH TO ALLOW THE MAJORITY OF 774E SEDIMENT TO SETTLE OUT USE BELOW DISTURBED FOR SITE MAINTENANCE. IMPROVE WILDLIFE HABITAT. TO ENHANCE NATURAL BEAUTY. UPON COMPLE7ON OF S AREAS WHERE 7HE TOTAL CONTRIBU77NG DRAINAGE AREA IS LESS 77-IAN 3 ACRES, WHERE THE SOIL DESCRIPTION IIIIIIIIIIIIIIIIIIIIIIIIII SEDIMENT TRAP WILL BE USED NO LONGER THAN 18 MON7HS, AND IT MAY BE CONSTRUCTED CONSTRUCTION AC71V/77ES, ALL AREAS WILL RECEIVE' A PERMANENT VEGETATIVE COVER. SECTION A -A __m EITHER INDEPENDENTLY OR IN CONJUNC77ON W7774 A TEMPORARY DIVERSION DIKE. 16 - CHEWACLA SILT LOAM (0 TO 27 SLOPES) � TABLE 331 -B 314 TEMPORARY SEDIMENT BASIN: SOIL IS DEEP, NEARLY LEVEL AND SOMEWHAT POORLY DRAINED. CUB INLET ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS A TEMPORARY BARRIER OR DAM KITH A CONTROLLED STORMWATER RELEASE STRUCTURE AR BROWN SILT LOAM ABOUT 8" THICK, UPPER SURFACE LAYER IS DARK , Lo - FORMED BY CONSTRUCTING AN EMBANKMENT OF COMPACTED SOIL ACROSS A DRA/NAGEWA Y. SUBSOIL LAYER TO ABOUT A DEPTH OF 26" THICK AND IS MOSTLY PALE APPLICA77ON OF PLANT RESIDUES OR OTHER SUITABLE MATERIALS TO 774E SOIL SURFACE. TO -._ O F � - "QUICK REFERENCE FOR ALL REGIONS" TO DETAIL SEDIMENT -LADEN RUNOFF FROM DISTURBED AREAS IN "WET" AND `DRY" STORAGE BROWN AND LIGHT YELLOWISH BROWN SILT LOAM AND SILTY CLAY LOAM LONG ENOUGH FOR THE MAJORITY OF THE SEDIMENT TO SETTLE OUT. APPLIES BELOW WITH LIGHT GRAY MOTTLES, LOWER PART OF SUBSOIL TO A DEPTH OF Rate Planting Dates cis ac DISTURBED AREAS WHERE THE TOTAL CON7RIBU77NG DRAINAGE AREA IS EQUAL TO OR 60" OR MORE IS LIGHT BROWNISH GRAY AND YELLOWISH BROWN SILTY THE VELOCITY OF OVERLAND FLOW. TO FOSTER THE GROWTH OF VEGETATION BY INCREASING GREATER THAN THREE ACRES THERE MUST BE SUFFICIENT SPACE AND APPROPRIATE CLAY LOAM AND SILT LOAM. r n TOPOGRAPHY FOR THE C0NS7RUC77ON OF A TEMPORARY IMPOUNDMENT. `__ - - � Sept. 1 -Feb- 15 50/50 Mix of 51B - MANTEO CHANNERY SILT LOAM (27 TO 79 SLOPES) n- N 9� " " .;: T Annual Ryegrass 3.18 OUTLET PROTECTION: STRUCTURALLY LINED APRONS OR OTHER ACCEPTABLE ENERGY DISSIPA71NG DEVICES PLACED SOIL IS SHALLOW, GEN7L Y SLOPING AND SOMEWHAT EXCESSIVELY WARE SCREEN -l� CONCRE7E BLOCK (Lolium muki- florum) & 50-100 AT 174E OUTLETS OF P /PES OR PAVED CHANNEL SECTIONS TO PREVENT SCOUR AT DRAINED. SURFACE LAYER IS VERY DARK GRAYISH BROWN AND BROWN - Cereal (Winter) Rye STORMWATER OUTLETS, TO PROTECT 774E OUTLET STRUCTURE, AND TO MINIMIZE 774E P07EN77AL SILT LOAM ABOUT 6" THICK. SUBSOIL IS YELLOWISH BROWN, FR /ABLE GRAVEL' FIL7ER (Seale cereale) FOR DOWNS7REAM EROSION BY REDUCING 7HE VELOCITY AND ENERGY OF CONCEN7RA7ED " " OR /5 COARSE AGGREGATE STORMWATER FLOWS APPLICABLE TO 774E OUTLETS OF ALL PIPES AND ENGINEERED CHANNEL ABOUT 8 THICK. SUBSTRATUM !S ABOUT 4 774 /C,K AND /S BROWNISH TIDTAL LBS YELLOW. BEDROCK IS AT A DEPTH OF 18': BLOCK & GRAVEL CURB INLET Feb. 16 - Apr. 30 Annual Ryegrass 60-100 GElEItAL SLQPE (fit OR LESS PER.� SECTIONS. IP 3.07 -8 (Loti� multi- flolvm) KENTUCKY 31 FESCUE 128 Les. 319 RIPRAP: 51C - MANTEO CHANNERY SILT LOAM (77 TO 157 SLOPES) SEDIMENT FILTER RED TOP GRASS 2 LBS. A PERMANENT, EROSION - RESISTANT GROUND COVER OF LARGE, LOOSE, ANGULAR STONE WITH SOIL IS SHALLOW STRONGLY SLOPING AND SOMEWHAT EXCESSIVELY NO SCALE , SEASONAL NURSE CROP 20 LBS. FILTER FABRIC OR GRANULAR UNDERLINING. TO PROTECT 774E SOIL FROM THE EROSIVE DRAINED. SURFACE LAYER IS VERY DARK GRAYISH BROWN AND BROWN FORCES OF CONCENTRATED RUNOFF, SLOW THE VELOCITY OF CONCENTRATED RUNOFF WHILE SILT LOAM ABOUT 6" THICK. SUBSOIL IS YELLOWSH BROWN, FRIABLE SEASONAL. NURSE CROP 150 LBS ENHANCING 774E P07EN77AL FOR INFILTRATION, AND TO STAFILIZE SLOPES WITH SEEPAGE ABOUT 8" 77­11CK. SUBS7RATUM IS ABOUT 4" THICK AND IS BROWNISH PROBLEMS, AND /OR NON - COHESIVE SOILS USE WHEREVEP SOIL AND WATER IN7FRFACE AND YELLOW. BEDROCK IS AT A DEPTH OF 18". FEBRUARY 16 THROUGH APRIL ANNUAL RYE 7HE SOIL CONDITIONS, WATER TURBULENCE AND VELOCITY, EXPECTED VEGETA77VE COVER, ETC, MAY 1 THROUGH AUGUST 15 FOXTAIL MILLET ARE SUCH THAT THE SOIL MAY ERODE UNDER 774E DESIGN FLOW CONDITIONS. 51D - MANTEO CHANNERY SILT LOAM 159. TO 257 SLOPES AUGUST 16 THROUGH OCTOBER ANNUAL RYE NOVEMBER THROUGH FEBRUARY 15 WINTER RYE 3.31 TEMPORARY SEEDING: SOIL 1S SHALLOW, MODERATELY SLOPING AND SOMEWHAT EXCESSIVELY NOTES: 774E ESTABLISHMENT OF A TEMPORARY VEGETA77VE COVER ON DISTURBED AREAS BY SEEDING DRAINED. SURFACE LAYER IS VERY DARK GRAYISH BROWN AND BROWN WITH APPROPRIATE" RAPIDLY GROWING ANNUAL PLANTS TO REDUCE EROSION AND SILT LOAM ABOUT 6" THICK. SUBSOIL IS YELLOWISH BROWN, FRIABLE 1. LIME AND FERTILIZER NEEDS SHALL BE DETERMINED BY SOIL SEDIMENTA77ON BY STABILIZING DISTURBED AREAS THAT WILL NOT BE BROUGHT TO FINAL ABOUT 8" THICK. SUBSTRATUM IS ABOUT 4" THICK AND IS BROWNISH TESTS AND APPLIED IN ACCORDANCE WITH VESCH STD. 3.32. GRADE FOR A PERIOD OF A410RE THAN 30 DAYS TO REDUCE DAMAGE FROM SEDIMENT AND YELLOW. BEDROCK IS AT A DEPTH OF 18 ". 2. SEEDINGS TO BE MULCHED IMMEDIATELY UPON COMPLETION RUNOFF TO DOWNSTREAM OR OFF -SITE- AREAS, AND TO PROVIDE PR07ECT70N TO BARE SOILS OF SEED APPLICATION, IN ACCORDANCE W/ VESCH STD 3.35. EXPOSED DURING CONSTRUCTION UN77L PERMANENT VEGETA77ON OR OTHER EROSION CONTROL 62B - NASON SILT LOAM (27 TO 77 SLOPES) MEASURES CAN BE ESTABLISHED. SOIL IS DEEP, GENTLY SLOPING AND WELL DRAINED. SURFACE LAYER IS May 1 - Aug 31 German Millet 50 (Solaria italics) I L Source: Va. DSWC _� SECTION A -A THEMSELVES, CAN BE USED IN CONJUNCTION W774 7E•MPORARY SEEDING. 3.36 SOIL STABILIZA77ON BLANKETS & MAT77NG: 774E INSTALLA77ON OF A PROTECTIVE COVERING (BLANKET) OR A SOIL STABILIZATION MAT ON A PREPARED PLAN77NG AREA OF A STEEP SLOPE, CHANNEL OR SHORELINE. TO AID IN 4 IF -1 II I I II II I I II 4' II 1 1 II II 1 1 1 t II I RISER CREST ELEVATION S PIPE OUTLET CONDITIONS 318-} NO SCALE POSTS MIN. SIZE 4" SQUARE CONTROLLING EROSION ON CRITICAL AREAS BY PROVIDING A MICROGLIMATE WHICH PROTECTS OR 5" ROUND. SET AT YOUNG VEGETATION AND PROMOTES ITS ESTABLISHMENT. APPLIES ON SHORT, STEEP SLOPES 8' LEAST 3' INTO THE GROUND WHERE EROSION HAZARD IS HIGH AND PLAN77NG IS LIKELY TO BE TOO SLOW IN PROVIDING H H -t ADEQUATE- PR07E-CTIVE COVER. SHALLOW 3 38 TREE PRESERVA770N AND PR07E'G770N• SLOPE ''+ OMERSION U1TCH """"'"� ! ' I PAW MINIMUM WIDTH AT Tp PM OLVIOLVICE it DESIGN WATER C.EVATION IS 4.0' PLAN VIEW MUST EXTEND FULL YAM OF INGRESS AND EGRESS OPERATION SET 1 t /2- WATER HYDRANT WITH FROST . - --- ---^2% fir, MM,� PROOF HYDRANT 3• 4 ABOVE GRADE AND 4' OFF EDGE OF PAVEMENT. SECTION A -A NOTE: A MINIMUM WATER TRAP OF 1- IS REQUIRED WITH A MINIMUM WASH HOSE DIA. OF 1.5- 5 PAVED TEMP COW SM 9 sa1IF lira ATTACH FILTER FABRIC TO STAKES OR POSTS & EXTEND IT INTO TRENCH WOODEN STAKE STEEL POST, = 5' MIN. EXCAVATED SOIL COMPAC EDD AND 4 "x4" TRENCH J SIL T FENCE sF (WI THOU T WIRE SUPPOR T) 05- NO SCALE ; FENCING AND ARMORING � i 1 .,'. •r. y V tj t (� Irav �,R i SNOW FENCE `� C �.I 'f �,,� 00 so ?. ` 00 k I III ! so I I I d I: I I,,,� j � j�'I, l : 90WO PENCE 00 ! CM FENCE CORRECT METHODS r,7 r • �I% �i . CORRECT ARMORING :�••� 1992 3.08 SILT FENCE CULVERT INLET PROTECTION . 1 -- __- - -- -------- - - - - -- - - -- j It ,, -, . ra a nA - t- sawn I _� _ __ ` -- - - -' me OF "I T4T DKY f *owmm is OIS` Y ' IF fu. I OPTIONAL STONE COMBINATION ** "...'.. i _ I T, V_ ati� oa f5 ca+�st +ronaare ,--a,, + ma., MGM S'a.ORtY aF RON K IXPCCTFD Source: Adapted from VDOT Standard Sheets and Va. DSWC 111.44 PR07EC77ON OF DESIRABLE' TREES FROM MECHANICAL OR 07HER INJURY DURING LAND , W ON S A L SLOPES, SMIPS "" NPIT TECTIVE COVERINGS DISTURBING AND CONSTRUCTION AC77WTY. TO ENSURE THE SURVIVAL OF DESIRABLE 7REES - I BE APPLIED ACROSS BERM WHERE THEY WILL BE EFFEC77VE FOR EROSION AND SEDIMENT CONTROL, WATERSHED - THE SLOPE. PROTFC77ON, LANDSCAPE BEAUTIFICATION, DUST AND POLLU77ON CONTROL, NOISE REDUCTION, 1. SET POSTS AND EXCAVATE A 4 "X4" 2. STAPLE WIRE FENCING TO THE POSTS. J. ATTACH THE FILTER FABRIC TO 4. BACKFILL AND COMPACT THE -1 WHERE THERE IS A BERM AT THE TOP OF THE SLOPE SHADE AND 07HER ENVIRONMENTAL BENEFITS WHILE 774E LAND IS BEING CONV£R7ED FROM TRENCH UPSLOPE ALONG THE LINE THE WRE FENCE AND EXTEND EXCAVATED SOIL. r., BRING THE MATERIAL OVER THE BERM AND ANCHOR It FOREST TO URBAN -TYPE USES APPLIES IN TREE- INHABl7E•D AREAS SUBJECT TO LAND ,,,: BEHIND THE BERM. OF POSTS. IT INTO THE TRENCH. I I -. DISTURBING ACTT V17TES _ 4" 1. 339 DUST CONTROL: BRING MATERIAL DOWN TO A LEVEL AREA BEFORE STEEP REDUCING SURFACE AND AIR MOVEMENT OF DUST DURING LAND DISTURBING, DEMOL17ION AND TERMINATING THE INSTALLATION„ TURN THE END SLOPE �-� / UNDER 4 AND STAPLE AT 12 INTERVALS CONS7RUC17ON AC71V171ES TO PREVENT SURFACE AND AIR MOVEMENT OF DUST FROM -- / _ - ` .' :.: `:; : - ,_ "::,; °: t . ';' _ 12" 11 /_ G I .. :. . :..... !I /` EXPOSED SOIL SURFACES AND REDUCE 774E PRESENCE OF AIRBORNE SUBSTANCES WHICH MAY I I!' ,._.. PRESENT HEALTH HAZARDS, TRAFFIC SAFETY PROBLEMS OR HARM ANIMAL OR PLANT LIFE. � -� /� � , 41qq � I � DITCH ..; F LOW DUST CONTROL MEASURES SHALL BE EMPLOYED TO PREVENT SURFACE AND AlR MOVEMENT OF ( / _� IN DITCHES APPLY PROTECTIVE COVERING DUST DURING CONSTRUCTION. MEASURES EMPLOYED SHALL BE IN ACCORDANCE W97H THE "' _ - - PARALLEL fo THE DIRECTION OF FLOW. - '' > VESCH. //��` I // -+�` =- 01 ----- �fI I 11= ��" USE CHECK SLOTS AS REQUIRED. AVOID _ / 1 _, _ / T -� - W11AIIAW1 1 /ArCO /AI IAI Tl1C nCA1=0 /'1C '1 / /�/ `_ r G- G� -) i I_ III= ' '" - - III -I I !='' 1 ' 1 - -1 I I- , � I ! 11 11- SIL T FENCE sF (WITH WIRE SUPPORT) 05-2 NO SCALE I_--,.--- EXTENSION OF FABRIC AND WRE INTO THE TRENCH. ON SLOPES APPLY O DIRECTION lOF FLOWLLEL AND ANCHOR SECURELY. Plate 3:08.1 1. . ; i%wm B/M SOIL STABILIZA TION BLANKET No TREA T MENT 1 SOIL STABILIZ477ON MArnNG MATERIAL SHALL BE INSTALLED AS NO SCALE REQUESTED BY 774E ALBEMARLE COUNTY EROSION CONTROL INSPECTOR �,TH 00� °, ��� ,_1 SCOTT R. COLLINS'Z U No. 35791 ,2 1,11,; w� o��SSIOVAL ElI OA z O a CC U m w 0 z O > w z 0 w H N W 1n 1n -4 1-4 O N � Ln 0 o z 0 0 O_ h ¢ tom ' - I- U Lf) � � � a N O O o a � � 4 z) � w Z O O Ce Of 13� a- a U) U) w w ce QY to to 111 - ,4 -4 M Lfl kD L) 0-1 40� ® � N mI- It M Nt ar, W N W J ® _` V U) w z° J Q WO Y Ul W � W Z w w I U) j W '4 r@71.. N z :5 CL U�.,� O H CL F- 3: C1 Q I z U 0 [V pe z 0 0 a z U a o z� P-4 W y [a- 5- -6 U W LU 0 o a 06 W z� � 0� v t+ O W � 1 _III \/ 1 J a 6 v D 0 z WE 0 LU z z z Lr (D L 2 z C 2 a c `C w v J b F- r In w s w a a I U') Q JOB NO. ,I 142109 SCALE 1C N/A I I SHEET NO. 3 I PERMANENT SEEDING SCHEDULE 3 STABILlZAT70N: G GRAYISH BROWN AND YELLOWISH BROWN SILT LOAM AND ABOUT 8" THICK. PS P NO SCALE T 332 PERMANENT S SUBSOIL IS MOSTLY YELLOWISH RED AND STRONG BROWN SILTY CLAY SEED. TO REDUCE EROSION AND DECREASE SEDIMENT WELD FROM DISTURBED AREAS TO L LOAM ABOUT 31" THICK. SUBSTRATUM TO A DEPTH OF ABOUT 50" IS A A 4 STD. &SPEC. 3.32 OF VIRGINIA EROSION & S PERMANENTLY STABILIZE DISTURBED AREAS IN A MANNER THAT IS ECONOMICAL, ADAPTABLE TO M MOSTLY 57RONG BROWN, YELLOWISH BROWN AND RED SILT LOAM. SEDIMENT CONTROL HANDBOOK, 3RD ED.) S SITE CONDITIONS, AND ALLOWS SELEC77ON OF 7HE MOST APPROPRIATE PLANT MATERIALS TO d d 4 IMPROVE WILDLIFE HABITAT. TO ENHANCE NATURAL BEAUTY. UPON COMPLE7ON OF S CONSTRUCTION AC71V/77ES, ALL AREAS WILL RECEIVE' A PERMANENT VEGETATIVE COVER. SECTION A -A PIPE OUTLET TO FLAT AREA WA7H NO DEFINED CHANNEL 411 3.35 MULCHING.• L Lo APPLICA77ON OF PLANT RESIDUES OR OTHER SUITABLE MATERIALS TO 774E SOIL SURFACE. TO PREVENT EROSION BY PR07EC77NG THE SOIL SURFACE FROM RAINDROP IMPACT AND REDUCING S SEDIMENT BASIN BAFFLE DETAIL r THE VELOCITY OF OVERLAND FLOW. TO FOSTER THE GROWTH OF VEGETATION BY INCREASING r n AVAILABLE MOISTURE AND PROVIDING INSULA77ON AGAINST EXTREME HEAT AND COLD. AREAS N NO SCALE I n- N 9� " " .;: T I 1 WHICH HA VE BEEN PERMAN'EN R Y SEEDED SHOULD BE MULCHED IMMEDIA TEL Y FOLLOWING - - 1 SEEDING. AREAS WHICH CANNOT BE SEEDED BECAUSE OF THE SEASON SHOULD BE MULCHED S SHEETS OF 4 x8'xj' EXTERIOR d d USING ORGANIC MULCH. MULCH MAY BE USED TOGEMER WITH PLAN77NGS OF TREES, SHRUBS, P PLYWOOD OR EQUIVALENT " } } P OR CERTAIN GROUND COVERS WHICH DO NOT PROVIDE ADEQUA7E SOIL STABILIZA 77ON BY _ THEMSELVES, CAN BE USED IN CONJUNCTION W774 7E•MPORARY SEEDING. 3.36 SOIL STABILIZA77ON BLANKETS & MAT77NG: 774E INSTALLA77ON OF A PROTECTIVE COVERING (BLANKET) OR A SOIL STABILIZATION MAT ON A PREPARED PLAN77NG AREA OF A STEEP SLOPE, CHANNEL OR SHORELINE. TO AID IN 4 IF -1 II I I II II I I II 4' II 1 1 II II 1 1 1 t II I RISER CREST ELEVATION S PIPE OUTLET CONDITIONS 318-} NO SCALE POSTS MIN. SIZE 4" SQUARE CONTROLLING EROSION ON CRITICAL AREAS BY PROVIDING A MICROGLIMATE WHICH PROTECTS OR 5" ROUND. SET AT YOUNG VEGETATION AND PROMOTES ITS ESTABLISHMENT. APPLIES ON SHORT, STEEP SLOPES 8' LEAST 3' INTO THE GROUND WHERE EROSION HAZARD IS HIGH AND PLAN77NG IS LIKELY TO BE TOO SLOW IN PROVIDING H H -t ADEQUATE- PR07E-CTIVE COVER. SHALLOW 3 38 TREE PRESERVA770N AND PR07E'G770N• SLOPE ''+ OMERSION U1TCH """"'"� ! ' I PAW MINIMUM WIDTH AT Tp PM OLVIOLVICE it DESIGN WATER C.EVATION IS 4.0' PLAN VIEW MUST EXTEND FULL YAM OF INGRESS AND EGRESS OPERATION SET 1 t /2- WATER HYDRANT WITH FROST . - --- ---^2% fir, MM,� PROOF HYDRANT 3• 4 ABOVE GRADE AND 4' OFF EDGE OF PAVEMENT. SECTION A -A NOTE: A MINIMUM WATER TRAP OF 1- IS REQUIRED WITH A MINIMUM WASH HOSE DIA. OF 1.5- 5 PAVED TEMP COW SM 9 sa1IF lira ATTACH FILTER FABRIC TO STAKES OR POSTS & EXTEND IT INTO TRENCH WOODEN STAKE STEEL POST, = 5' MIN. EXCAVATED SOIL COMPAC EDD AND 4 "x4" TRENCH J SIL T FENCE sF (WI THOU T WIRE SUPPOR T) 05- NO SCALE ; FENCING AND ARMORING � i 1 .,'. •r. y V tj t (� Irav �,R i SNOW FENCE `� C �.I 'f �,,� 00 so ?. ` 00 k I III ! so I I I d I: I I,,,� j � j�'I, l : 90WO PENCE 00 ! CM FENCE CORRECT METHODS r,7 r • �I% �i . CORRECT ARMORING :�••� 1992 3.08 SILT FENCE CULVERT INLET PROTECTION . 1 -- __- - -- -------- - - - - -- - - -- j It ,, -, . ra a nA - t- sawn I _� _ __ ` -- - - -' me OF "I T4T DKY f *owmm is OIS` Y ' IF fu. I OPTIONAL STONE COMBINATION ** "...'.. i _ I T, V_ ati� oa f5 ca+�st +ronaare ,--a,, + ma., MGM S'a.ORtY aF RON K IXPCCTFD Source: Adapted from VDOT Standard Sheets and Va. DSWC 111.44 PR07EC77ON OF DESIRABLE' TREES FROM MECHANICAL OR 07HER INJURY DURING LAND , W ON S A L SLOPES, SMIPS "" NPIT TECTIVE COVERINGS DISTURBING AND CONSTRUCTION AC77WTY. TO ENSURE THE SURVIVAL OF DESIRABLE 7REES - I BE APPLIED ACROSS BERM WHERE THEY WILL BE EFFEC77VE FOR EROSION AND SEDIMENT CONTROL, WATERSHED - THE SLOPE. PROTFC77ON, LANDSCAPE BEAUTIFICATION, DUST AND POLLU77ON CONTROL, NOISE REDUCTION, 1. SET POSTS AND EXCAVATE A 4 "X4" 2. STAPLE WIRE FENCING TO THE POSTS. J. ATTACH THE FILTER FABRIC TO 4. BACKFILL AND COMPACT THE -1 WHERE THERE IS A BERM AT THE TOP OF THE SLOPE SHADE AND 07HER ENVIRONMENTAL BENEFITS WHILE 774E LAND IS BEING CONV£R7ED FROM TRENCH UPSLOPE ALONG THE LINE THE WRE FENCE AND EXTEND EXCAVATED SOIL. r., BRING THE MATERIAL OVER THE BERM AND ANCHOR It FOREST TO URBAN -TYPE USES APPLIES IN TREE- INHABl7E•D AREAS SUBJECT TO LAND ,,,: BEHIND THE BERM. OF POSTS. IT INTO THE TRENCH. I I -. DISTURBING ACTT V17TES _ 4" 1. 339 DUST CONTROL: BRING MATERIAL DOWN TO A LEVEL AREA BEFORE STEEP REDUCING SURFACE AND AIR MOVEMENT OF DUST DURING LAND DISTURBING, DEMOL17ION AND TERMINATING THE INSTALLATION„ TURN THE END SLOPE �-� / UNDER 4 AND STAPLE AT 12 INTERVALS CONS7RUC17ON AC71V171ES TO PREVENT SURFACE AND AIR MOVEMENT OF DUST FROM -- / _ - ` .' :.: `:; : - ,_ "::,; °: t . ';' _ 12" 11 /_ G I .. :. . :..... !I /` EXPOSED SOIL SURFACES AND REDUCE 774E PRESENCE OF AIRBORNE SUBSTANCES WHICH MAY I I!' ,._.. PRESENT HEALTH HAZARDS, TRAFFIC SAFETY PROBLEMS OR HARM ANIMAL OR PLANT LIFE. � -� /� � , 41qq � I � DITCH ..; F LOW DUST CONTROL MEASURES SHALL BE EMPLOYED TO PREVENT SURFACE AND AlR MOVEMENT OF ( / _� IN DITCHES APPLY PROTECTIVE COVERING DUST DURING CONSTRUCTION. MEASURES EMPLOYED SHALL BE IN ACCORDANCE W97H THE "' _ - - PARALLEL fo THE DIRECTION OF FLOW. - '' > VESCH. //��` I // -+�` =- 01 ----- �fI I 11= ��" USE CHECK SLOTS AS REQUIRED. AVOID _ / 1 _, _ / T -� - W11AIIAW1 1 /ArCO /AI IAI Tl1C nCA1=0 /'1C '1 / /�/ `_ r G- G� -) i I_ III= ' '" - - III -I I !='' 1 ' 1 - -1 I I- , � I ! 11 11- SIL T FENCE sF (WITH WIRE SUPPORT) 05-2 NO SCALE I_--,.--- EXTENSION OF FABRIC AND WRE INTO THE TRENCH. ON SLOPES APPLY O DIRECTION lOF FLOWLLEL AND ANCHOR SECURELY. Plate 3:08.1 1. . ; i%wm B/M SOIL STABILIZA TION BLANKET No TREA T MENT 1 SOIL STABILIZ477ON MArnNG MATERIAL SHALL BE INSTALLED AS NO SCALE REQUESTED BY 774E ALBEMARLE COUNTY EROSION CONTROL INSPECTOR �,TH 00� °, ��� ,_1 SCOTT R. COLLINS'Z U No. 35791 ,2 1,11,; w� o��SSIOVAL ElI OA z O a CC U m w 0 z O > w z 0 w H N W 1n 1n -4 1-4 O N � Ln 0 o z 0 0 O_ h ¢ tom ' - I- U Lf) � � � a N O O o a � � 4 z) � w Z O O Ce Of 13� a- a U) U) w w ce QY to to 111 - ,4 -4 M Lfl kD L) 0-1 40� ® � N mI- It M Nt ar, W N W J ® _` V U) w z° J Q WO Y Ul W � W Z w w I U) j W '4 r@71.. N z :5 CL U�.,� O H CL F- 3: C1 Q I z U 0 [V pe z 0 0 a z U a o z� P-4 W y [a- 5- -6 U W LU 0 o a 06 W z� � 0� v t+ O W � 1 _III \/ 1 J a 6 v D 0 z WE 0 LU z z z Lr (D L 2 z C 2 a c `C w v J b F- r In w s w a a I U') Q JOB NO. ,I 142109 SCALE 1C N/A I I SHEET NO. 3 I RISER CREST ELEVATION S PIPE OUTLET CONDITIONS 318-} NO SCALE POSTS MIN. SIZE 4" SQUARE CONTROLLING EROSION ON CRITICAL AREAS BY PROVIDING A MICROGLIMATE WHICH PROTECTS OR 5" ROUND. SET AT YOUNG VEGETATION AND PROMOTES ITS ESTABLISHMENT. APPLIES ON SHORT, STEEP SLOPES 8' LEAST 3' INTO THE GROUND WHERE EROSION HAZARD IS HIGH AND PLAN77NG IS LIKELY TO BE TOO SLOW IN PROVIDING H H -t ADEQUATE- PR07E-CTIVE COVER. SHALLOW 3 38 TREE PRESERVA770N AND PR07E'G770N• SLOPE ''+ OMERSION U1TCH """"'"� ! ' I PAW MINIMUM WIDTH AT Tp PM OLVIOLVICE it DESIGN WATER C.EVATION IS 4.0' PLAN VIEW MUST EXTEND FULL YAM OF INGRESS AND EGRESS OPERATION SET 1 t /2- WATER HYDRANT WITH FROST . - --- ---^2% fir, MM,� PROOF HYDRANT 3• 4 ABOVE GRADE AND 4' OFF EDGE OF PAVEMENT. SECTION A -A NOTE: A MINIMUM WATER TRAP OF 1- IS REQUIRED WITH A MINIMUM WASH HOSE DIA. OF 1.5- 5 PAVED TEMP COW SM 9 sa1IF lira ATTACH FILTER FABRIC TO STAKES OR POSTS & EXTEND IT INTO TRENCH WOODEN STAKE STEEL POST, = 5' MIN. EXCAVATED SOIL COMPAC EDD AND 4 "x4" TRENCH J SIL T FENCE sF (WI THOU T WIRE SUPPOR T) 05- NO SCALE ; FENCING AND ARMORING � i 1 .,'. •r. y V tj t (� Irav �,R i SNOW FENCE `� C �.I 'f �,,� 00 so ?. ` 00 k I III ! so I I I d I: I I,,,� j � j�'I, l : 90WO PENCE 00 ! CM FENCE CORRECT METHODS r,7 r • �I% �i . CORRECT ARMORING :�••� 1992 3.08 SILT FENCE CULVERT INLET PROTECTION . 1 -- __- - -- -------- - - - - -- - - -- j It ,, -, . ra a nA - t- sawn I _� _ __ ` -- - - -' me OF "I T4T DKY f *owmm is OIS` Y ' IF fu. I OPTIONAL STONE COMBINATION ** "...'.. i _ I T, V_ ati� oa f5 ca+�st +ronaare ,--a,, + ma., MGM S'a.ORtY aF RON K IXPCCTFD Source: Adapted from VDOT Standard Sheets and Va. DSWC 111.44 PR07EC77ON OF DESIRABLE' TREES FROM MECHANICAL OR 07HER INJURY DURING LAND , W ON S A L SLOPES, SMIPS "" NPIT TECTIVE COVERINGS DISTURBING AND CONSTRUCTION AC77WTY. TO ENSURE THE SURVIVAL OF DESIRABLE 7REES - I BE APPLIED ACROSS BERM WHERE THEY WILL BE EFFEC77VE FOR EROSION AND SEDIMENT CONTROL, WATERSHED - THE SLOPE. PROTFC77ON, LANDSCAPE BEAUTIFICATION, DUST AND POLLU77ON CONTROL, NOISE REDUCTION, 1. SET POSTS AND EXCAVATE A 4 "X4" 2. STAPLE WIRE FENCING TO THE POSTS. J. ATTACH THE FILTER FABRIC TO 4. BACKFILL AND COMPACT THE -1 WHERE THERE IS A BERM AT THE TOP OF THE SLOPE SHADE AND 07HER ENVIRONMENTAL BENEFITS WHILE 774E LAND IS BEING CONV£R7ED FROM TRENCH UPSLOPE ALONG THE LINE THE WRE FENCE AND EXTEND EXCAVATED SOIL. r., BRING THE MATERIAL OVER THE BERM AND ANCHOR It FOREST TO URBAN -TYPE USES APPLIES IN TREE- INHABl7E•D AREAS SUBJECT TO LAND ,,,: BEHIND THE BERM. OF POSTS. IT INTO THE TRENCH. I I -. DISTURBING ACTT V17TES _ 4" 1. 339 DUST CONTROL: BRING MATERIAL DOWN TO A LEVEL AREA BEFORE STEEP REDUCING SURFACE AND AIR MOVEMENT OF DUST DURING LAND DISTURBING, DEMOL17ION AND TERMINATING THE INSTALLATION„ TURN THE END SLOPE �-� / UNDER 4 AND STAPLE AT 12 INTERVALS CONS7RUC17ON AC71V171ES TO PREVENT SURFACE AND AIR MOVEMENT OF DUST FROM -- / _ - ` .' :.: `:; : - ,_ "::,; °: t . ';' _ 12" 11 /_ G I .. :. . :..... !I /` EXPOSED SOIL SURFACES AND REDUCE 774E PRESENCE OF AIRBORNE SUBSTANCES WHICH MAY I I!' ,._.. PRESENT HEALTH HAZARDS, TRAFFIC SAFETY PROBLEMS OR HARM ANIMAL OR PLANT LIFE. � -� /� � , 41qq � I � DITCH ..; F LOW DUST CONTROL MEASURES SHALL BE EMPLOYED TO PREVENT SURFACE AND AlR MOVEMENT OF ( / _� IN DITCHES APPLY PROTECTIVE COVERING DUST DURING CONSTRUCTION. MEASURES EMPLOYED SHALL BE IN ACCORDANCE W97H THE "' _ - - PARALLEL fo THE DIRECTION OF FLOW. - '' > VESCH. //��` I // -+�` =- 01 ----- �fI I 11= ��" USE CHECK SLOTS AS REQUIRED. AVOID _ / 1 _, _ / T -� - W11AIIAW1 1 /ArCO /AI IAI Tl1C nCA1=0 /'1C '1 / /�/ `_ r G- G� -) i I_ III= ' '" - - III -I I !='' 1 ' 1 - -1 I I- , � I ! 11 11- SIL T FENCE sF (WITH WIRE SUPPORT) 05-2 NO SCALE I_--,.--- EXTENSION OF FABRIC AND WRE INTO THE TRENCH. ON SLOPES APPLY O DIRECTION lOF FLOWLLEL AND ANCHOR SECURELY. Plate 3:08.1 1. . ; i%wm B/M SOIL STABILIZA TION BLANKET No TREA T MENT 1 SOIL STABILIZ477ON MArnNG MATERIAL SHALL BE INSTALLED AS NO SCALE REQUESTED BY 774E ALBEMARLE COUNTY EROSION CONTROL INSPECTOR �,TH 00� °, ��� ,_1 SCOTT R. COLLINS'Z U No. 35791 ,2 1,11,; w� o��SSIOVAL ElI OA z O a CC U m w 0 z O > w z 0 w H N W 1n 1n -4 1-4 O N � Ln 0 o z 0 0 O_ h ¢ tom ' - I- U Lf) � � � a N O O o a � � 4 z) � w Z O O Ce Of 13� a- a U) U) w w ce QY to to 111 - ,4 -4 M Lfl kD L) 0-1 40� ® � N mI- It M Nt ar, W N W J ® _` V U) w z° J Q WO Y Ul W � W Z w w I U) j W '4 r@71.. N z :5 CL U�.,� O H CL F- 3: C1 Q I z U 0 [V pe z 0 0 a z U a o z� P-4 W y [a- 5- -6 U W LU 0 o a 06 W z� � 0� v t+ O W � 1 _III \/ 1 J a 6 v D 0 z WE 0 LU z z z Lr (D L 2 z C 2 a c `C w v J b F- r In w s w a a I U') Q JOB NO. ,I 142109 SCALE 1C N/A I I SHEET NO. 3 I ATTACH FILTER FABRIC TO STAKES OR POSTS & EXTEND IT INTO TRENCH WOODEN STAKE STEEL POST, = 5' MIN. EXCAVATED SOIL COMPAC EDD AND 4 "x4" TRENCH J SIL T FENCE sF (WI THOU T WIRE SUPPOR T) 05- NO SCALE ; FENCING AND ARMORING � i 1 .,'. •r. y V tj t (� Irav �,R i SNOW FENCE `� C �.I 'f �,,� 00 so ?. ` 00 k I III ! so I I I d I: I I,,,� j � j�'I, l : 90WO PENCE 00 ! CM FENCE CORRECT METHODS r,7 r • �I% �i . CORRECT ARMORING :�••� 1992 3.08 SILT FENCE CULVERT INLET PROTECTION . 1 -- __- - -- -------- - - - - -- - - -- j It ,, -, . ra a nA - t- sawn I _� _ __ ` -- - - -' me OF "I T4T DKY f *owmm is OIS` Y ' IF fu. I OPTIONAL STONE COMBINATION ** "...'.. i _ I T, V_ ati� oa f5 ca+�st +ronaare ,--a,, + ma., MGM S'a.ORtY aF RON K IXPCCTFD Source: Adapted from VDOT Standard Sheets and Va. DSWC 111.44 PR07EC77ON OF DESIRABLE' TREES FROM MECHANICAL OR 07HER INJURY DURING LAND , W ON S A L SLOPES, SMIPS "" NPIT TECTIVE COVERINGS DISTURBING AND CONSTRUCTION AC77WTY. TO ENSURE THE SURVIVAL OF DESIRABLE 7REES - I BE APPLIED ACROSS BERM WHERE THEY WILL BE EFFEC77VE FOR EROSION AND SEDIMENT CONTROL, WATERSHED - THE SLOPE. PROTFC77ON, LANDSCAPE BEAUTIFICATION, DUST AND POLLU77ON CONTROL, NOISE REDUCTION, 1. SET POSTS AND EXCAVATE A 4 "X4" 2. STAPLE WIRE FENCING TO THE POSTS. J. ATTACH THE FILTER FABRIC TO 4. BACKFILL AND COMPACT THE -1 WHERE THERE IS A BERM AT THE TOP OF THE SLOPE SHADE AND 07HER ENVIRONMENTAL BENEFITS WHILE 774E LAND IS BEING CONV£R7ED FROM TRENCH UPSLOPE ALONG THE LINE THE WRE FENCE AND EXTEND EXCAVATED SOIL. r., BRING THE MATERIAL OVER THE BERM AND ANCHOR It FOREST TO URBAN -TYPE USES APPLIES IN TREE- INHABl7E•D AREAS SUBJECT TO LAND ,,,: BEHIND THE BERM. OF POSTS. IT INTO THE TRENCH. I I -. DISTURBING ACTT V17TES _ 4" 1. 339 DUST CONTROL: BRING MATERIAL DOWN TO A LEVEL AREA BEFORE STEEP REDUCING SURFACE AND AIR MOVEMENT OF DUST DURING LAND DISTURBING, DEMOL17ION AND TERMINATING THE INSTALLATION„ TURN THE END SLOPE �-� / UNDER 4 AND STAPLE AT 12 INTERVALS CONS7RUC17ON AC71V171ES TO PREVENT SURFACE AND AIR MOVEMENT OF DUST FROM -- / _ - ` .' :.: `:; : - ,_ "::,; °: t . ';' _ 12" 11 /_ G I .. :. . :..... !I /` EXPOSED SOIL SURFACES AND REDUCE 774E PRESENCE OF AIRBORNE SUBSTANCES WHICH MAY I I!' ,._.. PRESENT HEALTH HAZARDS, TRAFFIC SAFETY PROBLEMS OR HARM ANIMAL OR PLANT LIFE. � -� /� � , 41qq � I � DITCH ..; F LOW DUST CONTROL MEASURES SHALL BE EMPLOYED TO PREVENT SURFACE AND AlR MOVEMENT OF ( / _� IN DITCHES APPLY PROTECTIVE COVERING DUST DURING CONSTRUCTION. MEASURES EMPLOYED SHALL BE IN ACCORDANCE W97H THE "' _ - - PARALLEL fo THE DIRECTION OF FLOW. - '' > VESCH. //��` I // -+�` =- 01 ----- �fI I 11= ��" USE CHECK SLOTS AS REQUIRED. AVOID _ / 1 _, _ / T -� - W11AIIAW1 1 /ArCO /AI IAI Tl1C nCA1=0 /'1C '1 / /�/ `_ r G- G� -) i I_ III= ' '" - - III -I I !='' 1 ' 1 - -1 I I- , � I ! 11 11- SIL T FENCE sF (WITH WIRE SUPPORT) 05-2 NO SCALE I_--,.--- EXTENSION OF FABRIC AND WRE INTO THE TRENCH. ON SLOPES APPLY O DIRECTION lOF FLOWLLEL AND ANCHOR SECURELY. Plate 3:08.1 1. . ; i%wm B/M SOIL STABILIZA TION BLANKET No TREA T MENT 1 SOIL STABILIZ477ON MArnNG MATERIAL SHALL BE INSTALLED AS NO SCALE REQUESTED BY 774E ALBEMARLE COUNTY EROSION CONTROL INSPECTOR �,TH 00� °, ��� ,_1 SCOTT R. COLLINS'Z U No. 35791 ,2 1,11,; w� o��SSIOVAL ElI OA z O a CC U m w 0 z O > w z 0 w H N W 1n 1n -4 1-4 O N � Ln 0 o z 0 0 O_ h ¢ tom ' - I- U Lf) � � � a N O O o a � � 4 z) � w Z O O Ce Of 13� a- a U) U) w w ce QY to to 111 - ,4 -4 M Lfl kD L) 0-1 40� ® � N mI- It M Nt ar, W N W J ® _` V U) w z° J Q WO Y Ul W � W Z w w I U) j W '4 r@71.. N z :5 CL U�.,� O H CL F- 3: C1 Q I z U 0 [V pe z 0 0 a z U a o z� P-4 W y [a- 5- -6 U W LU 0 o a 06 W z� � 0� v t+ O W � 1 _III \/ 1 J a 6 v D 0 z WE 0 LU z z z Lr (D L 2 z C 2 a c `C w v J b F- r In w s w a a I U') Q JOB NO. ,I 142109 SCALE 1C N/A I I SHEET NO. 3 I 1992 3.08 SILT FENCE CULVERT INLET PROTECTION . 1 -- __- - -- -------- - - - - -- - - -- j It ,, -, . ra a nA - t- sawn I _� _ __ ` -- - - -' me OF "I T4T DKY f *owmm is OIS` Y ' IF fu. I OPTIONAL STONE COMBINATION ** "...'.. i _ I T, V_ ati� oa f5 ca+�st +ronaare ,--a,, + ma., MGM S'a.ORtY aF RON K IXPCCTFD Source: Adapted from VDOT Standard Sheets and Va. DSWC 111.44 PR07EC77ON OF DESIRABLE' TREES FROM MECHANICAL OR 07HER INJURY DURING LAND , W ON S A L SLOPES, SMIPS "" NPIT TECTIVE COVERINGS DISTURBING AND CONSTRUCTION AC77WTY. TO ENSURE THE SURVIVAL OF DESIRABLE 7REES - I BE APPLIED ACROSS BERM WHERE THEY WILL BE EFFEC77VE FOR EROSION AND SEDIMENT CONTROL, WATERSHED - THE SLOPE. PROTFC77ON, LANDSCAPE BEAUTIFICATION, DUST AND POLLU77ON CONTROL, NOISE REDUCTION, 1. SET POSTS AND EXCAVATE A 4 "X4" 2. STAPLE WIRE FENCING TO THE POSTS. J. ATTACH THE FILTER FABRIC TO 4. BACKFILL AND COMPACT THE -1 WHERE THERE IS A BERM AT THE TOP OF THE SLOPE SHADE AND 07HER ENVIRONMENTAL BENEFITS WHILE 774E LAND IS BEING CONV£R7ED FROM TRENCH UPSLOPE ALONG THE LINE THE WRE FENCE AND EXTEND EXCAVATED SOIL. r., BRING THE MATERIAL OVER THE BERM AND ANCHOR It FOREST TO URBAN -TYPE USES APPLIES IN TREE- INHABl7E•D AREAS SUBJECT TO LAND ,,,: BEHIND THE BERM. OF POSTS. IT INTO THE TRENCH. I I -. DISTURBING ACTT V17TES _ 4" 1. 339 DUST CONTROL: BRING MATERIAL DOWN TO A LEVEL AREA BEFORE STEEP REDUCING SURFACE AND AIR MOVEMENT OF DUST DURING LAND DISTURBING, DEMOL17ION AND TERMINATING THE INSTALLATION„ TURN THE END SLOPE �-� / UNDER 4 AND STAPLE AT 12 INTERVALS CONS7RUC17ON AC71V171ES TO PREVENT SURFACE AND AIR MOVEMENT OF DUST FROM -- / _ - ` .' :.: `:; : - ,_ "::,; °: t . ';' _ 12" 11 /_ G I .. :. . :..... !I /` EXPOSED SOIL SURFACES AND REDUCE 774E PRESENCE OF AIRBORNE SUBSTANCES WHICH MAY I I!' ,._.. PRESENT HEALTH HAZARDS, TRAFFIC SAFETY PROBLEMS OR HARM ANIMAL OR PLANT LIFE. � -� /� � , 41qq � I � DITCH ..; F LOW DUST CONTROL MEASURES SHALL BE EMPLOYED TO PREVENT SURFACE AND AlR MOVEMENT OF ( / _� IN DITCHES APPLY PROTECTIVE COVERING DUST DURING CONSTRUCTION. MEASURES EMPLOYED SHALL BE IN ACCORDANCE W97H THE "' _ - - PARALLEL fo THE DIRECTION OF FLOW. - '' > VESCH. //��` I // -+�` =- 01 ----- �fI I 11= ��" USE CHECK SLOTS AS REQUIRED. AVOID _ / 1 _, _ / T -� - W11AIIAW1 1 /ArCO /AI IAI Tl1C nCA1=0 /'1C '1 / /�/ `_ r G- G� -) i I_ III= ' '" - - III -I I !='' 1 ' 1 - -1 I I- , � I ! 11 11- SIL T FENCE sF (WITH WIRE SUPPORT) 05-2 NO SCALE I_--,.--- EXTENSION OF FABRIC AND WRE INTO THE TRENCH. ON SLOPES APPLY O DIRECTION lOF FLOWLLEL AND ANCHOR SECURELY. Plate 3:08.1 1. . ; i%wm B/M SOIL STABILIZA TION BLANKET No TREA T MENT 1 SOIL STABILIZ477ON MArnNG MATERIAL SHALL BE INSTALLED AS NO SCALE REQUESTED BY 774E ALBEMARLE COUNTY EROSION CONTROL INSPECTOR �,TH 00� °, ��� ,_1 SCOTT R. COLLINS'Z U No. 35791 ,2 1,11,; w� o��SSIOVAL ElI OA z O a CC U m w 0 z O > w z 0 w H N W 1n 1n -4 1-4 O N � Ln 0 o z 0 0 O_ h ¢ tom ' - I- U Lf) � � � a N O O o a � � 4 z) � w Z O O Ce Of 13� a- a U) U) w w ce QY to to 111 - ,4 -4 M Lfl kD L) 0-1 40� ® � N mI- It M Nt ar, W N W J ® _` V U) w z° J Q WO Y Ul W � W Z w w I U) j W '4 r@71.. N z :5 CL U�.,� O H CL F- 3: C1 Q I z U 0 [V pe z 0 0 a z U a o z� P-4 W y [a- 5- -6 U W LU 0 o a 06 W z� � 0� v t+ O W � 1 _III \/ 1 J a 6 v D 0 z WE 0 LU z z z Lr (D L 2 z C 2 a c `C w v J b F- r In w s w a a I U') Q JOB NO. ,I 142109 SCALE 1C N/A I I SHEET NO. 3 I / /�/ `_ r G- G� -) i I_ III= ' '" - - III -I I !='' 1 ' 1 - -1 I I- , � I ! 11 11- SIL T FENCE sF (WITH WIRE SUPPORT) 05-2 NO SCALE I_--,.--- EXTENSION OF FABRIC AND WRE INTO THE TRENCH. ON SLOPES APPLY O DIRECTION lOF FLOWLLEL AND ANCHOR SECURELY. Plate 3:08.1 1. . ; i%wm B/M SOIL STABILIZA TION BLANKET No TREA T MENT 1 SOIL STABILIZ477ON MArnNG MATERIAL SHALL BE INSTALLED AS NO SCALE REQUESTED BY 774E ALBEMARLE COUNTY EROSION CONTROL INSPECTOR �,TH 00� °, ��� ,_1 SCOTT R. COLLINS'Z U No. 35791 ,2 1,11,; w� o��SSIOVAL ElI OA z O a CC U m w 0 z O > w z 0 w H N W 1n 1n -4 1-4 O N � Ln 0 o z 0 0 O_ h ¢ tom ' - I- U Lf) � � � a N O O o a � � 4 z) � w Z O O Ce Of 13� a- a U) U) w w ce QY to to 111 - ,4 -4 M Lfl kD L) 0-1 40� ® � N mI- It M Nt ar, W N W J ® _` V U) w z° J Q WO Y Ul W � W Z w w I U) j W '4 r@71.. N z :5 CL U�.,� O H CL F- 3: C1 Q I z U 0 [V pe z 0 0 a z U a o z� P-4 W y [a- 5- -6 U W LU 0 o a 06 W z� � 0� v t+ O W � 1 _III \/ 1 J a 6 v D 0 z WE 0 LU z z z Lr (D L 2 z C 2 a c `C w v J b F- r In w s w a a I U') Q JOB NO. ,I 142109 SCALE 1C N/A I I SHEET NO. 3 I 'n U" o rn Ct to 0 0 w w Q Q J W w CC) = O O N U U Q Z Z O O U U .rlim C, 0 w w a ce u — . _ YYll.on Yf1 GG.7Y! I: .. . Y. >... .. .. _ _ ; -.- .; _.. .. / , / x U MAIN AINt _. _ \ i / .. c >.. ..... Ln _ , .60 AC ( �.n -K2-OA-00700 TMP. 093A5 K i VI DEVELOPMENT INC o _ ._ / .. , . ._ _.:._ • . ... _. _. _ OWNER. SANSO CH i n� � ! � 7 ® M ® M N Z M z N � 4 0 u04 0� Q F— Z 7 0 ® J V > U z U) N w O � J W es� U) Q p o' U Q U � z w LU o CIS cn 0 cf) W cl� % � w W . i _� o U W z Q jw w CL O N w J U ~ �-� w O ww ce y,^^ V/ JOB NO. 142109 SCALE 1 " =50' SHEET NO. 5 =z I z z p p 3 i O u y a> u n � x �a � 3 s r O it J to G +� V � C � p i V �p a� o� a� � c U � � V N Y L If V � d p V O p C -O U O D p p C N _ O D O . N N p� �p o O �o � 3 SEDIMENT BASIN #1 PROFILE(SCALEI " =4o') 375 PROPOSED 01 INVERT IN =3 5" CL. III FRCP BARREL, 84 LF TOP OF I PROPOSED GRADE 24.00'; INVERT OUT = 822.00' DAM = 336.00 350 - -- - -- - - - -- + - - -- -- - - - -- -- -- - - - - -- r---- - - - - -- - EXISTI N ----- - - - - -- - G GRADE ' 1 _ - - - - - - - - - -- - - - - -- - - - - -- X M •Z 325 BASIN FLOOR= 329.50 PROPOSED 024 CL. III RCP RISER STRUCTURE 300 OUTLET�PROTECTION i RISER RIM ELEVATION = 333.75• i 00 01 .t O O lD O N O ri n Q, u, Ln o u, rt Lf, C) Ln oo Lo o, Lo ri M M r: Oi Ol 01 ri ri ri N M M N M M r4 ri M M M M M M M M m 0+00 0 +50 1 +00 1 +50 2 +00 2 +50 3 +00 SEDIMENT BASIN #1 6" TOPSOIL EXISTING GROUND NTS 10' 13" HIGH, 16 GAGE TEMPORARY CMP TOP OF DAM ELEV = 336.00' TRASH RACK DEVICE 25 YR. STORM 1.o' MIN. EMERGENCY SPILLWAY ELEV= 334.75' CREST ELEV- 334.75 RISER TOP ELEV.= 1.0' MIN.' s 2 ' DIA. CL. III RCP RISER 33 •7 ' i - 4' DRY VOLUME ELEV. REQUIRED = 333.75' �; .f" 1' SCARIFIED KEY FOR 4 u! �tjj , SOIL COHESION 5 DIA DEWATERING tee,, �t DEVICE ELEV 331.81 %may j INV. OUT = 322.00' BOTTOM OF BASIN'' EXISTING GROUND ELEV= 3z9.5o M TOE O UPSTREAM ELEV= 329.50 J'Y CONCRETE FOUNDATION (18" THICK, 72" DIA., RISER OUTLET PROTECTION EMBEDDED 6" INTO THE CONCRETE) CLAY C RED DAM KEYED INTO THE EXISTING GROUND INV. IN = 324.00' 15" CL. III RCP (2) 3.4'X 3.4' GALV. STEEL LENGTH =84' ANTI -SEEP COLLARS SLOPE =2.38% Sediment Basin #1 Design drainage area (acres) 7.20 basin volumes: (using 2' contour intervals) elevation (ft) contour area (sf) volume (cy) 329.50 4949.0 0 330.00 5217.0 94.1 332.00 6363.0 522.3 334.00 8058.0 1055.2 336.00 9898.0 1719.1 DESIGN HIGH WATER (z:4�YR 'rt ay.) to DRY ' STORAGE ' WET' STORAGE ._ -- SEDIMENT CI.EANOUT POINT (' WETT ` STOWE REDUCED WAN. W(SPILLWAY CREST OF DERGENCY 1WITiHOUT $FttLWAY f RISER CREST O ACC£t wet storage required (cy) (67 *DA) 482.4 design high waster (ft) 334.75 dewatering orifice elevation (ft) 331.81 top of dam (ft) 336.00 wet storage provided at this elevation (cy) 482.4 top width of dam (ft) 10.0 available volume before cleanout (cy) (34 *DA) 244.8 bottom of basin (ft) 329.5 cleanout elevation (ft) 330.69 approx bottom dimensions: 42'x122' distance from cleanout to orifice (ft) (> 1') 1.1 upstream face slope: 2 :1 downstream face slope: 3:1 dry stora±ae: dry storage required (cy) (67 *DA) 482.4 YES principle spillway crest (ft) 333.75 length of flow, L (ft) 62 dry storage provided at this elevation (cy) 507.4 effective width, We (ft) 156 diameter of dewatering orifice (in) 5.0 L / We ( baffles not required if > 2) 0.4 diameter of flexble tubing (in) (orifice+2") 7.0 collars: YES ruriaif: depth of water at spillway crest (ft) 4.25 C (use 0.45 for bare earth) 0.6 slope of upstream face (Z1) 2 :1 tc (min) 13 slope of barrel (Sb) 2.38% 1 2yr 3.70 Q 2yr 15.98 length of barrel in saturated zone (Ls) 28.18 1 25y 6,20 Q 25yr 29.46 number collars required 2 dimension of collars 3.4V.4' principle SpiitiA . available head (ft) 2.25 emergency spiba: YES diameter riser (in) 24 required capacity (Q25 -0p) (cfs) 13.48 spillway capacity, Qp (cfs) 15.98 bottom width (ft) 115 diameter trash rack (in) 36 slope of exist channel (ftlft) 25.0% barrel length (ft) 84 minimun length of exit channel (ft) 60 head on barrel through embankment {ft) 12.75 crest of spillway (ft) 334.75 diameter of barrel in 15 SEDIMENT BASIN #1 DETAIL (SCALE I "=20') PR POSED VDOT #3 COARSE AGGREGATE OUTLET 3So - -- - -- PROTECTION w/ GEOTEXTILE FILTER FABRIC 350 PROPOSED VDOT #3 COARSE AGGREGATE OUTLET -5 ° PROTECTION w/ GEOTEXTILE FILTER FABRIC NDERLAYMENT (L -_ 30, W _ 5, D _ 2 MIN.) \34 UNDERLAYMENT (L -13', W1- 3.75', W2- 14.25', D -2' MIN.) 34 x 3 N 0 -_ tr' PROPOSED 024" CL. III RC�RISER- STRUCTURE _ 1AlOO RISER RIM ELEVATION= / ' 33 X75 • -- PROPOSED 01511 CL. III RCP BARREL, 84 LF; k -Zf 00 / INVERT IN= 324.00, -- INVERTOUT= 320.50 y ok5° 330' PROPOS __. BAFFLES ZZ - ED ___ 34 z __ 0 +p0. ti ROPOS D VDOT #3 COARSE AGGREGATE OUTLET -' u< _ - -PROTECTION w/ GEOTEXTILE FILTER FABRIC o -r_Y \ IUNDERLAYMENT (L =6', W1= 3.75',_W2= 7.25', D =2 MIN.) -- -330--' J - --Y - X Io' WI[5E 1`OP OF A ELEVATION =3 6 PROPOSED 115' WIDE ,RAS EM ENCY ' X i�._:- i(--j( SPILLWAY CREST ELEVATION=S 4.75 SEDIMENT TRAP #1 DETAIL (SCALE 1"=20') SEDIMLN I BANN #2 6" TOPSOIL EXISTING GROUND NTS -i 10' 13" HIGH, 16 GAGE TEMPORARY CMP TOP OF DAM ELEV. = 350.00' I I TRASH RACK DEVICE N 0 25 YR. STORM 1.0, MI r °" EMERGENCY SPILLWAY " ELEV = 348.75' CRESTELEV.= 348.75 I 1 RISER TOP ELEV. =34 .00' 1.0' MIN. 24" DIA. HDPE RISER VOLU Ey DRY REQU REDME ELOEOV. 1 1' SCARIFIED KEY FOR 34„ DIA. DEWATERING � �, SOIL COHESION BOTTOM OF BASIN DEVICE, ELEV. = 345.75 NV. OUT = 336.50' �� EXISTING GROUND i ELEV= oo UPSTREAM TOE OF Doo • 344 1o' WIDE TOP OF DAM ELEVATION =336' if ,f I CONCRETE FOUNDATION (18" THICK, 6o" DIA., RISER OUTLET PROTECTION -- EMBEDDED 6" INTO THE CONCRETE) CLAY C RED DAM =41 I KEYED INTO THE A-41 - 41 INV. IN _ EXISTING GROUND N 10 DOUBLE WALL HDPE 5 -- i r I. . = 340.00' (z) 2.0'X 2.0' GALV. STEEL LENGTH =112' ANTI -SEEP COLLARS SLOPE -- 3.13% Sediment Trap 1 design drainage area (acres) ( <3) 0.34 trap volumes: but CREST OF STORE WEIRyg• elevation (ft) area (sf) volume(cy) ,�• 415.00 932.0 0.0 416.00 1215.0 39.6 DRY STORAGE ,�� VMWkE 417.00 1522.0 90.2 418.00 1855.0 152.7 WET STORAGE 4, MAX. 0.0 (k%C"110) FILTER aoTH WOUND RSLV. wet storage: RPW wet storage required (cy) (67*DA) 22.8 MATE 3t3_, "` "` CLASS ` I bottom of stone weir (ft) 416.0 wet storage provided at this elevation (cy) 39.6 slope of wet storage sides 2:1 weir length (ft) (6)dDA) 2.0 (grin.) dry storage: bottom of trap elevation (ft) 415 dry storage required (cy) (67 *DA) 22.8 bottom trap dimensions: 19x46 crest of stone weir 417.0 top of dam elevation (ft) 418 dry storage provided at this elevation (cy) 50.6 top width of dam (ft) 6 slope of dry _storage sides 2:1 top trap dimensions 31'x58' SEDIMENT BASIN #3 6 "TOPSOIL EXISTING GROUND NTS -1 10, 13" HIGH, 16 GAGE TEMPORARY CMP TOP OF DAM ELEV. = 326.00' TRASH RACK DEVICE 25 YR. STORM 1.o' MIN. %. EMERGENCY SPILLWAY ELEV= 324.75' CREST ELEV. = 324.75 RISER TOP ELEV.=3z3.75' 1.0' MIN. %s 2 ' DIA. CL. III RCP RISER i s � Vii: 4' DRY VOLUME ELEV. 1' SCARIFIED KEY FOR REQUIRED = 323.75' ; ;;' " "' �' SOIL COHESION 5" DIA. DEWATERING DEVICE, ELEV. = 321.82' INV. OUT = 316.0' UPSTREAM TOE OF DAM n BOTTOM OF BASIN EXISTING GROUND ELEV= 319.50 ELEV- 319.50 CONCRETE FOUNDATION (18" THICK, 72" DIA., RISER ry OUTLET PROTECTION EMBEDDED 6" INTO THE CONCRETE) CLAY C RED DAM KEYED INTO THE EXISTING GROUND INV. IN = 316.72' 15" CL. III RCP (2) 3.3'X 3.3' GALV. STEEL LENGTH =72' ANTI -SEEP COLLARS SLOPE =1.00% SEDIMENT BASIN #3 PROFILE(SCALEI " =4o') 375 PROPOSED 015" INVERT IN =316 L. III RCP BARREL, 72 LF; TOP OFD; PROPOSED 24" CL. III RCP RISER STRUCTURE 72'; INVERT OUT= 316.00' DAM= 326.00 RISER RIM ELEVATION =323.75'• 350 TING GRADE 325 IMN Mme• BASIN FLOOR = 319.50' --- PROPOSED GRADE 300 i OUTLET PROTECTION 0o Oqq rr! oo � rn °, N' Oq r q N N N M ri R�YI M M M M M M M M M 0 +00 0 +50 1 +00 1 +50 2 +00 2 +25 Sediment Basin #2 Design M. VW ! SPILLWAY CREST OF EMERGENCY Y WITHOUT SPUWAY drainage area (acres) 3.47 DESIGN HIGH WATER basin volumes: (using 2' contour intenats) (25 -YR. STORY ELEV.) elevation (ft) contour area (sf) volume (cy) 0.s 344,00 3649.0 0 LtlN T O 346.00 4710.0 308.8 r RISE CREST oRY • sroRACE .� �� RING 348.00 5887.0 700.4 350.00 7174.0 1183.4 •WET • Sm""' E - SEDIMENT CLEMIOUT POfHT (' WET ' STORAGE REaIxEo TO 34 C.Y. / ACRE) wet storage: wet storage required (cy) (67 *DA) 232.5 design high wafer (ft) 348.75 dewatering orifice elevation (ft) 345.75 top of dam (ft) 350.00 wet storage provided at this elevation (cy) 269.5 top width of dam (ft) 10.0 available volume before cleanout (cy) (34 *DA) 118.0 bottom of basin (ft) 344.0 cleanout elevation (ft) 344.75 approx bottom dimensions: 66'X74' distance from cleanout to orifice (ft) (> 1') 1.0 upstream face slope: 2:1 downstream face slope: 3:1 dry storage: dry storage required (cy) (67 *DA) 232.5 baffles: YES principle spillway crest (ft) 347.0 length of flow, L (ft) 99 dry storage provided at this elevation (cy) 234.35 effective width, We (ft) 53 diameter of dewatering orifice (in) 4.0 L / We (baffles not required if > 2) 1.9 diameter of flexible tubing (in) (orifice +2 ") 6.0 collars: YES runoff: depth of water at spillway crest (ft) 3.00 C ( use 0.45 for bare earth) 0.6 sloe of upstream face (Z 1) 2 :1 tc (Mn) 7.5 slope of barrel (Sb) 3.13 % 1 2yr 4.60 Q 2yr 9.58 length of barrel in saturated zone (Ls) 20.57' 1 25yr 7.50 Q 25yr 17.18 number collars required 2 dimension of collars 2.9x2.0' principle spillway: available head (ft) 10 emergency Will\Aey: YES diameter riser (in) 24 required capacity (Q25 -Qp) (cfs) 7.60 spillway capacity, Op (cfs) 10 bottom width (ft) 56 diameter trash rack (in) 36 slope of east channel (ft/ft) 25% barrel length (ft) 112 ininimun length of exit channel (ft) 55 head on barrel through embankment (ft) 11.5 crest of spillway (ft) 348.75 diameter of barrel in 10 Sediment Basin #3 Design drainage area (acres) 6.34 basin volumes: (using 2' contour intervals) elevation (ft) contour area (sf) volume (cy) 319.50 4122.0 0 320.00 4450.0 79.4 322.00 5843.0 459.4 324.00 7359.0 947.3 326.00 8980.0 1551.4 vwet storage required (cy) (67 *DA) dewatering orifice elevation (ft) wet storage provided at this elevation (cy) available volume before cleanout (cy) (34 *DA) cleanout elevation (ft) distance from cleanout to orifice (ft) (> 1') dry s We- dry storage required (cy) (67 *DA) principle spillway crest (ft) dry storage provided at this elevation (cy) diameter of dewatering orifice (in) diameter of flexible tubing (in) (orifice+2 ") runoff: C (use 0,45 for bare earth) tc (min) 1 2yr 3.95 Q 2yr 125yr 6.60 Q25yr Rrincigle illrtvav: available head (ft) diameter riser (in) Spillway capacity, Op (cfs) diameter trash rack (in) barrel length (ft) head on barrel through embankment (ft) diameter of barrel (in) MIN. t Wf SPILLWAY CREST OF ENC- 2' WITHOl1T SPILLWAY DESIGN HIGH WATER ,,(25 -YR- STORM ELEV.) SEDMEM CLEANOUT POINT (' WET ' STORAGE REDUCED TO 34 C.Y. / ACRt) 424.8 design high water (ft) 321.82 top of dam (ft) 424.8 top width of dam (ft) 215.6 bottom of basin (ft) 320.70 approx bottom dimensions: 1.1 upstream face slope: downstream face slope: 424.8 baffles: 323.75 length of flow, L (ft) 461.8 effective width, We (ft) 5.0 L / We (baffles not required if > 2) 7.0 collars: depth of water at spillway crest (ft) 0.6 slope of upstream face (Z 1) 11.5 slope of barrel (Sb) 15.03 length of barrel in saturated zone (Ls) 27.62 number collars required dimension of collars 2.3 ernercg@ncy spillway: 24 required capacity (Q25 -Qp) (cfs) 15.03 bottom width (ft) 36 slope of exist channel (ft/ft) 72 minimun length of exit channel (ft) 8.75 crest of spillway (ft) 15 RISER CREST DEMTER "r. 324.75 32"6.00 10.0 319.5 4(YX131' 2 :1 3:1 YES 91 79 1.2 YES 4.25 2 :1 1 % 26.56 2 3.3 "X3.3' YES 12:59 45 25% 40 324 -75 SEDIMENT BASIN #2 DETAIL (SCALE 2"=2o') SEDIMENT BASIN #2 PROFILE (SCALE 1"=40') 400 TOP OF PROPOSED 024" HDPE RISER STRUCTURE RISER RIM ELEVATION = 347.00 PROPOSED 010'1 HDPE DAM= 350-00' i 375 -35 i PRO POSEDGRADE DOUBLE WALL BARREL,-- - - - - -- - -- - - - -- -- - - -- - -- - -T-------------- - - - 112 LF; INVERT IN= 340.00; j EXISTING GRADE INVERT OUT = 336.50' 350. ' = BASIN FLOOR 21 ' ' -- 344• 00' 325 OUTLET PROTECTION d- 00 00 0) Ln Ln O Ln O LD It 00 n N Ln CO O O 10 N Ln 00 00 M LD LD It ri o o, M M M It It 't It Ln � W Ln M M M M M M M M M M M o +o0 0 +50 1 +00 1 +50 2 +00 2 +50 2 +75 0 PROPOSED WIDE GRASS INE MERGENCY 1 PROPOSE 024" HDPE R SER Sl' UC URE RISER RIM ELEVATION = 347.00' SPILLWAY CREST ELEVATION =348.75' \ PROPOSED VDOT " #3 COARSE AGGREGATE OUTLET PROTECTION w/ GEOTEXTILE FILTER FABRIC' UNDERLAYMENT (L =16', W1 =6'1 ? M W2 =18' D =2' MIN.' ) ' w PR POSED �AF S `� co N 1 ( \ \ + ?V PROPOSED 010" HDPE _ ' DOUBLE WALL BARREL, ' ;' 66, \. 1 �N SEDIMENT BASIN #3 DETAIL (SCALEI " =20') _--- 3 PR POSED VDOT #3 - COARSE AGGREGATE -- OUTLET PROTECTION w% boo / GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =35', o -""34O -_ W1 =10_, D =2' MIN.)," 33� _.._ - -_ --- _ 324 - 330 3 20 PROPOSED BAFFLES ~ _- PROPOSED 24 CL. III C RISER ST UC� _ -RIS ER RIM ELEVATION= = 23.7 13 " - - = -- - - - 319.50 6 r r 2 - 326 10' WIDE TOP OF DAM ELEVATION =326' 'hop VDOT #3 COARSE AGGREGATE OUTLET ROTECTION w/ GEOTEXTILE FILTER FABRIC o 324 ,% NDERLAYMENT (L =11', W1= 3.75', W2= 12.25', D =2' MIN.) 0 -- ry f _ 320 % "PROPOSED 015" CL. III RCP BARREL, 72 LF- INVERT IN= 316.72'; .. � - _ PROPOSED 45WIDE G2ASS LINED EM ERGENCY =�-- SPILLWAY CREST ELEVATION = 324.75 INVERT OUT = 316.00' , / CONTRACTOR SHALL NOT Y % PROPOSED VDOT #3 COARSE AGGREGATE OUTLET DISTURB WETLANDS (TYP.) PROTECTION w/ GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =12', W1= 3.75', W2= 13.25', D =2' MIN.) v -- ....- OF 0 r� ZCOTT R. COLLINS---* U No. 35791 �SSIONAL E��1 Z O a U 0 w ° Z O Ln w RY Z O w �a H ° W ce Ln In O C7% ,-i N v Ln U.1 LU Z O a Ln U') Inc w w U m m j � O O Z a - 5 � > Z O O w U U r0r Ce. a a w w Ce Ce Ln Ln LL, Ln M U1 t0 L9 M M 07 N M d' I N � O � N W � ~ Q Q LU > W W � J � J J > U �c U) N �- � z I- 0 a o U° J Z Q Q z° W31 U 5' P__4 I Q U Lij L W to U1 W F- to 06 a U) W z 0 r Z W (- O c W 0 V) e. .j F- V vJ W F- 0 - J W W 0 z w z z U 0 Z 0 N ti w a r a s O w a U) JOB NO. 142109 z SCALE AS SHOWN t SHEET NO. t 6 z 0 U c 3 a t 0 y 3 0 c _o U 0 c 0 0 V T: 0 U Z G 0 0 0+00 0 +50 1 +00 1 +50 2 +00 2 +50 3 +00 SEDIMENT BASIN #1 6" TOPSOIL EXISTING GROUND NTS 10' 13" HIGH, 16 GAGE TEMPORARY CMP TOP OF DAM ELEV = 336.00' TRASH RACK DEVICE 25 YR. STORM 1.o' MIN. EMERGENCY SPILLWAY ELEV= 334.75' CREST ELEV- 334.75 RISER TOP ELEV.= 1.0' MIN.' s 2 ' DIA. CL. III RCP RISER 33 •7 ' i - 4' DRY VOLUME ELEV. REQUIRED = 333.75' �; .f" 1' SCARIFIED KEY FOR 4 u! �tjj , SOIL COHESION 5 DIA DEWATERING tee,, �t DEVICE ELEV 331.81 %may j INV. OUT = 322.00' BOTTOM OF BASIN'' EXISTING GROUND ELEV= 3z9.5o M TOE O UPSTREAM ELEV= 329.50 J'Y CONCRETE FOUNDATION (18" THICK, 72" DIA., RISER OUTLET PROTECTION EMBEDDED 6" INTO THE CONCRETE) CLAY C RED DAM KEYED INTO THE EXISTING GROUND INV. IN = 324.00' 15" CL. III RCP (2) 3.4'X 3.4' GALV. STEEL LENGTH =84' ANTI -SEEP COLLARS SLOPE =2.38% Sediment Basin #1 Design drainage area (acres) 7.20 basin volumes: (using 2' contour intervals) elevation (ft) contour area (sf) volume (cy) 329.50 4949.0 0 330.00 5217.0 94.1 332.00 6363.0 522.3 334.00 8058.0 1055.2 336.00 9898.0 1719.1 DESIGN HIGH WATER (z:4�YR 'rt ay.) to DRY ' STORAGE ' WET' STORAGE ._ -- SEDIMENT CI.EANOUT POINT (' WETT ` STOWE REDUCED WAN. W(SPILLWAY CREST OF DERGENCY 1WITiHOUT $FttLWAY f RISER CREST O ACC£t wet storage required (cy) (67 *DA) 482.4 design high waster (ft) 334.75 dewatering orifice elevation (ft) 331.81 top of dam (ft) 336.00 wet storage provided at this elevation (cy) 482.4 top width of dam (ft) 10.0 available volume before cleanout (cy) (34 *DA) 244.8 bottom of basin (ft) 329.5 cleanout elevation (ft) 330.69 approx bottom dimensions: 42'x122' distance from cleanout to orifice (ft) (> 1') 1.1 upstream face slope: 2 :1 downstream face slope: 3:1 dry stora±ae: dry storage required (cy) (67 *DA) 482.4 YES principle spillway crest (ft) 333.75 length of flow, L (ft) 62 dry storage provided at this elevation (cy) 507.4 effective width, We (ft) 156 diameter of dewatering orifice (in) 5.0 L / We ( baffles not required if > 2) 0.4 diameter of flexble tubing (in) (orifice+2") 7.0 collars: YES ruriaif: depth of water at spillway crest (ft) 4.25 C (use 0.45 for bare earth) 0.6 slope of upstream face (Z1) 2 :1 tc (min) 13 slope of barrel (Sb) 2.38% 1 2yr 3.70 Q 2yr 15.98 length of barrel in saturated zone (Ls) 28.18 1 25y 6,20 Q 25yr 29.46 number collars required 2 dimension of collars 3.4V.4' principle SpiitiA . available head (ft) 2.25 emergency spiba: YES diameter riser (in) 24 required capacity (Q25 -0p) (cfs) 13.48 spillway capacity, Qp (cfs) 15.98 bottom width (ft) 115 diameter trash rack (in) 36 slope of exist channel (ftlft) 25.0% barrel length (ft) 84 minimun length of exit channel (ft) 60 head on barrel through embankment {ft) 12.75 crest of spillway (ft) 334.75 diameter of barrel in 15 SEDIMENT BASIN #1 DETAIL (SCALE I "=20') PR POSED VDOT #3 COARSE AGGREGATE OUTLET 3So - -- - -- PROTECTION w/ GEOTEXTILE FILTER FABRIC 350 PROPOSED VDOT #3 COARSE AGGREGATE OUTLET -5 ° PROTECTION w/ GEOTEXTILE FILTER FABRIC NDERLAYMENT (L -_ 30, W _ 5, D _ 2 MIN.) \34 UNDERLAYMENT (L -13', W1- 3.75', W2- 14.25', D -2' MIN.) 34 x 3 N 0 -_ tr' PROPOSED 024" CL. III RC�RISER- STRUCTURE _ 1AlOO RISER RIM ELEVATION= / ' 33 X75 • -- PROPOSED 01511 CL. III RCP BARREL, 84 LF; k -Zf 00 / INVERT IN= 324.00, -- INVERTOUT= 320.50 y ok5° 330' PROPOS __. BAFFLES ZZ - ED ___ 34 z __ 0 +p0. ti ROPOS D VDOT #3 COARSE AGGREGATE OUTLET -' u< _ - -PROTECTION w/ GEOTEXTILE FILTER FABRIC o -r_Y \ IUNDERLAYMENT (L =6', W1= 3.75',_W2= 7.25', D =2 MIN.) -- -330--' J - --Y - X Io' WI[5E 1`OP OF A ELEVATION =3 6 PROPOSED 115' WIDE ,RAS EM ENCY ' X i�._:- i(--j( SPILLWAY CREST ELEVATION=S 4.75 SEDIMENT TRAP #1 DETAIL (SCALE 1"=20') SEDIMLN I BANN #2 6" TOPSOIL EXISTING GROUND NTS -i 10' 13" HIGH, 16 GAGE TEMPORARY CMP TOP OF DAM ELEV. = 350.00' I I TRASH RACK DEVICE N 0 25 YR. STORM 1.0, MI r °" EMERGENCY SPILLWAY " ELEV = 348.75' CRESTELEV.= 348.75 I 1 RISER TOP ELEV. =34 .00' 1.0' MIN. 24" DIA. HDPE RISER VOLU Ey DRY REQU REDME ELOEOV. 1 1' SCARIFIED KEY FOR 34„ DIA. DEWATERING � �, SOIL COHESION BOTTOM OF BASIN DEVICE, ELEV. = 345.75 NV. OUT = 336.50' �� EXISTING GROUND i ELEV= oo UPSTREAM TOE OF Doo • 344 1o' WIDE TOP OF DAM ELEVATION =336' if ,f I CONCRETE FOUNDATION (18" THICK, 6o" DIA., RISER OUTLET PROTECTION -- EMBEDDED 6" INTO THE CONCRETE) CLAY C RED DAM =41 I KEYED INTO THE A-41 - 41 INV. IN _ EXISTING GROUND N 10 DOUBLE WALL HDPE 5 -- i r I. . = 340.00' (z) 2.0'X 2.0' GALV. STEEL LENGTH =112' ANTI -SEEP COLLARS SLOPE -- 3.13% Sediment Trap 1 design drainage area (acres) ( <3) 0.34 trap volumes: but CREST OF STORE WEIRyg• elevation (ft) area (sf) volume(cy) ,�• 415.00 932.0 0.0 416.00 1215.0 39.6 DRY STORAGE ,�� VMWkE 417.00 1522.0 90.2 418.00 1855.0 152.7 WET STORAGE 4, MAX. 0.0 (k%C"110) FILTER aoTH WOUND RSLV. wet storage: RPW wet storage required (cy) (67*DA) 22.8 MATE 3t3_, "` "` CLASS ` I bottom of stone weir (ft) 416.0 wet storage provided at this elevation (cy) 39.6 slope of wet storage sides 2:1 weir length (ft) (6)dDA) 2.0 (grin.) dry storage: bottom of trap elevation (ft) 415 dry storage required (cy) (67 *DA) 22.8 bottom trap dimensions: 19x46 crest of stone weir 417.0 top of dam elevation (ft) 418 dry storage provided at this elevation (cy) 50.6 top width of dam (ft) 6 slope of dry _storage sides 2:1 top trap dimensions 31'x58' SEDIMENT BASIN #3 6 "TOPSOIL EXISTING GROUND NTS -1 10, 13" HIGH, 16 GAGE TEMPORARY CMP TOP OF DAM ELEV. = 326.00' TRASH RACK DEVICE 25 YR. STORM 1.o' MIN. %. EMERGENCY SPILLWAY ELEV= 324.75' CREST ELEV. = 324.75 RISER TOP ELEV.=3z3.75' 1.0' MIN. %s 2 ' DIA. CL. III RCP RISER i s � Vii: 4' DRY VOLUME ELEV. 1' SCARIFIED KEY FOR REQUIRED = 323.75' ; ;;' " "' �' SOIL COHESION 5" DIA. DEWATERING DEVICE, ELEV. = 321.82' INV. OUT = 316.0' UPSTREAM TOE OF DAM n BOTTOM OF BASIN EXISTING GROUND ELEV= 319.50 ELEV- 319.50 CONCRETE FOUNDATION (18" THICK, 72" DIA., RISER ry OUTLET PROTECTION EMBEDDED 6" INTO THE CONCRETE) CLAY C RED DAM KEYED INTO THE EXISTING GROUND INV. IN = 316.72' 15" CL. III RCP (2) 3.3'X 3.3' GALV. STEEL LENGTH =72' ANTI -SEEP COLLARS SLOPE =1.00% SEDIMENT BASIN #3 PROFILE(SCALEI " =4o') 375 PROPOSED 015" INVERT IN =316 L. III RCP BARREL, 72 LF; TOP OFD; PROPOSED 24" CL. III RCP RISER STRUCTURE 72'; INVERT OUT= 316.00' DAM= 326.00 RISER RIM ELEVATION =323.75'• 350 TING GRADE 325 IMN Mme• BASIN FLOOR = 319.50' --- PROPOSED GRADE 300 i OUTLET PROTECTION 0o Oqq rr! oo � rn °, N' Oq r q N N N M ri R�YI M M M M M M M M M 0 +00 0 +50 1 +00 1 +50 2 +00 2 +25 Sediment Basin #2 Design M. VW ! SPILLWAY CREST OF EMERGENCY Y WITHOUT SPUWAY drainage area (acres) 3.47 DESIGN HIGH WATER basin volumes: (using 2' contour intenats) (25 -YR. STORY ELEV.) elevation (ft) contour area (sf) volume (cy) 0.s 344,00 3649.0 0 LtlN T O 346.00 4710.0 308.8 r RISE CREST oRY • sroRACE .� �� RING 348.00 5887.0 700.4 350.00 7174.0 1183.4 •WET • Sm""' E - SEDIMENT CLEMIOUT POfHT (' WET ' STORAGE REaIxEo TO 34 C.Y. / ACRE) wet storage: wet storage required (cy) (67 *DA) 232.5 design high wafer (ft) 348.75 dewatering orifice elevation (ft) 345.75 top of dam (ft) 350.00 wet storage provided at this elevation (cy) 269.5 top width of dam (ft) 10.0 available volume before cleanout (cy) (34 *DA) 118.0 bottom of basin (ft) 344.0 cleanout elevation (ft) 344.75 approx bottom dimensions: 66'X74' distance from cleanout to orifice (ft) (> 1') 1.0 upstream face slope: 2:1 downstream face slope: 3:1 dry storage: dry storage required (cy) (67 *DA) 232.5 baffles: YES principle spillway crest (ft) 347.0 length of flow, L (ft) 99 dry storage provided at this elevation (cy) 234.35 effective width, We (ft) 53 diameter of dewatering orifice (in) 4.0 L / We (baffles not required if > 2) 1.9 diameter of flexible tubing (in) (orifice +2 ") 6.0 collars: YES runoff: depth of water at spillway crest (ft) 3.00 C ( use 0.45 for bare earth) 0.6 sloe of upstream face (Z 1) 2 :1 tc (Mn) 7.5 slope of barrel (Sb) 3.13 % 1 2yr 4.60 Q 2yr 9.58 length of barrel in saturated zone (Ls) 20.57' 1 25yr 7.50 Q 25yr 17.18 number collars required 2 dimension of collars 2.9x2.0' principle spillway: available head (ft) 10 emergency Will\Aey: YES diameter riser (in) 24 required capacity (Q25 -Qp) (cfs) 7.60 spillway capacity, Op (cfs) 10 bottom width (ft) 56 diameter trash rack (in) 36 slope of east channel (ft/ft) 25% barrel length (ft) 112 ininimun length of exit channel (ft) 55 head on barrel through embankment (ft) 11.5 crest of spillway (ft) 348.75 diameter of barrel in 10 Sediment Basin #3 Design drainage area (acres) 6.34 basin volumes: (using 2' contour intervals) elevation (ft) contour area (sf) volume (cy) 319.50 4122.0 0 320.00 4450.0 79.4 322.00 5843.0 459.4 324.00 7359.0 947.3 326.00 8980.0 1551.4 vwet storage required (cy) (67 *DA) dewatering orifice elevation (ft) wet storage provided at this elevation (cy) available volume before cleanout (cy) (34 *DA) cleanout elevation (ft) distance from cleanout to orifice (ft) (> 1') dry s We- dry storage required (cy) (67 *DA) principle spillway crest (ft) dry storage provided at this elevation (cy) diameter of dewatering orifice (in) diameter of flexible tubing (in) (orifice+2 ") runoff: C (use 0,45 for bare earth) tc (min) 1 2yr 3.95 Q 2yr 125yr 6.60 Q25yr Rrincigle illrtvav: available head (ft) diameter riser (in) Spillway capacity, Op (cfs) diameter trash rack (in) barrel length (ft) head on barrel through embankment (ft) diameter of barrel (in) MIN. t Wf SPILLWAY CREST OF ENC- 2' WITHOl1T SPILLWAY DESIGN HIGH WATER ,,(25 -YR- STORM ELEV.) SEDMEM CLEANOUT POINT (' WET ' STORAGE REDUCED TO 34 C.Y. / ACRt) 424.8 design high water (ft) 321.82 top of dam (ft) 424.8 top width of dam (ft) 215.6 bottom of basin (ft) 320.70 approx bottom dimensions: 1.1 upstream face slope: downstream face slope: 424.8 baffles: 323.75 length of flow, L (ft) 461.8 effective width, We (ft) 5.0 L / We (baffles not required if > 2) 7.0 collars: depth of water at spillway crest (ft) 0.6 slope of upstream face (Z 1) 11.5 slope of barrel (Sb) 15.03 length of barrel in saturated zone (Ls) 27.62 number collars required dimension of collars 2.3 ernercg@ncy spillway: 24 required capacity (Q25 -Qp) (cfs) 15.03 bottom width (ft) 36 slope of exist channel (ft/ft) 72 minimun length of exit channel (ft) 8.75 crest of spillway (ft) 15 RISER CREST DEMTER "r. 324.75 32"6.00 10.0 319.5 4(YX131' 2 :1 3:1 YES 91 79 1.2 YES 4.25 2 :1 1 % 26.56 2 3.3 "X3.3' YES 12:59 45 25% 40 324 -75 SEDIMENT BASIN #2 DETAIL (SCALE 2"=2o') SEDIMENT BASIN #2 PROFILE (SCALE 1"=40') 400 TOP OF PROPOSED 024" HDPE RISER STRUCTURE RISER RIM ELEVATION = 347.00 PROPOSED 010'1 HDPE DAM= 350-00' i 375 -35 i PRO POSEDGRADE DOUBLE WALL BARREL,-- - - - - -- - -- - - - -- -- - - -- - -- - -T-------------- - - - 112 LF; INVERT IN= 340.00; j EXISTING GRADE INVERT OUT = 336.50' 350. ' = BASIN FLOOR 21 ' ' -- 344• 00' 325 OUTLET PROTECTION d- 00 00 0) Ln Ln O Ln O LD It 00 n N Ln CO O O 10 N Ln 00 00 M LD LD It ri o o, M M M It It 't It Ln � W Ln M M M M M M M M M M M o +o0 0 +50 1 +00 1 +50 2 +00 2 +50 2 +75 0 PROPOSED WIDE GRASS INE MERGENCY 1 PROPOSE 024" HDPE R SER Sl' UC URE RISER RIM ELEVATION = 347.00' SPILLWAY CREST ELEVATION =348.75' \ PROPOSED VDOT " #3 COARSE AGGREGATE OUTLET PROTECTION w/ GEOTEXTILE FILTER FABRIC' UNDERLAYMENT (L =16', W1 =6'1 ? M W2 =18' D =2' MIN.' ) ' w PR POSED �AF S `� co N 1 ( \ \ + ?V PROPOSED 010" HDPE _ ' DOUBLE WALL BARREL, ' ;' 66, \. 1 �N SEDIMENT BASIN #3 DETAIL (SCALEI " =20') _--- 3 PR POSED VDOT #3 - COARSE AGGREGATE -- OUTLET PROTECTION w% boo / GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =35', o -""34O -_ W1 =10_, D =2' MIN.)," 33� _.._ - -_ --- _ 324 - 330 3 20 PROPOSED BAFFLES ~ _- PROPOSED 24 CL. III C RISER ST UC� _ -RIS ER RIM ELEVATION= = 23.7 13 " - - = -- - - - 319.50 6 r r 2 - 326 10' WIDE TOP OF DAM ELEVATION =326' 'hop VDOT #3 COARSE AGGREGATE OUTLET ROTECTION w/ GEOTEXTILE FILTER FABRIC o 324 ,% NDERLAYMENT (L =11', W1= 3.75', W2= 12.25', D =2' MIN.) 0 -- ry f _ 320 % "PROPOSED 015" CL. III RCP BARREL, 72 LF- INVERT IN= 316.72'; .. � - _ PROPOSED 45WIDE G2ASS LINED EM ERGENCY =�-- SPILLWAY CREST ELEVATION = 324.75 INVERT OUT = 316.00' , / CONTRACTOR SHALL NOT Y % PROPOSED VDOT #3 COARSE AGGREGATE OUTLET DISTURB WETLANDS (TYP.) PROTECTION w/ GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =12', W1= 3.75', W2= 13.25', D =2' MIN.) v -- ....- OF 0 r� ZCOTT R. COLLINS---* U No. 35791 �SSIONAL E��1 Z O a U 0 w ° Z O Ln w RY Z O w �a H ° W ce Ln In O C7% ,-i N v Ln U.1 LU Z O a Ln U') Inc w w U m m j � O O Z a - 5 � > Z O O w U U r0r Ce. a a w w Ce Ce Ln Ln LL, Ln M U1 t0 L9 M M 07 N M d' I N � O � N W � ~ Q Q LU > W W � J � J J > U �c U) N �- � z I- 0 a o U° J Z Q Q z° W31 U 5' P__4 I Q U Lij L W to U1 W F- to 06 a U) W z 0 r Z W (- O c W 0 V) e. .j F- V vJ W F- 0 - J W W 0 z w z z U 0 Z 0 N ti w a r a s O w a U) JOB NO. 142109 z SCALE AS SHOWN t SHEET NO. t 6 z 0 U c 3 a t 0 y 3 0 c _o U 0 c 0 0 V T: 0 U Z G 0 0 Sediment Basin #1 Design drainage area (acres) 7.20 basin volumes: (using 2' contour intervals) elevation (ft) contour area (sf) volume (cy) 329.50 4949.0 0 330.00 5217.0 94.1 332.00 6363.0 522.3 334.00 8058.0 1055.2 336.00 9898.0 1719.1 DESIGN HIGH WATER (z:4�YR 'rt ay.) to DRY ' STORAGE ' WET' STORAGE ._ -- SEDIMENT CI.EANOUT POINT (' WETT ` STOWE REDUCED WAN. W(SPILLWAY CREST OF DERGENCY 1WITiHOUT $FttLWAY f RISER CREST O ACC£t wet storage required (cy) (67 *DA) 482.4 design high waster (ft) 334.75 dewatering orifice elevation (ft) 331.81 top of dam (ft) 336.00 wet storage provided at this elevation (cy) 482.4 top width of dam (ft) 10.0 available volume before cleanout (cy) (34 *DA) 244.8 bottom of basin (ft) 329.5 cleanout elevation (ft) 330.69 approx bottom dimensions: 42'x122' distance from cleanout to orifice (ft) (> 1') 1.1 upstream face slope: 2 :1 downstream face slope: 3:1 dry stora±ae: dry storage required (cy) (67 *DA) 482.4 YES principle spillway crest (ft) 333.75 length of flow, L (ft) 62 dry storage provided at this elevation (cy) 507.4 effective width, We (ft) 156 diameter of dewatering orifice (in) 5.0 L / We ( baffles not required if > 2) 0.4 diameter of flexble tubing (in) (orifice+2") 7.0 collars: YES ruriaif: depth of water at spillway crest (ft) 4.25 C (use 0.45 for bare earth) 0.6 slope of upstream face (Z1) 2 :1 tc (min) 13 slope of barrel (Sb) 2.38% 1 2yr 3.70 Q 2yr 15.98 length of barrel in saturated zone (Ls) 28.18 1 25y 6,20 Q 25yr 29.46 number collars required 2 dimension of collars 3.4V.4' principle SpiitiA . available head (ft) 2.25 emergency spiba: YES diameter riser (in) 24 required capacity (Q25 -0p) (cfs) 13.48 spillway capacity, Qp (cfs) 15.98 bottom width (ft) 115 diameter trash rack (in) 36 slope of exist channel (ftlft) 25.0% barrel length (ft) 84 minimun length of exit channel (ft) 60 head on barrel through embankment {ft) 12.75 crest of spillway (ft) 334.75 diameter of barrel in 15 SEDIMENT BASIN #1 DETAIL (SCALE I "=20') PR POSED VDOT #3 COARSE AGGREGATE OUTLET 3So - -- - -- PROTECTION w/ GEOTEXTILE FILTER FABRIC 350 PROPOSED VDOT #3 COARSE AGGREGATE OUTLET -5 ° PROTECTION w/ GEOTEXTILE FILTER FABRIC NDERLAYMENT (L -_ 30, W _ 5, D _ 2 MIN.) \34 UNDERLAYMENT (L -13', W1- 3.75', W2- 14.25', D -2' MIN.) 34 x 3 N 0 -_ tr' PROPOSED 024" CL. III RC�RISER- STRUCTURE _ 1AlOO RISER RIM ELEVATION= / ' 33 X75 • -- PROPOSED 01511 CL. III RCP BARREL, 84 LF; k -Zf 00 / INVERT IN= 324.00, -- INVERTOUT= 320.50 y ok5° 330' PROPOS __. BAFFLES ZZ - ED ___ 34 z __ 0 +p0. ti ROPOS D VDOT #3 COARSE AGGREGATE OUTLET -' u< _ - -PROTECTION w/ GEOTEXTILE FILTER FABRIC o -r_Y \ IUNDERLAYMENT (L =6', W1= 3.75',_W2= 7.25', D =2 MIN.) -- -330--' J - --Y - X Io' WI[5E 1`OP OF A ELEVATION =3 6 PROPOSED 115' WIDE ,RAS EM ENCY ' X i�._:- i(--j( SPILLWAY CREST ELEVATION=S 4.75 SEDIMENT TRAP #1 DETAIL (SCALE 1"=20') SEDIMLN I BANN #2 6" TOPSOIL EXISTING GROUND NTS -i 10' 13" HIGH, 16 GAGE TEMPORARY CMP TOP OF DAM ELEV. = 350.00' I I TRASH RACK DEVICE N 0 25 YR. STORM 1.0, MI r °" EMERGENCY SPILLWAY " ELEV = 348.75' CRESTELEV.= 348.75 I 1 RISER TOP ELEV. =34 .00' 1.0' MIN. 24" DIA. HDPE RISER VOLU Ey DRY REQU REDME ELOEOV. 1 1' SCARIFIED KEY FOR 34„ DIA. DEWATERING � �, SOIL COHESION BOTTOM OF BASIN DEVICE, ELEV. = 345.75 NV. OUT = 336.50' �� EXISTING GROUND i ELEV= oo UPSTREAM TOE OF Doo • 344 1o' WIDE TOP OF DAM ELEVATION =336' if ,f I CONCRETE FOUNDATION (18" THICK, 6o" DIA., RISER OUTLET PROTECTION -- EMBEDDED 6" INTO THE CONCRETE) CLAY C RED DAM =41 I KEYED INTO THE A-41 - 41 INV. IN _ EXISTING GROUND N 10 DOUBLE WALL HDPE 5 -- i r I. . = 340.00' (z) 2.0'X 2.0' GALV. STEEL LENGTH =112' ANTI -SEEP COLLARS SLOPE -- 3.13% Sediment Trap 1 design drainage area (acres) ( <3) 0.34 trap volumes: but CREST OF STORE WEIRyg• elevation (ft) area (sf) volume(cy) ,�• 415.00 932.0 0.0 416.00 1215.0 39.6 DRY STORAGE ,�� VMWkE 417.00 1522.0 90.2 418.00 1855.0 152.7 WET STORAGE 4, MAX. 0.0 (k%C"110) FILTER aoTH WOUND RSLV. wet storage: RPW wet storage required (cy) (67*DA) 22.8 MATE 3t3_, "` "` CLASS ` I bottom of stone weir (ft) 416.0 wet storage provided at this elevation (cy) 39.6 slope of wet storage sides 2:1 weir length (ft) (6)dDA) 2.0 (grin.) dry storage: bottom of trap elevation (ft) 415 dry storage required (cy) (67 *DA) 22.8 bottom trap dimensions: 19x46 crest of stone weir 417.0 top of dam elevation (ft) 418 dry storage provided at this elevation (cy) 50.6 top width of dam (ft) 6 slope of dry _storage sides 2:1 top trap dimensions 31'x58' SEDIMENT BASIN #3 6 "TOPSOIL EXISTING GROUND NTS -1 10, 13" HIGH, 16 GAGE TEMPORARY CMP TOP OF DAM ELEV. = 326.00' TRASH RACK DEVICE 25 YR. STORM 1.o' MIN. %. EMERGENCY SPILLWAY ELEV= 324.75' CREST ELEV. = 324.75 RISER TOP ELEV.=3z3.75' 1.0' MIN. %s 2 ' DIA. CL. III RCP RISER i s � Vii: 4' DRY VOLUME ELEV. 1' SCARIFIED KEY FOR REQUIRED = 323.75' ; ;;' " "' �' SOIL COHESION 5" DIA. DEWATERING DEVICE, ELEV. = 321.82' INV. OUT = 316.0' UPSTREAM TOE OF DAM n BOTTOM OF BASIN EXISTING GROUND ELEV= 319.50 ELEV- 319.50 CONCRETE FOUNDATION (18" THICK, 72" DIA., RISER ry OUTLET PROTECTION EMBEDDED 6" INTO THE CONCRETE) CLAY C RED DAM KEYED INTO THE EXISTING GROUND INV. IN = 316.72' 15" CL. III RCP (2) 3.3'X 3.3' GALV. STEEL LENGTH =72' ANTI -SEEP COLLARS SLOPE =1.00% SEDIMENT BASIN #3 PROFILE(SCALEI " =4o') 375 PROPOSED 015" INVERT IN =316 L. III RCP BARREL, 72 LF; TOP OFD; PROPOSED 24" CL. III RCP RISER STRUCTURE 72'; INVERT OUT= 316.00' DAM= 326.00 RISER RIM ELEVATION =323.75'• 350 TING GRADE 325 IMN Mme• BASIN FLOOR = 319.50' --- PROPOSED GRADE 300 i OUTLET PROTECTION 0o Oqq rr! oo � rn °, N' Oq r q N N N M ri R�YI M M M M M M M M M 0 +00 0 +50 1 +00 1 +50 2 +00 2 +25 Sediment Basin #2 Design M. VW ! SPILLWAY CREST OF EMERGENCY Y WITHOUT SPUWAY drainage area (acres) 3.47 DESIGN HIGH WATER basin volumes: (using 2' contour intenats) (25 -YR. STORY ELEV.) elevation (ft) contour area (sf) volume (cy) 0.s 344,00 3649.0 0 LtlN T O 346.00 4710.0 308.8 r RISE CREST oRY • sroRACE .� �� RING 348.00 5887.0 700.4 350.00 7174.0 1183.4 •WET • Sm""' E - SEDIMENT CLEMIOUT POfHT (' WET ' STORAGE REaIxEo TO 34 C.Y. / ACRE) wet storage: wet storage required (cy) (67 *DA) 232.5 design high wafer (ft) 348.75 dewatering orifice elevation (ft) 345.75 top of dam (ft) 350.00 wet storage provided at this elevation (cy) 269.5 top width of dam (ft) 10.0 available volume before cleanout (cy) (34 *DA) 118.0 bottom of basin (ft) 344.0 cleanout elevation (ft) 344.75 approx bottom dimensions: 66'X74' distance from cleanout to orifice (ft) (> 1') 1.0 upstream face slope: 2:1 downstream face slope: 3:1 dry storage: dry storage required (cy) (67 *DA) 232.5 baffles: YES principle spillway crest (ft) 347.0 length of flow, L (ft) 99 dry storage provided at this elevation (cy) 234.35 effective width, We (ft) 53 diameter of dewatering orifice (in) 4.0 L / We (baffles not required if > 2) 1.9 diameter of flexible tubing (in) (orifice +2 ") 6.0 collars: YES runoff: depth of water at spillway crest (ft) 3.00 C ( use 0.45 for bare earth) 0.6 sloe of upstream face (Z 1) 2 :1 tc (Mn) 7.5 slope of barrel (Sb) 3.13 % 1 2yr 4.60 Q 2yr 9.58 length of barrel in saturated zone (Ls) 20.57' 1 25yr 7.50 Q 25yr 17.18 number collars required 2 dimension of collars 2.9x2.0' principle spillway: available head (ft) 10 emergency Will\Aey: YES diameter riser (in) 24 required capacity (Q25 -Qp) (cfs) 7.60 spillway capacity, Op (cfs) 10 bottom width (ft) 56 diameter trash rack (in) 36 slope of east channel (ft/ft) 25% barrel length (ft) 112 ininimun length of exit channel (ft) 55 head on barrel through embankment (ft) 11.5 crest of spillway (ft) 348.75 diameter of barrel in 10 Sediment Basin #3 Design drainage area (acres) 6.34 basin volumes: (using 2' contour intervals) elevation (ft) contour area (sf) volume (cy) 319.50 4122.0 0 320.00 4450.0 79.4 322.00 5843.0 459.4 324.00 7359.0 947.3 326.00 8980.0 1551.4 vwet storage required (cy) (67 *DA) dewatering orifice elevation (ft) wet storage provided at this elevation (cy) available volume before cleanout (cy) (34 *DA) cleanout elevation (ft) distance from cleanout to orifice (ft) (> 1') dry s We- dry storage required (cy) (67 *DA) principle spillway crest (ft) dry storage provided at this elevation (cy) diameter of dewatering orifice (in) diameter of flexible tubing (in) (orifice+2 ") runoff: C (use 0,45 for bare earth) tc (min) 1 2yr 3.95 Q 2yr 125yr 6.60 Q25yr Rrincigle illrtvav: available head (ft) diameter riser (in) Spillway capacity, Op (cfs) diameter trash rack (in) barrel length (ft) head on barrel through embankment (ft) diameter of barrel (in) MIN. t Wf SPILLWAY CREST OF ENC- 2' WITHOl1T SPILLWAY DESIGN HIGH WATER ,,(25 -YR- STORM ELEV.) SEDMEM CLEANOUT POINT (' WET ' STORAGE REDUCED TO 34 C.Y. / ACRt) 424.8 design high water (ft) 321.82 top of dam (ft) 424.8 top width of dam (ft) 215.6 bottom of basin (ft) 320.70 approx bottom dimensions: 1.1 upstream face slope: downstream face slope: 424.8 baffles: 323.75 length of flow, L (ft) 461.8 effective width, We (ft) 5.0 L / We (baffles not required if > 2) 7.0 collars: depth of water at spillway crest (ft) 0.6 slope of upstream face (Z 1) 11.5 slope of barrel (Sb) 15.03 length of barrel in saturated zone (Ls) 27.62 number collars required dimension of collars 2.3 ernercg@ncy spillway: 24 required capacity (Q25 -Qp) (cfs) 15.03 bottom width (ft) 36 slope of exist channel (ft/ft) 72 minimun length of exit channel (ft) 8.75 crest of spillway (ft) 15 RISER CREST DEMTER "r. 324.75 32"6.00 10.0 319.5 4(YX131' 2 :1 3:1 YES 91 79 1.2 YES 4.25 2 :1 1 % 26.56 2 3.3 "X3.3' YES 12:59 45 25% 40 324 -75 SEDIMENT BASIN #2 DETAIL (SCALE 2"=2o') SEDIMENT BASIN #2 PROFILE (SCALE 1"=40') 400 TOP OF PROPOSED 024" HDPE RISER STRUCTURE RISER RIM ELEVATION = 347.00 PROPOSED 010'1 HDPE DAM= 350-00' i 375 -35 i PRO POSEDGRADE DOUBLE WALL BARREL,-- - - - - -- - -- - - - -- -- - - -- - -- - -T-------------- - - - 112 LF; INVERT IN= 340.00; j EXISTING GRADE INVERT OUT = 336.50' 350. ' = BASIN FLOOR 21 ' ' -- 344• 00' 325 OUTLET PROTECTION d- 00 00 0) Ln Ln O Ln O LD It 00 n N Ln CO O O 10 N Ln 00 00 M LD LD It ri o o, M M M It It 't It Ln � W Ln M M M M M M M M M M M o +o0 0 +50 1 +00 1 +50 2 +00 2 +50 2 +75 0 PROPOSED WIDE GRASS INE MERGENCY 1 PROPOSE 024" HDPE R SER Sl' UC URE RISER RIM ELEVATION = 347.00' SPILLWAY CREST ELEVATION =348.75' \ PROPOSED VDOT " #3 COARSE AGGREGATE OUTLET PROTECTION w/ GEOTEXTILE FILTER FABRIC' UNDERLAYMENT (L =16', W1 =6'1 ? M W2 =18' D =2' MIN.' ) ' w PR POSED �AF S `� co N 1 ( \ \ + ?V PROPOSED 010" HDPE _ ' DOUBLE WALL BARREL, ' ;' 66, \. 1 �N SEDIMENT BASIN #3 DETAIL (SCALEI " =20') _--- 3 PR POSED VDOT #3 - COARSE AGGREGATE -- OUTLET PROTECTION w% boo / GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =35', o -""34O -_ W1 =10_, D =2' MIN.)," 33� _.._ - -_ --- _ 324 - 330 3 20 PROPOSED BAFFLES ~ _- PROPOSED 24 CL. III C RISER ST UC� _ -RIS ER RIM ELEVATION= = 23.7 13 " - - = -- - - - 319.50 6 r r 2 - 326 10' WIDE TOP OF DAM ELEVATION =326' 'hop VDOT #3 COARSE AGGREGATE OUTLET ROTECTION w/ GEOTEXTILE FILTER FABRIC o 324 ,% NDERLAYMENT (L =11', W1= 3.75', W2= 12.25', D =2' MIN.) 0 -- ry f _ 320 % "PROPOSED 015" CL. III RCP BARREL, 72 LF- INVERT IN= 316.72'; .. � - _ PROPOSED 45WIDE G2ASS LINED EM ERGENCY =�-- SPILLWAY CREST ELEVATION = 324.75 INVERT OUT = 316.00' , / CONTRACTOR SHALL NOT Y % PROPOSED VDOT #3 COARSE AGGREGATE OUTLET DISTURB WETLANDS (TYP.) PROTECTION w/ GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =12', W1= 3.75', W2= 13.25', D =2' MIN.) v -- ....- OF 0 r� ZCOTT R. COLLINS---* U No. 35791 �SSIONAL E��1 Z O a U 0 w ° Z O Ln w RY Z O w �a H ° W ce Ln In O C7% ,-i N v Ln U.1 LU Z O a Ln U') Inc w w U m m j � O O Z a - 5 � > Z O O w U U r0r Ce. a a w w Ce Ce Ln Ln LL, Ln M U1 t0 L9 M M 07 N M d' I N � O � N W � ~ Q Q LU > W W � J � J J > U �c U) N �- � z I- 0 a o U° J Z Q Q z° W31 U 5' P__4 I Q U Lij L W to U1 W F- to 06 a U) W z 0 r Z W (- O c W 0 V) e. .j F- V vJ W F- 0 - J W W 0 z w z z U 0 Z 0 N ti w a r a s O w a U) JOB NO. 142109 z SCALE AS SHOWN t SHEET NO. t 6 z 0 U c 3 a t 0 y 3 0 c _o U 0 c 0 0 V T: 0 U Z G 0 0 DESIGN HIGH WATER (z:4�YR 'rt ay.) to DRY ' STORAGE ' WET' STORAGE ._ -- SEDIMENT CI.EANOUT POINT (' WETT ` STOWE REDUCED WAN. W(SPILLWAY CREST OF DERGENCY 1WITiHOUT $FttLWAY f RISER CREST O ACC£t wet storage required (cy) (67 *DA) 482.4 design high waster (ft) 334.75 dewatering orifice elevation (ft) 331.81 top of dam (ft) 336.00 wet storage provided at this elevation (cy) 482.4 top width of dam (ft) 10.0 available volume before cleanout (cy) (34 *DA) 244.8 bottom of basin (ft) 329.5 cleanout elevation (ft) 330.69 approx bottom dimensions: 42'x122' distance from cleanout to orifice (ft) (> 1') 1.1 upstream face slope: 2 :1 downstream face slope: 3:1 dry stora±ae: dry storage required (cy) (67 *DA) 482.4 YES principle spillway crest (ft) 333.75 length of flow, L (ft) 62 dry storage provided at this elevation (cy) 507.4 effective width, We (ft) 156 diameter of dewatering orifice (in) 5.0 L / We ( baffles not required if > 2) 0.4 diameter of flexble tubing (in) (orifice+2") 7.0 collars: YES ruriaif: depth of water at spillway crest (ft) 4.25 C (use 0.45 for bare earth) 0.6 slope of upstream face (Z1) 2 :1 tc (min) 13 slope of barrel (Sb) 2.38% 1 2yr 3.70 Q 2yr 15.98 length of barrel in saturated zone (Ls) 28.18 1 25y 6,20 Q 25yr 29.46 number collars required 2 dimension of collars 3.4V.4' principle SpiitiA . available head (ft) 2.25 emergency spiba: YES diameter riser (in) 24 required capacity (Q25 -0p) (cfs) 13.48 spillway capacity, Qp (cfs) 15.98 bottom width (ft) 115 diameter trash rack (in) 36 slope of exist channel (ftlft) 25.0% barrel length (ft) 84 minimun length of exit channel (ft) 60 head on barrel through embankment {ft) 12.75 crest of spillway (ft) 334.75 diameter of barrel in 15 SEDIMENT BASIN #1 DETAIL (SCALE I "=20') PR POSED VDOT #3 COARSE AGGREGATE OUTLET 3So - -- - -- PROTECTION w/ GEOTEXTILE FILTER FABRIC 350 PROPOSED VDOT #3 COARSE AGGREGATE OUTLET -5 ° PROTECTION w/ GEOTEXTILE FILTER FABRIC NDERLAYMENT (L -_ 30, W _ 5, D _ 2 MIN.) \34 UNDERLAYMENT (L -13', W1- 3.75', W2- 14.25', D -2' MIN.) 34 x 3 N 0 -_ tr' PROPOSED 024" CL. III RC�RISER- STRUCTURE _ 1AlOO RISER RIM ELEVATION= / ' 33 X75 • -- PROPOSED 01511 CL. III RCP BARREL, 84 LF; k -Zf 00 / INVERT IN= 324.00, -- INVERTOUT= 320.50 y ok5° 330' PROPOS __. BAFFLES ZZ - ED ___ 34 z __ 0 +p0. ti ROPOS D VDOT #3 COARSE AGGREGATE OUTLET -' u< _ - -PROTECTION w/ GEOTEXTILE FILTER FABRIC o -r_Y \ IUNDERLAYMENT (L =6', W1= 3.75',_W2= 7.25', D =2 MIN.) -- -330--' J - --Y - X Io' WI[5E 1`OP OF A ELEVATION =3 6 PROPOSED 115' WIDE ,RAS EM ENCY ' X i�._:- i(--j( SPILLWAY CREST ELEVATION=S 4.75 SEDIMENT TRAP #1 DETAIL (SCALE 1"=20') SEDIMLN I BANN #2 6" TOPSOIL EXISTING GROUND NTS -i 10' 13" HIGH, 16 GAGE TEMPORARY CMP TOP OF DAM ELEV. = 350.00' I I TRASH RACK DEVICE N 0 25 YR. STORM 1.0, MI r °" EMERGENCY SPILLWAY " ELEV = 348.75' CRESTELEV.= 348.75 I 1 RISER TOP ELEV. =34 .00' 1.0' MIN. 24" DIA. HDPE RISER VOLU Ey DRY REQU REDME ELOEOV. 1 1' SCARIFIED KEY FOR 34„ DIA. DEWATERING � �, SOIL COHESION BOTTOM OF BASIN DEVICE, ELEV. = 345.75 NV. OUT = 336.50' �� EXISTING GROUND i ELEV= oo UPSTREAM TOE OF Doo • 344 1o' WIDE TOP OF DAM ELEVATION =336' if ,f I CONCRETE FOUNDATION (18" THICK, 6o" DIA., RISER OUTLET PROTECTION -- EMBEDDED 6" INTO THE CONCRETE) CLAY C RED DAM =41 I KEYED INTO THE A-41 - 41 INV. IN _ EXISTING GROUND N 10 DOUBLE WALL HDPE 5 -- i r I. . = 340.00' (z) 2.0'X 2.0' GALV. STEEL LENGTH =112' ANTI -SEEP COLLARS SLOPE -- 3.13% Sediment Trap 1 design drainage area (acres) ( <3) 0.34 trap volumes: but CREST OF STORE WEIRyg• elevation (ft) area (sf) volume(cy) ,�• 415.00 932.0 0.0 416.00 1215.0 39.6 DRY STORAGE ,�� VMWkE 417.00 1522.0 90.2 418.00 1855.0 152.7 WET STORAGE 4, MAX. 0.0 (k%C"110) FILTER aoTH WOUND RSLV. wet storage: RPW wet storage required (cy) (67*DA) 22.8 MATE 3t3_, "` "` CLASS ` I bottom of stone weir (ft) 416.0 wet storage provided at this elevation (cy) 39.6 slope of wet storage sides 2:1 weir length (ft) (6)dDA) 2.0 (grin.) dry storage: bottom of trap elevation (ft) 415 dry storage required (cy) (67 *DA) 22.8 bottom trap dimensions: 19x46 crest of stone weir 417.0 top of dam elevation (ft) 418 dry storage provided at this elevation (cy) 50.6 top width of dam (ft) 6 slope of dry _storage sides 2:1 top trap dimensions 31'x58' SEDIMENT BASIN #3 6 "TOPSOIL EXISTING GROUND NTS -1 10, 13" HIGH, 16 GAGE TEMPORARY CMP TOP OF DAM ELEV. = 326.00' TRASH RACK DEVICE 25 YR. STORM 1.o' MIN. %. EMERGENCY SPILLWAY ELEV= 324.75' CREST ELEV. = 324.75 RISER TOP ELEV.=3z3.75' 1.0' MIN. %s 2 ' DIA. CL. III RCP RISER i s � Vii: 4' DRY VOLUME ELEV. 1' SCARIFIED KEY FOR REQUIRED = 323.75' ; ;;' " "' �' SOIL COHESION 5" DIA. DEWATERING DEVICE, ELEV. = 321.82' INV. OUT = 316.0' UPSTREAM TOE OF DAM n BOTTOM OF BASIN EXISTING GROUND ELEV= 319.50 ELEV- 319.50 CONCRETE FOUNDATION (18" THICK, 72" DIA., RISER ry OUTLET PROTECTION EMBEDDED 6" INTO THE CONCRETE) CLAY C RED DAM KEYED INTO THE EXISTING GROUND INV. IN = 316.72' 15" CL. III RCP (2) 3.3'X 3.3' GALV. STEEL LENGTH =72' ANTI -SEEP COLLARS SLOPE =1.00% SEDIMENT BASIN #3 PROFILE(SCALEI " =4o') 375 PROPOSED 015" INVERT IN =316 L. III RCP BARREL, 72 LF; TOP OFD; PROPOSED 24" CL. III RCP RISER STRUCTURE 72'; INVERT OUT= 316.00' DAM= 326.00 RISER RIM ELEVATION =323.75'• 350 TING GRADE 325 IMN Mme• BASIN FLOOR = 319.50' --- PROPOSED GRADE 300 i OUTLET PROTECTION 0o Oqq rr! oo � rn °, N' Oq r q N N N M ri R�YI M M M M M M M M M 0 +00 0 +50 1 +00 1 +50 2 +00 2 +25 Sediment Basin #2 Design M. VW ! SPILLWAY CREST OF EMERGENCY Y WITHOUT SPUWAY drainage area (acres) 3.47 DESIGN HIGH WATER basin volumes: (using 2' contour intenats) (25 -YR. STORY ELEV.) elevation (ft) contour area (sf) volume (cy) 0.s 344,00 3649.0 0 LtlN T O 346.00 4710.0 308.8 r RISE CREST oRY • sroRACE .� �� RING 348.00 5887.0 700.4 350.00 7174.0 1183.4 •WET • Sm""' E - SEDIMENT CLEMIOUT POfHT (' WET ' STORAGE REaIxEo TO 34 C.Y. / ACRE) wet storage: wet storage required (cy) (67 *DA) 232.5 design high wafer (ft) 348.75 dewatering orifice elevation (ft) 345.75 top of dam (ft) 350.00 wet storage provided at this elevation (cy) 269.5 top width of dam (ft) 10.0 available volume before cleanout (cy) (34 *DA) 118.0 bottom of basin (ft) 344.0 cleanout elevation (ft) 344.75 approx bottom dimensions: 66'X74' distance from cleanout to orifice (ft) (> 1') 1.0 upstream face slope: 2:1 downstream face slope: 3:1 dry storage: dry storage required (cy) (67 *DA) 232.5 baffles: YES principle spillway crest (ft) 347.0 length of flow, L (ft) 99 dry storage provided at this elevation (cy) 234.35 effective width, We (ft) 53 diameter of dewatering orifice (in) 4.0 L / We (baffles not required if > 2) 1.9 diameter of flexible tubing (in) (orifice +2 ") 6.0 collars: YES runoff: depth of water at spillway crest (ft) 3.00 C ( use 0.45 for bare earth) 0.6 sloe of upstream face (Z 1) 2 :1 tc (Mn) 7.5 slope of barrel (Sb) 3.13 % 1 2yr 4.60 Q 2yr 9.58 length of barrel in saturated zone (Ls) 20.57' 1 25yr 7.50 Q 25yr 17.18 number collars required 2 dimension of collars 2.9x2.0' principle spillway: available head (ft) 10 emergency Will\Aey: YES diameter riser (in) 24 required capacity (Q25 -Qp) (cfs) 7.60 spillway capacity, Op (cfs) 10 bottom width (ft) 56 diameter trash rack (in) 36 slope of east channel (ft/ft) 25% barrel length (ft) 112 ininimun length of exit channel (ft) 55 head on barrel through embankment (ft) 11.5 crest of spillway (ft) 348.75 diameter of barrel in 10 Sediment Basin #3 Design drainage area (acres) 6.34 basin volumes: (using 2' contour intervals) elevation (ft) contour area (sf) volume (cy) 319.50 4122.0 0 320.00 4450.0 79.4 322.00 5843.0 459.4 324.00 7359.0 947.3 326.00 8980.0 1551.4 vwet storage required (cy) (67 *DA) dewatering orifice elevation (ft) wet storage provided at this elevation (cy) available volume before cleanout (cy) (34 *DA) cleanout elevation (ft) distance from cleanout to orifice (ft) (> 1') dry s We- dry storage required (cy) (67 *DA) principle spillway crest (ft) dry storage provided at this elevation (cy) diameter of dewatering orifice (in) diameter of flexible tubing (in) (orifice+2 ") runoff: C (use 0,45 for bare earth) tc (min) 1 2yr 3.95 Q 2yr 125yr 6.60 Q25yr Rrincigle illrtvav: available head (ft) diameter riser (in) Spillway capacity, Op (cfs) diameter trash rack (in) barrel length (ft) head on barrel through embankment (ft) diameter of barrel (in) MIN. t Wf SPILLWAY CREST OF ENC- 2' WITHOl1T SPILLWAY DESIGN HIGH WATER ,,(25 -YR- STORM ELEV.) SEDMEM CLEANOUT POINT (' WET ' STORAGE REDUCED TO 34 C.Y. / ACRt) 424.8 design high water (ft) 321.82 top of dam (ft) 424.8 top width of dam (ft) 215.6 bottom of basin (ft) 320.70 approx bottom dimensions: 1.1 upstream face slope: downstream face slope: 424.8 baffles: 323.75 length of flow, L (ft) 461.8 effective width, We (ft) 5.0 L / We (baffles not required if > 2) 7.0 collars: depth of water at spillway crest (ft) 0.6 slope of upstream face (Z 1) 11.5 slope of barrel (Sb) 15.03 length of barrel in saturated zone (Ls) 27.62 number collars required dimension of collars 2.3 ernercg@ncy spillway: 24 required capacity (Q25 -Qp) (cfs) 15.03 bottom width (ft) 36 slope of exist channel (ft/ft) 72 minimun length of exit channel (ft) 8.75 crest of spillway (ft) 15 RISER CREST DEMTER "r. 324.75 32"6.00 10.0 319.5 4(YX131' 2 :1 3:1 YES 91 79 1.2 YES 4.25 2 :1 1 % 26.56 2 3.3 "X3.3' YES 12:59 45 25% 40 324 -75 SEDIMENT BASIN #2 DETAIL (SCALE 2"=2o') SEDIMENT BASIN #2 PROFILE (SCALE 1"=40') 400 TOP OF PROPOSED 024" HDPE RISER STRUCTURE RISER RIM ELEVATION = 347.00 PROPOSED 010'1 HDPE DAM= 350-00' i 375 -35 i PRO POSEDGRADE DOUBLE WALL BARREL,-- - - - - -- - -- - - - -- -- - - -- - -- - -T-------------- - - - 112 LF; INVERT IN= 340.00; j EXISTING GRADE INVERT OUT = 336.50' 350. ' = BASIN FLOOR 21 ' ' -- 344• 00' 325 OUTLET PROTECTION d- 00 00 0) Ln Ln O Ln O LD It 00 n N Ln CO O O 10 N Ln 00 00 M LD LD It ri o o, M M M It It 't It Ln � W Ln M M M M M M M M M M M o +o0 0 +50 1 +00 1 +50 2 +00 2 +50 2 +75 0 PROPOSED WIDE GRASS INE MERGENCY 1 PROPOSE 024" HDPE R SER Sl' UC URE RISER RIM ELEVATION = 347.00' SPILLWAY CREST ELEVATION =348.75' \ PROPOSED VDOT " #3 COARSE AGGREGATE OUTLET PROTECTION w/ GEOTEXTILE FILTER FABRIC' UNDERLAYMENT (L =16', W1 =6'1 ? M W2 =18' D =2' MIN.' ) ' w PR POSED �AF S `� co N 1 ( \ \ + ?V PROPOSED 010" HDPE _ ' DOUBLE WALL BARREL, ' ;' 66, \. 1 �N SEDIMENT BASIN #3 DETAIL (SCALEI " =20') _--- 3 PR POSED VDOT #3 - COARSE AGGREGATE -- OUTLET PROTECTION w% boo / GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =35', o -""34O -_ W1 =10_, D =2' MIN.)," 33� _.._ - -_ --- _ 324 - 330 3 20 PROPOSED BAFFLES ~ _- PROPOSED 24 CL. III C RISER ST UC� _ -RIS ER RIM ELEVATION= = 23.7 13 " - - = -- - - - 319.50 6 r r 2 - 326 10' WIDE TOP OF DAM ELEVATION =326' 'hop VDOT #3 COARSE AGGREGATE OUTLET ROTECTION w/ GEOTEXTILE FILTER FABRIC o 324 ,% NDERLAYMENT (L =11', W1= 3.75', W2= 12.25', D =2' MIN.) 0 -- ry f _ 320 % "PROPOSED 015" CL. III RCP BARREL, 72 LF- INVERT IN= 316.72'; .. � - _ PROPOSED 45WIDE G2ASS LINED EM ERGENCY =�-- SPILLWAY CREST ELEVATION = 324.75 INVERT OUT = 316.00' , / CONTRACTOR SHALL NOT Y % PROPOSED VDOT #3 COARSE AGGREGATE OUTLET DISTURB WETLANDS (TYP.) PROTECTION w/ GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =12', W1= 3.75', W2= 13.25', D =2' MIN.) v -- ....- OF 0 r� ZCOTT R. COLLINS---* U No. 35791 �SSIONAL E��1 Z O a U 0 w ° Z O Ln w RY Z O w �a H ° W ce Ln In O C7% ,-i N v Ln U.1 LU Z O a Ln U') Inc w w U m m j � O O Z a - 5 � > Z O O w U U r0r Ce. a a w w Ce Ce Ln Ln LL, Ln M U1 t0 L9 M M 07 N M d' I N � O � N W � ~ Q Q LU > W W � J � J J > U �c U) N �- � z I- 0 a o U° J Z Q Q z° W31 U 5' P__4 I Q U Lij L W to U1 W F- to 06 a U) W z 0 r Z W (- O c W 0 V) e. .j F- V vJ W F- 0 - J W W 0 z w z z U 0 Z 0 N ti w a r a s O w a U) JOB NO. 142109 z SCALE AS SHOWN t SHEET NO. t 6 z 0 U c 3 a t 0 y 3 0 c _o U 0 c 0 0 V T: 0 U Z G 0 0 SEDIMENT BASIN #1 DETAIL (SCALE I "=20') PR POSED VDOT #3 COARSE AGGREGATE OUTLET 3So - -- - -- PROTECTION w/ GEOTEXTILE FILTER FABRIC 350 PROPOSED VDOT #3 COARSE AGGREGATE OUTLET -5 ° PROTECTION w/ GEOTEXTILE FILTER FABRIC NDERLAYMENT (L -_ 30, W _ 5, D _ 2 MIN.) \34 UNDERLAYMENT (L -13', W1- 3.75', W2- 14.25', D -2' MIN.) 34 x 3 N 0 -_ tr' PROPOSED 024" CL. III RC�RISER- STRUCTURE _ 1AlOO RISER RIM ELEVATION= / ' 33 X75 • -- PROPOSED 01511 CL. III RCP BARREL, 84 LF; k -Zf 00 / INVERT IN= 324.00, -- INVERTOUT= 320.50 y ok5° 330' PROPOS __. BAFFLES ZZ - ED ___ 34 z __ 0 +p0. ti ROPOS D VDOT #3 COARSE AGGREGATE OUTLET -' u< _ - -PROTECTION w/ GEOTEXTILE FILTER FABRIC o -r_Y \ IUNDERLAYMENT (L =6', W1= 3.75',_W2= 7.25', D =2 MIN.) -- -330--' J - --Y - X Io' WI[5E 1`OP OF A ELEVATION =3 6 PROPOSED 115' WIDE ,RAS EM ENCY ' X i�._:- i(--j( SPILLWAY CREST ELEVATION=S 4.75 SEDIMENT TRAP #1 DETAIL (SCALE 1"=20') SEDIMLN I BANN #2 6" TOPSOIL EXISTING GROUND NTS -i 10' 13" HIGH, 16 GAGE TEMPORARY CMP TOP OF DAM ELEV. = 350.00' I I TRASH RACK DEVICE N 0 25 YR. STORM 1.0, MI r °" EMERGENCY SPILLWAY " ELEV = 348.75' CRESTELEV.= 348.75 I 1 RISER TOP ELEV. =34 .00' 1.0' MIN. 24" DIA. HDPE RISER VOLU Ey DRY REQU REDME ELOEOV. 1 1' SCARIFIED KEY FOR 34„ DIA. DEWATERING � �, SOIL COHESION BOTTOM OF BASIN DEVICE, ELEV. = 345.75 NV. OUT = 336.50' �� EXISTING GROUND i ELEV= oo UPSTREAM TOE OF Doo • 344 1o' WIDE TOP OF DAM ELEVATION =336' if ,f I CONCRETE FOUNDATION (18" THICK, 6o" DIA., RISER OUTLET PROTECTION -- EMBEDDED 6" INTO THE CONCRETE) CLAY C RED DAM =41 I KEYED INTO THE A-41 - 41 INV. IN _ EXISTING GROUND N 10 DOUBLE WALL HDPE 5 -- i r I. . = 340.00' (z) 2.0'X 2.0' GALV. STEEL LENGTH =112' ANTI -SEEP COLLARS SLOPE -- 3.13% Sediment Trap 1 design drainage area (acres) ( <3) 0.34 trap volumes: but CREST OF STORE WEIRyg• elevation (ft) area (sf) volume(cy) ,�• 415.00 932.0 0.0 416.00 1215.0 39.6 DRY STORAGE ,�� VMWkE 417.00 1522.0 90.2 418.00 1855.0 152.7 WET STORAGE 4, MAX. 0.0 (k%C"110) FILTER aoTH WOUND RSLV. wet storage: RPW wet storage required (cy) (67*DA) 22.8 MATE 3t3_, "` "` CLASS ` I bottom of stone weir (ft) 416.0 wet storage provided at this elevation (cy) 39.6 slope of wet storage sides 2:1 weir length (ft) (6)dDA) 2.0 (grin.) dry storage: bottom of trap elevation (ft) 415 dry storage required (cy) (67 *DA) 22.8 bottom trap dimensions: 19x46 crest of stone weir 417.0 top of dam elevation (ft) 418 dry storage provided at this elevation (cy) 50.6 top width of dam (ft) 6 slope of dry _storage sides 2:1 top trap dimensions 31'x58' SEDIMENT BASIN #3 6 "TOPSOIL EXISTING GROUND NTS -1 10, 13" HIGH, 16 GAGE TEMPORARY CMP TOP OF DAM ELEV. = 326.00' TRASH RACK DEVICE 25 YR. STORM 1.o' MIN. %. EMERGENCY SPILLWAY ELEV= 324.75' CREST ELEV. = 324.75 RISER TOP ELEV.=3z3.75' 1.0' MIN. %s 2 ' DIA. CL. III RCP RISER i s � Vii: 4' DRY VOLUME ELEV. 1' SCARIFIED KEY FOR REQUIRED = 323.75' ; ;;' " "' �' SOIL COHESION 5" DIA. DEWATERING DEVICE, ELEV. = 321.82' INV. OUT = 316.0' UPSTREAM TOE OF DAM n BOTTOM OF BASIN EXISTING GROUND ELEV= 319.50 ELEV- 319.50 CONCRETE FOUNDATION (18" THICK, 72" DIA., RISER ry OUTLET PROTECTION EMBEDDED 6" INTO THE CONCRETE) CLAY C RED DAM KEYED INTO THE EXISTING GROUND INV. IN = 316.72' 15" CL. III RCP (2) 3.3'X 3.3' GALV. STEEL LENGTH =72' ANTI -SEEP COLLARS SLOPE =1.00% SEDIMENT BASIN #3 PROFILE(SCALEI " =4o') 375 PROPOSED 015" INVERT IN =316 L. III RCP BARREL, 72 LF; TOP OFD; PROPOSED 24" CL. III RCP RISER STRUCTURE 72'; INVERT OUT= 316.00' DAM= 326.00 RISER RIM ELEVATION =323.75'• 350 TING GRADE 325 IMN Mme• BASIN FLOOR = 319.50' --- PROPOSED GRADE 300 i OUTLET PROTECTION 0o Oqq rr! oo � rn °, N' Oq r q N N N M ri R�YI M M M M M M M M M 0 +00 0 +50 1 +00 1 +50 2 +00 2 +25 Sediment Basin #2 Design M. VW ! SPILLWAY CREST OF EMERGENCY Y WITHOUT SPUWAY drainage area (acres) 3.47 DESIGN HIGH WATER basin volumes: (using 2' contour intenats) (25 -YR. STORY ELEV.) elevation (ft) contour area (sf) volume (cy) 0.s 344,00 3649.0 0 LtlN T O 346.00 4710.0 308.8 r RISE CREST oRY • sroRACE .� �� RING 348.00 5887.0 700.4 350.00 7174.0 1183.4 •WET • Sm""' E - SEDIMENT CLEMIOUT POfHT (' WET ' STORAGE REaIxEo TO 34 C.Y. / ACRE) wet storage: wet storage required (cy) (67 *DA) 232.5 design high wafer (ft) 348.75 dewatering orifice elevation (ft) 345.75 top of dam (ft) 350.00 wet storage provided at this elevation (cy) 269.5 top width of dam (ft) 10.0 available volume before cleanout (cy) (34 *DA) 118.0 bottom of basin (ft) 344.0 cleanout elevation (ft) 344.75 approx bottom dimensions: 66'X74' distance from cleanout to orifice (ft) (> 1') 1.0 upstream face slope: 2:1 downstream face slope: 3:1 dry storage: dry storage required (cy) (67 *DA) 232.5 baffles: YES principle spillway crest (ft) 347.0 length of flow, L (ft) 99 dry storage provided at this elevation (cy) 234.35 effective width, We (ft) 53 diameter of dewatering orifice (in) 4.0 L / We (baffles not required if > 2) 1.9 diameter of flexible tubing (in) (orifice +2 ") 6.0 collars: YES runoff: depth of water at spillway crest (ft) 3.00 C ( use 0.45 for bare earth) 0.6 sloe of upstream face (Z 1) 2 :1 tc (Mn) 7.5 slope of barrel (Sb) 3.13 % 1 2yr 4.60 Q 2yr 9.58 length of barrel in saturated zone (Ls) 20.57' 1 25yr 7.50 Q 25yr 17.18 number collars required 2 dimension of collars 2.9x2.0' principle spillway: available head (ft) 10 emergency Will\Aey: YES diameter riser (in) 24 required capacity (Q25 -Qp) (cfs) 7.60 spillway capacity, Op (cfs) 10 bottom width (ft) 56 diameter trash rack (in) 36 slope of east channel (ft/ft) 25% barrel length (ft) 112 ininimun length of exit channel (ft) 55 head on barrel through embankment (ft) 11.5 crest of spillway (ft) 348.75 diameter of barrel in 10 Sediment Basin #3 Design drainage area (acres) 6.34 basin volumes: (using 2' contour intervals) elevation (ft) contour area (sf) volume (cy) 319.50 4122.0 0 320.00 4450.0 79.4 322.00 5843.0 459.4 324.00 7359.0 947.3 326.00 8980.0 1551.4 vwet storage required (cy) (67 *DA) dewatering orifice elevation (ft) wet storage provided at this elevation (cy) available volume before cleanout (cy) (34 *DA) cleanout elevation (ft) distance from cleanout to orifice (ft) (> 1') dry s We- dry storage required (cy) (67 *DA) principle spillway crest (ft) dry storage provided at this elevation (cy) diameter of dewatering orifice (in) diameter of flexible tubing (in) (orifice+2 ") runoff: C (use 0,45 for bare earth) tc (min) 1 2yr 3.95 Q 2yr 125yr 6.60 Q25yr Rrincigle illrtvav: available head (ft) diameter riser (in) Spillway capacity, Op (cfs) diameter trash rack (in) barrel length (ft) head on barrel through embankment (ft) diameter of barrel (in) MIN. t Wf SPILLWAY CREST OF ENC- 2' WITHOl1T SPILLWAY DESIGN HIGH WATER ,,(25 -YR- STORM ELEV.) SEDMEM CLEANOUT POINT (' WET ' STORAGE REDUCED TO 34 C.Y. / ACRt) 424.8 design high water (ft) 321.82 top of dam (ft) 424.8 top width of dam (ft) 215.6 bottom of basin (ft) 320.70 approx bottom dimensions: 1.1 upstream face slope: downstream face slope: 424.8 baffles: 323.75 length of flow, L (ft) 461.8 effective width, We (ft) 5.0 L / We (baffles not required if > 2) 7.0 collars: depth of water at spillway crest (ft) 0.6 slope of upstream face (Z 1) 11.5 slope of barrel (Sb) 15.03 length of barrel in saturated zone (Ls) 27.62 number collars required dimension of collars 2.3 ernercg@ncy spillway: 24 required capacity (Q25 -Qp) (cfs) 15.03 bottom width (ft) 36 slope of exist channel (ft/ft) 72 minimun length of exit channel (ft) 8.75 crest of spillway (ft) 15 RISER CREST DEMTER "r. 324.75 32"6.00 10.0 319.5 4(YX131' 2 :1 3:1 YES 91 79 1.2 YES 4.25 2 :1 1 % 26.56 2 3.3 "X3.3' YES 12:59 45 25% 40 324 -75 SEDIMENT BASIN #2 DETAIL (SCALE 2"=2o') SEDIMENT BASIN #2 PROFILE (SCALE 1"=40') 400 TOP OF PROPOSED 024" HDPE RISER STRUCTURE RISER RIM ELEVATION = 347.00 PROPOSED 010'1 HDPE DAM= 350-00' i 375 -35 i PRO POSEDGRADE DOUBLE WALL BARREL,-- - - - - -- - -- - - - -- -- - - -- - -- - -T-------------- - - - 112 LF; INVERT IN= 340.00; j EXISTING GRADE INVERT OUT = 336.50' 350. ' = BASIN FLOOR 21 ' ' -- 344• 00' 325 OUTLET PROTECTION d- 00 00 0) Ln Ln O Ln O LD It 00 n N Ln CO O O 10 N Ln 00 00 M LD LD It ri o o, M M M It It 't It Ln � W Ln M M M M M M M M M M M o +o0 0 +50 1 +00 1 +50 2 +00 2 +50 2 +75 0 PROPOSED WIDE GRASS INE MERGENCY 1 PROPOSE 024" HDPE R SER Sl' UC URE RISER RIM ELEVATION = 347.00' SPILLWAY CREST ELEVATION =348.75' \ PROPOSED VDOT " #3 COARSE AGGREGATE OUTLET PROTECTION w/ GEOTEXTILE FILTER FABRIC' UNDERLAYMENT (L =16', W1 =6'1 ? M W2 =18' D =2' MIN.' ) ' w PR POSED �AF S `� co N 1 ( \ \ + ?V PROPOSED 010" HDPE _ ' DOUBLE WALL BARREL, ' ;' 66, \. 1 �N SEDIMENT BASIN #3 DETAIL (SCALEI " =20') _--- 3 PR POSED VDOT #3 - COARSE AGGREGATE -- OUTLET PROTECTION w% boo / GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =35', o -""34O -_ W1 =10_, D =2' MIN.)," 33� _.._ - -_ --- _ 324 - 330 3 20 PROPOSED BAFFLES ~ _- PROPOSED 24 CL. III C RISER ST UC� _ -RIS ER RIM ELEVATION= = 23.7 13 " - - = -- - - - 319.50 6 r r 2 - 326 10' WIDE TOP OF DAM ELEVATION =326' 'hop VDOT #3 COARSE AGGREGATE OUTLET ROTECTION w/ GEOTEXTILE FILTER FABRIC o 324 ,% NDERLAYMENT (L =11', W1= 3.75', W2= 12.25', D =2' MIN.) 0 -- ry f _ 320 % "PROPOSED 015" CL. III RCP BARREL, 72 LF- INVERT IN= 316.72'; .. � - _ PROPOSED 45WIDE G2ASS LINED EM ERGENCY =�-- SPILLWAY CREST ELEVATION = 324.75 INVERT OUT = 316.00' , / CONTRACTOR SHALL NOT Y % PROPOSED VDOT #3 COARSE AGGREGATE OUTLET DISTURB WETLANDS (TYP.) PROTECTION w/ GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =12', W1= 3.75', W2= 13.25', D =2' MIN.) v -- ....- OF 0 r� ZCOTT R. COLLINS---* U No. 35791 �SSIONAL E��1 Z O a U 0 w ° Z O Ln w RY Z O w �a H ° W ce Ln In O C7% ,-i N v Ln U.1 LU Z O a Ln U') Inc w w U m m j � O O Z a - 5 � > Z O O w U U r0r Ce. a a w w Ce Ce Ln Ln LL, Ln M U1 t0 L9 M M 07 N M d' I N � O � N W � ~ Q Q LU > W W � J � J J > U �c U) N �- � z I- 0 a o U° J Z Q Q z° W31 U 5' P__4 I Q U Lij L W to U1 W F- to 06 a U) W z 0 r Z W (- O c W 0 V) e. .j F- V vJ W F- 0 - J W W 0 z w z z U 0 Z 0 N ti w a r a s O w a U) JOB NO. 142109 z SCALE AS SHOWN t SHEET NO. t 6 z 0 U c 3 a t 0 y 3 0 c _o U 0 c 0 0 V T: 0 U Z G 0 0 Sediment Trap 1 design drainage area (acres) ( <3) 0.34 trap volumes: but CREST OF STORE WEIRyg• elevation (ft) area (sf) volume(cy) ,�• 415.00 932.0 0.0 416.00 1215.0 39.6 DRY STORAGE ,�� VMWkE 417.00 1522.0 90.2 418.00 1855.0 152.7 WET STORAGE 4, MAX. 0.0 (k%C"110) FILTER aoTH WOUND RSLV. wet storage: RPW wet storage required (cy) (67*DA) 22.8 MATE 3t3_, "` "` CLASS ` I bottom of stone weir (ft) 416.0 wet storage provided at this elevation (cy) 39.6 slope of wet storage sides 2:1 weir length (ft) (6)dDA) 2.0 (grin.) dry storage: bottom of trap elevation (ft) 415 dry storage required (cy) (67 *DA) 22.8 bottom trap dimensions: 19x46 crest of stone weir 417.0 top of dam elevation (ft) 418 dry storage provided at this elevation (cy) 50.6 top width of dam (ft) 6 slope of dry _storage sides 2:1 top trap dimensions 31'x58' SEDIMENT BASIN #3 6 "TOPSOIL EXISTING GROUND NTS -1 10, 13" HIGH, 16 GAGE TEMPORARY CMP TOP OF DAM ELEV. = 326.00' TRASH RACK DEVICE 25 YR. STORM 1.o' MIN. %. EMERGENCY SPILLWAY ELEV= 324.75' CREST ELEV. = 324.75 RISER TOP ELEV.=3z3.75' 1.0' MIN. %s 2 ' DIA. CL. III RCP RISER i s � Vii: 4' DRY VOLUME ELEV. 1' SCARIFIED KEY FOR REQUIRED = 323.75' ; ;;' " "' �' SOIL COHESION 5" DIA. DEWATERING DEVICE, ELEV. = 321.82' INV. OUT = 316.0' UPSTREAM TOE OF DAM n BOTTOM OF BASIN EXISTING GROUND ELEV= 319.50 ELEV- 319.50 CONCRETE FOUNDATION (18" THICK, 72" DIA., RISER ry OUTLET PROTECTION EMBEDDED 6" INTO THE CONCRETE) CLAY C RED DAM KEYED INTO THE EXISTING GROUND INV. IN = 316.72' 15" CL. III RCP (2) 3.3'X 3.3' GALV. STEEL LENGTH =72' ANTI -SEEP COLLARS SLOPE =1.00% SEDIMENT BASIN #3 PROFILE(SCALEI " =4o') 375 PROPOSED 015" INVERT IN =316 L. III RCP BARREL, 72 LF; TOP OFD; PROPOSED 24" CL. III RCP RISER STRUCTURE 72'; INVERT OUT= 316.00' DAM= 326.00 RISER RIM ELEVATION =323.75'• 350 TING GRADE 325 IMN Mme• BASIN FLOOR = 319.50' --- PROPOSED GRADE 300 i OUTLET PROTECTION 0o Oqq rr! oo � rn °, N' Oq r q N N N M ri R�YI M M M M M M M M M 0 +00 0 +50 1 +00 1 +50 2 +00 2 +25 Sediment Basin #2 Design M. VW ! SPILLWAY CREST OF EMERGENCY Y WITHOUT SPUWAY drainage area (acres) 3.47 DESIGN HIGH WATER basin volumes: (using 2' contour intenats) (25 -YR. STORY ELEV.) elevation (ft) contour area (sf) volume (cy) 0.s 344,00 3649.0 0 LtlN T O 346.00 4710.0 308.8 r RISE CREST oRY • sroRACE .� �� RING 348.00 5887.0 700.4 350.00 7174.0 1183.4 •WET • Sm""' E - SEDIMENT CLEMIOUT POfHT (' WET ' STORAGE REaIxEo TO 34 C.Y. / ACRE) wet storage: wet storage required (cy) (67 *DA) 232.5 design high wafer (ft) 348.75 dewatering orifice elevation (ft) 345.75 top of dam (ft) 350.00 wet storage provided at this elevation (cy) 269.5 top width of dam (ft) 10.0 available volume before cleanout (cy) (34 *DA) 118.0 bottom of basin (ft) 344.0 cleanout elevation (ft) 344.75 approx bottom dimensions: 66'X74' distance from cleanout to orifice (ft) (> 1') 1.0 upstream face slope: 2:1 downstream face slope: 3:1 dry storage: dry storage required (cy) (67 *DA) 232.5 baffles: YES principle spillway crest (ft) 347.0 length of flow, L (ft) 99 dry storage provided at this elevation (cy) 234.35 effective width, We (ft) 53 diameter of dewatering orifice (in) 4.0 L / We (baffles not required if > 2) 1.9 diameter of flexible tubing (in) (orifice +2 ") 6.0 collars: YES runoff: depth of water at spillway crest (ft) 3.00 C ( use 0.45 for bare earth) 0.6 sloe of upstream face (Z 1) 2 :1 tc (Mn) 7.5 slope of barrel (Sb) 3.13 % 1 2yr 4.60 Q 2yr 9.58 length of barrel in saturated zone (Ls) 20.57' 1 25yr 7.50 Q 25yr 17.18 number collars required 2 dimension of collars 2.9x2.0' principle spillway: available head (ft) 10 emergency Will\Aey: YES diameter riser (in) 24 required capacity (Q25 -Qp) (cfs) 7.60 spillway capacity, Op (cfs) 10 bottom width (ft) 56 diameter trash rack (in) 36 slope of east channel (ft/ft) 25% barrel length (ft) 112 ininimun length of exit channel (ft) 55 head on barrel through embankment (ft) 11.5 crest of spillway (ft) 348.75 diameter of barrel in 10 Sediment Basin #3 Design drainage area (acres) 6.34 basin volumes: (using 2' contour intervals) elevation (ft) contour area (sf) volume (cy) 319.50 4122.0 0 320.00 4450.0 79.4 322.00 5843.0 459.4 324.00 7359.0 947.3 326.00 8980.0 1551.4 vwet storage required (cy) (67 *DA) dewatering orifice elevation (ft) wet storage provided at this elevation (cy) available volume before cleanout (cy) (34 *DA) cleanout elevation (ft) distance from cleanout to orifice (ft) (> 1') dry s We- dry storage required (cy) (67 *DA) principle spillway crest (ft) dry storage provided at this elevation (cy) diameter of dewatering orifice (in) diameter of flexible tubing (in) (orifice+2 ") runoff: C (use 0,45 for bare earth) tc (min) 1 2yr 3.95 Q 2yr 125yr 6.60 Q25yr Rrincigle illrtvav: available head (ft) diameter riser (in) Spillway capacity, Op (cfs) diameter trash rack (in) barrel length (ft) head on barrel through embankment (ft) diameter of barrel (in) MIN. t Wf SPILLWAY CREST OF ENC- 2' WITHOl1T SPILLWAY DESIGN HIGH WATER ,,(25 -YR- STORM ELEV.) SEDMEM CLEANOUT POINT (' WET ' STORAGE REDUCED TO 34 C.Y. / ACRt) 424.8 design high water (ft) 321.82 top of dam (ft) 424.8 top width of dam (ft) 215.6 bottom of basin (ft) 320.70 approx bottom dimensions: 1.1 upstream face slope: downstream face slope: 424.8 baffles: 323.75 length of flow, L (ft) 461.8 effective width, We (ft) 5.0 L / We (baffles not required if > 2) 7.0 collars: depth of water at spillway crest (ft) 0.6 slope of upstream face (Z 1) 11.5 slope of barrel (Sb) 15.03 length of barrel in saturated zone (Ls) 27.62 number collars required dimension of collars 2.3 ernercg@ncy spillway: 24 required capacity (Q25 -Qp) (cfs) 15.03 bottom width (ft) 36 slope of exist channel (ft/ft) 72 minimun length of exit channel (ft) 8.75 crest of spillway (ft) 15 RISER CREST DEMTER "r. 324.75 32"6.00 10.0 319.5 4(YX131' 2 :1 3:1 YES 91 79 1.2 YES 4.25 2 :1 1 % 26.56 2 3.3 "X3.3' YES 12:59 45 25% 40 324 -75 SEDIMENT BASIN #2 DETAIL (SCALE 2"=2o') SEDIMENT BASIN #2 PROFILE (SCALE 1"=40') 400 TOP OF PROPOSED 024" HDPE RISER STRUCTURE RISER RIM ELEVATION = 347.00 PROPOSED 010'1 HDPE DAM= 350-00' i 375 -35 i PRO POSEDGRADE DOUBLE WALL BARREL,-- - - - - -- - -- - - - -- -- - - -- - -- - -T-------------- - - - 112 LF; INVERT IN= 340.00; j EXISTING GRADE INVERT OUT = 336.50' 350. ' = BASIN FLOOR 21 ' ' -- 344• 00' 325 OUTLET PROTECTION d- 00 00 0) Ln Ln O Ln O LD It 00 n N Ln CO O O 10 N Ln 00 00 M LD LD It ri o o, M M M It It 't It Ln � W Ln M M M M M M M M M M M o +o0 0 +50 1 +00 1 +50 2 +00 2 +50 2 +75 0 PROPOSED WIDE GRASS INE MERGENCY 1 PROPOSE 024" HDPE R SER Sl' UC URE RISER RIM ELEVATION = 347.00' SPILLWAY CREST ELEVATION =348.75' \ PROPOSED VDOT " #3 COARSE AGGREGATE OUTLET PROTECTION w/ GEOTEXTILE FILTER FABRIC' UNDERLAYMENT (L =16', W1 =6'1 ? M W2 =18' D =2' MIN.' ) ' w PR POSED �AF S `� co N 1 ( \ \ + ?V PROPOSED 010" HDPE _ ' DOUBLE WALL BARREL, ' ;' 66, \. 1 �N SEDIMENT BASIN #3 DETAIL (SCALEI " =20') _--- 3 PR POSED VDOT #3 - COARSE AGGREGATE -- OUTLET PROTECTION w% boo / GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =35', o -""34O -_ W1 =10_, D =2' MIN.)," 33� _.._ - -_ --- _ 324 - 330 3 20 PROPOSED BAFFLES ~ _- PROPOSED 24 CL. III C RISER ST UC� _ -RIS ER RIM ELEVATION= = 23.7 13 " - - = -- - - - 319.50 6 r r 2 - 326 10' WIDE TOP OF DAM ELEVATION =326' 'hop VDOT #3 COARSE AGGREGATE OUTLET ROTECTION w/ GEOTEXTILE FILTER FABRIC o 324 ,% NDERLAYMENT (L =11', W1= 3.75', W2= 12.25', D =2' MIN.) 0 -- ry f _ 320 % "PROPOSED 015" CL. III RCP BARREL, 72 LF- INVERT IN= 316.72'; .. � - _ PROPOSED 45WIDE G2ASS LINED EM ERGENCY =�-- SPILLWAY CREST ELEVATION = 324.75 INVERT OUT = 316.00' , / CONTRACTOR SHALL NOT Y % PROPOSED VDOT #3 COARSE AGGREGATE OUTLET DISTURB WETLANDS (TYP.) PROTECTION w/ GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =12', W1= 3.75', W2= 13.25', D =2' MIN.) v -- ....- OF 0 r� ZCOTT R. COLLINS---* U No. 35791 �SSIONAL E��1 Z O a U 0 w ° Z O Ln w RY Z O w �a H ° W ce Ln In O C7% ,-i N v Ln U.1 LU Z O a Ln U') Inc w w U m m j � O O Z a - 5 � > Z O O w U U r0r Ce. a a w w Ce Ce Ln Ln LL, Ln M U1 t0 L9 M M 07 N M d' I N � O � N W � ~ Q Q LU > W W � J � J J > U �c U) N �- � z I- 0 a o U° J Z Q Q z° W31 U 5' P__4 I Q U Lij L W to U1 W F- to 06 a U) W z 0 r Z W (- O c W 0 V) e. .j F- V vJ W F- 0 - J W W 0 z w z z U 0 Z 0 N ti w a r a s O w a U) JOB NO. 142109 z SCALE AS SHOWN t SHEET NO. t 6 z 0 U c 3 a t 0 y 3 0 c _o U 0 c 0 0 V T: 0 U Z G 0 0 SEDIMENT BASIN #3 6 "TOPSOIL EXISTING GROUND NTS -1 10, 13" HIGH, 16 GAGE TEMPORARY CMP TOP OF DAM ELEV. = 326.00' TRASH RACK DEVICE 25 YR. STORM 1.o' MIN. %. EMERGENCY SPILLWAY ELEV= 324.75' CREST ELEV. = 324.75 RISER TOP ELEV.=3z3.75' 1.0' MIN. %s 2 ' DIA. CL. III RCP RISER i s � Vii: 4' DRY VOLUME ELEV. 1' SCARIFIED KEY FOR REQUIRED = 323.75' ; ;;' " "' �' SOIL COHESION 5" DIA. DEWATERING DEVICE, ELEV. = 321.82' INV. OUT = 316.0' UPSTREAM TOE OF DAM n BOTTOM OF BASIN EXISTING GROUND ELEV= 319.50 ELEV- 319.50 CONCRETE FOUNDATION (18" THICK, 72" DIA., RISER ry OUTLET PROTECTION EMBEDDED 6" INTO THE CONCRETE) CLAY C RED DAM KEYED INTO THE EXISTING GROUND INV. IN = 316.72' 15" CL. III RCP (2) 3.3'X 3.3' GALV. STEEL LENGTH =72' ANTI -SEEP COLLARS SLOPE =1.00% SEDIMENT BASIN #3 PROFILE(SCALEI " =4o') 375 PROPOSED 015" INVERT IN =316 L. III RCP BARREL, 72 LF; TOP OFD; PROPOSED 24" CL. III RCP RISER STRUCTURE 72'; INVERT OUT= 316.00' DAM= 326.00 RISER RIM ELEVATION =323.75'• 350 TING GRADE 325 IMN Mme• BASIN FLOOR = 319.50' --- PROPOSED GRADE 300 i OUTLET PROTECTION 0o Oqq rr! oo � rn °, N' Oq r q N N N M ri R�YI M M M M M M M M M 0 +00 0 +50 1 +00 1 +50 2 +00 2 +25 Sediment Basin #2 Design M. VW ! SPILLWAY CREST OF EMERGENCY Y WITHOUT SPUWAY drainage area (acres) 3.47 DESIGN HIGH WATER basin volumes: (using 2' contour intenats) (25 -YR. STORY ELEV.) elevation (ft) contour area (sf) volume (cy) 0.s 344,00 3649.0 0 LtlN T O 346.00 4710.0 308.8 r RISE CREST oRY • sroRACE .� �� RING 348.00 5887.0 700.4 350.00 7174.0 1183.4 •WET • Sm""' E - SEDIMENT CLEMIOUT POfHT (' WET ' STORAGE REaIxEo TO 34 C.Y. / ACRE) wet storage: wet storage required (cy) (67 *DA) 232.5 design high wafer (ft) 348.75 dewatering orifice elevation (ft) 345.75 top of dam (ft) 350.00 wet storage provided at this elevation (cy) 269.5 top width of dam (ft) 10.0 available volume before cleanout (cy) (34 *DA) 118.0 bottom of basin (ft) 344.0 cleanout elevation (ft) 344.75 approx bottom dimensions: 66'X74' distance from cleanout to orifice (ft) (> 1') 1.0 upstream face slope: 2:1 downstream face slope: 3:1 dry storage: dry storage required (cy) (67 *DA) 232.5 baffles: YES principle spillway crest (ft) 347.0 length of flow, L (ft) 99 dry storage provided at this elevation (cy) 234.35 effective width, We (ft) 53 diameter of dewatering orifice (in) 4.0 L / We (baffles not required if > 2) 1.9 diameter of flexible tubing (in) (orifice +2 ") 6.0 collars: YES runoff: depth of water at spillway crest (ft) 3.00 C ( use 0.45 for bare earth) 0.6 sloe of upstream face (Z 1) 2 :1 tc (Mn) 7.5 slope of barrel (Sb) 3.13 % 1 2yr 4.60 Q 2yr 9.58 length of barrel in saturated zone (Ls) 20.57' 1 25yr 7.50 Q 25yr 17.18 number collars required 2 dimension of collars 2.9x2.0' principle spillway: available head (ft) 10 emergency Will\Aey: YES diameter riser (in) 24 required capacity (Q25 -Qp) (cfs) 7.60 spillway capacity, Op (cfs) 10 bottom width (ft) 56 diameter trash rack (in) 36 slope of east channel (ft/ft) 25% barrel length (ft) 112 ininimun length of exit channel (ft) 55 head on barrel through embankment (ft) 11.5 crest of spillway (ft) 348.75 diameter of barrel in 10 Sediment Basin #3 Design drainage area (acres) 6.34 basin volumes: (using 2' contour intervals) elevation (ft) contour area (sf) volume (cy) 319.50 4122.0 0 320.00 4450.0 79.4 322.00 5843.0 459.4 324.00 7359.0 947.3 326.00 8980.0 1551.4 vwet storage required (cy) (67 *DA) dewatering orifice elevation (ft) wet storage provided at this elevation (cy) available volume before cleanout (cy) (34 *DA) cleanout elevation (ft) distance from cleanout to orifice (ft) (> 1') dry s We- dry storage required (cy) (67 *DA) principle spillway crest (ft) dry storage provided at this elevation (cy) diameter of dewatering orifice (in) diameter of flexible tubing (in) (orifice+2 ") runoff: C (use 0,45 for bare earth) tc (min) 1 2yr 3.95 Q 2yr 125yr 6.60 Q25yr Rrincigle illrtvav: available head (ft) diameter riser (in) Spillway capacity, Op (cfs) diameter trash rack (in) barrel length (ft) head on barrel through embankment (ft) diameter of barrel (in) MIN. t Wf SPILLWAY CREST OF ENC- 2' WITHOl1T SPILLWAY DESIGN HIGH WATER ,,(25 -YR- STORM ELEV.) SEDMEM CLEANOUT POINT (' WET ' STORAGE REDUCED TO 34 C.Y. / ACRt) 424.8 design high water (ft) 321.82 top of dam (ft) 424.8 top width of dam (ft) 215.6 bottom of basin (ft) 320.70 approx bottom dimensions: 1.1 upstream face slope: downstream face slope: 424.8 baffles: 323.75 length of flow, L (ft) 461.8 effective width, We (ft) 5.0 L / We (baffles not required if > 2) 7.0 collars: depth of water at spillway crest (ft) 0.6 slope of upstream face (Z 1) 11.5 slope of barrel (Sb) 15.03 length of barrel in saturated zone (Ls) 27.62 number collars required dimension of collars 2.3 ernercg@ncy spillway: 24 required capacity (Q25 -Qp) (cfs) 15.03 bottom width (ft) 36 slope of exist channel (ft/ft) 72 minimun length of exit channel (ft) 8.75 crest of spillway (ft) 15 RISER CREST DEMTER "r. 324.75 32"6.00 10.0 319.5 4(YX131' 2 :1 3:1 YES 91 79 1.2 YES 4.25 2 :1 1 % 26.56 2 3.3 "X3.3' YES 12:59 45 25% 40 324 -75 SEDIMENT BASIN #2 DETAIL (SCALE 2"=2o') SEDIMENT BASIN #2 PROFILE (SCALE 1"=40') 400 TOP OF PROPOSED 024" HDPE RISER STRUCTURE RISER RIM ELEVATION = 347.00 PROPOSED 010'1 HDPE DAM= 350-00' i 375 -35 i PRO POSEDGRADE DOUBLE WALL BARREL,-- - - - - -- - -- - - - -- -- - - -- - -- - -T-------------- - - - 112 LF; INVERT IN= 340.00; j EXISTING GRADE INVERT OUT = 336.50' 350. ' = BASIN FLOOR 21 ' ' -- 344• 00' 325 OUTLET PROTECTION d- 00 00 0) Ln Ln O Ln O LD It 00 n N Ln CO O O 10 N Ln 00 00 M LD LD It ri o o, M M M It It 't It Ln � W Ln M M M M M M M M M M M o +o0 0 +50 1 +00 1 +50 2 +00 2 +50 2 +75 0 PROPOSED WIDE GRASS INE MERGENCY 1 PROPOSE 024" HDPE R SER Sl' UC URE RISER RIM ELEVATION = 347.00' SPILLWAY CREST ELEVATION =348.75' \ PROPOSED VDOT " #3 COARSE AGGREGATE OUTLET PROTECTION w/ GEOTEXTILE FILTER FABRIC' UNDERLAYMENT (L =16', W1 =6'1 ? M W2 =18' D =2' MIN.' ) ' w PR POSED �AF S `� co N 1 ( \ \ + ?V PROPOSED 010" HDPE _ ' DOUBLE WALL BARREL, ' ;' 66, \. 1 �N SEDIMENT BASIN #3 DETAIL (SCALEI " =20') _--- 3 PR POSED VDOT #3 - COARSE AGGREGATE -- OUTLET PROTECTION w% boo / GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =35', o -""34O -_ W1 =10_, D =2' MIN.)," 33� _.._ - -_ --- _ 324 - 330 3 20 PROPOSED BAFFLES ~ _- PROPOSED 24 CL. III C RISER ST UC� _ -RIS ER RIM ELEVATION= = 23.7 13 " - - = -- - - - 319.50 6 r r 2 - 326 10' WIDE TOP OF DAM ELEVATION =326' 'hop VDOT #3 COARSE AGGREGATE OUTLET ROTECTION w/ GEOTEXTILE FILTER FABRIC o 324 ,% NDERLAYMENT (L =11', W1= 3.75', W2= 12.25', D =2' MIN.) 0 -- ry f _ 320 % "PROPOSED 015" CL. III RCP BARREL, 72 LF- INVERT IN= 316.72'; .. � - _ PROPOSED 45WIDE G2ASS LINED EM ERGENCY =�-- SPILLWAY CREST ELEVATION = 324.75 INVERT OUT = 316.00' , / CONTRACTOR SHALL NOT Y % PROPOSED VDOT #3 COARSE AGGREGATE OUTLET DISTURB WETLANDS (TYP.) PROTECTION w/ GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =12', W1= 3.75', W2= 13.25', D =2' MIN.) v -- ....- OF 0 r� ZCOTT R. COLLINS---* U No. 35791 �SSIONAL E��1 Z O a U 0 w ° Z O Ln w RY Z O w �a H ° W ce Ln In O C7% ,-i N v Ln U.1 LU Z O a Ln U') Inc w w U m m j � O O Z a - 5 � > Z O O w U U r0r Ce. a a w w Ce Ce Ln Ln LL, Ln M U1 t0 L9 M M 07 N M d' I N � O � N W � ~ Q Q LU > W W � J � J J > U �c U) N �- � z I- 0 a o U° J Z Q Q z° W31 U 5' P__4 I Q U Lij L W to U1 W F- to 06 a U) W z 0 r Z W (- O c W 0 V) e. .j F- V vJ W F- 0 - J W W 0 z w z z U 0 Z 0 N ti w a r a s O w a U) JOB NO. 142109 z SCALE AS SHOWN t SHEET NO. t 6 z 0 U c 3 a t 0 y 3 0 c _o U 0 c 0 0 V T: 0 U Z G 0 0 SEDIMENT BASIN #3 PROFILE(SCALEI " =4o') 375 PROPOSED 015" INVERT IN =316 L. III RCP BARREL, 72 LF; TOP OFD; PROPOSED 24" CL. III RCP RISER STRUCTURE 72'; INVERT OUT= 316.00' DAM= 326.00 RISER RIM ELEVATION =323.75'• 350 TING GRADE 325 IMN Mme• BASIN FLOOR = 319.50' --- PROPOSED GRADE 300 i OUTLET PROTECTION 0o Oqq rr! oo � rn °, N' Oq r q N N N M ri R�YI M M M M M M M M M 0 +00 0 +50 1 +00 1 +50 2 +00 2 +25 Sediment Basin #2 Design M. VW ! SPILLWAY CREST OF EMERGENCY Y WITHOUT SPUWAY drainage area (acres) 3.47 DESIGN HIGH WATER basin volumes: (using 2' contour intenats) (25 -YR. STORY ELEV.) elevation (ft) contour area (sf) volume (cy) 0.s 344,00 3649.0 0 LtlN T O 346.00 4710.0 308.8 r RISE CREST oRY • sroRACE .� �� RING 348.00 5887.0 700.4 350.00 7174.0 1183.4 •WET • Sm""' E - SEDIMENT CLEMIOUT POfHT (' WET ' STORAGE REaIxEo TO 34 C.Y. / ACRE) wet storage: wet storage required (cy) (67 *DA) 232.5 design high wafer (ft) 348.75 dewatering orifice elevation (ft) 345.75 top of dam (ft) 350.00 wet storage provided at this elevation (cy) 269.5 top width of dam (ft) 10.0 available volume before cleanout (cy) (34 *DA) 118.0 bottom of basin (ft) 344.0 cleanout elevation (ft) 344.75 approx bottom dimensions: 66'X74' distance from cleanout to orifice (ft) (> 1') 1.0 upstream face slope: 2:1 downstream face slope: 3:1 dry storage: dry storage required (cy) (67 *DA) 232.5 baffles: YES principle spillway crest (ft) 347.0 length of flow, L (ft) 99 dry storage provided at this elevation (cy) 234.35 effective width, We (ft) 53 diameter of dewatering orifice (in) 4.0 L / We (baffles not required if > 2) 1.9 diameter of flexible tubing (in) (orifice +2 ") 6.0 collars: YES runoff: depth of water at spillway crest (ft) 3.00 C ( use 0.45 for bare earth) 0.6 sloe of upstream face (Z 1) 2 :1 tc (Mn) 7.5 slope of barrel (Sb) 3.13 % 1 2yr 4.60 Q 2yr 9.58 length of barrel in saturated zone (Ls) 20.57' 1 25yr 7.50 Q 25yr 17.18 number collars required 2 dimension of collars 2.9x2.0' principle spillway: available head (ft) 10 emergency Will\Aey: YES diameter riser (in) 24 required capacity (Q25 -Qp) (cfs) 7.60 spillway capacity, Op (cfs) 10 bottom width (ft) 56 diameter trash rack (in) 36 slope of east channel (ft/ft) 25% barrel length (ft) 112 ininimun length of exit channel (ft) 55 head on barrel through embankment (ft) 11.5 crest of spillway (ft) 348.75 diameter of barrel in 10 Sediment Basin #3 Design drainage area (acres) 6.34 basin volumes: (using 2' contour intervals) elevation (ft) contour area (sf) volume (cy) 319.50 4122.0 0 320.00 4450.0 79.4 322.00 5843.0 459.4 324.00 7359.0 947.3 326.00 8980.0 1551.4 vwet storage required (cy) (67 *DA) dewatering orifice elevation (ft) wet storage provided at this elevation (cy) available volume before cleanout (cy) (34 *DA) cleanout elevation (ft) distance from cleanout to orifice (ft) (> 1') dry s We- dry storage required (cy) (67 *DA) principle spillway crest (ft) dry storage provided at this elevation (cy) diameter of dewatering orifice (in) diameter of flexible tubing (in) (orifice+2 ") runoff: C (use 0,45 for bare earth) tc (min) 1 2yr 3.95 Q 2yr 125yr 6.60 Q25yr Rrincigle illrtvav: available head (ft) diameter riser (in) Spillway capacity, Op (cfs) diameter trash rack (in) barrel length (ft) head on barrel through embankment (ft) diameter of barrel (in) MIN. t Wf SPILLWAY CREST OF ENC- 2' WITHOl1T SPILLWAY DESIGN HIGH WATER ,,(25 -YR- STORM ELEV.) SEDMEM CLEANOUT POINT (' WET ' STORAGE REDUCED TO 34 C.Y. / ACRt) 424.8 design high water (ft) 321.82 top of dam (ft) 424.8 top width of dam (ft) 215.6 bottom of basin (ft) 320.70 approx bottom dimensions: 1.1 upstream face slope: downstream face slope: 424.8 baffles: 323.75 length of flow, L (ft) 461.8 effective width, We (ft) 5.0 L / We (baffles not required if > 2) 7.0 collars: depth of water at spillway crest (ft) 0.6 slope of upstream face (Z 1) 11.5 slope of barrel (Sb) 15.03 length of barrel in saturated zone (Ls) 27.62 number collars required dimension of collars 2.3 ernercg@ncy spillway: 24 required capacity (Q25 -Qp) (cfs) 15.03 bottom width (ft) 36 slope of exist channel (ft/ft) 72 minimun length of exit channel (ft) 8.75 crest of spillway (ft) 15 RISER CREST DEMTER "r. 324.75 32"6.00 10.0 319.5 4(YX131' 2 :1 3:1 YES 91 79 1.2 YES 4.25 2 :1 1 % 26.56 2 3.3 "X3.3' YES 12:59 45 25% 40 324 -75 SEDIMENT BASIN #2 DETAIL (SCALE 2"=2o') SEDIMENT BASIN #2 PROFILE (SCALE 1"=40') 400 TOP OF PROPOSED 024" HDPE RISER STRUCTURE RISER RIM ELEVATION = 347.00 PROPOSED 010'1 HDPE DAM= 350-00' i 375 -35 i PRO POSEDGRADE DOUBLE WALL BARREL,-- - - - - -- - -- - - - -- -- - - -- - -- - -T-------------- - - - 112 LF; INVERT IN= 340.00; j EXISTING GRADE INVERT OUT = 336.50' 350. ' = BASIN FLOOR 21 ' ' -- 344• 00' 325 OUTLET PROTECTION d- 00 00 0) Ln Ln O Ln O LD It 00 n N Ln CO O O 10 N Ln 00 00 M LD LD It ri o o, M M M It It 't It Ln � W Ln M M M M M M M M M M M o +o0 0 +50 1 +00 1 +50 2 +00 2 +50 2 +75 0 PROPOSED WIDE GRASS INE MERGENCY 1 PROPOSE 024" HDPE R SER Sl' UC URE RISER RIM ELEVATION = 347.00' SPILLWAY CREST ELEVATION =348.75' \ PROPOSED VDOT " #3 COARSE AGGREGATE OUTLET PROTECTION w/ GEOTEXTILE FILTER FABRIC' UNDERLAYMENT (L =16', W1 =6'1 ? M W2 =18' D =2' MIN.' ) ' w PR POSED �AF S `� co N 1 ( \ \ + ?V PROPOSED 010" HDPE _ ' DOUBLE WALL BARREL, ' ;' 66, \. 1 �N SEDIMENT BASIN #3 DETAIL (SCALEI " =20') _--- 3 PR POSED VDOT #3 - COARSE AGGREGATE -- OUTLET PROTECTION w% boo / GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =35', o -""34O -_ W1 =10_, D =2' MIN.)," 33� _.._ - -_ --- _ 324 - 330 3 20 PROPOSED BAFFLES ~ _- PROPOSED 24 CL. III C RISER ST UC� _ -RIS ER RIM ELEVATION= = 23.7 13 " - - = -- - - - 319.50 6 r r 2 - 326 10' WIDE TOP OF DAM ELEVATION =326' 'hop VDOT #3 COARSE AGGREGATE OUTLET ROTECTION w/ GEOTEXTILE FILTER FABRIC o 324 ,% NDERLAYMENT (L =11', W1= 3.75', W2= 12.25', D =2' MIN.) 0 -- ry f _ 320 % "PROPOSED 015" CL. III RCP BARREL, 72 LF- INVERT IN= 316.72'; .. � - _ PROPOSED 45WIDE G2ASS LINED EM ERGENCY =�-- SPILLWAY CREST ELEVATION = 324.75 INVERT OUT = 316.00' , / CONTRACTOR SHALL NOT Y % PROPOSED VDOT #3 COARSE AGGREGATE OUTLET DISTURB WETLANDS (TYP.) PROTECTION w/ GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =12', W1= 3.75', W2= 13.25', D =2' MIN.) v -- ....- OF 0 r� ZCOTT R. COLLINS---* U No. 35791 �SSIONAL E��1 Z O a U 0 w ° Z O Ln w RY Z O w �a H ° W ce Ln In O C7% ,-i N v Ln U.1 LU Z O a Ln U') Inc w w U m m j � O O Z a - 5 � > Z O O w U U r0r Ce. a a w w Ce Ce Ln Ln LL, Ln M U1 t0 L9 M M 07 N M d' I N � O � N W � ~ Q Q LU > W W � J � J J > U �c U) N �- � z I- 0 a o U° J Z Q Q z° W31 U 5' P__4 I Q U Lij L W to U1 W F- to 06 a U) W z 0 r Z W (- O c W 0 V) e. .j F- V vJ W F- 0 - J W W 0 z w z z U 0 Z 0 N ti w a r a s O w a U) JOB NO. 142109 z SCALE AS SHOWN t SHEET NO. t 6 z 0 U c 3 a t 0 y 3 0 c _o U 0 c 0 0 V T: 0 U Z G 0 0 Sediment Basin #3 Design drainage area (acres) 6.34 basin volumes: (using 2' contour intervals) elevation (ft) contour area (sf) volume (cy) 319.50 4122.0 0 320.00 4450.0 79.4 322.00 5843.0 459.4 324.00 7359.0 947.3 326.00 8980.0 1551.4 vwet storage required (cy) (67 *DA) dewatering orifice elevation (ft) wet storage provided at this elevation (cy) available volume before cleanout (cy) (34 *DA) cleanout elevation (ft) distance from cleanout to orifice (ft) (> 1') dry s We- dry storage required (cy) (67 *DA) principle spillway crest (ft) dry storage provided at this elevation (cy) diameter of dewatering orifice (in) diameter of flexible tubing (in) (orifice+2 ") runoff: C (use 0,45 for bare earth) tc (min) 1 2yr 3.95 Q 2yr 125yr 6.60 Q25yr Rrincigle illrtvav: available head (ft) diameter riser (in) Spillway capacity, Op (cfs) diameter trash rack (in) barrel length (ft) head on barrel through embankment (ft) diameter of barrel (in) MIN. t Wf SPILLWAY CREST OF ENC- 2' WITHOl1T SPILLWAY DESIGN HIGH WATER ,,(25 -YR- STORM ELEV.) SEDMEM CLEANOUT POINT (' WET ' STORAGE REDUCED TO 34 C.Y. / ACRt) 424.8 design high water (ft) 321.82 top of dam (ft) 424.8 top width of dam (ft) 215.6 bottom of basin (ft) 320.70 approx bottom dimensions: 1.1 upstream face slope: downstream face slope: 424.8 baffles: 323.75 length of flow, L (ft) 461.8 effective width, We (ft) 5.0 L / We (baffles not required if > 2) 7.0 collars: depth of water at spillway crest (ft) 0.6 slope of upstream face (Z 1) 11.5 slope of barrel (Sb) 15.03 length of barrel in saturated zone (Ls) 27.62 number collars required dimension of collars 2.3 ernercg@ncy spillway: 24 required capacity (Q25 -Qp) (cfs) 15.03 bottom width (ft) 36 slope of exist channel (ft/ft) 72 minimun length of exit channel (ft) 8.75 crest of spillway (ft) 15 RISER CREST DEMTER "r. 324.75 32"6.00 10.0 319.5 4(YX131' 2 :1 3:1 YES 91 79 1.2 YES 4.25 2 :1 1 % 26.56 2 3.3 "X3.3' YES 12:59 45 25% 40 324 -75 SEDIMENT BASIN #2 DETAIL (SCALE 2"=2o') SEDIMENT BASIN #2 PROFILE (SCALE 1"=40') 400 TOP OF PROPOSED 024" HDPE RISER STRUCTURE RISER RIM ELEVATION = 347.00 PROPOSED 010'1 HDPE DAM= 350-00' i 375 -35 i PRO POSEDGRADE DOUBLE WALL BARREL,-- - - - - -- - -- - - - -- -- - - -- - -- - -T-------------- - - - 112 LF; INVERT IN= 340.00; j EXISTING GRADE INVERT OUT = 336.50' 350. ' = BASIN FLOOR 21 ' ' -- 344• 00' 325 OUTLET PROTECTION d- 00 00 0) Ln Ln O Ln O LD It 00 n N Ln CO O O 10 N Ln 00 00 M LD LD It ri o o, M M M It It 't It Ln � W Ln M M M M M M M M M M M o +o0 0 +50 1 +00 1 +50 2 +00 2 +50 2 +75 0 PROPOSED WIDE GRASS INE MERGENCY 1 PROPOSE 024" HDPE R SER Sl' UC URE RISER RIM ELEVATION = 347.00' SPILLWAY CREST ELEVATION =348.75' \ PROPOSED VDOT " #3 COARSE AGGREGATE OUTLET PROTECTION w/ GEOTEXTILE FILTER FABRIC' UNDERLAYMENT (L =16', W1 =6'1 ? M W2 =18' D =2' MIN.' ) ' w PR POSED �AF S `� co N 1 ( \ \ + ?V PROPOSED 010" HDPE _ ' DOUBLE WALL BARREL, ' ;' 66, \. 1 �N SEDIMENT BASIN #3 DETAIL (SCALEI " =20') _--- 3 PR POSED VDOT #3 - COARSE AGGREGATE -- OUTLET PROTECTION w% boo / GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =35', o -""34O -_ W1 =10_, D =2' MIN.)," 33� _.._ - -_ --- _ 324 - 330 3 20 PROPOSED BAFFLES ~ _- PROPOSED 24 CL. III C RISER ST UC� _ -RIS ER RIM ELEVATION= = 23.7 13 " - - = -- - - - 319.50 6 r r 2 - 326 10' WIDE TOP OF DAM ELEVATION =326' 'hop VDOT #3 COARSE AGGREGATE OUTLET ROTECTION w/ GEOTEXTILE FILTER FABRIC o 324 ,% NDERLAYMENT (L =11', W1= 3.75', W2= 12.25', D =2' MIN.) 0 -- ry f _ 320 % "PROPOSED 015" CL. III RCP BARREL, 72 LF- INVERT IN= 316.72'; .. � - _ PROPOSED 45WIDE G2ASS LINED EM ERGENCY =�-- SPILLWAY CREST ELEVATION = 324.75 INVERT OUT = 316.00' , / CONTRACTOR SHALL NOT Y % PROPOSED VDOT #3 COARSE AGGREGATE OUTLET DISTURB WETLANDS (TYP.) PROTECTION w/ GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =12', W1= 3.75', W2= 13.25', D =2' MIN.) v -- ....- OF 0 r� ZCOTT R. COLLINS---* U No. 35791 �SSIONAL E��1 Z O a U 0 w ° Z O Ln w RY Z O w �a H ° W ce Ln In O C7% ,-i N v Ln U.1 LU Z O a Ln U') Inc w w U m m j � O O Z a - 5 � > Z O O w U U r0r Ce. a a w w Ce Ce Ln Ln LL, Ln M U1 t0 L9 M M 07 N M d' I N � O � N W � ~ Q Q LU > W W � J � J J > U �c U) N �- � z I- 0 a o U° J Z Q Q z° W31 U 5' P__4 I Q U Lij L W to U1 W F- to 06 a U) W z 0 r Z W (- O c W 0 V) e. .j F- V vJ W F- 0 - J W W 0 z w z z U 0 Z 0 N ti w a r a s O w a U) JOB NO. 142109 z SCALE AS SHOWN t SHEET NO. t 6 z 0 U c 3 a t 0 y 3 0 c _o U 0 c 0 0 V T: 0 U Z G 0 0 vwet storage required (cy) (67 *DA) dewatering orifice elevation (ft) wet storage provided at this elevation (cy) available volume before cleanout (cy) (34 *DA) cleanout elevation (ft) distance from cleanout to orifice (ft) (> 1') dry s We- dry storage required (cy) (67 *DA) principle spillway crest (ft) dry storage provided at this elevation (cy) diameter of dewatering orifice (in) diameter of flexible tubing (in) (orifice+2 ") runoff: C (use 0,45 for bare earth) tc (min) 1 2yr 3.95 Q 2yr 125yr 6.60 Q25yr Rrincigle illrtvav: available head (ft) diameter riser (in) Spillway capacity, Op (cfs) diameter trash rack (in) barrel length (ft) head on barrel through embankment (ft) diameter of barrel (in) MIN. t Wf SPILLWAY CREST OF ENC- 2' WITHOl1T SPILLWAY DESIGN HIGH WATER ,,(25 -YR- STORM ELEV.) SEDMEM CLEANOUT POINT (' WET ' STORAGE REDUCED TO 34 C.Y. / ACRt) 424.8 design high water (ft) 321.82 top of dam (ft) 424.8 top width of dam (ft) 215.6 bottom of basin (ft) 320.70 approx bottom dimensions: 1.1 upstream face slope: downstream face slope: 424.8 baffles: 323.75 length of flow, L (ft) 461.8 effective width, We (ft) 5.0 L / We (baffles not required if > 2) 7.0 collars: depth of water at spillway crest (ft) 0.6 slope of upstream face (Z 1) 11.5 slope of barrel (Sb) 15.03 length of barrel in saturated zone (Ls) 27.62 number collars required dimension of collars 2.3 ernercg@ncy spillway: 24 required capacity (Q25 -Qp) (cfs) 15.03 bottom width (ft) 36 slope of exist channel (ft/ft) 72 minimun length of exit channel (ft) 8.75 crest of spillway (ft) 15 RISER CREST DEMTER "r. 324.75 32"6.00 10.0 319.5 4(YX131' 2 :1 3:1 YES 91 79 1.2 YES 4.25 2 :1 1 % 26.56 2 3.3 "X3.3' YES 12:59 45 25% 40 324 -75 SEDIMENT BASIN #2 DETAIL (SCALE 2"=2o') SEDIMENT BASIN #2 PROFILE (SCALE 1"=40') 400 TOP OF PROPOSED 024" HDPE RISER STRUCTURE RISER RIM ELEVATION = 347.00 PROPOSED 010'1 HDPE DAM= 350-00' i 375 -35 i PRO POSEDGRADE DOUBLE WALL BARREL,-- - - - - -- - -- - - - -- -- - - -- - -- - -T-------------- - - - 112 LF; INVERT IN= 340.00; j EXISTING GRADE INVERT OUT = 336.50' 350. ' = BASIN FLOOR 21 ' ' -- 344• 00' 325 OUTLET PROTECTION d- 00 00 0) Ln Ln O Ln O LD It 00 n N Ln CO O O 10 N Ln 00 00 M LD LD It ri o o, M M M It It 't It Ln � W Ln M M M M M M M M M M M o +o0 0 +50 1 +00 1 +50 2 +00 2 +50 2 +75 0 PROPOSED WIDE GRASS INE MERGENCY 1 PROPOSE 024" HDPE R SER Sl' UC URE RISER RIM ELEVATION = 347.00' SPILLWAY CREST ELEVATION =348.75' \ PROPOSED VDOT " #3 COARSE AGGREGATE OUTLET PROTECTION w/ GEOTEXTILE FILTER FABRIC' UNDERLAYMENT (L =16', W1 =6'1 ? M W2 =18' D =2' MIN.' ) ' w PR POSED �AF S `� co N 1 ( \ \ + ?V PROPOSED 010" HDPE _ ' DOUBLE WALL BARREL, ' ;' 66, \. 1 �N SEDIMENT BASIN #3 DETAIL (SCALEI " =20') _--- 3 PR POSED VDOT #3 - COARSE AGGREGATE -- OUTLET PROTECTION w% boo / GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =35', o -""34O -_ W1 =10_, D =2' MIN.)," 33� _.._ - -_ --- _ 324 - 330 3 20 PROPOSED BAFFLES ~ _- PROPOSED 24 CL. III C RISER ST UC� _ -RIS ER RIM ELEVATION= = 23.7 13 " - - = -- - - - 319.50 6 r r 2 - 326 10' WIDE TOP OF DAM ELEVATION =326' 'hop VDOT #3 COARSE AGGREGATE OUTLET ROTECTION w/ GEOTEXTILE FILTER FABRIC o 324 ,% NDERLAYMENT (L =11', W1= 3.75', W2= 12.25', D =2' MIN.) 0 -- ry f _ 320 % "PROPOSED 015" CL. III RCP BARREL, 72 LF- INVERT IN= 316.72'; .. � - _ PROPOSED 45WIDE G2ASS LINED EM ERGENCY =�-- SPILLWAY CREST ELEVATION = 324.75 INVERT OUT = 316.00' , / CONTRACTOR SHALL NOT Y % PROPOSED VDOT #3 COARSE AGGREGATE OUTLET DISTURB WETLANDS (TYP.) PROTECTION w/ GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =12', W1= 3.75', W2= 13.25', D =2' MIN.) v -- ....- OF 0 r� ZCOTT R. COLLINS---* U No. 35791 �SSIONAL E��1 Z O a U 0 w ° Z O Ln w RY Z O w �a H ° W ce Ln In O C7% ,-i N v Ln U.1 LU Z O a Ln U') Inc w w U m m j � O O Z a - 5 � > Z O O w U U r0r Ce. a a w w Ce Ce Ln Ln LL, Ln M U1 t0 L9 M M 07 N M d' I N � O � N W � ~ Q Q LU > W W � J � J J > U �c U) N �- � z I- 0 a o U° J Z Q Q z° W31 U 5' P__4 I Q U Lij L W to U1 W F- to 06 a U) W z 0 r Z W (- O c W 0 V) e. .j F- V vJ W F- 0 - J W W 0 z w z z U 0 Z 0 N ti w a r a s O w a U) JOB NO. 142109 z SCALE AS SHOWN t SHEET NO. t 6 z 0 U c 3 a t 0 y 3 0 c _o U 0 c 0 0 V T: 0 U Z G 0 0 RISER CREST DEMTER "r. 324.75 32"6.00 10.0 319.5 4(YX131' 2 :1 3:1 YES 91 79 1.2 YES 4.25 2 :1 1 % 26.56 2 3.3 "X3.3' YES 12:59 45 25% 40 324 -75 SEDIMENT BASIN #2 DETAIL (SCALE 2"=2o') SEDIMENT BASIN #2 PROFILE (SCALE 1"=40') 400 TOP OF PROPOSED 024" HDPE RISER STRUCTURE RISER RIM ELEVATION = 347.00 PROPOSED 010'1 HDPE DAM= 350-00' i 375 -35 i PRO POSEDGRADE DOUBLE WALL BARREL,-- - - - - -- - -- - - - -- -- - - -- - -- - -T-------------- - - - 112 LF; INVERT IN= 340.00; j EXISTING GRADE INVERT OUT = 336.50' 350. ' = BASIN FLOOR 21 ' ' -- 344• 00' 325 OUTLET PROTECTION d- 00 00 0) Ln Ln O Ln O LD It 00 n N Ln CO O O 10 N Ln 00 00 M LD LD It ri o o, M M M It It 't It Ln � W Ln M M M M M M M M M M M o +o0 0 +50 1 +00 1 +50 2 +00 2 +50 2 +75 0 PROPOSED WIDE GRASS INE MERGENCY 1 PROPOSE 024" HDPE R SER Sl' UC URE RISER RIM ELEVATION = 347.00' SPILLWAY CREST ELEVATION =348.75' \ PROPOSED VDOT " #3 COARSE AGGREGATE OUTLET PROTECTION w/ GEOTEXTILE FILTER FABRIC' UNDERLAYMENT (L =16', W1 =6'1 ? M W2 =18' D =2' MIN.' ) ' w PR POSED �AF S `� co N 1 ( \ \ + ?V PROPOSED 010" HDPE _ ' DOUBLE WALL BARREL, ' ;' 66, \. 1 �N SEDIMENT BASIN #3 DETAIL (SCALEI " =20') _--- 3 PR POSED VDOT #3 - COARSE AGGREGATE -- OUTLET PROTECTION w% boo / GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =35', o -""34O -_ W1 =10_, D =2' MIN.)," 33� _.._ - -_ --- _ 324 - 330 3 20 PROPOSED BAFFLES ~ _- PROPOSED 24 CL. III C RISER ST UC� _ -RIS ER RIM ELEVATION= = 23.7 13 " - - = -- - - - 319.50 6 r r 2 - 326 10' WIDE TOP OF DAM ELEVATION =326' 'hop VDOT #3 COARSE AGGREGATE OUTLET ROTECTION w/ GEOTEXTILE FILTER FABRIC o 324 ,% NDERLAYMENT (L =11', W1= 3.75', W2= 12.25', D =2' MIN.) 0 -- ry f _ 320 % "PROPOSED 015" CL. III RCP BARREL, 72 LF- INVERT IN= 316.72'; .. � - _ PROPOSED 45WIDE G2ASS LINED EM ERGENCY =�-- SPILLWAY CREST ELEVATION = 324.75 INVERT OUT = 316.00' , / CONTRACTOR SHALL NOT Y % PROPOSED VDOT #3 COARSE AGGREGATE OUTLET DISTURB WETLANDS (TYP.) PROTECTION w/ GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =12', W1= 3.75', W2= 13.25', D =2' MIN.) v -- ....- OF 0 r� ZCOTT R. COLLINS---* U No. 35791 �SSIONAL E��1 Z O a U 0 w ° Z O Ln w RY Z O w �a H ° W ce Ln In O C7% ,-i N v Ln U.1 LU Z O a Ln U') Inc w w U m m j � O O Z a - 5 � > Z O O w U U r0r Ce. a a w w Ce Ce Ln Ln LL, Ln M U1 t0 L9 M M 07 N M d' I N � O � N W � ~ Q Q LU > W W � J � J J > U �c U) N �- � z I- 0 a o U° J Z Q Q z° W31 U 5' P__4 I Q U Lij L W to U1 W F- to 06 a U) W z 0 r Z W (- O c W 0 V) e. .j F- V vJ W F- 0 - J W W 0 z w z z U 0 Z 0 N ti w a r a s O w a U) JOB NO. 142109 z SCALE AS SHOWN t SHEET NO. t 6 z 0 U c 3 a t 0 y 3 0 c _o U 0 c 0 0 V T: 0 U Z G 0 0 o +o0 0 +50 1 +00 1 +50 2 +00 2 +50 2 +75 0 PROPOSED WIDE GRASS INE MERGENCY 1 PROPOSE 024" HDPE R SER Sl' UC URE RISER RIM ELEVATION = 347.00' SPILLWAY CREST ELEVATION =348.75' \ PROPOSED VDOT " #3 COARSE AGGREGATE OUTLET PROTECTION w/ GEOTEXTILE FILTER FABRIC' UNDERLAYMENT (L =16', W1 =6'1 ? M W2 =18' D =2' MIN.' ) ' w PR POSED �AF S `� co N 1 ( \ \ + ?V PROPOSED 010" HDPE _ ' DOUBLE WALL BARREL, ' ;' 66, \. 1 �N SEDIMENT BASIN #3 DETAIL (SCALEI " =20') _--- 3 PR POSED VDOT #3 - COARSE AGGREGATE -- OUTLET PROTECTION w% boo / GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =35', o -""34O -_ W1 =10_, D =2' MIN.)," 33� _.._ - -_ --- _ 324 - 330 3 20 PROPOSED BAFFLES ~ _- PROPOSED 24 CL. III C RISER ST UC� _ -RIS ER RIM ELEVATION= = 23.7 13 " - - = -- - - - 319.50 6 r r 2 - 326 10' WIDE TOP OF DAM ELEVATION =326' 'hop VDOT #3 COARSE AGGREGATE OUTLET ROTECTION w/ GEOTEXTILE FILTER FABRIC o 324 ,% NDERLAYMENT (L =11', W1= 3.75', W2= 12.25', D =2' MIN.) 0 -- ry f _ 320 % "PROPOSED 015" CL. III RCP BARREL, 72 LF- INVERT IN= 316.72'; .. � - _ PROPOSED 45WIDE G2ASS LINED EM ERGENCY =�-- SPILLWAY CREST ELEVATION = 324.75 INVERT OUT = 316.00' , / CONTRACTOR SHALL NOT Y % PROPOSED VDOT #3 COARSE AGGREGATE OUTLET DISTURB WETLANDS (TYP.) PROTECTION w/ GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L =12', W1= 3.75', W2= 13.25', D =2' MIN.) v -- ....- OF 0 r� ZCOTT R. COLLINS---* U No. 35791 �SSIONAL E��1 Z O a U 0 w ° Z O Ln w RY Z O w �a H ° W ce Ln In O C7% ,-i N v Ln U.1 LU Z O a Ln U') Inc w w U m m j � O O Z a - 5 � > Z O O w U U r0r Ce. a a w w Ce Ce Ln Ln LL, Ln M U1 t0 L9 M M 07 N M d' I N � O � N W � ~ Q Q LU > W W � J � J J > U �c U) N �- � z I- 0 a o U° J Z Q Q z° W31 U 5' P__4 I Q U Lij L W to U1 W F- to 06 a U) W z 0 r Z W (- O c W 0 V) e. .j F- V vJ W F- 0 - J W W 0 z w z z U 0 Z 0 N ti w a r a s O w a U) JOB NO. 142109 z SCALE AS SHOWN t SHEET NO. t 6 z 0 U c 3 a t 0 y 3 0 c _o U 0 c 0 0 V T: 0 U Z G 0 0 C7 0 m cl� 1� 0 0 I O O O O O 0 WE Yj O Watershed Summary Pre - Development Post- Development rnl Tr hrc 1 -VAar i -YQar in_Year Area CN Tc. hrs. 1 -Year 2 -Year 10 -Year Subarea A 4.92 ac. 83.5 0.22 2.24 cfs 5.37 cfs 12.52 cfs Subarea B 6.13 ac. 77.0 0.24 9.93 cfs 10.98 cfs 22.50 cfs 1.7 ac. 79.0 0.16 3.54 cfs 3.90 cfs 7.73 cfs Subarea C 3.67 ac. 81.6 0.21 4.03 cfs 4.92 cfs 7.34 cfs Subarea D 14.38 ac. 77.1 0.25 22.61 cfs 24.97 cfs 51.18 cfs 3.36 ac. 85.5 0.18 0.41 cfs 3.14 cfs 11.96 cfs Subarea E 1 8.25 ac. 79.4 0.25 14.37 cfs 15.80 cfs 31.42 cfs Subarea F 11.11 ac. 77.5 0.25 17.75 cfs 19.60 cfs 39.97 cfs 1 9.72 ac. 78.9 0.25 16.55 cfs 18.21 cfs 36.46 cfs o SCOTT R. COLLINS-Z' �J No. 35791 y 1 z O o� c} W 0 z O ,r � � o rn � n Qcq LU Ln f LU Uj CD O O z O O U U w w CL a W W W W 0� &_ FILL SHALL BE PROCTOR MAXIMUM DRY DENSITY ASTM D6 8. _....... _: <..:, , ...: Q.. LO Lo Uj SOIL COMPACTED 9 .�. a r l,>r T �� _ �� _ ,. . � . _ � . •• ... _ - � W � .. ...... R INDEX OF BETWEEN so & o OR BETWEEN AND a ,..., .1(" .J,.:. � _ ,,:..:: r ,- - _ ....... ,. FILTER MEDIA SHALL BE SUPPLIED BY VENDOR &TESTED FOR ACCEPTABLE PHOSPHOROUS 3 7 _., f /,..,., ... J, ;. ; . _ , , , , ..> ... .....::.. . .. . .: ... �: ;- . " ...........�. - ,._ ---- - - _ .... _ ,- m k OF PHOSPHOROUS. Z s . , >,:. r _.: , .. ........ � •. � ..... -' - -' - -" _., ,. ." _ _,. � . � �:,' � to tp _ rn TCf] CADDII' ,. .. IAI \AlIf1TlJ CLJAI i Qr of nr•rn ❑ci n\ni oce coevcl nvGR I InInGRnRAIN PIPIN(.' FII TFR FARRI(' SNAI I NC1T FXTFNII RFY(1N1� � .-� __.._.._..3 f. _l:l . ! �.::� i..,Y..�L.s. r._._�.._.fi . f ..� -__7 �,....:::r.; j � -: >. -r 1 ..:..f >;�r :..::. �, -• ®� �. - - -'- ��- � . ". - / 1 .,9' � i I ��\ _ ��... � � � E:31 �_ . -_ I � �'�1 7� _ cy) �My� _ v"J N z z Uc\j 00 U N z N W Q 2: 7 ' c� W Q z _> U Q N � w E-- �S/ w Q 0 z?2 O �L uU '-' o t w W z - Uj V / 3 W o z w wti 0 w > - T W U) ' T C E-- Z V) z J � '.0 -Z Q � Z w o - N ' ll ct Q W tu- J � a W n W v JOB NO. 142109 SCALE 1 " -60' C C C V SHEET NO. 8 e a L c r� v N 0 0 c 0 v N C N N c 3 ---- ---- / '/ ' \ / \ \ \ uj V-4 01 m uj Cie w mm a- c. In a Z 4� 0 2: LU CL 0 o Fill --4 F- IL, LU CL uj LLI JOB NO, SCALE SHEET NO. � � � � � s � � ° � = � � � 5 a ^ 3 e � � ~ � � � � � � BIORETENTION BASIN 'A' (SCALE V =20') - �-" - �_` - - M '- ~~ - / _ - -- _ -- _ - �_ _ ___ ._ - l ....... _ _ 1"�, �. ___ ___-' - -.. -.- /FACILITY SIDE SLOPES i r - _ �: _ - -- -•--SHALL BE MULCHED WITH - -•_ r,.�' \ , '_ i�'.. ... - ---� JUNIPER PLANTt1�S / l ! / I ._ --- __ _ ... -- - -- -TYPICAL. I C _- ......... _ - _- -- _ T �k0 , kll -� _ - / % i t _ _ CONTRACTOR SHALL INSTALL A 42" TALL (MIN.) FENCE \ _ ED VARIABLE WI / `" __ , _WrtH WARNING SIGNS AROUND -THE PERIMETER OF - SWM & ACCESS EASEMENT LS 1,) THE 2:1 DE CELL GRADES ASS�IATE9 -.. _ G _ - SWiPhF ILITY A T D UFtAGE TRESPAS IN . A 10' ... z ' ;,,` _. - l o } �C 0 I= S G - -. LS y � WIDE LEVEL GRADED EARTHEN - ACCESS ROAD SHALL ' "" � � ALIGNME T P.) AR 1 �, BE MAINTAINED -FQR ACCESS TO THE FACILITY Y: r �� ' ' 7 / `,, ---- -- - #k � / 1. -! -_- _ n ti r PROPOSE>3-024" CL. III R�CP-RiSER STRUCTURE. ._ - � f' • "`�` `' �--_ � . ; ;� � y „s RISER RIM ELEVATION= 75' w/ A LOW- _ # "` j� - � \ " -333 c _ _ - _ fiL, , r `iB•io_ ORIFICE INVERT ELEVATION - 26.00 I I \ ION _ 10 WID�GRADED EARTHEN ACCESS °;a; '. / ___ROAD. MAX. 2o% LONGiTUDINAL __ __, -- ~ :_. StOPE_$Lz9b CRO55 SLOPE -- ____ . _ . _ ._, __ _ - _ .: ,^ ` °'�. / �' PROPOSED �PRAP OUTLET PROTf~CTION TO ___ - -. _.._y OF SPILLW Y : - _ / : ` EDGE A (TYP) - :..;, ` r , , •. :'' , ', .. , : REDUCE RISK OFS000R. PROPOSEQ C FORERAYTO PROVIDE ADDITIONAL R THE T UPLAND OF FILTER MEDIA y t L IA -.. - ti' :< . ' f / MIX. RO PLAN FOR RIPRAP D -- ._ .� 5 E.SIGN. _. I 11 - PROP05ED 01 CLA RCP BARREL - - :f%t3 f) -- ° 8 LFS INVERT IN= z .00" INVE T 11 11. - ` A\ (1) r DD 4 3 4 , A_ -� \ �' BUT= 22.00 j. . 3 - _ - _ .. ... ......... . 11 _.. z IaPV DE FOR AY T(�P OF D A`M\ �''r , LEVATION =34' w15' WIDE FOREBAY,,-' _ :; ,AM CRFPT ELEVATION =34� - _ _ j� +,,� �. _� . �100sf) �' ` , ,/ / \�x "/ " ___ _ ` - / / I/ I'll e °-'"� / _, - -'' -- "� � ,-_. ...' _ . "' r �,-`' . � 6 "SCHEDULE 4o PERFORATED PVC UNDERDRAINS,1o' , \. "� 7.'.'. „.:. I)'. '..'.. MAXIMUM SPACING WITH CLEANOUTS, SHALL BE INSTALLED -- - ' '" r ' j THROUGHOUT THE BIOFILTER5 IN THE LOWER STONE LAYER. ...... ...,- -..... :l - _ _ - - " r _ "- j / UNDERDRAINS SHALL BE SLOPED TO DRAIN TO THE RISER ,`' _ ___ - ' "" _ ' "` PROP135E0 SOT #3 COARSE AGGREGATE - � _ -- _ r -- l - STRUCTURE OR TO DAYLIGHT INTO THE DETENTION CELL & �� - - ` ~'r --' "`OUTLET PROTECTION / GE"EXTME FILTER _- _.- - - '- ~ yn °f SHALL HAVE A 12" STONE SUMP LOCATED BELOW THE FABR. If liNBERLAYMENTT,(L -6 ,-W3 =3.75'; " - / .�•-`" .- � INVERTOFTHEUNDERDRA) ,, ! -- W2 =7.25', 0=2' MIN.) _---- � /` f " -- PROPOSED LEVEL 1 BIORETENTION BASIN TO PROVIDE ' _ _ 1 ,� -"' �" ` PROPOSED 6o WIDE GRASS =�� - �_1- - WATER QUALITY TREATMENT. 30' WIDE SPILLWAY CREST ,/' ` r"' C11VED EMERGENCY SPILLWAY - %-- ELEVATION= WEIR CREST IS 12" ABOVE BIOFILTER TOP �,.s . " --"' `' _ --- .-= � 10' WIRE TOE^OF DAM Y• 33 - - "` CREST ELEVATION= 334.75' " " - " LAYER, CREATING A MAXIMUM PONDING DEPTH OF 1z ". z ,111 -. ._.. - -- ,._�_._ ..,_ -- ELEVATION = 336'.•, ---"r _ - - `' - - " __' WEIR TO OUTFALL INTO DOWNSTREAM DETENTION CELL , -- ° _ -_„ _ " - -- - (RIM =336', FLOOR =326') FOR QUANTITY CONTROL /r �•� '� a ' J _ PROPOSED 10W OW IMPACT °' r !' ' ! / `'�_ 1--- - TRAILALIGNMEN r '� ' ° / EXTENDED DETENTION BASIN 'C' (SCALE 1" =20') , `- I i I - \ I I EXTENDED DETENTION NOTES: / \ '_ , i. THE PROPOSED LEVEL i EXTENDED DETENTION BASIN SHALL HAVE A TURF GROUND I COVER, SUCH AS GRASS, MULCH OR SOME OTHER FORM OF A VEGETATIVE '' �� -j j � ' I i i It GROUNDCOVER. LANDSCAPING BEYOND THIS 15 OPTIONAL, BUT NOT REQUIRED. z. THE PROPOSED SIDE SLOPES OF THE BASIN SHALL BE A MAXIMUM OF 4:1. 'Z r I , I \ 3. THE PROPOSED FLOOR SLOPES, EXCLUSIVE OF THE MICROPOOL SHALL HAVE A SLOPE \ ! I � t \ \ RANGING FROM o.5 %- 1.o9b. i, . 4. THE DOWNSTREAM EMBANKMENT SIDE SLOPES SHALL HAVE A MAXIMUM 3:1 SLOPE. - �) . \ / ` i j.. } PR PDSED 4 DEEP MICROPCIQL f \ I I PROPOSED R= ED,) .. ,.. ..... ... .. . \ N I P O E TMD DE NTION BASIN FOR , . ?,,r ''.', j WATER QUALI & QUAN TREATM NT / _ ... i'` - �' � �� - . .. �1 \ PROPOSDI 6" TALL, 12 WIDE STONE , , VAFFLE EXTENDING FLO PATH LEN H. / .-- �� __ _--'` � j� ... "_�' �� v � BASIN LENGV:WIDTH RATIO IS z.5a °- � - /' • \ (GREATER THAN THE MINI�AUM 2:1) E -I' % -' I , I ), .. - _' 1o' WIDE GRADED EARTHEN CESS � \' \ z' WIDE FOREBAY TC OF \. IG NG " RO_AD " AX. zo9b LO ITUDINAL -y I '' DAM ELEVATION= 0'w/ . f: \ ����`� / A SLOPE & z%C9OSS SLOPE J / , ! 5' FOREBAY SPILLWAY ,, . - . � 1 REST ELEVATION =34g SPILLWAY-,, ,_ - �� � \ PR01yOSED7o WIDE GRASS .'. t �:...:E._,• / _--i'INED EMERGENCY SPILLWAY , „� N, \ CREST ELEVATION 34a. 0' I � I • } . +` 1 . I CA 3! 1:..., '} �" \ '' \. ' �, .., �' PROPOSED 0zo HDPE A 5 DlSUBLE 110 WID TOP F DAM WALL BARREL, OJt EQlVALENT, ELEVATNSo' f . p ! "ate' " )' .� 00 \1 / - "` _ 112LF IN\CERT1iJ= 340.00'; INVERT _ OUT= 6. ' I -, r t, "• _a 33 5: lo PROPOSED VARIABLE WIDTH I z.6 WM & AC ES EASEMENT - -� S ACCESS J PROPOSED VDOT #3 COARSE �% kph AGGREGATE OUTLET PROTECTION w/ / 1 i' 0 +00 "'� FLOW \ `_` GEOTEXTILE FILTER FABRIC 3 PATH UNDERLAYMENT (L =8', W1 =2.5' °� ; -'v 1_ ­__­­1 - - -W2= 8.83'. D=2' MI� I - , / `/ ` / 1 / % �. /� O. % SEE T�fIS SHEET FOR 4 ,. SCALED PR061LE OF ? ArLIGNM I OW.) ^. . ... .. _ .. 1. . �� - j PROPOSED LOW IMPACT .. V _ . _ Z+ % 5 . �' / TRAIL AjdGNMENT' _/ -'` z ' ' 024 -ADP STANDPIPE w/ DU4TILE IRON GRATE SHALL SERVE AS THE ° °v - °° . K� _ ' �0 +00 . ,r r RISER STRUCTURE & TRASHRACK, SEE`Di=TAIL ON SHEET 1i. RISER STRUCTtJRESHALL -__.P� SEE Yr ` ' // .. -.. HAVE RW E EV TION= .'6d WITH 0 "LOW FLOW ORIFIC NVERT INTO THE p IDE PRETREATMENT TO A L A 341 A 3 Et • ,/ RISER AyELEV. 344' (CONNECTED TO MICROPOOl l/IF�AIV INVERT(;•D PIPE w/ A LOWER UPLAND OF EXTENDED I 11 ,;' r- - E / INVERT SET AT THE BASIN FLOOR OF 340 RISER SHALL ALSO HAVE TWB {z) 06 "- _ -- DF�NTION BASIN. ' .,' i MIDFLOW ORIFICES WITH INVERT ELEVATIONS= 46.i5'. TO PREVENT FLOTATION THE ^, 1, - RISER BASE BARREL CONNECTION SHALL BE FI EMB€DD�ED -6" INTO AN i8" - - -. -. ,f e , ' f ;, / J THICK CONCRETE FOUNDATION THAT IS 5' IN DI ER, THAT IS BURIED OUTSIDE -THE _ '` ! LIMITS OF E MICROPOOL. _ . ,., . PROP, 1a2LF; 360 0 +00 0 +50 1+00 1+50 2 +00 2 +50 PROPOSED VDOT #3 COARSE AGGREGATE OUTLET PROTECTION w/ GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L -6', W1= 3.75', W2= 7.25', D =2' MIN.) BIORETENTION BASIN A 360 _ -_ ___._.. - -I -- - --I I I - -- - -- - z' IDE FOREBAY * TO OF DAM- - . --'- -- __.__. M . . . . . TTO _ 9 1,132 1,535 329 F REBA PROVIDE- AUDITIONA 2,878 330 2,054 ELEVA ION =34 'w /5'WI EFOREB Y XI STING EDIA MIX. SEE ROAD P RIP R - -_ 1 i j 3,235 345 . . DAM ELEVATION= 0' w/ . - 3,750 : - _ - . ; J M 355 SPILL AYCR TELEV TION =34 ' GRADE FOREB TOPO 345 E 15T{NG _/ I ST ELE T __ z' WIDE FOREBAY TOP OF -- _Y _- . - __- PROPOSED CLE NOUT, EE DE RADE OPOSED o' WIDE PILLWA CREST E EVATIO =337'. W IR BAY SPIL DETAIL ON SHEET 11 F R \ -- _- __- � ', , -11 ( -- -, - RIDE INSTALL CREST IS 12" AB VE BIOF LTER TO LAYER IOi_ _ _ IN ORMATI N. ! ___________� ACCOR ANCE j THE CREATING A MAXI UM PO DING DE TH OF 1 ". _-ADDITIONAL _ ____TT TT T _ - - JJ ' DEEP F REBAY r r. O OP OF D M ELEV TION= 3 87 O W i L0 n ' n Lei ROPOS / 2:1 SID SLOPES 340 - `-P OPOSED (o' TOP OF DAM EL V. = 350.0') I DETAIL I ? R I 340 PROPOSED 60' IDE GRASS - - DETEN RIM =336' ONCE FLOOR= 26') -- - - . PROPOSED 024" HDPE STANDPIPE w/ TOP OF ULCH LINED E ER EN G SPILLWAY S { DUCTILE IRON GRATE SHALL SERVE AS THE ELEV= 6.00 3 CRES ELEVAT ON= 334. 5' - -- - _ .- - -- -- - - -- ____ - - - - -- / 1 ;7 I, \_ 3 _ (so' WI , �. AM-EL _ - - PROPOSED 6" TALL, 1z" ORIFICES w/ INVERT ELEVATIONS =346.15' & AN INVERTED PIPE INTO THE RISER FOR LOW -- EDE 0. 336• ') FLOW (ORIFICE OPENING AT 344 ON RISER). BIOR TENTI0 BASIN RIM1 EL V_= - - (GREATER THE -___ i BIORETENTION BASIN 335 -' DEEP MRI' _ __ OPOOL / 2:1 SID SLOPE 34 = - - _ . _ . - _ .._ - .. - _.. - .. - .._ - -' 3" LAYER OF SHREDDED HARDW00[ =344', FL OR =340 INSTALL EMBA KMENT __ 340 I - -.. -_ _ -- - - -- - --- - - _, --- -- )SED 010" HDPE ADS DOUBLE WALL .. 344'} w/ TRASHR CK. - { - - _ -- -- _ - ACCORDANCE w TH / � 06" INVERTED N �• E TO BE SURROU DIED "= - - - - -- .- - - - - ::_:g'::_ . - - 6' OF STATE APPROVED SOIL MED]< DESI 1J EST 1 1� __ - _ - -_ - - __j - - - - - '' - - - - - - - - - .3 _ SLOPE EXCAVATION II NEED NOT BE 0 TION TH RISER B SE AND BARREL -- - - -- - - -- - - - .. - . - -- - - „ PROPOSED 024 CL. III RCP .. .. O ANA 1 RISER STRUCTURE. RISER RIM OPED TO DRAIN TO THE RISER THICK CO - -- - -- -, -- _ 3' - -- :___ -- - _::_::_: -- - 12 ! THAT IS BU - -- 330 ELEVATION= 333 IMITS O THE MI ROPOOL _ -__ r PROPO .• AGGREG TE OUTLET _ - - -____- ____ I J - - - - ILE FILTER - - 3" MINIMU PEA GRAVEL LAYER LOW -FLOW 01o" ORIFICE UNDER YMENT(L -'r8', W1 =2. ', W2 =8.8 INVERT ELEVATION =326.00'. .) M r7 rN I------- 2' MINIMU GRAN L SUM . - 12' - - -- - - -- - ------- - -- - I -- - I ----------- -- -- - - -- - LEY 3. -5! - - - -- OD 04 N L0 Cp WLOi � � n � M n f 4 n r) i (MIN. D PTH) FLOOR LEV.= 325 325 326.00' TO PREVENT FLOTATI DN THE ISER 6" SCHEDULE 4o PERFORATED PV( BASE AND BARREL CDNNECTIDN SPACING WITH CLEANOUTS, SHAL S ALL BE IRMLY E BEDDE 6" THE BIOFILTERS IN THE LOWER'_ _ _ SHALL BE SLOPED TO DRAIN TO DAYLIGHT INTO THE DETENTION C J _ f _ '--PROPOSED 01 " CL. III RCP FOUND TION TH CR T IS 6' 1 __ 320 BA REL (84L ;INVERT DI METER, HAT 15 B RIED BE OW SUMP LOCATED BELOW THE IM IN =324. ;INNER OUT =3z .00'j ED 1 N FLOOR. O O L ",I_ 00 •- 0O � O 00 It O CN N . K) n N M n Qi � 1 I n n r') n M r) n NO n M 0 +00 0 +50 1+00 1+50 2 +00 2 +50 PROPOSED VDOT #3 COARSE AGGREGATE OUTLET PROTECTION w/ GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L -6', W1= 3.75', W2= 7.25', D =2' MIN.) BIORETENTION BASIN A 360 BIORETENTION BASIN 'D' (SCALE 1 " =20') _ -_ ___._.. - -I -- - --I I I - -- - -- - - - -- - - - - -- - . --'- -- __.__. M . . . . . TTO _ 9 1,132 1,535 329 F REBA PROVIDE- AUDITIONA 2,878 330 2,054 4,683 PRETREATMENT UPLAND OF FIE' 2,284 7,039 355 i EDIA MIX. SEE ROAD P RIP R - -_ 1 i j 3,235 _ -. '. _ . . . . . . DAM ELEVATION= 0' w/ . - 3,750 : - _ - . ; J M 355 . . . _ _ - -. _- " G " ` SPILLWAY CREST_, _ - -- 2'WID FOREB TOPO DAM E 15T{NG _/ I ST ELE T __ z' WIDE FOREBAY TOP OF -- _Y _- . - __- _ _ - EL TION =3 o'w /5' DE RADE '8' WIDE FOREBAY __ - " SPILLWAYCREST - ___ _ - - FOR BAY SPIL WAY CR ST '. . . . . \ -- _- __- � ', , -11 ( -- -, - FO INSTALL EMBAN MENT I 4 PEE ! N =349 IOi_ _ _ VATION I - - - -- -- I - - XI STI N ! ___________� ACCOR ANCE j THE I GRADE ILLW N CRESTE 340 =328' 3jQ DESIGN ON SHPT 11. JJ N O r. r r. O W W 1` 350 PROPOS D 7o NI2E GRAS LINED E{IERGEN O W i L0 n ' n Lei ROPOS SPILLWAY CREST ELE ATION- 348.80' OUT E - `-P OPOSED (o' TOP OF DAM EL V. = 350.0') I DETAIL N SHE T 11 F R RADE ' DEEP FOREBAY - - -- -- - - - - -- - - -- - - - - -- INF -- - - . PROPOSED 024" HDPE STANDPIPE w/ �, { DUCTILE IRON GRATE SHALL SERVE AS THE 325 \_ RISER STRUCTURE. RISER STRUCTURE RIM - - I II - I I - - / 1 ;7 I, \_ , 345 ELEVATION = 347.00' w /TWO (2) 06" MIDFLOW , �. _- - - PROPOSED 6" TALL, 1z" ORIFICES w/ INVERT ELEVATIONS =346.15' & AN INVERTED PIPE INTO THE RISER FOR LOW -- - 0. %71% FLOW PATH LENGTH. BAS FLOW (ORIFICE OPENING AT 344 ON RISER). BIOR TENTI0 BASIN RIM1 EL V_= - - (GREATER THE -___ i -- .00' -' DEEP MRI' _ __ OPOOL / 2:1 SID SLOPE 34 = FL00 ELEV. - - =344', FL OR =340 340.00' 340 I - -.. -_ _ -- LONG 6" INVER -D PIPE 340 - - - - __ OF STATE APPROVE (INVE )SED 010" HDPE ADS DOUBLE WALL TS =34o' 344'} w/ TRASHR CK. BARREL, OR EQUIVALENT, - - _ -- -- _ - 06" INVERTED P E TO BE SURROU DIED NVERT IN= 340.00'; INVERT OUT= 336.5' -. :RDRAINS,10 MAXIMUM SPACING MEDIA. SIDE SLOPE EX WI ­H STON FOR PR ECTION & __ _ _ _ - I LAT-A-03' - - _ - L W FLO ORIFICE PENIN _ .. - -_ E .3 (IN ERT =3 ) 335 TO PREY NT FLOT TION TH RISER B SE AND BARREL 335 3" MINIMUM PEA GRAY - CONNECTI N SHALL BE FIRM EMBED ED 6" IN O ANA - OPED TO DRAIN TO THE RISER THICK CO CRETE F UNDATI N THAT S 5' IN DI METER, 12 ff _ __ __ t THAT IS BU - -- IED OU IDE THE IMITS O THE MI ROPOOL MIN. DEPTH) STONE SUMP LOCATED BELOW r PROPO ED VDOT( #3 COARSE AGGREG TE OUTLET _ - - -____- ____ 315 J N PR CTION vi/ GE ILE FILTER FABRIC 00 W W 330 UNDER YMENT(L -'r8', W1 =2. ', W2 =8.8 ', D =2' MI .) M r7 rN M n 330 JJ O . 0 . O .� O N . O W W 4 r CD `4 OD 04 N L0 Cp WLOi � � n � M n ro n 4 n r) r7 BIORETENTION BASIN 'D' (SCALE 1 " =20') _ -_ ___._.. _ _. . N\ , - - Forebay Cell _••_ '' N\ (ft) _ " / _ '" -__ 11 _ ___ _ �' ^ __ ROPOSED RIPRAP OUTLET PROTECTION -- " ". TO REDUCE RISK OF SCOUR. P(301?OSED !° _� . --'- -- __.__. M . . . . . TTO _ 9 1,132 1,535 329 F REBA PROVIDE- AUDITIONA 2,878 330 2,054 4,683 PRETREATMENT UPLAND OF FIE' 2,284 7,039 334 2' WIDE FOREBAY TOP OF EDIA MIX. SEE ROAD P RIP R - -_ 1 - �° 3,235 _ -. '. _ . . . . . . DAM ELEVATION= 0' w/ . - 3,750 : - _ - . ; J M 8' WIDE FOREBAY. . . . . . _ _ - -. _- " G " _ _ SPILLWAY CREST_, _ - -- "" _ _ -" / LWAY ELEV,4TI0 - r� - - I ST ELE T __ z' WIDE FOREBAY TOP OF -- _Y _- . - __- _ _ - ( DAM ELEVATION= 33o''w/ IN ALONG ''� _ L - " ''_ '8' WIDE FOREBAY __ - " SPILLWAYCREST - ___ _ - - _ / ._ -- - it - O d '. . . . . \ -- _- __- � ', , -11 ( -- -, - y - _ - __ FACILITY SI PLANTING - _ JUNIPER � S (2) _� - 7 ---- ® .- _. _ ..___.. " _ oo _1 % SCALED PROFILE OF `Z I ALIGNMENT GYP.) sc _--_ - __ _- __ - - - - _ -- - �" N �., - . -._ ���,,--� 11 - -- :. R GRADED o %ONG TUDINAL ACCESS .� " ' '• -. • = ,:..�.. - P & 2% CROSS SLOPE . L S r1' : 3 - M _. -, c ,' .W . YY: ; . : ; ,..: .. _ ,� N3 0 N ._g ROPOSFAtfVEL 1 BIORETENTION BAST PROVIDE WATER QUALITY TREATMENT. __ . , _ _ WIDE SPILLWAY CREST ELEVATION =327'. r ., ., ____ - N _may IS iz ABOVE BIOFILTER TOP _ F { . ;; _ -LAYER, CREATING A MAXIMUM PONDING ,r v, .., -1 y _ �: V' $% ° '�" ° ' --" ' DEPTH OF 12 ". WEIR T OUTFALL INTO ' �� _ - sf '" :... DOWNSTREAM DETEN ION CELL (RIM =326, .�' _ /- , �, ; .. - _ FLOOR 320) FOR Q ANTITY CONTROL. l - J _ _.. ._ , f f f _ _ Yf"r � - F PROPOSED II R 0 CL I RCP _- .. R / PV RISER STRUCTU E. RISER RIM (30 f� - - ': 0 +.6 ....... ELEVATIONL-323.75' w/A �, - •/ - I LOW- FLOV�V 08" ORIFICE - 1 _ 7 J INVERT EVATION= 320.00;/ . �--" i / w -- 1. r �f ...... \ \' _ ' 'J 11 IX. / _. .. �o / f ' ' /' . / I. �. - _ / .. 1 �°, i �✓ % , .- _ - _ /- _- - - .- _ - - - - f - ° io' WIDE TOE' OF DAM �� ° ~' J '' -- 09 - ELEVATION �, i - - - - - - ` ° ,,- r PROPOSED RIPRAP OUTLET}?R09 ECTION TO __ - - �' x /,' /r z f REDUCE RISK OF -SCOUR. PROPOSED - ' 7 PROPOSED' o' W E GRASS / /f FQREBAV TO PROVIDE ADD IONJ>;L �_- l �, %f LINED E ERGE Y SPILLWAY -' RETREATMENT UPLANBOf= FILTER MEDIA_" - �" - -- z CRELErYATION= 32x75' Z , MIX. SEE RQAD-PCANS FOR RIPRAP DESIGN. r f __ - ~ .. -_ __ ____ � '��/ % % 1.1 - /` sue, _ i QROPOSEp`VARI�BLE WIDTH . ?r w � 11 - 6" SCHED 1LE4o PERFORATED PVC ERDRAIN_5,�o' MA3CIMUM \__ - % /SWM & ACCESIEASEMENT / I / SP V1lITH CLEANOU , ALL BE 1NSTALLE6;64ROUGHOII� THEE""" `�� - / rf r / / - BIOFILTERS IN LOWER STONE LAffER. UNDERDRAINS SHALL BE _ _� __ _ �NTRA�i OR SHA / " / /- LL -NOT " ROP65ED 0" CL. III REP BARREL SLOPED T IN TO THE RISE12 STRUCTURE OR T`�O DAYLIGHT INTO -- '' - µ W DISTURB WETCICNDS (TYPJ �J2LF; INVERT IN= ?}6,72'; INV RT ' �/ _.•THE DETENTION - ELLt SHALL HAVE A�STONE SUMP LOCATED` W f - -BELOW THE INVERT OFl fFiE UNDERDRP�tN$. r- ! %. ?" OUT=316.00 / " Z l -' ! - ' - PROPOSED VDOT #3 COARSE AGGREGATE OUTLET -- - - - . f� � -'`r '� � z n - F PROTECTION w/ GEOI EXTILE FILTER FABRIC'S _ �� w ' ?/ //r,/ j � ", j UNDERLAYMENT-(L-12', W1 =3.75', W2= 13'15', D=2' MIN. w ' -�^ " - / 0 +50 1 +00 1 +50 2 +00 2 +50 2 +75 EXTENDED DETENTION BASIN C 6" UNDI If Blt U SI STF THE 12" THE BIORETENTION BASIN 'D' DESIGN & REQUIREMENTS: Treatment Volume (Per VRRM Calculations) 5,641 cf Minimum Treatment Volume Required 5,641 cf Minimum Forebay Volume Required (15% of Tv) 846 cf Forebay Volume Provided 4,683 cf Minimum Surface Area Required (Tv /Storage Depth) 1,942 sf Surface Area Provided 2,429 sf STORMWATER MANAGEMENT FACILITY GRADING -4' DEEP FOREBAY W/ 2:1 SIDE SLOPES BIORETENTION BASIN 'A' DESIGN & REQUIREMENTS: Treatment Volume (Per VRRM Calculations) BASIN ANOTES: Minimum Treatment Volume Required 1. SEE DETAIL ON SHEET 11 FOR RISER TRASHRACK/FRAME & COVER. Minimum Forebay Volume Required (15% of Tv) z. STATE APPROVED TRASH RACKS SHALL BE INSTALLED ON ALL ORIFICE OPENINGS. Forebay Volume Provided 3. A CONCRETE FOUNDATION SHALL BE INSTALLED ON THE RISER AS Minimum Surface Area Required (Tv /Storage Depth) SHOWN &MEETING THE MINIMUM SPECIFICATIONS SET FORTH IN THE VESCH SPEC. #3.14. Surface Area Provided 4. AS SHOWN ON THE PLANS, A 30' WIDE BIORETENTION BASIN SPILLWAY SHALL BE CONSTRUCTED WITH A CREST ELEVATION OF 337', CREATING A MAXIMUM BIORETENTION BASIN PONDING DEPTH OF i2 ". THE STORMWATER MANAGEMENT FACILITY GRADING O TEN O S BI RE TI NBA IN WEIR WILL THEN OUTFACE TO THE DOWNSTREAM DETENTION CELL FOR QUANTITY CONTROL. O 5. CONTRACTOR AND CONSTRUCTION SHALL ADHERE TO ALL OSHA REQUIREMENTS. ADDITIONALLY, SPECIAL ATTENTION SHALL BE GIVEN TO THE CONSTRUCTION SHORING ASSOCIATED WITH THE BIORETENTION BASIN EXCAVATION. MULCH 340 PROPOSED 6o' WIDE GRASS LINED EMERGENCY SIDE - SPILLWAYCREST ELEVATION - 334.75 �ERTIICAL. (io' WIDE TOP OF DAM ELEV. = 336.00') i 335 PROPOSED BASIN SPILLWAY SIDE SLOPES SHALL BE 4:1 OR FLATTER TO PROVIDE A st SMOOTH VEHICULAR TRANSITION ALONG I THE ACCESS ROAD & TO PROTECT THE - - - - - -- - - -- GRASS LINED SPILLWAY. Area of I Elevation Forebay Cell Volume (ft) Contours (sf) (cf) 326 450 0 327 757 597 328 1,132 1,535 329 1,566 2,878 330 2,054 4,683 -4' DEEP FOREBAY W/ 2:1 SIDE SLOPES BIORETENTION BASIN 'A' DESIGN & REQUIREMENTS: Treatment Volume (Per VRRM Calculations) BASIN ANOTES: Minimum Treatment Volume Required 1. SEE DETAIL ON SHEET 11 FOR RISER TRASHRACK/FRAME & COVER. Minimum Forebay Volume Required (15% of Tv) z. STATE APPROVED TRASH RACKS SHALL BE INSTALLED ON ALL ORIFICE OPENINGS. Forebay Volume Provided 3. A CONCRETE FOUNDATION SHALL BE INSTALLED ON THE RISER AS Minimum Surface Area Required (Tv /Storage Depth) SHOWN &MEETING THE MINIMUM SPECIFICATIONS SET FORTH IN THE VESCH SPEC. #3.14. Surface Area Provided 4. AS SHOWN ON THE PLANS, A 30' WIDE BIORETENTION BASIN SPILLWAY SHALL BE CONSTRUCTED WITH A CREST ELEVATION OF 337', CREATING A MAXIMUM BIORETENTION BASIN PONDING DEPTH OF i2 ". THE STORMWATER MANAGEMENT FACILITY GRADING O TEN O S BI RE TI NBA IN WEIR WILL THEN OUTFACE TO THE DOWNSTREAM DETENTION CELL FOR QUANTITY CONTROL. O 5. CONTRACTOR AND CONSTRUCTION SHALL ADHERE TO ALL OSHA REQUIREMENTS. ADDITIONALLY, SPECIAL ATTENTION SHALL BE GIVEN TO THE CONSTRUCTION SHORING ASSOCIATED WITH THE BIORETENTION BASIN EXCAVATION. MULCH 340 PROPOSED 6o' WIDE GRASS LINED EMERGENCY SIDE - SPILLWAYCREST ELEVATION - 334.75 �ERTIICAL. (io' WIDE TOP OF DAM ELEV. = 336.00') i 335 PROPOSED BASIN SPILLWAY SIDE SLOPES SHALL BE 4:1 OR FLATTER TO PROVIDE A st SMOOTH VEHICULAR TRANSITION ALONG I THE ACCESS ROAD & TO PROTECT THE - - - - - -- - - -- GRASS LINED SPILLWAY. 3 +00 3 +25 PROFILE SCALES 1"=7' (V) 1 " =5o' (H) /IDE STONE BAFFLE EXTENDING IN LENGTH:WIDTH RATIO IS 2.5:: 1N THE MINIMUM 2:1) PROPOSED BASIN SPILLWAY SI[ SHALL BE 4 :1 OR FLATTER TO P SMOOTH VEHICULARTRANSITI( THE ACCESS ROAD & TO PROI GRASS LINED SPILLWA' BASIN C NOTES: 1. SEE DETAIL ON SHEET 11 FOR RISER TRASHRACK/FRAME & COVER. 2. STATE APPROVED TRASH RACKS SHALL BE INSTALLED ON ALL ORIFICE OPENINGS. A CONCRETE FOUNDATION SHALL BE 3 0 INSTALLED ON THE RISER AS SHOWN & MEETING THE MINIMUM SPECIFICATIONS SET FORTH IN THE VESCH SPEC. #3.14. PROFILE SCALES 1 "=5, M 1 " =5o' (H) 355 340 330 I UNDERDRAINS, io' MAXIMUM Forebay Cell EXISTI - BE INSTALLED THROUGHOUT Contours (sf) E I GRADE TONE LAYER, UNDERDRAINS 85 0 ____ _ __ / HE RISER STRUCTURE OR TO 139 _LL & SHALL HAVE A 12" STONE 347 j 1 / IERT OF THE UNDERDRAINS. 325 841 344 724 ww 333 2,284 7,039 334 2,747 9,551 W W 3,235 12,538 W - 3,750 16,028 LOi 490 778 3 +00 3 +25 PROFILE SCALES 1"=7' (V) 1 " =5o' (H) /IDE STONE BAFFLE EXTENDING IN LENGTH:WIDTH RATIO IS 2.5:: 1N THE MINIMUM 2:1) PROPOSED BASIN SPILLWAY SI[ SHALL BE 4 :1 OR FLATTER TO P SMOOTH VEHICULARTRANSITI( THE ACCESS ROAD & TO PROI GRASS LINED SPILLWA' BASIN C NOTES: 1. SEE DETAIL ON SHEET 11 FOR RISER TRASHRACK/FRAME & COVER. 2. STATE APPROVED TRASH RACKS SHALL BE INSTALLED ON ALL ORIFICE OPENINGS. A CONCRETE FOUNDATION SHALL BE 3 0 INSTALLED ON THE RISER AS SHOWN & MEETING THE MINIMUM SPECIFICATIONS SET FORTH IN THE VESCH SPEC. #3.14. PROFILE SCALES 1 "=5, M 1 " =5o' (H) 355 340 6,930 cf 6,930 cf 1,040 cf 1,461 cf 2,386 sf 2,390 sf <- 6' Mix at 25% porosity; 3" pea gravel at 2% porosity, 12" stone at 40% porosity & 12" of ponding at 100% porosity Area of Volume (cf) Elevation Forebay Cell Volume (ft) Contours (sf) (cf) 340 85 0 341 201 139 342 347 410 343 522 841 344 724 1,461 6,930 cf 6,930 cf 1,040 cf 1,461 cf 2,386 sf 2,390 sf <- 6' Mix at 25% porosity; 3" pea gravel at 2% porosity, 12" stone at 40% porosity & 12" of ponding at 100% porosity 3�1 BIORETENTION BASIN A LANDSCAPING SCHEDULE GRAD 330 325 Elevation (ft) Area of Filter Volume (cf) Elevation Cell Contours Volume (ft) (sf) (cf) 336 2,390 0 337 2,901 2,641 338 3 44 5 5,810 3�1 BIORETENTION BASIN A LANDSCAPING SCHEDULE GRAD 330 325 Elevation (ft) Area of Detention Cell Contours (sf) Volume (cf) 326 68 0 327 248 149 328 485 509 329 768 1,130 330 1,092 2,055 331 1,455 3,324 332 1,853 4,974 333 2,284 7,039 334 2,747 9,551 335 3,235 12,538 336 - 3,750 16,028 SYM BOTANICAL COMMON NAME SIZE I SWM FACILITY QUANTITY COVERAGE (sf) PERENNIALS /HERBACEOUS SC SCIRPUSCYPERINUS WOOLGRASS - - 100 jC JUNIPERUS CHINENSIS & CVS. CHINESE JUNIPER - - 950 PV PANICUM VIRGATUM SWITCHGRASS - - 60 SHRUBS MC MYRICA CERIFERA WAX MYRTLE 2 -1/2" CAL. 2 - IG ILEXGLABRA INKBERRY 2-1/2" CAL. 6 - 0 +50 0 +75 BASIN A- SPILLWAY TREES BN BETULA NIGRA RIVER BIRCH 2" CAL. 1 - AR ACER RUBRUM RED MAPLE 2 -1/2" CAL. 1 - LS LIQUIDAMBAR STYRACIFLUA SWEETGUM 1 -1/2" CAL. 3 - 355 P POSED o' WIDE GRASS LINED EME GE CY (sf) SPILLWAY CREST ELEVA ON= 34.830' 327 2,998 2,709 (s0' OP OF D M ELEV. = 3�0.00'�__ - - I - - 346 13 350 I - -- -- - -- - - - - -- ----- - - - - -- 350 150 i _ -XI STIN 307 383 350 490 778 E SLOPES GRASS 3 1 LIN D 1 GRADE NCY SPI L LWAY PRO 335 1 I ST ELE T tOVIDE A 4.75') - ( 335 IN ALONG _ i 70' z' WIDE OREBAY _ 3 PROPO D ECT THE J� O d '. _ ____- I \ 1 GRADIf FO _TOP ELEV.= 345 4 PEE ! IOi_ 345 EL VATION I - - - -- -- I - - XI STI N ! ___________� - -- 326.00' w/ 2:1. I GRADE ILLW N CRESTE 340 =328' � 340 JJ N O r. r r. O W W 1` O -t oU Lo O W L0 n rn tcj n Lei ROPOS D CLEA OUT E 0 +50 0 +85 BASIN C- SPILLWAY <- 6' Mix at 25% porosity; 3" pea gravel at 2% porosity, 12" stone at 40% porosity & 12" of ponding at 100% porosity 0 +50 1+00 1+50 2 +00 2 +25 'I BIORETENTION BASIN D Area of Filter Volume (cf) Elevation Cell Contours Volume (ft) (sf) (cf) 326 2,429 0 327 2,998 2,709 328 3,601 6,003 329 - - 330 - - 0 +50 1+00 1+50 2 +00 2 +25 'I BIORETENTION BASIN D 340 Volume (cf) I I Contours, Volume (ft) j (cf) 326 2,429 340 327 3,755 3,068 I-- 4,733 7,303 329 1,566 - -� 330 2,054 12,114 346 13 -- - - - "- - - -- -- - -- - - - - -- ----- - - - - -- 166 150 i _ -XI STIN 307 383 350 490 778 0' WID G GRASS 3 1 LIN D 1 GRADE NCY SPI L LWAY PRO 335 1 I ST ELE T ; 4.75') - ( 335 - I z' WIDE OREBAY OP OF i O MULCH J� O d ____ -__' _ ____- I __ �" � cfl `t FO _TOP ELEV.= 4 PEE rn IOi_ EL VATION 330' w/ 8 WIDE EBAY 326.00' w/ 2:1. PROPOSE ILLW N CRESTE EVATIO =328' 330 GRAD ) 4 330 ROPOS D CLEA OUT E DETAIL N SHE T 11 F R ' DEEP FOREBAY I ADDITIONAL INF RMATIO . (DEEP ESLBAY { 325 \_ - - I II - I I - - I I I� - - 1 ;7 I, \_ 325 PRO OSED EVEL 1 _- - - -- - _. - -- - - - , 3" LAYER OF SHREDDI BIOR TENTI0 BASIN - - - - - -- -- - - - = HARDWOOD MULCH CHEDULE4oPERFORATEDPVC - - - _ .. _- -= - -.. -_ _ -- s, - _ - - - - __ OF STATE APPROVE - _ - - - _ _ -- - - - - _ -- -- _ - -- - _ _ .. _ - - - - -. :RDRAINS,10 MAXIMUM SPACING MEDIA. SIDE SLOPE EX NITH CLEANOUTS, SHALL BE - - - _ _ - - • • • .. - - _ - NEED NOT BE VERTICP ISTALLED THROUGHOUT THE _ .. - -_ E .3 _ ' -_ -_ -_ ( j 3201 IFILTERSINTHELOWERSTONE 3" MINIMUM PEA GRAY - :YER. UNDERDRAINS SHALL BE - OPED TO DRAIN TO THE RISER 2" MINIMUM GRAVEL `, UCTURE OR TO DAYLIGHT INTO _ 12 ff _ __ __ t ►ETENTION CELL & SHALL HAVE A 1 LEV. = 316.50' MIN. DEPTH) STONE SUMP LOCATED BELOW INVERT OF THE UNDERDRAINS. 315 J N 0) . � "' 00 0. 0 d. 00 W W CIE '� rM M r7 rN M n 0 +50 1+00 1+50 2 +00 2 +25 'I BIORETENTION BASIN D ' FOREBAY IDE SLOPES PROPOSED GRADE DETENTION CELL (RIM =326', FLOOR =320') TO PREVENT FLOTATION THE RISER BA BARREL CONNECTION SHALL BE FIR 340 Elevation (ft) Total Facility Volume (cf) Elevation Contours, Volume (ft) Total (sf) (cf) 326 2,429 0 327 3,755 3,068 328 4,733 7,303 329 1,566 10,310 330 2,054 12,114 ' FOREBAY IDE SLOPES PROPOSED GRADE DETENTION CELL (RIM =326', FLOOR =320') TO PREVENT FLOTATION THE RISER BA BARREL CONNECTION SHALL BE FIR 340 Elevation (ft) Area of Detention Cell Contours (sf) Volume (cf) 320 707 0 321 1,129 910 322 1,660 2,296 323 2,267 4,251 324 2,901 6,829 325 3,560 10,054 326 4,244 13,951 EXTENDED DETENTION BASIN 'C' DESIGN & REQUIREMENTS: Treatment Volume (Per VRRM Calculations) 4,144 cf Minimum Design Treatment Volume 4,144 cf Minimum Treatment Volume Required in Permanent Pool 622 cf Provided Treatment Volume in Perm. Pool (15% of Tv) 1,145 cf Approximate Length of Facility (Measured at 350') 83 ft Approximate Width of Facility 33 ft Minimum Length: Width Ratio Required 2:1 Provided Length : Width Ratio 2.5 . 1 STORMWATER MANAGEMENT FACILITY GRADING Elevation ft Area of Forebay Cell Contours sf Volume cf 340 - - 341 - - 342 - - 343 - - 344 - - 344.33 - - 345 - - 346 13 0 347 68 37 348 166 150 349 307 383 350 490 778 a! SE AND 325 FIRM EMBEDDED 6" INTO AN 18" THICK CONCRETE FOUNDATION THAT IS VIN DIAMETER, THAT IS BURIED BELOW THE DETENTION CELL FLOOR. :D n D SOIL 32v �AVATION L. =L LAYER UMP 315 Pf B RF 312 W W O I� (6 r� W Lea. M 1015" L. III INVE T IN= OUT= 6.oc N '4 r7 Ln N N N r7 M 0 +50 Elevation (ft) -E - I - ___ - . I - - - - -. ___ 341 26 12 GRADE I 75 I 343 149 335 3 344 249 367 344.33 - 335 345 \ I I I I I - - - - -- 347 330 - PROPOSED 1 10' I IDE TO O OF DAM 330 - 350 ELEV = = 26.o0 0 0' WID G GRASS 3 LIN D D EMER N NCY SPI L LWAY PRO _,X - 40 C S ST ELE T TION =3 4 4.75') - - - - -- ,EXI - -- GRADE 320 EMBEDDED 6" INTO AN 18" THICK CONCRETE FOUNDATION THAT IS VIN DIAMETER, THAT IS BURIED BELOW THE DETENTION CELL FLOOR. :D n D SOIL 32v �AVATION L. =L LAYER UMP 315 Pf B RF 312 W W O I� (6 r� W Lea. M 1015" L. III INVE T IN= OUT= 6.oc N '4 r7 Ln N N N r7 M 0 +50 Elevation (ft) Area of Micropool Cell Contours sf O Volume cf O 340 2 0 341 26 12 342 75 60 343 149 170 344 249 367 344.33 - - 345 - - 346 - - 347 - - 348 - - 349 - - 350 - - LEGATE .E FILTER : PRO DOSED 40 1= 3.75', G ADE 1015" L. III INVE T IN= OUT= 6.oc N '4 r7 Ln N N N r7 M 0 +50 Elevation (ft) Area of Micropool Cell Contours sf O Volume cf O 340 2 0 341 26 12 342 75 60 343 149 170 344 249 367 344.33 - - 345 - - 346 - - 347 - - 348 - - 349 - - 350 - - Elevation (ft) Area of Extended Detention Cell Contours, Total (sf) Volume (cf) 340 - - 341 - - 342 - - I 343 - - 344 249 - 344.33 1367 - 345 1831 1,676 346 2292 0 347 3020 2,648 348 3883 6,090 349 4745 10,397 350 5802 15,662 BIORETENTION BASIN D LANDSCAPING SCHEDULE Elevation ft Facility Contours, Tota I sf Volume cf 340 2 0 341 26 12 342 75 60 343 149 170 344 249 367 344.33 1,367 609 345 1,831 1,676 346 2,305 3,740 347 3,088 6,427 348 4,049 9,984 349 5,052 14,526 350 6,292 20,186 SYM BOTANICAL COMMON NAME SIZE SWM FACILITY QUANTITY COVERAGE (so PERENNIALS /HERBACEOUS Sc SCIRPUS CYPERINUS WOOLGRASS - - 70 jC JUNIPERUS CHINENSIS & CVS. CHINESE JUNIPER - - 1,500 PV PAN ICU M VIRGATUM SWITCHGRASS - - 60 SHRUBS MC MYRICA CERIFERA WAX MYRTLE 2 -1/2" CAL. 5 - IG ILEX GLABRA INKBERRY 2 -1/2" CAL. 4 - TREES BN BETULA NIGRA RIVER BIRCH 2" CAL. 1 - AR ACER RUBRUM RED MAPLE 2 -1/2" CAL. 2 - LS LIQUIDAMBAR STYRACIFLUA SWEETGUM 1 -1/2" CAL. 4 - CONTRACTOR SHALL INSTALL EMBANKMENT IN ACCORDANCE w/ THE DESIGN ON SHEET 11. PROPOSED 024" CL. III RCP RISER STRUCTURE. RISER RIM ELEVATION= _ 323.75' w/A LOW -FLOW 08" ORIFICE .. INVERT ELEVATION = 320.00' PROPOSED BASIN SPILLWAY SIDE POS 320 SHALL BE 4:1 OR FLATTER TO PAC SMOOTH VEHICULAR TRANSITION EV.= THE ACCESS ROAD & TO PROTE( GRASS LINED SPILLWAY. �- PROPOSED VDOT #3 COARSE AGG OUTLET PROTECTION w/ GEOTDXTI 315 FABRIC UNDERLAYMENT (L =12', N W2 =13.25', D =2' MIN.) ,� 312 0, . 0) O 00 6 tN n 1+00 1+25 PROFILE SCALES 1 "=5' (V) 1 " =50' (H) 330 330 0 +50 0 +75 BASIN D- SPILLWAY BASIN D NOTES: 1. SEE DETAIL ON SHEET 11 FOR RISER TRASHRACK/FRAME & COVER. z. STATE APPROVED TRASH RACKS SHALL BE INSTALLED ON ALL ORIFICE OPENINGS. 3. A CONCRETE FOUNDATION SHALL BE INSTALLED ON THE RISER AS SHOWN & MEETING THE MINIMUM SPECIFICATIONS SET FORTH IN THE VESCH SPEC. #3.14. 4. AS SHOWN ON THE PLANS, A 30' WIDE BIORETENTION BASIN SPILLWAY SHALL BE CONSTRUCTED WITH A CREST ELEVATION OF 327', CREATING A MAXIMUM BIORETENTION BASIN PONDING DEPTH OF sz ". THE BIORETENTION BASIN WEIR WILL THEN OUTFALL TO THE DOWNSTREAM DETENTION CELL FOR QUANTITY CONTROL. 5. CONTRACTOR AND CONSTRUCTION SHALL ADHERE TO ALL OSHA REQUIREMENTS. ADDITIONALLY, SPECIAL ATTENTION SHALL BE GIVEN TO THE CONSTRUCTION SHORING ASSOCIATED WITH THE BIORETENTION BASIN EXCAVATION. ('O'__�� II TH �7 . _, I- 00- O SCOT R. COLLINS `z L� No. 35791 1�01�W,6�s_ W7- 1,S ��4 , C.1� ONAL � z O E 9 W a Z O N w V) z UJI 0! 0 H U) H W W In In o rn 4 � < P Z 0 0 >s. Q L E z Z UJI U m f � 0 V) O O N ; z z z > 5 I•-. O O a a U) En W LLj ce of O ; ID L9 IT- z Ill M �� � N z It 0! qqt 15 C� I CL w N O O N w N Q J '� 1--1 LLJ �_ J W �> U o L9W N z � � O w cc z � z Q = O Qli W U ~ U W r Ul �- un : w Uj Q c 2 U) � ce s z� O 2 W �"' _ UJ IIIIIIIIIIIIIIIIIIIIIIIII O U) �zC J z '-�' = Ch W W cc I z Z C \1 w Z z 0 ID O C N U a ,, W a, LU � I O W . a V)) JOB N0. 1421 a9 SCALE 0 u AS SHOWN C SHEET NO. c 10 I z . N C. 1 0 s C 0 I 0 4, C ROPOSE 10' WID TOP OF AM LEV. _ .00 o 3 6 (4 WIDE GRASS SLOPES LINED EERGEN Y SPILLWAY VIDE A RFSTI = ') ALONG TTHE 325 325 LEGATE .E FILTER : PRO DOSED 40 1= 3.75', G ADE - - - -- ,EXI - -- GRADE 320 320 J� O d LO W W �" � cfl `t L6 W M r7 rn IOi_ 0 +50 0 +75 BASIN D- SPILLWAY BASIN D NOTES: 1. SEE DETAIL ON SHEET 11 FOR RISER TRASHRACK/FRAME & COVER. z. STATE APPROVED TRASH RACKS SHALL BE INSTALLED ON ALL ORIFICE OPENINGS. 3. A CONCRETE FOUNDATION SHALL BE INSTALLED ON THE RISER AS SHOWN & MEETING THE MINIMUM SPECIFICATIONS SET FORTH IN THE VESCH SPEC. #3.14. 4. AS SHOWN ON THE PLANS, A 30' WIDE BIORETENTION BASIN SPILLWAY SHALL BE CONSTRUCTED WITH A CREST ELEVATION OF 327', CREATING A MAXIMUM BIORETENTION BASIN PONDING DEPTH OF sz ". THE BIORETENTION BASIN WEIR WILL THEN OUTFALL TO THE DOWNSTREAM DETENTION CELL FOR QUANTITY CONTROL. 5. CONTRACTOR AND CONSTRUCTION SHALL ADHERE TO ALL OSHA REQUIREMENTS. ADDITIONALLY, SPECIAL ATTENTION SHALL BE GIVEN TO THE CONSTRUCTION SHORING ASSOCIATED WITH THE BIORETENTION BASIN EXCAVATION. ('O'__�� II TH �7 . _, I- 00- O SCOT R. COLLINS `z L� No. 35791 1�01�W,6�s_ W7- 1,S ��4 , C.1� ONAL � z O E 9 W a Z O N w V) z UJI 0! 0 H U) H W W In In o rn 4 � < P Z 0 0 >s. Q L E z Z UJI U m f � 0 V) O O N ; z z z > 5 I•-. O O a a U) En W LLj ce of O ; ID L9 IT- z Ill M �� � N z It 0! qqt 15 C� I CL w N O O N w N Q J '� 1--1 LLJ �_ J W �> U o L9W N z � � O w cc z � z Q = O Qli W U ~ U W r Ul �- un : w Uj Q c 2 U) � ce s z� O 2 W �"' _ UJ IIIIIIIIIIIIIIIIIIIIIIIII O U) �zC J z '-�' = Ch W W cc I z Z C \1 w Z z 0 ID O C N U a ,, W a, LU � I O W . a V)) JOB N0. 1421 a9 SCALE 0 u AS SHOWN C SHEET NO. c 10 I z . N C. 1 0 s C 0 I 0 4, C 500F1_-MR PtANT&6M effr uo -w W L -P -- ..1 ..,r I I "A IE mlcwLTEI-t. SIB AAED t L-�A. I, L TOPFD -VL as 2m, LEAF C_0%*K WI=11: I ) ZTA'5L&E;5UM AND SPILLWAYS °a#u'" IEC�-3 MATTIN3. 2tFk0AArzNG D1ss- 'TuPWED OLIO SHALL M STAFULZED VOTH I C -2 1MATE, 0r ALL SERNI FILL %>4ATERLA1. i,.HALLCONSISTOF %fL; OL, CC, OR GC ;COLS AND FIPEE>Df "a #7; RMTC. ROGKU, OR ANY GTHEA NION C&VAOTIB E 001-. MMI PACTED FILL ,LL 13E R -4 TALLfr�3a IN F. f4)MA L1M 3 T4CH LJFf3 TC .A DRY ' bENS47Y LW '95% OF THE.' STA`J31ARi1 Ot?.00TCR 1u1AXI&iUf0 [CRY OErdGtTY';ASPTU •L3654H- F Are 949.1 Tjlocalf Elibrerendm &isin 8atm RECD -AlI LEN EED :3.' 1Lt 'SOLI #.t`ti I_A e F, 9 . QEDA ;LE14{EL 1 K4II•akt4ti. JM 247i III �r-1 rEp, QR1 -m,E perivE F rOUNDATION DRAIN SECTION A -9; ' IIgCAL GRAPHICAL DETAILS Homopmous 91 ,,,-,� - � . I � ,- �- - - If , -_ :_ - - � � - - -I ♦I ✓ rmrt off t»ach-# below subbla I TYPICAL HOMOGENEOUS EMBANKMENT 0 d* 3004 ref or f"* 0" Jrlmc In �s_Tmnsmw flitter CHIMNEY DRAIN Trdnsffm dill or grlmi ",,Blanket dram BLANKET 01tAll! Rod or groel 4 TTar"lu m filer VE DRAIN 30ured _ .mz Emgmmmr F Figure' A -h, Honrogemeons Embankments wl&ee Controls I.I 4'i F rS E TYPICAL BIORETENT)O 1 - LEVEL I �-50E SLOPE MOMA1VIA7= FL-TER FABFefC 4PLACIED N REA. 1' � IF13aC-P I Itt9PCIA.%J_N F'E1qF4DqATED Uf4DET fi - :4 PC 0,1 I) CDAC IK6 OAA,:(, m FeWPSAY FLOW F'ATH INTERi AL. SAWLFS BENCH PL ,kN VIEV1t E;K_', ENDE0 0ETEP4TI0N F Jf'.JD Em Rr.Rem-"y 8PII_L' 0-}r VAX DESIGN t44 W1A 5 E Y: QU'd TIC WARD E3L'EF GE11.1cy BENCH ^'1 SPA WA` i HANNF _\ .\ 1dCaiL1#btE } /N fir' s m CITLET KAICA01 PAY L `t,D-�" I _ t j_ F LI J k 1`_ ? F FrI.E DEL QLTEN' -TlQf4 PVND Typica II Extended betentiort Pond Details (LEVel .i) 2499CGS APPROX DRAIN AREA = 194.60 SO IN APPROX. IP/EIG44T WITH FIRAME= 424.00 LOS (SWM FACILITY TRASHRACK, OR EQUIVLAEIYI) °,5P 3,04 r- � , �s � x" %j � kR\1 / I I �� ,R 1 t?� ' ( �-1� / , �S\ \I,I\ Imo' Imo_ �_ x_.. 14 , t I rte/ �,1 r S 1> f _ _ _ �- �• iu� _._ ...... _ i .� Duc'I` IRC1R i L g 24.75 f �:- -'- ' $ 28.59 ��} - c ��� DIMENSIONS ARE FOR REFERENCE ONLY THIS PRINT DI SC,OSESWa,EC7WTTERIN'MICH D!RAWNSY F,dC MATERIAL 3134 VEPANA AVE ACTU AL DIMENSIONS MAY VARY Nti4PLAST I± AS PROPRE ARY RIGHTS. THE RECEIFT 6UiM,.GA3NI* DIMENSIONS ARE IN INCHES OR PCSS£S310N OF 7N S PWN; DC SNFT L'�1FER DATE 3.8-06 DNC71L€ �V PHN (TR 93MU3 GRATE MEETS H-20, DAD RATING TRANSFER, OR LICENSE THE LSE tlF TY.E DESIGN OR Ny !� FAX 1776# 972.2.1901 TECMACAL INFGR7titATl CPI SROdM t RERJ ".•X O �"�� _ QUAL ITY: MATERIALS SHALL CONFORM TO ASTM A636 GINDE 76+X105 REVISES BY EBG PROJECT NO,JNAME nYlaWac9wueom PAINT CASTINGS ARE FURNISFTED \VITHA BLACK PAINT REPROC�LICTONOFTAS PRN'CRANYIFIFORI,IAT04 CONCLE HE IEREIN. PYiRT MANUFACTURE OS Cff ANl' 24IN4TAWD ARUQRATEASSEIIRE7- TYPEI3 LOCKING DEVICE AVAILABLE UPON REQUEST SEE DRAWING Na. „a *JCL NE�EFRCAt Paz TwE dscLasuRE ,-oo r ERS 3'1� is p01.17ML4 IS FORRIDOEN, ExCEFT 6Y SPECIFIC 9Yaff EN -SIZE A SCALE '..10 SHEET ,oF1 DwG NO, 7601.110.217 REV C FERMIS511"AI F,:ZY . f, ,rot.osnae,.s+ BIORETENTION BASIN CONSTRUCTION NOTES: FACILITY PLANTING SPECIFICATIONS: 1. ROOT STOCK OF THE PLANT MATERIAL SHALL BE KEPT MOIST DURING TRANSPORT FROM THE SOURCE TO THE JOB SITE AND UNTIL PLANTED. 2. WALLS OF PLANTING PIT SHALL BE DUG SO THAT THEY ARE VERTICAL. 3. THE DIAMETER OF THE PLANTING PIT MUST BE A MINIMUM OF SIX INCHES (6 ") LARGER THAN THE DIAMETER OF THE BALL OF THE TREE. 4. THE PLANTING PIT SHALL BE DEEP ENOUGH TO ALLOW 1/8 OF THE OVERALL DIMENSION OF THE ROOT BALL TO BE ABOVE GRADE. LOOSE SOIL AT THE BOTTOM OF THE PIT SHALL BE TAMPED BY HAND, 5. THE APPROPRIATE AMOUNT OF FERTILIZER IS TO BE PLACE AT THE BOTTOM OF THE PIT (SEE BELOW FOR FERTILIZATION RATES). 6. THE PLANT SHALL BE REMOVED FROM THE CONTAINER AND PLACED IN THE PLANTING PIT BY LIFTING AND CARRYING THE PLANT BY ITS BALL (NEVER LIFT BY BRANCHES OR TRUNK). 7. SET THE PLANT STRAIGHT AND IN THE CENTER OF THE PIT SO THAT APPROXIMATELY 1/8 OF THE DIAMETER OF THE ROOT BALL IS ABOVE THE FINAL GRADE. 8. BACKFILL PLANTING PIT WITH EXISTING SOIL. 9, MAKE SURE PLANT REMAINS STRAIGHT DURING BACKFILLING PROCEDURE. 10, NEVER COVER THE TOP OF THE BALL WITH SOIL. MOUNT SOIL AROUND THE EXPOSED BALL. 11. TREES SHALL BE BRACED BY USING 2' BY 2' WHITE OAK STAKES, STAKES SHALL BE PLACED PARALLEL TO WALKWAYS AND BUILDINGS. STAKES ARE TO BE EQUALLY SPACED ON THE OUTSIDE OF THE TREE BALL. UTILIZING HOSE AND WIRE THE TREE IS TO BE BRACED BY THE STAKES, 12. BECAUSE OF THE HIGH LEVELS OF NUTRIENTS IN STORMWATER RUNOFF TO BE TREATED, BIORETENTION BASIN PLANTS SHOULD NOT REQUIRE CHEMICAL FERTILIZATION. CONTRACTOR REQUIREMENTS: ( SEEPLANTscimouLEFORSPECIFdCPLANTSPECIES) 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF ALL WORK COVERED UNDER THESE PLANS, 2. LANDSCAPE CONTRACTOR SHALL REFER T THE STANDARDIZED LANDSCAPE SPECIFICATIONS O E S ANDARDIZ D LA FOR THE STATE OF VIRGINIA FOR ADDITIONAL INFORMATION. THE CONTRACTOR S AC OR HALL ABIDE BY ITS CONTENTS HOWEVER ANY NOTES OR SPECIFICATIONS ON THE PLANS SHALL SUPERSEDE T HOSE OUTLINED IN THE SPECIFICATIONS MANUAL COPIES ARE AVAILABLE FOR A FEE FROM THE VIRGINIA IRGINIA CHAPTER OF THE AMERICAN SOCIETY OF LANDSCAPE ARCHITECTS, VIRGINIA NURSERYMEN'S ASSOCIATION, INC. AND THE VIRGINIA SOCIETY OF LANDSCAPE DESIGNERS). 3. ALL PLANT MATERIAL SHALL MEET THE MINIMUM SPECIFICATIONS AND STANDARDS DESCRIBED IN THE CURRENT ISSUE OF THE AMERICAN STANDARD FOR NURSERY STOCK, PUBLISHED BY THE AMERICAN ASSOCIATION Of NURSERYMEN, 1250 STREET, NW, SUITE 500, WASHINGTON, DC 20005. 4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTIFY THE DESIGNER OF ANY VARIANCE FROM THE PLAN. 5. THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ANY ONSITE UTILITIES (CALL MISS UTILITY 1 -800- 552 -7001 BEFORE ANY EXCAVATION). 6, REFER TO THE APPROVED FINAL SITE P Y PLANS FOR AN DETAILED SITE INFORMATION. 7. ALL WORK SHALL BE COORDINATED WITH OTHER PARTIES. 8. PLANTS WILL BE PREPARED FOR SHIPMENT IN A MANNER THAT WILL NOT CAUSE DAMAGE TO THE BARK, BUDS, BRANCHES, STEMS, OR OVERALL SHAPE OF THE STOCK. CONTAINER GROWN PLANTS WILL BE TRANSPORTED IN THE CONTAINERS IN WHICH THEY HAVE BEEN GROWN. 9, ALL PLANT MATERIAL UNLESS OTHERWISE SPECIFIED SHALL BE UNIFORMLY BRANCHED AND HAVE A VIGOROUS ROOT SYSTEM. PLANT MATERIAL SHALL BE HEALTHY VIGOROUS AND FREE FROM DEFECTS DECAY DISEASES INSECT PEST EGGS AND ALL FORMS OF INFESTATION. ALL PLANT MATERIAL SH LA ALL BE FRESH FREE FROM TRANSPLANT SHOCK OR VISIBLE WILT. PLANTS DEEMED UNHEALTHY WILL BE REJECTED. 10. ALL CONTAINER STOCK SHALL HAVE BEEN PROPAGATED IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPED SUFFICIENTLY T 0 HOLD ITS SOIL. CONTAINER STOC K WI TH POORLY DEVELOPED ROO T SYSTEMS WILL NOT BE ACCEPTED. 11. PLANTS NOT INSTALLED ON THE DAY OF ARRIVAL ON SITE SHALL BE STORED AND PROTECTED BY THE CONTAINER. OUTSIDE STORAGE AREAS WILL BE SHADED AND PROTECTED FROM THE WIND AND SUN. PLANTS STORED ON SITE SHALL BE PROTECTED FROM ANY DRYING AT ALL TIMES BY COVERING THE BALLS OR ROOTS WITH MOIST SAWDUST, WET BURLAP, WOOD CHIPS, SHREDDED BARK, PEAT MOSS, OR OTHER SIMILAR MULCHING MATERIAL. 12. THE OWNER RESERVES THE RIGHT TO SUBSTITUTE PLANT MATERIAL TYPE, SIZE AND /OR QUANTITY. ANY SUBSTITUTIONS MUST BE APPROVED BY THE DESIGNER. 13. MINOR FIELD ADJUSTMENTS MAY BE NECESSARY DUE TO SITE CONDITIONS (EX: ROOTBALL AND UTILITY CONFLICT) MAJOR ADJUSTMENTS MUST BE APPROVED BY THE DESIGNER. 14. NO PLANTING SHALL OCCUR WHEN THE SOIL IS FROZEN. 15. PLANT MATERIAL SHALL BE PLACED IN EXISTING SOIL WITH EACH PLANTING PIT EXCAVATED TO A SIZE SUFFICIENT TO CONTAIN THE ENTIRE ROOT BALL OR ROOT MASS, WITHOUT CRAMPING ROOT STOCK. 16. THE CONTRACTOR SHALL MAINTAIN A ONE 1 CALENDAR YEAR 90% CARE AND REPLACEMENT T T WARRANTY FOR ALL PLANTINGS. HE PERIOD CARE AND REPLACEMENT SHALL BEGIN AFTER INSPECTION AND APPROVAL OF THE COMPLETE () S INSTALLATION Of ALL PLANTS AND CONTINUE FOR ONE CALENDAR YEAR. 17. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL OF TRASH AND DEBRIS WITHIN THE LIMITS OF THE PLANTING ON A DAILY BASIS. 18, THE CONTRACTOR WILL NOT BE RESPONSIBLE FOR PLANT MATERIAL THAT HAS BEEN DAMAGED BY VANDALISM, FIRE, OR OTHER ACTIVITIES BEYOND THE CONTRACTOR'S CONTROL. 19. THE CONTRACTOR SHALL CONTACT THE WATER RESOURCES INSPECTOR AND COLLINS ENGINEERING 24 HOURS PRIOR TO BACKFILLING THE BIOFILTERS AND REQUEST AN INSPECTION AND APPROVAL OF THE UNDERDRAINS INSTALLATION AND THE SOIL MIX. 20. THE BIOFILTER PLANTING AREAS SHALL BE COVERED WITH HEAVY STRAW MULCH TO A DEPTH OF 3" IMMEDIATELY AFTER PLANTING. FACILITY CONSTRUCTION 1. BIORETENTION AREAS SHALL BE FULLY PROTECTED BY SILT FENCE OR CONSTRUCTION FENCING, PARTICULARLY IF THEY WILL RELY ON INFILTRATION. IDEALLY, BIORETENTION SHALL REMAIN OUTSIDE THE LIMIT OF DISTURBANCE DURING CONSTRUCTION TO PREVENT SOIL COMPACTION BY HEAVY EQUIPMENT. BIORETENTION BASIN LOCATIONS MAY BE USED AS SMALL SEDIMENT TRAPS OR BASINS DURING CONSTRUCTION. HOWEVER, THESE MUST BE ACCOMPANIED BY NOTES AND GRAPHIC DETAILS ON THE E &S PLAN SPECIFYING THAT: A. THE MAXIMUM EXCAVATION DEPTH AT TH E CO NSTRUCTION STAGE MUST BEAT LEAST 7 FOOT ABOVE THE POST CONSTRUCTION INSTALLATION, AND B. THE FACILITY MUST CONTAIN AN RAIN. THE PLAN MUST ALSO SHOW THE E PROPER PROCEDURES FOR CONVERTING THE TEMPORARY SEDIMENT CONTROL PRACTICE TO A A PERMANENT BIORETENTION FACILITY, INCLUDING DEWATERING, CLEANOUT AND STABILIZATION. 2. CONSTRUCTION OF THE BIORETENTION AREA MAY ONLY BEGIN AFTER THE ENTIRE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED WITH VEGETATION. IT MAY BE NECESSARY TO BLOCK CERTAIN CURB OR OTHER INLETS WHILE THE BIORETENTION AREA IS BEING CONSTRUCTED. THE PROPOSED SITE SHALL BE CHECKED FOR EXISTING UTILITIES PRIOR TO ANY EXCAVATION. THE DESIGNER AND THE INSTALLER SHALL HAVE A PRE- CONSTRUCTION MEETING CHECKING THE BOUNDARIES OF THE CONTRIBUTING DRAINAGE AREA AND THE ACTUAL INLET ELEVATIONS 3 TO ENSURE THEY CONFORM TO THE ORIGINAL I N. BECAUSE THE TIMING OF T DES G HE INSTALLATION IS DICTATED Y 7H C ED B E CONTRACTOR THE CONTRACTOR SHALL BE RESPONSIBLE FOR TH LE CONTACTING O C E ENGINEER. SINCE OTHER CONTRACTORS MAY BE RESPONSIBLE FOR CONSTRUCTING PORTIONS OF THE SITE, IT IS QUITE COMMON TO FIND SUBTLE DIFFERENCES IN SITE GRADING, DRAINAGE AND PAVING ELEVATIONS THAT CAN PRODUCE HYDRAULICALLY IMPORTANT DIFFERENCES FOR THE PROPOSED BIORETENTION. THE GENERAL CONTRACTOR SHALL CLEARLY COMMUNICATE, IN WRITING, ANY PROJECT CHANGES DETERMINED DURING THE PRE- CONSTRUCTION MEETING TO THE E INSTALLER AN THE PLAN REV( W IN P TIO D L E S EC N AUTHORITY, 4 TEMPORARY E &S CONTROLS ARE NE EDE D DUR IN G CONSTRUCTION TION OF THE BIORETENTION AREA TO DIVERT ST O RMWATER AWAY F ROM THE BIORETENTION AREA UNTIL IT IS COMPLETED. SPECIAL PROTECTION MEASURES SUCH AS EROSION CONTROL FABRICS MAY BE NEEDED TO PROTECT VULNERABLE SIDE SLOPES FROM EROSION DURING THE CONSTRUCTION PROCESS. 1. ANY PRE - TREATMENT CELLS SHALL B EXCAVATED FIRST AND THEN SEALED TO TRAP I E EXCA SEDIMENTS. 2. EXCAVATORS OR BACKHOES SHALL WORK FROM THE SIDES TO EXCAVATE THE BIORETENTION ETENTION AREA TO ITS APPROPRIATE DESIGN DEPTH AND DIMENSIONS. EXCAVATING EQUIPMENT SHALL HAVE SCOOPS WITH ADEQUATE REACH 50 THEY DO NOT HAVE TO SIT INSIDE THE FOOTPRINT OF THE BIORETENTION AREA. CONTRACTORS SHALL USE A CELL CONSTRUCTION APPROACH IN LARGER BIORETENTION BASINS WHEREBY THE BASIN IS SPLIT INTO Soo TO z 000 SQ. FT. TEMPORARY CELLS WITH A io z FOOT EARTH BRIDGE IN BETWEEN SO THAT CELLS CAN BE EXCAVATED T S ATED FROM HE SIDE. S IT MAY BE NECESSARY TO RIP THE BOTTOM SOILS TO A DEPTH OF 6 TO 12 INCHES TO PROMOTE GREATER INFILTRATION. THIS REQUIREMENT I REMENT W LL BE DICTATED BY THE INSPECTOR R T INSTALLATION 3 , PRIOR O NSTALL ON OF THE REMAINDER OF THE FACILITY. 4. PLACE GEOTEXTILE FABRIC ON THE SIDES OF THE BIORETENTION AREA WITH A 6 -INCH OVERLAP ON THE SIDES. IF A STONE STORAGE LAYER WILL BE USED, PLACE THE APPROPRIATE DEPTH OF #57 STONE ON THE BOTTOM, INSTALL THE PERFORATED UNDERDRAIN PIPE, PACK #57 STONE TO 3 INCHES ABOVE THE UNDERDRAIN PIPE, AND ADD APPROXIMATELY 31NCHES OF CHOKER STONE /PEA GRAVEL AS A FILTER BETWEEN THE UNDERDRAIN AND THE SOIL MEDIA LAYER. IF NO STONE STORAGE LAYER IS USED, START WITH 6 INCHES OF #S7 STONE ON THE BOTTOM, AND PROCEED WITH THE LAYERING AS DESCRIBED ABOVE. DELIVER THE SOIL MEDIA FROM AN APPROVED VENDOR AND STORE IT ON AN ADJACENT IMPERVIOUS PERVIOUS AREA OR PLASTIC SHEETING. APPLY THE MEDIA IN i2-INCH LIFTS UNTIL THE DESIRED TOP ELEVATION OF THE BIORETENTION AREA IS ACHIEVED. WAIT FEW DAYS TO CHECK FOR SETTLEMENT, AND ADD ADDITIONAL MEDIA, AS NEEDED, TO ACHIEVE THE DESIGN ELEVATION. 6. PREPARE PLANTING HOLES FOR ANY TREES AND SHRUBS, INSTALL THE VEGETATION, AND WATER ACCORDINGLY. INSTALL ANY TEMPORARY IRRIGATION, 7 PLACE THE SURFACE COVER IN BOTH CELLS STONE O R TURF ), DEPENDING ON T HE DES I GN IF C IR OR JUTE MATTING LNG WILL BE USED IN LIEU OF M ULCH , THE MATTING WILL NEED TO BE INSTALLED P RIO R TO PLANTING NTNG (STEP 9), AND HOLES OR SLITS WILL HAVE 70 BE CUT IN THE (MATTING TO INSTALL THE PLANTS. 8. INSTALL THE PLANT MATERIALS AS SHOWN IN THE LANDSCAPING PLAN, AND WATER THEM DURING WEEKS OF NO RAIN FOR THE FIRST TWO MONTHS. 9. CONDUCT THE FINAL CONSTRUCTION INSPECTION (SEE SECTION 9.2). THEN LOG THE GPS COORDINATES FOR EACH BIORETENTION FACILITY AND SUBMIT THEM FOR ENTRY INTO THE LOCAL MAINTENANCE TRACKING DATABASE. FACILITY MAINTENANCE: THE FOLLOWING TASKS SHALL BE PERFORMED BY THE CONTRACTOR IN THE FIRST YEAR FOLLOWING'INSTALLATION: 1, FOR THE FIRST 6 MONTHS FOLLOWING CONSTRUCTION, THE SITE SHALL BE INSPECTED BY THE CONTRACTOR AT LEAST TWICE AFTER STORM EVENTS THAT EXCEED iJ2INCH OF RAINFALL. 2. THE CONTRACTOR SHALL LOOK FOR BARE OR ERODING AREAS IN THE CONTRIBUTING DRAINAGE AREA OR AROUND THE BIORETENTION AREA, AND MAKE SURE THEY ARE IMMEDIATELY STABILIZED WITH GRASS COVER. CONTRACTOR SHALL SPOT RESEED AS NECESSARY. 3. ONE -TIME SPOT FERTILIZATION MAY BEN T PLANTINGS. NEEDED FOR INITIAL LANT NGS. 4. WATERING IS NEEDED ONCE A WEEK DURING THE F IRST z MONTHS AND THEN AS NEEDED DURING THE FIRST GROWING SEASON APRIL -O T ( C OBER), DEPENDING ON RAINFALL, 0 5. REMOVE AND REPLACE DEAD PLANTS. SINCE UP TO 20 /o OF THE PLANT STOCK MAY DIE OFF IN THE FIRST YEAR, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CARE AND REPLACEMENT WARRANTY TO ENSURE THAT VEGETATION IS PROPERLY ESTABLISHED AND SURVIVES DURING THE FIRST GROWING SEASON FOLLOWING CONSTRUCTION. THE TYPICAL THRESHOLDS BELOW WHICH REPLACEMENT IS REQUIRED ARE 85% SURVIVAL OF PLANT MATERIAL AND ioo4b SURVIVAL OF TREES. 6. A SPRING MAINTENANCE INSPECTION AND CLEANUP SHALL BE CONDUCTED AT EACH BIORETENTION AREA. THE FOLLOWING IS A LIST OF SOME OF THE KEY MAINTENANCE PROBLEMS T O LOOK FOR: A. CHECK TO SEE IF 75% TO go%COVER (MULCH PLUS VEGETATIVE COVER) HAS BEEN ACHIEVED IN THE BED, AND MEASURE THE DEPTH OF THE REMAINING MULCH. B. CHECK FOR SEDIMENT BUILDUP AT CURB CUTS, GRAVEL DIAPHRAGMS OR PAVEMENT EDGES THAT PREVENTS FLOW FROM GETTING INTO THE BED, AND CHECK FOR OTHER SIGNS OF BYPASSING. C. CHECK FOR ANY WINTER- OR SALT- KILLED VEGETATION, AND REPLACE IT WITH HARDIER SPECIES. D. NOTE PRESENCE OF ACCUMULATED SAND, SEDIMENT AND TRASH IN THE PRE - TREATMENT CELL OR FILTER BEDS, AND REMOVE IT. E. INSPECT BIORETENTION SIDE SLOPES AND GRASS FILTER STRIPS FOR EVIDENCE OF ANY RILL O R GULLY EROSION AND REPAIR IT. F. CHECK THE BIORETENTION BED FOR EVIDENCE OF MULCH FLOTATION, EXCESSIVE PONDING, DEAD PLANTS OR CONCENTRATED FLOWS, AND TAKE APPROPRIATE REMEDIAL ACTION, G. CHECK INFLOW POINTS FOR CLOGGING, AND REMOVE ANY SEDIMENT. H. LOOK FOR ANY BARE SOIL OR SEDIMENT SOURCES IN THE CONTRIBUTING DRAINAGE AREA, AND STABILIZE THEM IMMEDIATELY. 1. CHECK FOR CLOGGED OR SLOW- DRAINING SOIL MEDIA, A CRUST FORMED ON THE TOP LAYER, INAPPROPRIATE SOIL MEDIA, OR OTHER CAUSES OF INSUFFICIENT FILTERING TIME, AND RESTORE PROPER FILTRATION CHARACTERISTICS. HAVE BEEN COMPLETED, PLEASE SEE BELOW, FACU.,ITY INSPECTION: CONSTRUCTION INSPECTIONS ARE CRITICAL TO ENSURE THE BIORETENTION BASINS ARE PROPERLY CONSTRUCTED AND ESTABLISHED. BECAUSE THE TIMING OF THE INSTALLATION IS DICTATED BY THE CONTRACTOR, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE ENGINEER AND INSPECTOR PRIOR TO INSTALLATION. MULTIPLE SITE VISITS AND INSPECTIONS ARE REQUIRED TO BE SCHEDULED BY THE CONTRACTOR, WITH THE ENGINEER AND INSPECTOR, DURING THE FOLLOWING STAGES OF THE BIOFILTER CONSTRUCTION PROCESS: 1. PRE - CONSTRUCTION MEETING 2. INITIAL SITE PREPARATION (INCLUDING INSTALLATION OF PROJECT E &S CONTROLS) 3. EXCAVATION /GRADING (E.G., INTERIM /FINAL ELEVATIONS) 4. BIOFILTER INSTALLATION (E.G., MICROTOPOGRAPHY, SOIL AMENDMENTS, STONE BEDDING, UNDERDRAINS AND STAKING OF PLANTING ZONES) 5. PLANTING PHASE (WITH AN EXPERIENCED LANDSCAPE ARCHITECT PRESENT) 6. FINAL INSPECTION (DEVELOP A PUNCH LIST FOR FACILITY ACCEPTANCE) PLEASE ALSO SEE ABOVE, UNDER FACILITY MAINTENANCE #6, FOR REQUIRED INSPECTIONS. WATER71GHT (�,'A.P ON TERMINAL EN OF pjpE EXTENDED DETENTION BASIN CONSTRUCTION NOTES: FACILITY PLANTING SPECIFICATIONS: I 4P PV,0, EGRET a° CAP ON GRADE 4tI# P_V_ . NONPERFOR,>ATED STANDPIPE Figure 9w&l. 4"' P..1 C. Cle2nout Detail EMBANKMENT NOTES: AFTER AN INVESTIGATION OF THE SITE's SOILS, SITE VISITS, AN ANALYSIS OF THE SURVEYED TOPOGRAPHY AND AN EXAMINATION OF VA DEQ APPENDIX A: EARTHEN EMBANKMENT (REQUIREMENTS vs. RECOMMENDATIONS), THE APPLICANT HAS PROVIDED A COMPREHENSIVE EMBANKMENT DESIGN THAT DOES NOT NEED A GEOTECHNICAL STUDY AT THIS TIME. SUCH IS THE CASE DUE TO THE PRECAUTIONARY EMBANKMENT DESIGNS PROPOSED. A SUMMARY OF THE EMBANKMENT DESIGN REQUIREMENTS ARE LISTED BELOW, MANDATING THE CONTRACTOR MEET THESE REQUIREMENTS AT A MINIMUM. THE EMBANKMENTS SHALL HAVE A COMPACTED CLAY CORE WITH A CUTOFF TRENCH & BE IN ACCORDANCE WITH THE DETAILS SHOWN ON THIS SHEET. BERMS AND SPILLWAYS SHALL BE STABILIZED WITH EC -3 MATTING & THE REMAINING DISTURBED SLOPES SHALL BE STABILIZED WITH EC -2 MATTING. ALL BERM FILL MATERIAL SHALL CONSIST OF ML, CL, SC OR GC SOILS & BE FREE OF WOOD, ROOTS, ROCKS OR ANY OTHER NON COMPACTING SOIL. COMPACTED FILL SHALL BE PROCTOR MAXIMUM DRY DENSITY ASTM D698 AND HAVE A MINIMUM OF 95% OF MAXIMUM DRY DENSITY AND 2% OF OPTIMUM MOISTURE CONTENT. ALL FILL MATERIAL AND CONSTRUCTION SHALL BE APPROVED BY AN ONSITE GEOTECHNICAL ENGINEER PRESENT DURING THE CONSTRUCTION OF THE EMBANKMENTS AND FILL AREAS. LEVEL 1 1. LEVEL 1 EXTENDED DETENTION BASINS SH A LL HAVE A T URF GROUND COVER, SUCH AS GRASS MULCH OR SOME OTHER FORM OF VEGETATIVE GROWN DC OVE R. LANDSCAPING BEYOND THIS IS OPTIONAL FOR LEVEL 1 FACILITIES BUT IS NOT REQUIRED. 2. THE PROPOSED SIDE SLOPES OF THE BASIN SHALL BE A MAXIMUM OF 4:1 TO PROMOTE SETTLING &REDUCE THE RISK OF EROSION. THE PROPOSED FLOOR SLOPES, EXCLUSIVE OF T - O 00 HE MICROPOOL SHALL HAVE A SLOPE RANGING FROM 0.5% 1 0%. LEVEL 2 1. THE PROPOSED SIDE SLOPES OF THE BASIN SHALL BE A MAXIMUM OF 4:1 TO PROMOTE SETTLING & REDUCE THE RISK OF EROSION. THE PROPOSED FLOOR SLOPES, EXCLUSIVE OF THE MICROPOOL SHALL HAVE A SLOPE RANGING FROM 0.5 % -1.0 %. 2. THE PLANT SELECTION SHALL PROMOTE DIVERSE WILDLIFE AND WATERFOWL USE WITHIN THE STORMWATER WETLAND AND BUFFER. 3. THE LANDSCAPING PLAN SHALL ALLOW THE POND TO MATURE INTO A NATIVE FOREST IN THE RIGHT PLACES, BUT YET KEEP MOWABLE TURF ALONG THE EMBANKMENT AND ALL ACCESS AREAS. 4. WOODY VEGETATION SHALL NOT L O BE PLANTED OR ALLOWED TO GROW WITHIN 15 FEET OF THE TOE EMBANKMENT OFT E NOR WITHIN 25 FEET H E OF THE PRINCIPAL SPILLWAY STRUCTURE. 5, A VEGETATED BUFFER SHALL B PROVIDED EXTENDS T E RO DED THAT E NDS A LEAST 25 FEET OUTWARD FROM THE MAXIMUM WATER SURFACE ELEVATION OF THE ED POND. PERMANENT STRUCTURES (E.G., BUILDINGS) SHOULD NOT BE CONSTRUCTED WITHIN THE BUFFER AREA. EXISTING TREES SHALL BE PRESERVED IN THE BUFFER AREA DURING CONSTRUCTION. 6. THE SOILS IN THE STORMWATER BUFFER AREA ARE OFTEN SEVERELY COMPACTED DURING THE CONSTRUCTION PROCESS TO ENSURE STABILITY THE DENSITY OF THESE COMPACTED SOILS CAN BE SO GREAT THAT IT EFFECTIVELY PREVENTS ROOT PENETRATION AND THEREFORE, T ERE ORE MAY LEAD TO PREMATURE MORTALITY OR LOSS OF VIGOR. AS A RULE OF THUMB, PLANTING HOLES SHOULD BE THREE TIMES DEEPER AND WIDER THAN THE DIAMETER OF THE ROOTBALL FOR BALL - AND - BURLAP STOCK, AND FIVE TIMES DEEPER AND WIDER FOR CONTAINER -GROWN STOCK. 7. AVOID SPECIES THAT REQUIRE FULL SHADE, OR ARE PRONE TO WIND DAMAGE. EXTRA MULCHING AROUND THE BASE OF TREES AND SHRUBS IS STRONGLY RECOMMENDED AS A MEANS OF CONSERVING MOISTURE AND SUPPRESSING WEEDS, CONTRACTOR REQUIREMENTS: 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF ALL WORK COVERED UNDER THESE PLANS. 2. LANDSCAPE CONTRACTOR SHALL REFER TO THE STANDARDIZED LANDSCAPE SPECIFICATIONS FOR THE STATE OF VIRGINIA FOR ADDITIONAL INFORMATION. THE CONTRACTOR SHALL ABIDE BY ITS CONTENTS; HOWEVER ANY NOTES OR SPECIFICATIONS ON THE PLANS SHALL SUPERSEDE THOSE OUTLINED IN THE SPECIFICATIONS MANUAL (COP)ES ARE AVAILABLE FOR A FEE FROM THE VIRGINIA CHAPT ER OF THE A MERICA N SOCIETY Y OF LANDSCAPE ARCHITECTS VIRGINIA NURSERYMEN'S ASSOCIATION, AND THE VIRGINIA S N E SOCIETY OF LANDSCAPE DESIGNER 3. ALL PLANT MATERIAL SHALL MEET THE MINIMUM SPECIFICATIONS AND STANDARDS DESCRIBED IN THE CURRENT ISSUE OF THE AMERICAN STANDARD FOR NURSERY STOCK PUBLISHED THE AMERICAN ASSOCIATION OF NURSERYMEN, E SHED BY A 1250 STREET, NW, SUITE 500, WASHINGTON, DC 20005. 4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTIFY THE DESIGNER OF ANY VARIANCE FROM THE PLAN. 5. THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ANY ONSITE UTILITIES (CALL MISS UTILITY 1- 800 -552 -7001 BEFORE ANY EXCAVATION). 6. REFER TO THE APPROVED FINAL SITE PLANS FOR ANY DETAILED SITE INFORMATION. 7. ALL WORK SHALL BE COORDINATED WITH OTHER PARTIES. 8. PLANTS WILL BE PREPARED FOR SHIPMENT IN A MANNER THAT WILL NOT CAUSE DAMAGE TO THE BARK BUDS, BRANCHES STEMS OR OVERALL SHAPE OF THE STOCK. CONTAINER GROWN PLANTS WILL TRANSPORTED L BE ANSPO ED I N THE CONTAINERS IN WHICH THEY AVE N E H BEEN GROWN. 9. ALL PLANT MATERIAL N E U L SS OTHERWISE SPECIFIED SHAL L BE UNIFORMLY BRANCHED AND HAVE A VIGOROUS ROOT SYSTEM. PLANT MATERIAL SHALL BE HEALTHY, VIGOROUS, AND FREE FROM DEFECTS, DECAY, DISEASES, INSECT PEST EGGS, AND ALL FORMS OF INFESTATION. ALL PLANT MATERIAL SHALL BE FRESH, FREE FROM TRANSPLANT SHOCK OR VISIBLE WILT. PLANTS DEEMED UNHEALTHY WILL BE REJECTED. 10. ALL CONTAINER STOCK SHALL HAVE BEEN PROPAGATED IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPED SUFFICIENTLY TO HOLD ITS SOIL CONTAINER STOCK WITH POORLY DEVELOPED ROOT SYSTEMS WILL NOT BE ACCEPTED. 11. PLANTS NOT INSTALLED ON THE DAY OF ARRIVAL ON SITE SHALL BE STORED AND PROTECTED BY THE CONTAINER. OUTSIDE STORAGE AREAS i SHADED W LL BE SH D AND PROTECTED FROM THE WIND AND SUN. PLANTS STORED ON SITE SHALL BE PROTECTED FROM ANY DRYING AT All TIMES BY COVERING THE BALLS OR ROOTS WITH MOIST SAWDUST, WET BURLAP, WOOD CHIPS, SHREDDED BARK, PEAT MOSS, OR OTHER SIMILAR MULCHING MATERIAL. 12. THE OWNER RESERVES THE RIGHT TO SUBSTITUTE PLANT MATERIAL TYPE SIZE AND/OR OR UANTITY. ANY SUBSTITUTIONS MUST B APPROVED Y E i Q E B THE DESIGNER. 11 MINOR FIELD ADJUSTMENTS MAY BE NECESSARY DUE TO SITE CONDITIONS EX: T ( ROOTBALL AND UTILITY CONFLICT). MAJOR ADJUSTMENTS MUST BE APPROVED BY THE DESIGNER. 14. NO PLANTING SHALL OCCUR WHEN THE SOIL IS FROZEN, 15. PLANT MATERIAL SHALL BE PLACED IN EXISTING SOIL WITH EACH PLANTING PIT EXCAVATED TO A SIZE SUFFICIENT TO CONTAIN THE ENTIRE ROOT BALL OR ROOT MASS, WITHOUT CRAMPING ROOT STOCK. 16. THE CONTRACTOR R OR SHALL MAINTAIN A ON E (l ) C A LEND A R YE AR 90% CARE AND R EP LACEMENT WARRANTY FOR ALL PLANTINGS. THE PERIOD O F CARE AND REPLACEMENT SHALL BEGIN AFTER INSPECTION AND APPROVAL OF THE COMPLETE INSTALLATION OF ALL PLANTS AND CONTINUE N NUE FOR ONE CALENDAR YEAR. 17. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL OF TRASH AND DEBRIS WITHIN THE LIMITS OF THE PLANTING ON A DAILY IL BA SI S, 18. THE CONTRACT T B OR WILL NO E RESPONSIBLE F P T OR PLANT MATERIAL THAT HAS BEEN DAMAGED BY VANDALISM FIRE OR OTHER ACTIVITIES BEYOND THE CONTRACTOR'S CONTROL. FACILITY CONSTRUCTION 1. AN ED POND MAY A SERVE AS A SEDIMENT BASIN DURING PROJECT CONSTRUCTION. IF THIS IS DONE THE VOLUME SHALL BE BASE D ON TH E MORE STRINGENT SIZING R ULE (EROSION SEDIMENT CONTROL REQUIREMENT VS. WAT ER Q UALITY TREATMENT REQUIREMENT). INSTALLATION OF E PERMANENT RI SE R SHALL LL BE INITIATED DURING THE CONSTRUCTION PHASE AND DESIGN ELEVATIONS SHALL BE SET WITH FINAL ClEANOUT Of THE SEDIMENT BASIN AND CONVERSION TO THE POST - CONSTRUCTION ED POND IN MIND. THE BOTTOM ELEVATION OF THE ED POND SHALL BE LOWER THAN THE BOTTOM ELEVATION OF THE TEMPORARY SEDIMENT BASIN. APPROPRIATE PROCEDURES SHALL BE IMPLEMENTED TO PREVENT DISCHARGE OF TURBID WATERS WHEN THE BASIN IS BEING CONVERTED INTO AN ED POND, 2. ED PONDS SHALL ONLY BE CONSTRUCTED AFTER THE CONTRIBUTING DRAINAGE AREA TO THE POND IS COMPLETELY STABILIZED. IF THE PROPOSED POND SITE WILL BE USED AS A SEDIMENT TRAP OR BASIN DURING THE CONSTRUCTION PHASE, THEN THE FACILITY WILL BE DEWATERED, DREDGED AND RE- GRADED TO DESIGN DIMENSIONS AFTER THE ORIGINAL SITE CONSTRUCTION IS COMPLETE. 3, INSTALL E &S CONTROLS PRIOR TO CONSTRUCTION OF THE BASIN, INCLUDING TEMPORARY DE- WATERING DEVICES AND STORMWATER DIVERSION PRACTICES. ALL AREAS SURROUNDING THE BASIN THAT ARE GRADED OR DENUDED DURING CONSTRUCTION SHALL BE PLANTED WITH TURF GRASS, NATIVE PLANTINGS, OR OTHER APPROVED METHODS OF SOIL STABILIZATION. 4. CONTRACTOR SHALL EXCAVATE THE CORE TRENCH AND INSTALL THE SPILLWAY PIPE DURING THE ESC PHASE. 5. CONTRACTOR SHALL T LL ALSO INSTALL THE RISER, OUTFLOW STRUCTURE AND /OR AND BARREL(S) DURING THE ESC PHASE TO ENSURE THE TOP INVERT OF THE OVERFLOW WEIR IS CONSTRUCTED LEVEL AT THE DESIGN ELEVATION. 6. THE CONTRACTOR SHAL L THEN CONSTRUCT THE EMBANKMENT AND ANY INTER T INTERNAL BERMS IN 8 TO 12 -INCH LIFTS COMPACT THE LIFTS WITH APPROPRIATE EQUIPMENT. 7. UPON COMPLETION OF THE EMBANKMENT GRADING THE CONTRACTOR SHALL EXCAVATE /GRAD E UNTILTHE APPROPRIATE ELEVATION AND DESIRED CONTOURS ARE ACHIEVED FOR THE BOTTOM AND SIDE SLOPES OF THE ED POND. 8. CONTRACTOR SHALL THEN CONSTRUCT THE EMERGENCY SPILLWAY IN CUT OR STRUCTURALLY STABILIZED SOILS. 9. FINISH CONSTRUCTION OF ALL OUTLET STRUCTURES, INCLUDING DOWNSTREAM RIP - RAP APRON PROTECTION. 10. THE CONTRACTOR SHALL NEXT STABILIZE EXPOSED LS WITH TEMPORARY SE E I W P ED MIXTURES APPROPRIATE FOR THE POND BUFFER. ALL AREAS ABOVE THE NORMAL POOL ELEVATI ON(S) SHALL BE PERMANENTLY STABILIZED BY HYDROSEEDING OR SEEDING OVER STRAW, 11. THE CONTRACTOR SHALL THEN INSTALL THE APPROPRIATE BASIN LANDSCAPING IN ACCORDANCE WITH THE APPROVED PLANS. FACILITY MAINTENANCE: MAINTENANCE OF ED PONDS IS DRIVEN BY ANNUAL INSPECTIONS THAT EVALUATE THE CONDITION AND PERFORMANCE OF THE POND. DURING THESE INSPECTIONS THE FOLLOWING TASKS SHALL BE PERFORMED BY THE CONTRACTOR IN THE FIRST YEAR FOLLOWING INSTALLATION, AND THE OWNER THEREAFTER: 1. MEASURE SEDIMENT ACCUMULATION LEVELS IN THE FOREBAY. 2. MONITOR THE GROWTH OF WETLANDS, TREES AND SHRUBS PLANTED, AS APPLICABLE. RECORD THE SPECIES AND THEIR APPROXIMATE COVERAGE, AND NOTE THE PRESENCE OF ANY INVASIVE PLANT SPECIES, AS APPLICABLE. 3. INSPECT THE CONDITION OF STORMWATER INLETS TO THE POND FOR MATERIAL DAMAGE, EROSION OR UNDERCUTTING. 4, INSPECT THE BANKS OF UPSTREAM AND DOWNSTREAM CHANNELS FOR EVIDENCE OF SLOUGHING, ANIMAL BURROWS, BOGGY AREAS, WOODY GROWTH, OR GULLY EROSION THAT MAY UNDERMINE EMBANKMENT INTEGRITY. 5. INSPECT POND OUTFALL CHANNEL FOR EROSION, UNDERCUTTING, RIP -RAP DISPLACEMENT, WOODY GROWTH, ETC. 6. INSPECT CONDITION OF PRINCIPAL SPILLWAY AND RISER FOR EVIDENCE OF SPALLING, JOINT FAILURE, LEAKAGE, CORROSION OR OTHER FAILURES. 7. INSPECT CONDITION OF ALL TRASH RACKS, REVERSE SLOPED PIPES OR FLASHBOARD RISERS FOR EVIDENCE OF CLOGGING, LEAKAGE, DEBRIS ACCUMULATION OR OTHER FAILURES. 8. INSPECT MAINTENANCE ACCESS TO ENSURE IT IS FREE OF WOODY VEGETATION, AND CHECK TO SEE WHETHER VALVES, MANHOLES AND LOCKS CAN BE OPENED AND OPERATED. 9. INSPECT INTERNAL AND EXTERNAL SIDE SLOPES OF THE POND FOR EVIDENCE OF SPARSE VEGETATIVE COVER, EROSION, OR SLUMPING, AND MAKE NEEDED REPAIRS IMMEDIATELY. FACILITY INSPECTION: MULTIPLE INSPECTIONS ARE CRITICAL TO ENSURE THE BASIN(SO ARE PROPERLY CONSTRUCTED. BECAUSE THE TIMING OF THE INSTALLATION IS DICTATED BY THE CONTRACTOR, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE ENGINEER AND INSPECTOR PRIOR TO INSTALLATION. MULTIPLE SITE VISITS AND INSPECTIONS ARE REQUIRED TO BE SCHEDULED BY THE CONTRACTOR, WITH THE ENGINEER AND INSPECTOR, DURING THE FOLLOWING STAGES OF THE EXTENDED DETENTION BASIN'S CONSTRUCTION PROCESS: 1. PRE - CONSTRUCTION MEETING 2. INITIAL SITE PREPARATION (INCLUDING INSTALLATION OF PROJECT E &S CONTROLS) 3. EXCAVATION /GRADING (E.G., INTERIM /FINAL ELEVATIONS) 4. EXTENDED DETENTION BASIN INSTALLATION (E.G., INTERIM AND FINAL ELEVATIONS) 5. INSTALLATION OF THE EMBANKMENT, THE RISER /PRIMARY SPILLWAY, AND THE OUTLET STRUCTURE(S). 6. PLANTING PHASE (WITH AN EXPERIENCED LANDSCAPE ARCHITECT PRESENT) 7. FINAL INSPECTION (DEVELOP A PUNCH LIST FOR FACILITY ACCEPTANCE) ���V 77 � ! f SCOTT R. COLLINS' ,U No. 35791 �__ � [1115 e �IONAL E�' z 0 E W a z O P-1 U) > LU U) z 0 H ° U) H W ce tln tln 1-1 T-41 O N 4 L1 0 d Z 9 0 O J E Q (n to Z Z N m E E a V) U O o Z z O 0 w ~ & U U 10� ce CL a In a H N W fn In ri rA t 1 Ln ;` L9 a) T 1AMyo ` c iiiiiiiIIiIiiiIIIiIIIIIIiIIIIiiIi CO 0 go q4t N 1 N 0 N N W Q W J I�w > co t9W z T_ O W U I W Ul =) t W W IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII CC � U) J W M 0 (< V 0 0 TI I I ON 9 OV J 3: Uj cd r h V 1 W U O NV Z �" Z - W X 11-1 O LU - 2 n c Z U E 13 . W � ?:W ,i1 0 ids n 2. Or 1 Z = Wz Of J 10 Z z W 0 t. 21 ) -: g1 _ttk r W ji\ I (1) C-I, �" sid. 191 ... ce Z - rL ; i AC C "" s- c JOB NO. E 142109 Q TS 0T IC:t.I" "C• NONE ItL1'' }-O'4 iCJtIdS.n`J Ir a•*•' •' -. SHEET NO. . ':' r� T - I �- r t t :# Y} -1n Ir I I (. ,�� ,�� 1 0 u. S I P� l 0 w - .. " W�� Y _.r.' ..�^3�r,,,,,>•A".i.'L„y - �`.1,.3A _1.�x':f, cy�I er�i�:.W. p:..'.e K � .,.\'+ 11-1 1 !`r;,-, z I sir w 1 s' K nf_aal I'. ,"e ' 17,E h,. . U 0 _ a p ': :) _, ; ,; -a , :xv, EXTENDED DETENTION BASIN CONSTRUCTION NOTES: FACILITY PLANTING SPECIFICATIONS: I 4P PV,0, EGRET a° CAP ON GRADE 4tI# P_V_ . NONPERFOR,>ATED STANDPIPE Figure 9w&l. 4"' P..1 C. Cle2nout Detail EMBANKMENT NOTES: AFTER AN INVESTIGATION OF THE SITE's SOILS, SITE VISITS, AN ANALYSIS OF THE SURVEYED TOPOGRAPHY AND AN EXAMINATION OF VA DEQ APPENDIX A: EARTHEN EMBANKMENT (REQUIREMENTS vs. RECOMMENDATIONS), THE APPLICANT HAS PROVIDED A COMPREHENSIVE EMBANKMENT DESIGN THAT DOES NOT NEED A GEOTECHNICAL STUDY AT THIS TIME. SUCH IS THE CASE DUE TO THE PRECAUTIONARY EMBANKMENT DESIGNS PROPOSED. A SUMMARY OF THE EMBANKMENT DESIGN REQUIREMENTS ARE LISTED BELOW, MANDATING THE CONTRACTOR MEET THESE REQUIREMENTS AT A MINIMUM. THE EMBANKMENTS SHALL HAVE A COMPACTED CLAY CORE WITH A CUTOFF TRENCH & BE IN ACCORDANCE WITH THE DETAILS SHOWN ON THIS SHEET. BERMS AND SPILLWAYS SHALL BE STABILIZED WITH EC -3 MATTING & THE REMAINING DISTURBED SLOPES SHALL BE STABILIZED WITH EC -2 MATTING. ALL BERM FILL MATERIAL SHALL CONSIST OF ML, CL, SC OR GC SOILS & BE FREE OF WOOD, ROOTS, ROCKS OR ANY OTHER NON COMPACTING SOIL. COMPACTED FILL SHALL BE PROCTOR MAXIMUM DRY DENSITY ASTM D698 AND HAVE A MINIMUM OF 95% OF MAXIMUM DRY DENSITY AND 2% OF OPTIMUM MOISTURE CONTENT. ALL FILL MATERIAL AND CONSTRUCTION SHALL BE APPROVED BY AN ONSITE GEOTECHNICAL ENGINEER PRESENT DURING THE CONSTRUCTION OF THE EMBANKMENTS AND FILL AREAS. LEVEL 1 1. LEVEL 1 EXTENDED DETENTION BASINS SH A LL HAVE A T URF GROUND COVER, SUCH AS GRASS MULCH OR SOME OTHER FORM OF VEGETATIVE GROWN DC OVE R. LANDSCAPING BEYOND THIS IS OPTIONAL FOR LEVEL 1 FACILITIES BUT IS NOT REQUIRED. 2. THE PROPOSED SIDE SLOPES OF THE BASIN SHALL BE A MAXIMUM OF 4:1 TO PROMOTE SETTLING &REDUCE THE RISK OF EROSION. THE PROPOSED FLOOR SLOPES, EXCLUSIVE OF T - O 00 HE MICROPOOL SHALL HAVE A SLOPE RANGING FROM 0.5% 1 0%. LEVEL 2 1. THE PROPOSED SIDE SLOPES OF THE BASIN SHALL BE A MAXIMUM OF 4:1 TO PROMOTE SETTLING & REDUCE THE RISK OF EROSION. THE PROPOSED FLOOR SLOPES, EXCLUSIVE OF THE MICROPOOL SHALL HAVE A SLOPE RANGING FROM 0.5 % -1.0 %. 2. THE PLANT SELECTION SHALL PROMOTE DIVERSE WILDLIFE AND WATERFOWL USE WITHIN THE STORMWATER WETLAND AND BUFFER. 3. THE LANDSCAPING PLAN SHALL ALLOW THE POND TO MATURE INTO A NATIVE FOREST IN THE RIGHT PLACES, BUT YET KEEP MOWABLE TURF ALONG THE EMBANKMENT AND ALL ACCESS AREAS. 4. WOODY VEGETATION SHALL NOT L O BE PLANTED OR ALLOWED TO GROW WITHIN 15 FEET OF THE TOE EMBANKMENT OFT E NOR WITHIN 25 FEET H E OF THE PRINCIPAL SPILLWAY STRUCTURE. 5, A VEGETATED BUFFER SHALL B PROVIDED EXTENDS T E RO DED THAT E NDS A LEAST 25 FEET OUTWARD FROM THE MAXIMUM WATER SURFACE ELEVATION OF THE ED POND. PERMANENT STRUCTURES (E.G., BUILDINGS) SHOULD NOT BE CONSTRUCTED WITHIN THE BUFFER AREA. EXISTING TREES SHALL BE PRESERVED IN THE BUFFER AREA DURING CONSTRUCTION. 6. THE SOILS IN THE STORMWATER BUFFER AREA ARE OFTEN SEVERELY COMPACTED DURING THE CONSTRUCTION PROCESS TO ENSURE STABILITY THE DENSITY OF THESE COMPACTED SOILS CAN BE SO GREAT THAT IT EFFECTIVELY PREVENTS ROOT PENETRATION AND THEREFORE, T ERE ORE MAY LEAD TO PREMATURE MORTALITY OR LOSS OF VIGOR. AS A RULE OF THUMB, PLANTING HOLES SHOULD BE THREE TIMES DEEPER AND WIDER THAN THE DIAMETER OF THE ROOTBALL FOR BALL - AND - BURLAP STOCK, AND FIVE TIMES DEEPER AND WIDER FOR CONTAINER -GROWN STOCK. 7. AVOID SPECIES THAT REQUIRE FULL SHADE, OR ARE PRONE TO WIND DAMAGE. EXTRA MULCHING AROUND THE BASE OF TREES AND SHRUBS IS STRONGLY RECOMMENDED AS A MEANS OF CONSERVING MOISTURE AND SUPPRESSING WEEDS, CONTRACTOR REQUIREMENTS: 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF ALL WORK COVERED UNDER THESE PLANS. 2. LANDSCAPE CONTRACTOR SHALL REFER TO THE STANDARDIZED LANDSCAPE SPECIFICATIONS FOR THE STATE OF VIRGINIA FOR ADDITIONAL INFORMATION. THE CONTRACTOR SHALL ABIDE BY ITS CONTENTS; HOWEVER ANY NOTES OR SPECIFICATIONS ON THE PLANS SHALL SUPERSEDE THOSE OUTLINED IN THE SPECIFICATIONS MANUAL (COP)ES ARE AVAILABLE FOR A FEE FROM THE VIRGINIA CHAPT ER OF THE A MERICA N SOCIETY Y OF LANDSCAPE ARCHITECTS VIRGINIA NURSERYMEN'S ASSOCIATION, AND THE VIRGINIA S N E SOCIETY OF LANDSCAPE DESIGNER 3. ALL PLANT MATERIAL SHALL MEET THE MINIMUM SPECIFICATIONS AND STANDARDS DESCRIBED IN THE CURRENT ISSUE OF THE AMERICAN STANDARD FOR NURSERY STOCK PUBLISHED THE AMERICAN ASSOCIATION OF NURSERYMEN, E SHED BY A 1250 STREET, NW, SUITE 500, WASHINGTON, DC 20005. 4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTIFY THE DESIGNER OF ANY VARIANCE FROM THE PLAN. 5. THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ANY ONSITE UTILITIES (CALL MISS UTILITY 1- 800 -552 -7001 BEFORE ANY EXCAVATION). 6. REFER TO THE APPROVED FINAL SITE PLANS FOR ANY DETAILED SITE INFORMATION. 7. ALL WORK SHALL BE COORDINATED WITH OTHER PARTIES. 8. PLANTS WILL BE PREPARED FOR SHIPMENT IN A MANNER THAT WILL NOT CAUSE DAMAGE TO THE BARK BUDS, BRANCHES STEMS OR OVERALL SHAPE OF THE STOCK. CONTAINER GROWN PLANTS WILL TRANSPORTED L BE ANSPO ED I N THE CONTAINERS IN WHICH THEY AVE N E H BEEN GROWN. 9. ALL PLANT MATERIAL N E U L SS OTHERWISE SPECIFIED SHAL L BE UNIFORMLY BRANCHED AND HAVE A VIGOROUS ROOT SYSTEM. PLANT MATERIAL SHALL BE HEALTHY, VIGOROUS, AND FREE FROM DEFECTS, DECAY, DISEASES, INSECT PEST EGGS, AND ALL FORMS OF INFESTATION. ALL PLANT MATERIAL SHALL BE FRESH, FREE FROM TRANSPLANT SHOCK OR VISIBLE WILT. PLANTS DEEMED UNHEALTHY WILL BE REJECTED. 10. ALL CONTAINER STOCK SHALL HAVE BEEN PROPAGATED IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPED SUFFICIENTLY TO HOLD ITS SOIL CONTAINER STOCK WITH POORLY DEVELOPED ROOT SYSTEMS WILL NOT BE ACCEPTED. 11. PLANTS NOT INSTALLED ON THE DAY OF ARRIVAL ON SITE SHALL BE STORED AND PROTECTED BY THE CONTAINER. OUTSIDE STORAGE AREAS i SHADED W LL BE SH D AND PROTECTED FROM THE WIND AND SUN. PLANTS STORED ON SITE SHALL BE PROTECTED FROM ANY DRYING AT All TIMES BY COVERING THE BALLS OR ROOTS WITH MOIST SAWDUST, WET BURLAP, WOOD CHIPS, SHREDDED BARK, PEAT MOSS, OR OTHER SIMILAR MULCHING MATERIAL. 12. THE OWNER RESERVES THE RIGHT TO SUBSTITUTE PLANT MATERIAL TYPE SIZE AND/OR OR UANTITY. ANY SUBSTITUTIONS MUST B APPROVED Y E i Q E B THE DESIGNER. 11 MINOR FIELD ADJUSTMENTS MAY BE NECESSARY DUE TO SITE CONDITIONS EX: T ( ROOTBALL AND UTILITY CONFLICT). MAJOR ADJUSTMENTS MUST BE APPROVED BY THE DESIGNER. 14. NO PLANTING SHALL OCCUR WHEN THE SOIL IS FROZEN, 15. PLANT MATERIAL SHALL BE PLACED IN EXISTING SOIL WITH EACH PLANTING PIT EXCAVATED TO A SIZE SUFFICIENT TO CONTAIN THE ENTIRE ROOT BALL OR ROOT MASS, WITHOUT CRAMPING ROOT STOCK. 16. THE CONTRACTOR R OR SHALL MAINTAIN A ON E (l ) C A LEND A R YE AR 90% CARE AND R EP LACEMENT WARRANTY FOR ALL PLANTINGS. THE PERIOD O F CARE AND REPLACEMENT SHALL BEGIN AFTER INSPECTION AND APPROVAL OF THE COMPLETE INSTALLATION OF ALL PLANTS AND CONTINUE N NUE FOR ONE CALENDAR YEAR. 17. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL OF TRASH AND DEBRIS WITHIN THE LIMITS OF THE PLANTING ON A DAILY IL BA SI S, 18. THE CONTRACT T B OR WILL NO E RESPONSIBLE F P T OR PLANT MATERIAL THAT HAS BEEN DAMAGED BY VANDALISM FIRE OR OTHER ACTIVITIES BEYOND THE CONTRACTOR'S CONTROL. FACILITY CONSTRUCTION 1. AN ED POND MAY A SERVE AS A SEDIMENT BASIN DURING PROJECT CONSTRUCTION. IF THIS IS DONE THE VOLUME SHALL BE BASE D ON TH E MORE STRINGENT SIZING R ULE (EROSION SEDIMENT CONTROL REQUIREMENT VS. WAT ER Q UALITY TREATMENT REQUIREMENT). INSTALLATION OF E PERMANENT RI SE R SHALL LL BE INITIATED DURING THE CONSTRUCTION PHASE AND DESIGN ELEVATIONS SHALL BE SET WITH FINAL ClEANOUT Of THE SEDIMENT BASIN AND CONVERSION TO THE POST - CONSTRUCTION ED POND IN MIND. THE BOTTOM ELEVATION OF THE ED POND SHALL BE LOWER THAN THE BOTTOM ELEVATION OF THE TEMPORARY SEDIMENT BASIN. APPROPRIATE PROCEDURES SHALL BE IMPLEMENTED TO PREVENT DISCHARGE OF TURBID WATERS WHEN THE BASIN IS BEING CONVERTED INTO AN ED POND, 2. ED PONDS SHALL ONLY BE CONSTRUCTED AFTER THE CONTRIBUTING DRAINAGE AREA TO THE POND IS COMPLETELY STABILIZED. IF THE PROPOSED POND SITE WILL BE USED AS A SEDIMENT TRAP OR BASIN DURING THE CONSTRUCTION PHASE, THEN THE FACILITY WILL BE DEWATERED, DREDGED AND RE- GRADED TO DESIGN DIMENSIONS AFTER THE ORIGINAL SITE CONSTRUCTION IS COMPLETE. 3, INSTALL E &S CONTROLS PRIOR TO CONSTRUCTION OF THE BASIN, INCLUDING TEMPORARY DE- WATERING DEVICES AND STORMWATER DIVERSION PRACTICES. ALL AREAS SURROUNDING THE BASIN THAT ARE GRADED OR DENUDED DURING CONSTRUCTION SHALL BE PLANTED WITH TURF GRASS, NATIVE PLANTINGS, OR OTHER APPROVED METHODS OF SOIL STABILIZATION. 4. CONTRACTOR SHALL EXCAVATE THE CORE TRENCH AND INSTALL THE SPILLWAY PIPE DURING THE ESC PHASE. 5. CONTRACTOR SHALL T LL ALSO INSTALL THE RISER, OUTFLOW STRUCTURE AND /OR AND BARREL(S) DURING THE ESC PHASE TO ENSURE THE TOP INVERT OF THE OVERFLOW WEIR IS CONSTRUCTED LEVEL AT THE DESIGN ELEVATION. 6. THE CONTRACTOR SHAL L THEN CONSTRUCT THE EMBANKMENT AND ANY INTER T INTERNAL BERMS IN 8 TO 12 -INCH LIFTS COMPACT THE LIFTS WITH APPROPRIATE EQUIPMENT. 7. UPON COMPLETION OF THE EMBANKMENT GRADING THE CONTRACTOR SHALL EXCAVATE /GRAD E UNTILTHE APPROPRIATE ELEVATION AND DESIRED CONTOURS ARE ACHIEVED FOR THE BOTTOM AND SIDE SLOPES OF THE ED POND. 8. CONTRACTOR SHALL THEN CONSTRUCT THE EMERGENCY SPILLWAY IN CUT OR STRUCTURALLY STABILIZED SOILS. 9. FINISH CONSTRUCTION OF ALL OUTLET STRUCTURES, INCLUDING DOWNSTREAM RIP - RAP APRON PROTECTION. 10. THE CONTRACTOR SHALL NEXT STABILIZE EXPOSED LS WITH TEMPORARY SE E I W P ED MIXTURES APPROPRIATE FOR THE POND BUFFER. ALL AREAS ABOVE THE NORMAL POOL ELEVATI ON(S) SHALL BE PERMANENTLY STABILIZED BY HYDROSEEDING OR SEEDING OVER STRAW, 11. THE CONTRACTOR SHALL THEN INSTALL THE APPROPRIATE BASIN LANDSCAPING IN ACCORDANCE WITH THE APPROVED PLANS. FACILITY MAINTENANCE: MAINTENANCE OF ED PONDS IS DRIVEN BY ANNUAL INSPECTIONS THAT EVALUATE THE CONDITION AND PERFORMANCE OF THE POND. DURING THESE INSPECTIONS THE FOLLOWING TASKS SHALL BE PERFORMED BY THE CONTRACTOR IN THE FIRST YEAR FOLLOWING INSTALLATION, AND THE OWNER THEREAFTER: 1. MEASURE SEDIMENT ACCUMULATION LEVELS IN THE FOREBAY. 2. MONITOR THE GROWTH OF WETLANDS, TREES AND SHRUBS PLANTED, AS APPLICABLE. RECORD THE SPECIES AND THEIR APPROXIMATE COVERAGE, AND NOTE THE PRESENCE OF ANY INVASIVE PLANT SPECIES, AS APPLICABLE. 3. INSPECT THE CONDITION OF STORMWATER INLETS TO THE POND FOR MATERIAL DAMAGE, EROSION OR UNDERCUTTING. 4, INSPECT THE BANKS OF UPSTREAM AND DOWNSTREAM CHANNELS FOR EVIDENCE OF SLOUGHING, ANIMAL BURROWS, BOGGY AREAS, WOODY GROWTH, OR GULLY EROSION THAT MAY UNDERMINE EMBANKMENT INTEGRITY. 5. INSPECT POND OUTFALL CHANNEL FOR EROSION, UNDERCUTTING, RIP -RAP DISPLACEMENT, WOODY GROWTH, ETC. 6. INSPECT CONDITION OF PRINCIPAL SPILLWAY AND RISER FOR EVIDENCE OF SPALLING, JOINT FAILURE, LEAKAGE, CORROSION OR OTHER FAILURES. 7. INSPECT CONDITION OF ALL TRASH RACKS, REVERSE SLOPED PIPES OR FLASHBOARD RISERS FOR EVIDENCE OF CLOGGING, LEAKAGE, DEBRIS ACCUMULATION OR OTHER FAILURES. 8. INSPECT MAINTENANCE ACCESS TO ENSURE IT IS FREE OF WOODY VEGETATION, AND CHECK TO SEE WHETHER VALVES, MANHOLES AND LOCKS CAN BE OPENED AND OPERATED. 9. INSPECT INTERNAL AND EXTERNAL SIDE SLOPES OF THE POND FOR EVIDENCE OF SPARSE VEGETATIVE COVER, EROSION, OR SLUMPING, AND MAKE NEEDED REPAIRS IMMEDIATELY. FACILITY INSPECTION: MULTIPLE INSPECTIONS ARE CRITICAL TO ENSURE THE BASIN(SO ARE PROPERLY CONSTRUCTED. BECAUSE THE TIMING OF THE INSTALLATION IS DICTATED BY THE CONTRACTOR, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE ENGINEER AND INSPECTOR PRIOR TO INSTALLATION. MULTIPLE SITE VISITS AND INSPECTIONS ARE REQUIRED TO BE SCHEDULED BY THE CONTRACTOR, WITH THE ENGINEER AND INSPECTOR, DURING THE FOLLOWING STAGES OF THE EXTENDED DETENTION BASIN'S CONSTRUCTION PROCESS: 1. PRE - CONSTRUCTION MEETING 2. INITIAL SITE PREPARATION (INCLUDING INSTALLATION OF PROJECT E &S CONTROLS) 3. EXCAVATION /GRADING (E.G., INTERIM /FINAL ELEVATIONS) 4. EXTENDED DETENTION BASIN INSTALLATION (E.G., INTERIM AND FINAL ELEVATIONS) 5. INSTALLATION OF THE EMBANKMENT, THE RISER /PRIMARY SPILLWAY, AND THE OUTLET STRUCTURE(S). 6. PLANTING PHASE (WITH AN EXPERIENCED LANDSCAPE ARCHITECT PRESENT) 7. FINAL INSPECTION (DEVELOP A PUNCH LIST FOR FACILITY ACCEPTANCE) ���V 77 � ! f SCOTT R. COLLINS' ,U No. 35791 �__ � [1115 e �IONAL E�' z 0 E W a z O P-1 U) > LU U) z 0 H ° U) H W ce tln tln 1-1 T-41 O N 4 L1 0 d Z 9 0 O J E Q (n to Z Z N m E E a V) U O o Z z O 0 w ~ & U U 10� ce CL a In a H N W fn In ri rA t 1 Ln ;` L9 a) T 1AMyo ` c iiiiiiiIIiIiiiIIIiIIIIIIiIIIIiiIi CO 0 go q4t N 1 N 0 N N W Q W J I�w > co t9W z T_ O W U I W Ul =) t W W IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII CC � U) J W M 0 (< V 0 0 TI I I ON 9 OV J 3: Uj cd r h V 1 W U O NV Z �" Z - W X 11-1 O LU - 2 n c Z U E 13 . W � ?:W ,i1 0 ids n 2. Or 1 Z = Wz Of J 10 Z z >> L N li 0 0 2 I 1-1 J Q c 0 L c . E c U T I S 3 W J - r W L r ce Z - rL I V4 c JOB NO. E 142109 Q SCALE NONE SHEET NO. 11 1 S r >> L N li 0 0 2 I 1-1 J Q c 0 L c . E c U T I S 3