HomeMy WebLinkAboutARB201500055 Action Letter 2015-10-23COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
October 23, 2015
Daniel R Hines
Bohler Engineering
29 Blackwell Park Lane Suite 201
Warrenton VA 20186
RE: ARB201500055 Fifth Street Station: Revisions to the architectural design
Dear Mr. Hines,
The Albemarle County Architectural Review Board reviewed the above noted item at its meeting on
Monday, October 19, 2015. The Board, by a vote of 3:0, approved the changes to the Haverty's design
with the condition that the color in the lighter bays be changed to a darker color, to be approved by staff.
Please provide:
1. One set of revised drawings addressing the above -noted condition. Include updated revision dates
on each drawing.
2. A memo including detailed responses indicating how each condition has been satisfied, if changes
other than those requested have been made, identify those changes in the memo also.
3. The attached "Revised Application Submittal" form. This form must be returned with your revisions
to ensure proper tracking and distribution.
When staffs review of this information indicates that all conditions of approval have been met, a Certificate
of Appropriateness may be issued.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Aa�
Margaret Maliszewski
Principal Planner
cc: 5th Street Station Ventures LLC
5 West Broad Street Ste B
Fairburn GA 30213
COUNTY OF ALBEMARLE
Department of Community Development
REVISED APPLICATION SUBMITTAL
This form must be returned with your revisions to ensure proper tracking and distribution. County staff
has indicated below what they think will be required as a resubmission of revisions. If you need to submit
additional information please explain on this form for the benefit of the intake staff. All plans must be
collated and folded to ft into legal size files, in order to be accepted for submittal.
W13
Margaret Maliszewski,
PROJECT NAME: ARB201500055 Fifth Street Station
DATE:
Submittal Type Requiring Revisions t 1 indicates submittal Code County Project Number # Copies
Erosion & Sediment Control Plan E&S
Mitigation Plan (MP)
Waiver Request (WR)
Stormwater Management Plan (SWMP)
Road Plan RP
Private Road Request, with private/public comparison (PRR)
Private Road Request — Development Area PRR-DA
Preliminary Site Plan PSP
Final Site Plan (or amendment) (FSP
Final Plat (FP)
Preliminary Plat (PP)
Easement Plat (EP)
Boundary Adjustment Plat (BAP)
Rezoning Plan (REZ)
Special Use Permit Concept Plan SP -CP
Reduced Concept Plan(R-CP)
Proffers (P)
Bond Estimate Request (BER)
Draft Groundwater Management Plan D-GWMP
Final Groundwater Management Plan F-GWMP
Aquifer Testing Work Plan ATWP
Groundwater Assessment Report (GWAR)
Architectural Review Board ARB ARB2015-55 1
Other: Please explain
(For staff use only)
Submittal Code
# Copies
Distribute To:
Submittal
Code
## Copies
Distribute To:
ARB
1
Margaret Maliszewski