HomeMy WebLinkAboutWPO201400105 Plan - Stormwater 2015-01-2610-4311-
CELS' OVERVIEW
\ler
Ga
w 'a
REFER TO SHEETS C-501 & C-502
er -loop
N
I
0
DIS'"F'RICT, ALBEMA'17%'LJ0
ow&
-*Q0
TMP 72-32
The Miller School of Albemarle
DB 670-529
DB 1950-169
1,0146.98 Acres
Zoned: RA
GS
COUNTY, VIRGINIA
0#129AWAI
LEGAL REFERENCE: TAX MAP 72, PARCEL 32
SOURCE OF TITLE: DB 670, PACE 529
PARCEL ADDRESS: 1000 SAMUEL MILLER LOOP
ZONING. RA — RURAL AREAS
MAGISTERIAL DISTRICT: SAMUEL MILLER
SOURCE OF BOUNDARY: ALBEMARLE COUNTY GIS MAPS
SOURCE OF TOPOGRAPHY: FIELD SURVEY BY
OWNER: THE MILLER SCHOOL OF ALBEMARLE
1000 SAMUEL MILLER LOOP
CHARLOTTESVILLE, VA 22903
CONTRACTOR: BBX CORPORATION
413 REAS FORD ROAD
EARLYSVILLE, VA
ATTN: BRAD BOOKER
PHONE: 434-531-5548
E—MAIL: brodbbx@earhtlink.net
ENGINEER: MERIDIAN PLANNING GROUP, LLC
1413 SACHEM PLACE, STE. 1
CHARLOTTESVILLE, VA 22901
ATTN: TIMOTHY MILLER
PHONE: 434-882-0121
E—MAIL: tmiller@meridionwbe.com
0 01191
C- 500........ COVERSI-IEET
C-501 ........ EXISTING CONDITIONS & DEMOLITION PLAN
C-502 ........ STORM WATER POLLUTION PLAN
0503 ......... STORM. WATER POLLUTION NOTES
VICINITY MAP
"50 SCALE: 1 "— 2000'
I
AP F-1 C'
D
F 1
A
r�-
LLJ
k
O Ln
CD
CD 21
•
z
0
a-
Cn
I
•
•
•
•
SHEET NO.
a
[II&Ilre
SHEET 1 of 4
Q
0
7—
(N
V)
V)
<
ww���
M
M
M
Q
Of00
0
0
r)
z
0
a-
Cn
I
•
•
•
•
SHEET NO.
a
[II&Ilre
SHEET 1 of 4
L3 - Existing soccer field + '
{ I
/ Ex. pavement
HATCHED AREA,
T.B.R.
Z z - Z_ �_\'
/
Ex. brick walk ++_
`Ex. c ret "- wa4l� -- Ex. sign- J'
9� J
--------- \` � ` T.B.R. WV t `\
r i
INY,
it
19 \\ \\ \ \ ; ! It 1, \\
it \ /
?\Ex. light pole f
?C
Existing tennis courts l✓ %�'O�•- �� rr' r!/ // // �' ,,' // / /J Il ! i 1 1 �\\ LD '
tEx. sign
E t1Qf Rpq'L p OAT/oestal f� rt i �, +`4{ Ex, 6 PVC pipe
,T ,tt , inv out = 702.68
it
♦''� .� " /! ,,''! '' r /rrrr _..__- r ,/ /r' j j I 1 j i � j I' �; ;
LD
// // /rr ,.' rr /r � ., _ Jr �'� rrr r-- -•� \\ ..r r/ _ - - - - - J j r f I � I 111 ?
- - -
�Ex. stone — — — —
m MUM ent.
\ _. _ r r \ \ \ r ., ! ! ' F+H • Ili i I
_Pond
\ t it
_ _ J
rrr /r. _ _. J /rr rrr `\\ - - - -• - - '\ `\ \ \ `\ \� I
Fx. cable gugdrail\ \\
r /r- -_____ B.R. \ ', ° • \'
it
it CD I
113 1
It CD
/ r
It CD t \ CO
- °\ Ex. 6 \ Pk PiPe \ \ `\ \ tl t \
' _ - - - -' '' rr.- \ \ \1.2_ P\ ` \\ `\ `� v ou`k= 69$.\87
_____ -- rrrr - - - -- \ (ln Irl`'r656�12 \\ `\ \`\ \ \\ \\ \` \\ \ \\ \\ \'1 \Il \ \\._ ^> s
r J r \ Ex. 1.2 ast 1 e I t t II\ \
-__ _ - \ P P \ \ \\ `\ \ I ', t 11 \ \Ex. pavement \ i W i I
-------------- _ ,- ,-- tn�v�'�ut= .654- �2a� \\ `\ \ , , I t t tt , I ;
r ----- - - - - -- - -- `l 1 E 12 \ lastic \Y�1}i o
` / -- - - - - -- �g6o-_`-' \ `i�rly out = 64.118 ,
---- - - - - -- ' Ei�, ri i-ra ' ; J! ,' / / t Il I Ex.) light pdje -r
Ex. 4" plastic pipe -------- - - - - -- IELOATEf t 1
inv. out = 660.5 -- - - - - --
CONNECT TO NEW DITCH / / ' / ' rt fJ l r t Ex\\water meter
_---------- -
\r RIELOCATE
'----- ----- - - --.\
ej
/
` /''^ ,.- ..- r' r' r'r _ �...-- P•L-AJ�I_�._.___..���\,_.. --''' ,.r / ! ' � / ' / / � / ! 1 I { r r { 11 ?\
PIPE
INV. OUT - -
4 )(. silt fen evl
r
w
•
W
Q
c�
i�A
LLJ
o z
VU
N Gj Quo
r
T.B R� /r� r''' 'f � '`� -`'' \� ri�'f rl' ,� rr 'r' 1 'f ' • r' ' rJ J J / !1 J' J l , ! ! ! I t� 1 I ' ! � \\ 11 r' ' �_
\ \ \� Ex. baseball field / rrr / / / / r/ rr / r ; .-'`�` r r % _rr %i rrrr' -�.1; r r ,r r•'' r r r r 1 ! J ! ! /! J / 11 'i ' ' ' !t t 1 ! l \�\ Ex. sign
�
\\ \ \�. / /i /r / /, / /./ rr / rr r / ,,. .. -' rr -- — "\ ~"_ � rO / ^\ ,' ' �• /' ' ' r' // /' l' !! 1 ! ! 1 1 /
/r
r`\`
' r / / I ! ! 1 / t
- \��r ,, /! ! /rvrr rr // r, / r r ,% rr r r r rr r , / / I I !1 I \ rr U!7
Q
\' ��\ \ \ \ \` \ / / / , / / r / ! / / r r ,,. / r r r r .•- -` .... r,; ..,, y'^" r r r / J J r r r r r r r J J J / J 1 / f I \ ,'` �., .
Q' �. \\ \ \\ \ / rrr / ! / / / .• / r r .. r .� �+ ,/ 1 /// rr � r r , , r / , r r r r r r r r / / / J 1 ! ! 1 J 1 J /
/ rrr / / r r r / r / , - /' / �, r . ri / / / r , r , , ,.,/ / r / / / r / ♦ / 1 1 1 t
Q
G r r r r"i
vern
VIA
rrrr /r rrr /// ♦ ♦ /
\ \ � ,. `' \ ��\ \ \ \` `-- -�'' -, G ��. _ -'" r rrrrrr / / rrrr // ._ / /• /r r ♦ //s / ,'/ ,,r ✓ f' J J J / / 1 1 ,c /�
69
°� \ \� -'" \mot \ •\ \ ` � \ \ \ \ + t ( � -_ .-"-, -' � f: rr'r �/ rr ; r /r r' // /' / r /' t J// / / r ! / / 1 ' l / ' !
s'° / scre ed
d Ex. /
EXISTING PAVEMENT TO BE REMOVED.
\, �`�.� y___ • \ \\ \ O \ \\ \\ �, \ \\ \\ \\ CY
_
._._. -� rrr rr / / r' ,r r / .. f, / ' > ! / / /
\ 1 _ r r r r r ! r / , 1 r limit /sign
� •� �(9 X
\ r/r/ • i ;
� / a \\ _.__-- - i-_- -'-- ____
/
_ /`/
°\ \ \ \ �."� \ \ \\ \ \ \ \ \\ \ \ \ \ tr'� \ \ \ \ \ \ •\ N _ - ._.._ -- - --------- _._.___......- \ /
\ \ \ \ \\ \ \ \ '- _------ - ^_.__.__
' ----------------- •.' r' r' 'r rrr'~ �'. / / / /
\ \ \ \ \d \ \ 4 \\ tb/ ,
\�`qq,�\ \ \iyt,' \\ t ! \\� f\ \\``��'\`\ ° \ \\ °\ \\. °\ \ \ `• \\~- ____ -- ----- - - - - -- ---- _- __`-��._- r. rr r.''' 'r.�'r J�! /• / `' Ex. paper ---A >
\n \ \t \ 1'I\ \ \` \ \ ° ° ° \\ `\ \ `\ °\ \\ \ \\ - - -- ` /' r' l/i ! /�� box r \/
\ \ \ \\ 1 + \\ \y. 1/- ��\ ' \\ \ \ \\ \ \\ \\ \\ \ \ -_ - -- --- - - - - -- r/
-------------- --- -.._.. --- ,_._ --
�\ -_ - - - - - -- -- _ -_. - -- _ - \ \` r r ` r /r� O 1,
yy I ' t}I \ \ \`\ ' \\ \ \1\ y °\ \ __\ \ \\ \. "------ - - - --- -- - - - - -- ` \\ \_ ` - J� /i• rir ! �O
\\ \71 jt /?� II\ \ \\ \ \ \\\ _ _ - -_ - -_- --- _ -� 1 \--------
44 n Ili _....__._--- --'-'_ ! �...,,......._
\ \ \ 1 I II row \ \' \ \ \\;` \ \ \\ `\ °\ \ - - -- -- - _ - --
Ex. 48 x 48 \ \ � t + + it l' . jllI } 1 \ \> > \ \\\\ ! -- -_ - - - -_ _ _
concrete box culvert \ \ \r fi fill ; I' i' ` \`+ i _ '! /
inv in= 601.73 \\�\ f f {4 I It + '\ ',�\\ \`��i\ \ \\ ; `--- ______ __ _ -_ - -_ - - - -_- _ _____ •'J y/„ r
t
\\ \ I r \ 1 \\ / - - - - - -- - -- _ - - -- c-3 inv out = 599.7 \\ \/r),'1 I+ t ' , \\ ` \\ \`\` \ c ______ - 20 _ - _ - -----------
141i I' ! - - - - - -_
111 \ \\ \\ ! I_ - ` -�
t/ If
{ 1,
1 t \ \ - „r \\ \ \ —r s' �' ------
O l(y pj 1, i it I I \
1 1 °\ °\ • \�1 %rrri \ \ \ \\ - �-`-��
\
1\\il,l
CD
r
...4 R9 CJ
II i
I 1 + I
is
9/ 11 XV1 f ! t t I
%r'
lilly;t t!i t i l
I� �{
!!
i GRADE TO DRAIN. TOPSOILED,
1 % FERTILIZED, SEEDED & MULCHED
WHERE NOT IN NEW PAVEMENT.
/
qD
`-
z
N
Q
r
ry
Q
�
M
m
M
Q
Q
U
z
Cn
0
0
Z
Y
C>!
C7
W
in
'J
r
T.B R� /r� r''' 'f � '`� -`'' \� ri�'f rl' ,� rr 'r' 1 'f ' • r' ' rJ J J / !1 J' J l , ! ! ! I t� 1 I ' ! � \\ 11 r' ' �_
\ \ \� Ex. baseball field / rrr / / / / r/ rr / r ; .-'`�` r r % _rr %i rrrr' -�.1; r r ,r r•'' r r r r 1 ! J ! ! /! J / 11 'i ' ' ' !t t 1 ! l \�\ Ex. sign
�
\\ \ \�. / /i /r / /, / /./ rr / rr r / ,,. .. -' rr -- — "\ ~"_ � rO / ^\ ,' ' �• /' ' ' r' // /' l' !! 1 ! ! 1 1 /
/r
r`\`
' r / / I ! ! 1 / t
- \��r ,, /! ! /rvrr rr // r, / r r ,% rr r r r rr r , / / I I !1 I \ rr U!7
Q
\' ��\ \ \ \ \` \ / / / , / / r / ! / / r r ,,. / r r r r .•- -` .... r,; ..,, y'^" r r r / J J r r r r r r r J J J / J 1 / f I \ ,'` �., .
Q' �. \\ \ \\ \ / rrr / ! / / / .• / r r .. r .� �+ ,/ 1 /// rr � r r , , r / , r r r r r r r r / / / J 1 ! ! 1 J 1 J /
/ rrr / / r r r / r / , - /' / �, r . ri / / / r , r , , ,.,/ / r / / / r / ♦ / 1 1 1 t
Q
G r r r r"i
vern
VIA
rrrr /r rrr /// ♦ ♦ /
\ \ � ,. `' \ ��\ \ \ \` `-- -�'' -, G ��. _ -'" r rrrrrr / / rrrr // ._ / /• /r r ♦ //s / ,'/ ,,r ✓ f' J J J / / 1 1 ,c /�
69
°� \ \� -'" \mot \ •\ \ ` � \ \ \ \ + t ( � -_ .-"-, -' � f: rr'r �/ rr ; r /r r' // /' / r /' t J// / / r ! / / 1 ' l / ' !
s'° / scre ed
d Ex. /
EXISTING PAVEMENT TO BE REMOVED.
\, �`�.� y___ • \ \\ \ O \ \\ \\ �, \ \\ \\ \\ CY
_
._._. -� rrr rr / / r' ,r r / .. f, / ' > ! / / /
\ 1 _ r r r r r ! r / , 1 r limit /sign
� •� �(9 X
\ r/r/ • i ;
� / a \\ _.__-- - i-_- -'-- ____
/
_ /`/
°\ \ \ \ �."� \ \ \\ \ \ \ \ \\ \ \ \ \ tr'� \ \ \ \ \ \ •\ N _ - ._.._ -- - --------- _._.___......- \ /
\ \ \ \ \\ \ \ \ '- _------ - ^_.__.__
' ----------------- •.' r' r' 'r rrr'~ �'. / / / /
\ \ \ \ \d \ \ 4 \\ tb/ ,
\�`qq,�\ \ \iyt,' \\ t ! \\� f\ \\``��'\`\ ° \ \\ °\ \\. °\ \ \ `• \\~- ____ -- ----- - - - - -- ---- _- __`-��._- r. rr r.''' 'r.�'r J�! /• / `' Ex. paper ---A >
\n \ \t \ 1'I\ \ \` \ \ ° ° ° \\ `\ \ `\ °\ \\ \ \\ - - -- ` /' r' l/i ! /�� box r \/
\ \ \ \\ 1 + \\ \y. 1/- ��\ ' \\ \ \ \\ \ \\ \\ \\ \ \ -_ - -- --- - - - - -- r/
-------------- --- -.._.. --- ,_._ --
�\ -_ - - - - - -- -- _ -_. - -- _ - \ \` r r ` r /r� O 1,
yy I ' t}I \ \ \`\ ' \\ \ \1\ y °\ \ __\ \ \\ \. "------ - - - --- -- - - - - -- ` \\ \_ ` - J� /i• rir ! �O
\\ \71 jt /?� II\ \ \\ \ \ \\\ _ _ - -_ - -_- --- _ -� 1 \--------
44 n Ili _....__._--- --'-'_ ! �...,,......._
\ \ \ 1 I II row \ \' \ \ \\;` \ \ \\ `\ °\ \ - - -- -- - _ - --
Ex. 48 x 48 \ \ � t + + it l' . jllI } 1 \ \> > \ \\\\ ! -- -_ - - - -_ _ _
concrete box culvert \ \ \r fi fill ; I' i' ` \`+ i _ '! /
inv in= 601.73 \\�\ f f {4 I It + '\ ',�\\ \`��i\ \ \\ ; `--- ______ __ _ -_ - -_ - - - -_- _ _____ •'J y/„ r
t
\\ \ I r \ 1 \\ / - - - - - -- - -- _ - - -- c-3 inv out = 599.7 \\ \/r),'1 I+ t ' , \\ ` \\ \`\` \ c ______ - 20 _ - _ - -----------
141i I' ! - - - - - -_
111 \ \\ \\ ! I_ - ` -�
t/ If
{ 1,
1 t \ \ - „r \\ \ \ —r s' �' ------
O l(y pj 1, i it I I \
1 1 °\ °\ • \�1 %rrri \ \ \ \\ - �-`-��
\
1\\il,l
CD
r
...4 R9 CJ
II i
I 1 + I
is
9/ 11 XV1 f ! t t I
%r'
lilly;t t!i t i l
I� �{
!!
i GRADE TO DRAIN. TOPSOILED,
1 % FERTILIZED, SEEDED & MULCHED
WHERE NOT IN NEW PAVEMENT.
a
•
so
V
i
•
W
W
0
n
MEN-ank N
r
SHEET 2 of 4
/
qD
I
a
•
so
V
i
•
W
W
0
n
MEN-ank N
r
SHEET 2 of 4
t t
- - Existing soccer field ;
} 1 {
I /
CHAIN -LINK C'V' IN
rl
'' \�G \N i A
Uj
-_� `P T 8 +6.8 Sq'LTY o "'
IN CE t ° " ,o i +—�
6 11-1
r r D= 4075'19' J\ - O �C;
R= 100.00
N r e�s L = 70.28 \ '
T = 36.65 „® ss ® _ Y - -_
..". -' r '- --�- i' � -~-Ex. brick walk
,- ✓® •- '"- -... + ° -+.,, '\ ice'" �'}d`" "..- -..... - /
VF Z
ae
Q 4- {-
r
CHAIN-LINK ; o w Uj
!r 4k ,yos" - "____ \\ \ OPI `� , SAFETY ; z Q Q m m m
J r ' ' ' " r " "— •' csr \k �' ` \✓'\ - - - -- FEf�CE t 1 U Z t� C)
! /
& M 'y \h ' J/ r ' �k�'j�• .- -=- `� "=%` x— :1{a /�_ ems- k '�. \. t i \. \ O cn
CIP ,aj? , \ i \ \ \\ `\ \ U
\ \ p IN
! SILT NCE ,♦ x r -' - r ?o r s Sill L ENC, 1 \
OP' r r
Ex. light pole
CV t cj7 /® X
,r Existing tennis courts T - ,V
t!2 O
p U
4%, ! t t I \ •.Q . t I j { t B "Ex. sig n C) j'C �
� I QW a
/ r/ // ' / /�`, - "'X'F- ' I `"� t Ex, 6" PVC pipe ✓''a V1 ti
�- -�' -_J _ , /`� ,r /off' ,% l` i + i TOPGOfL ! ° 1 i !' `�i 1f inv out = 702.68 A
�P r � r,r /fl J I ; STO�KPILE� ' t t i� t W ® d°
rr' r' -' r/' JJ r -' j ' .• J r'� /�,`` J' j / i % r x � f! � ! 1 t/ 1 S i Z
®\ \ ITS ! r i �` \ \\ /—•1 <C t<nG Z
SF - x•i-- .,,, ,. X ,Lx l 1 U2 f+y p
w �•-�
xQG
-''It
' -LINK
TPr _ -
W Y Es. stone T s 2 m oRurn en t FENCE W
t
IN
-_-
Pond - -_- y tz >4 '
IN
- - — — — — — } ,�. CfS' a
-' - - - - - - - } } } \1 \jjyy } P E
NOTES. -� � r,.• " + +ae° /` r' /` ~1 ` \`\ — _ — — — } ,`}
k 7i 1. Refer to approved Road Plans for details on proposed "� - - °a- - -�� "„ �� SILT FENCE
improvements. Refer to approved Erosion and Sediment ��� I �, {� " ; rQ - / -�,��,
Control plans for details on erosion control measures. All sFrr'r \
ro osed im rovements and erosion control measures shown ' °' '' J 'rr - ~J \ , '
p p p _ - --
l s f •'
on these plans were provided by Brian P. Smith and are for °•" - -''_ y__ .� -''" _ � \\ \` --'\ `\ �,
p p -/ \ \ \
r } }
reference purposes only. r/ "a__ i ____ , ' r/ - " _ \\ \\ \ -`- \`` \`\ 'Ex. 6t� Psi' TP \`
- , r \ Cc Pipe
pp y _ ~, -' " I--'_ ' , '/ r' �" \ .�2 CM P' \\ \`\ \ \\ v ou`�= 69$e87 \,'\
2. A pump truck with non - potable water shall be located next - r ; ------------
-- - - -- ' r - -- - -- In r In`�656�12 \\
r r \ \ s \- ` \ \ \ \ -,-
11 \1 P} o
r , " _ \ Ex. X12 {�lastrr� pipe \ • • \ "` `} a
to the Vehicle Washdown Area (WDA) at all times. The fire �- ' /'-- -- --- - - \ ' \ t i
f invr\out�654.25\ , } IN } X , ,
------------
---- - - --'- r _ - /, / \ 12"\ IaiStIC ` ! e• `\ \\ \\ i\ `, } �',$ \ w
hydrant located near Station 26 +00 will be used to fill the \p P } `,
y -- Fs60-�� TS &� \ itv out =64.118 t ! } a } t \ \
Pump Truck as needed. Ex. 4
♦ " o . �' Ex. rl ,-ra r r / / !
plastic pipe _ - r 'r ' ^ iJ�' ! P, P' r i t r 1 ! t , X'
3. Refer to Below Grade Spill Containment Detail on C -503. inv. out =660.5 ®.° �, ; l; \
CONNECT TO NEW DITCH r / '�-'�/ i
which shall be installed at the Vehicle Fueling Station (VFS). sil_ r r / J 'a ^,�' ! ; I a
?00"3`
Jrsr7? �,� pO \ /
CHANGE GRADING ON fir± r - — ' - _ 89i 6��_ �! r/ F 1 r ° // JJ / r` / r/ // t! t i J
/ / r s,r/ i�'rj r' , r' � .•- r r ., .\ _-' e'`"/ rJ r/ ` r / % r' Ilr ! ! 11 r � � t r \\ CHAIN -LINK rf
CUT SLOPE FROM ,/, err rrr r - - - _ / \ ® 1 / /4 ai / / r / / / 1 / r A r \ SAFETY
1.5/1 TO 2/1. 'r :'� °r . / _ \ r x —rR' } r J/F ®r r J ®- t -- ,. /J J / 1 }. r rrJ', ®'� / r FENCE
fir/ /r % .-- r
SFJ ,/ O
" $�J —` . LPj J `j + ®/ 0 ♦ J I / 1 as r/ 8 1 O /
,, / .�'- \ �\ , , �p , ✓, �.- ' ® �J r r r ,,� r 1 rJ r / e STAGING /PARKING AREfi�
Ex. baseball field < , \ n-
r r - _ = i r /OS 1 ! r i ! I /
\ rrr r r o r r 01 r ®y I ! r lI J ♦ ON STONE BASE r�
rrr o`,rr ` �/' � r r , r ` ' ~\ /' r r / / / i � t / r k! r ( 1 r / , , � r
CONTRACTOR TO CONSTRUCT A ,/ r r r r r f f r rD / - r r 1 / ®° �- e / i ' // rf ji i ' ♦ } Ex. sign r,' r 0
PERMANENT DIVERSION DITCH _ / / " r i l
<' W
ABOVE THE 1.5 1 SLOPES. r e - r m
\ \\ / r / /, / r '� ♦ .- r r tf„r% r /�jF � 1 100 r'�l r { 1®
r r r.- / ,r r r r �/ 35 , r 1 R =! l r t
THE GRADING FOR THE TRAVELWAY r/: �;�, "Q� T r r �- ,� r 6 J r ,rte , ' /` ,/ j 19 .as ;' pl' 1 "�� ; o
FROM STA 11+50 TO STA 17 +00 1.5/1 SLOPE .-�
., ' �:\` � Pr rrrir,,�7y,'�'',r / rrr' r,. 'rrr .✓' r � J / // ,� , — _ ..
v' � r ♦ I O I J ,,
s, CANNOT BEGIN UNTIL THE CULVERT IS r / r r rrr %,r � ♦ / / , r r r , , , ' , k ® , •.r. "\✓' . ' ,- ,-1 J { ' i >k , • •. ' / '' ♦ e ,r�' — :r � r— Q ♦ �t p INSTALLED AND SEDIMENT TRAP 1 15 GRADED. _a-
c em-we'n '
•t
r< ~
n r r r s.r r J ' r \ r .1Y r P. j r r rr J r J J, iii
STA 10 +00 TO STA 17 +00 x a @B/M r r r - J r °° // r - J J / LV � r r♦ / S A / i i4j J✓ r / / r / �w
-2 SOIL STABILIZATION G R° •ygy0j2 . __ -- ,.- -,,, -^ " . / / ,/i //o / /r I ♦ y,5\• ti r / USE EC O
o MATTING FROM THE ROAD
✓
♦
Z
rrr _ r ♦ '�. ' /
r r' ♦ r r rrr/ / / & MU o, a . , / / / r a` \ <�,. / --'rr
\a \ 1 t ! j s " ~ r r' r rr r' �h rr r ' r` rr t t P I / r, ✓ R. ; r r/ J/ r ® \ / r ♦, rr"_ - 694 _ _
- • \ \ \ 1 } ! 1 SHOULDER TO THE LIMITS OF �- _ � r r �P�;' r r rrr' rJ ®� ,%D ® r J ' r ' r e e" / T _ � r -• ♦
�;;; \ \ \•o`\ \ } \��e \t DISTURBANCE Q EVERY 100 LF - r / �� ` f�\�'r ~ ® / r r , p , Op N
.'•. \ \ \ r� \ \ -_ ' r / ' ` ♦, ' -.7.- r ,, ' r ! j i °I / /r � hwI .° , r' � r / j Tf"° -- ' ♦® ® 1 .r--' ♦ /
� - - -- \ �♦ \\ ®` \` ., \\ \ \\` O ': / / / ' `� r\r r r ' r ''�i !1i !l' ®, ®' ' rJ J/ / r 1 / r ~ 7 ` r/' °j� a °®
\ \ \ \\ \ GF- CHANGE GRADING CD _ — �� r / o �. / _, // ® / e J J r r r l r r, i 1 J
-00 ` \ \ ` \ \ \ \ \` \`` \ \ \ \i� �� - ON CUT SLOPE _ /,,,i•' r' // D(} ' ' f r'J 6D -r - / a 7•- le f• I �J
\ \ \ ..,,` ♦_� _ - 7 I r r r �/ ' /r // �I ,i j J /' r ' ! TP / r / / ® ♦
\ ` FROM 2/1 TO 1.5/1. :� _ ♦ J� r rrr• ; // e \\ / ® J J r , / / r r r (�
V\V\ \ `\ \ \ ® . - ® r iii' ® ® .' J / cbd / / / ` �� t/ ♦ / I
IN,
\,\ \ , \ y,�' \ . \ \ \ ,\ TP
\ \\ \ \ \ `,1\ ' t y \ \ � e ` g O ,
,} }t' \\ t \ ...'"\ \ \e ` \ \ \� \` ` \ \ `` _ �"." °8,, »••" _ r x °r r r ' r' ' f Qrr rjr v e r 'r 11 t1 / 'r O' / `® r
\ \ \ \\ } \ \\ ! \` - \. \ � - -- - � . .•- r � / 1 , SILT r r
IN I /� / s FENCE
\ \ \ \ \\}
PHASE
•r
CE � ,} i 1 i;ji / i r \`\ \ ` _ v - -- - -- _ - - -_ '• / ..-"' .. �;i''"`�.,.•' '� ,r%; /r��J/
e: \\ \ t i i i li It ,\� , , \ \\ a o __._ 2 .•, -- -- ... _ — — \, ~,ig \ ✓.� _ /' -.- .- -^�"' / ._ —' / %'- i�r
Ex. 48 x 48 \ \ \ I t ! i it } _ _ "- -- _ -`� c _
concrete bo I '' a-a - -o- _ WA \ , \ � , _ `.. -- _ ` y- .'- '- �`� ,♦ SF r�J','',.�rr THIS DIVERSION MUST REMAIN IN PLACE
T` \ ` I I Ili ¢o a o a Note 2 1 _ _4 -T " ~s �_� =•:x -r - ' :' rJ J,rf DIRECTING RUNOFF TO TRAP 2 UNTIL
\ • \ ! ! ! oaa a _ _ _` •:. c ___ \`�r�/ j Jr
y
Inv In \a� \ IIIa a a 1 \\ _ - - __ _
_ _ `- ---- �'� `- --__ � /r'' /` % r r / -r THE CONTRACTOR IS READY TO APPLY
inv out =5 OF ----------- - -TM x. <_'® M rrr ri
r " - �,� ,� - -:- - - -- S, U ,' ;, ASPHALT PAVING TO THE TRAVELWAY
l
PHASE 2 ` ` \ \ ' '- ��� —~ = ==` '` _ �� " i 'r - -, / AS AN ALTERNATIVE, A TEMPORARY
\,\`- „l,j; gr i l SF `\ _ ~``� _ __= .�' -'� 2�1, SLOPE %' -_ -�' CULVERT CAN BE USED.
+ty lrlt _ 1 I I 1 `
\-
O �. ..r.
GO 94 O yM _� ! 1! \ '} } F� l it i r � D
\\ \ 1 L I ( rV \ ll
”' \
--
,
N
T
! / • / ,e
Ex. paper---,t f'
♦
box
r
r' f
a0Q l
1
r
/
r ,
/
' r r
w`" rr rr r J
t
J '
r ,
o m M m N
CWA
CONCRETE WASHDOWN AREA
PT
PORTABLE TOILET
SCK
SPILL CONTAINMENT KIT
VWA
VEHICLE WASHDOWN AREA
VFS
VEHICLE FUELING STATION
WDA
WASTE DISPOSAL AREA
W
W
W
w
Q
WEB°'
�
�
►►tea
�
W
r
Qf
a-
cn
SHEET
NO.
C — 5
SHEET 3 of
4
i t
4VAC50 -60 -54 of the Virginia Stormwater Management Program (VSMP) Permit
Regulations requires that Stormwater Pollution Prevention Plan (SWPPP) be developed
for all regulated land disturbing activities. The SWPPP must include, but not be limited
to, an approved erosion and sediment control plan, an approved stormwater
management plan, and this Pollution Prevention Plan (PPP) for regulated land
disturbing activities, and a description of any additional control measures necessary to
address a TMDL as applicable.
The plan for implementing pollution prevention measures during construction activities
developed on this sheet must be implemented and updated as necessary. Any PPP
requirements not included on this sheet must be incorporated into the SWPPP required
by 4VAC50 -60 -54 that must be developed before land disturbance commences. This
PPP identifies potential sources of pollutants that may reasonable be expected to affect
the quality stormwater discharges from the construction site (both on- and off -site
activities) and describes control measures that will be used to minimize pollutants in
stormwater discharges from the construction site.
OTHER REFERENCED PLANS
SWPPP requirements may be fulfilled by incorporating, by reference, other plans. All
plans incorporated by reference become enforceable under the VSMP Permit
Regulations and General Permit VAR10 for Discharges of Stormwater from
Construction Activities. If a plan incorporated by reference does not contain all of the
required elements of the PPP, the operator must develop the missing elements and
include them in the SWPPP.
Independent Plans
Incorporated by Reference
Date
Approved
Stormwater Management Plans (Regional or Master)
Water Source
Spill Prevention, Control, and Countermeasure Plans
Dedicated Area(s)
Off -Site Stockpile
Location
Off -Site Borrow Area
Approved
Sheet #(s)
REVISIONS TO LOCATIONS
Wheel Wash
VWA
POTENTIAL POLLUTANT SOURCES
The following sources of potential pollutants must be addressed in the Pollution
Prevention Plan. Various controls and /or measures designed to prevent and /or
minimize pollutants in stormwater discharges from the project site must be applied to
the sources found on the site. Additional information concerning the following controls
and /or measures may be found in the SWPPP. Deviations from the location criteria
may be approved by the Albemarle County Inspector.
LEAKS, SPILLS, AND OTHER RELEASES
✓ The operator(s) shall ensure procedures are in place to prevent and respond to all
leaks, spills and other releases of pollutants.
✓ The operator(s) shall ensure all leaks, spills and other releases of pollutant are
contained and cleaned immediately upon discovery. Any contaminated materials
are to be disposed in accordance with federal, state, and /or local requirements.
✓ The operator(s) shall ensure spill containment kits containing appropriate materials
(e.g., absorbent material and pads, brooms, gloves, sand, etc.) are available at
appropriate locations, including, but not limited to: designated areas for vehicle and
equipment maintenance, vehicle and equipment fueling; storage and disposal of
construction materials, products, and waste; and storage and disposal of hazardous
and toxic materials; and sanitary waste facilities.
✓ The locations of the spill containment kits are identified as described below:
Shown on
Date Plan Sheet Location
#s
Approved C-502 SCK - Near Sediment Trap #2
Plan
REVISIONS TO LOCATIONS
Shown on Operator(s)
Date Plan Sheet Location Initials
#(s)
✓ The operator(s) shall notify the Department of Environmental Quality of leaks, spills,
and other releases that discharge to or have the potential to discharge to surface
waters immediately upon discovery of the discharge but in no case later than 24
after the discovery.
✓ The operator(s) shall notify the Department of Environmental Quality (DEQ) of leaks,
spills, and other releases that discharge to or have the potential to discharge to
surface waters immediately upon discovery of the discharge but in no case later than
24 after the discovery. Written notice of the discharge must be sent to DEQ and
Henrico County Department of Public Works within five (5) days of the discovery.
Virginia Department of Environmental Albemarle County
Quality Community Development
NEED ADDRESS Engineering Department
(804) 786 -3998 (phone) 401 McIntire Road
(804) 786 -1798 (fax) Charlottesville, VA 22901
(800) 468 -8892 (outside normal working (434) 296 -5832
hours)
EQUIPMENT / VEHICLE WASHING
✓ Washing must be conducted in a dedicated area that is located to maximize the
distance from storm drain inlets, ditches, waterbodies or wetlands but no less than
50 feet from those features.
• All wash water used in vehicle wheel washing must be directed to a sediment
basin /trap.
• All vehicle washing activities other than wheel washing must have secondary
containment.
• Each facility must have appropriate signage to inform users where the dedicated
area(s) are located.
✓ Conduct regular maintenance in a dedicated area that is located to maximize the
distance from storm drain inlets, ditches, waterbodies or wetlands but no less than
50 feet from those features.
✓ If fueling is conducted at a dedicated area, the location must be located to
maximize the distance from storm drain inlets, ditches, waterbodies or wetlands but
no less than 50 feet from those features.
✓ The dedicated areas must be designed to eliminate the discharge of spilled and
leaked fuels and chemicals from vehicle fueling and maintenance activities by
providing secondary containment (spill berms, decks, spill containment pallets,
providing cover where appropriate, and having spill kits readily available).
✓ Each facility must have appropriate signage to inform users where the dedicated
area(s) are located.
Shown on
Date Plan Location of Dedicated Area(s)
Sheet #(s)
Approved C -502 VFS — Near Sediment Trap #2
Plan
REVISIONS TO LOCATIONS
Shown on Operator's
Date Plan Location of Dedicated Area(s) Initials
Sheet #(s)
✓ If mobile fueling will be used, the fueling must be done in an area that located to
maximize the distance from storm drain inlets, ditches, waterbodies or wetlands but
no less than 50 feet from those features.
✓ Spill kits must be readily available at all mobile fueling locations.
✓ On -site storage tanks must have a means of secondary containment (spill berms,
decks, spill containment pallets, etc.) and must be covered where appropriate.
✓ All vehicles on site must be monitored for leaks and receive regular preventive
maintenance to reduce the chance of leakage.
a� ice► ►
OF CONSTRUCTION PRODUCTS, MATERIALS, AND WASTE
✓ Storage of construction products, materials, and waste is to be conducted in
dedicated areas.
✓ The dedicated area must be located to maximize the distance from storm drain
inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features.
Separations of less than 50 feet may be approved by the Environmental Inspector.
✓ The dedicated areas must be designed to minimize the discharge of pollutants from
storage, handling, and disposal of construction products, materials and wastes
including (i) building products such as asphalt sealants, copper flashing, roofing
materials, adhesives, concrete admixtures; (ii) pesticides, herbicides, insecticides,
fertilizers, and landscape materials; and (iii) construction and domestic wastes such
as packaging materials, scrap construction materials, masonry products, timber,
pipe and electrical cuttings, plastics, Styrofoam, concrete and other trash or building
products..
✓ Each facility must have appropriate signage to inform users where the dedicated
area(s) are located.
Location of
Shown on
Water Source
Activity
Dedicated Area(s)
Plan
Location
�
Approved
Sheet #(s)
REVISIONS TO LOCATIONS
Wheel Wash
VWA
C -502
Pump truck stationed next to VWA
Other Wash
Shown on
c ations of Dedicated Areas for stoma e
D erator s
Areas
Plan Sheee t
of construction products and materials
Fo
Initials
REVISIONS TO LOCATIONS
clo rn
Location of
Shown on
Water Source
Operator's
Activity
Dedicated Area(s)
Plan
Sheet #(s)
Location
Initials
✓ Conduct regular maintenance in a dedicated area that is located to maximize the
distance from storm drain inlets, ditches, waterbodies or wetlands but no less than
50 feet from those features.
✓ If fueling is conducted at a dedicated area, the location must be located to
maximize the distance from storm drain inlets, ditches, waterbodies or wetlands but
no less than 50 feet from those features.
✓ The dedicated areas must be designed to eliminate the discharge of spilled and
leaked fuels and chemicals from vehicle fueling and maintenance activities by
providing secondary containment (spill berms, decks, spill containment pallets,
providing cover where appropriate, and having spill kits readily available).
✓ Each facility must have appropriate signage to inform users where the dedicated
area(s) are located.
Shown on
Date Plan Location of Dedicated Area(s)
Sheet #(s)
Approved C -502 VFS — Near Sediment Trap #2
Plan
REVISIONS TO LOCATIONS
Shown on Operator's
Date Plan Location of Dedicated Area(s) Initials
Sheet #(s)
✓ If mobile fueling will be used, the fueling must be done in an area that located to
maximize the distance from storm drain inlets, ditches, waterbodies or wetlands but
no less than 50 feet from those features.
✓ Spill kits must be readily available at all mobile fueling locations.
✓ On -site storage tanks must have a means of secondary containment (spill berms,
decks, spill containment pallets, etc.) and must be covered where appropriate.
✓ All vehicles on site must be monitored for leaks and receive regular preventive
maintenance to reduce the chance of leakage.
a� ice► ►
OF CONSTRUCTION PRODUCTS, MATERIALS, AND WASTE
✓ Storage of construction products, materials, and waste is to be conducted in
dedicated areas.
✓ The dedicated area must be located to maximize the distance from storm drain
inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features.
Separations of less than 50 feet may be approved by the Environmental Inspector.
✓ The dedicated areas must be designed to minimize the discharge of pollutants from
storage, handling, and disposal of construction products, materials and wastes
including (i) building products such as asphalt sealants, copper flashing, roofing
materials, adhesives, concrete admixtures; (ii) pesticides, herbicides, insecticides,
fertilizers, and landscape materials; and (iii) construction and domestic wastes such
as packaging materials, scrap construction materials, masonry products, timber,
pipe and electrical cuttings, plastics, Styrofoam, concrete and other trash or building
products..
✓ Each facility must have appropriate signage to inform users where the dedicated
area(s) are located.
Date
Shown on
Location(s) of Dedicated A rea(s) for storage of construction
Date
Plan Sheet
products and materials
Plan
Z
�
Approved
REVISIONS TO LOCATIONS
Plan
Shown on
Location(s) of Dedicated Area(s) for waste Operator(s)
REVISIONS TO LOCATIONS
Plan Sheet
Shown on
c ations of Dedicated Areas for stoma e
D erator s
Date
Plan Sheee t
of construction products and materials
Fo
Initials
#(s)
clo rn
Date
Shown on
Plan Sheet
#s
Location(s) of Dedicated Areas) for waste from
construction products and materials
Approved
C -502
WDA —Near staging area
Plan
Z
�
REVISIONS TO LOCATIONS
Shown on
Location(s) of Dedicated Area(s) for waste Operator(s)
Date
Plan Sheet
from construction products and materials Initials
I
#(s)
0
✓ Follow all federal, state, and local requirements that apply to the use, handling and
disposal of pesticides, herbicides, and fertilizers.
✓ Keep chemicals on -site in small quantities and in closed, well marked containers.
✓ Clean up solid waste, including building materials, garbage, and debris on a daily
basis and deposit into covered dumpsters that are periodically emptied.
✓ Schedule waste collection to prevent exceeding the capacity of onsite containers.
Additional containers may be necessary depending on the phase of construction
(e.g., demolition, etc.)
✓ Dispose of all solid waste at an authorized disposal site.
✓ Ensure that containers have lids or are otherwise protected from exposure to
precipitation.
DISCHARGES FROM OTHER POTENTIAL POLLUTANT
SOURCES
✓ Discharges from other pollutant sources (e.g., water line flushing, storm sewer
flushing, above ground storage tanks, etc.) not mentioned elsewhere must be
addressed.
Other Potential Pollutant Sources Locations of Potential Pollutant Sources
✓ Above ground oil storage tanks with a storage capacity exceeding 1,320 gallons and
have a reasonable expectation of a discharge into or upon Waters of the United
States are required to have a Spill Prevention Control and Countermeasure (SPCC)
Plan.
✓ The discharge of contaminated flush water and material removed during flushing
operations must be collected and disposed of in accordance with appropriate
federal, state, and local requirements.
BELOW GRADE SPILL CONTAINMENT DETAIL.
00 C'� CO O 0
0 0
0 WMIK 1 10' MiN. 0
t A n
Seamless HPDE
Membrane (6mil)
6° High diversion berm
on downhill side.
00 0 0 0 00
PLAN VIEW
Seamless HPDE Sandba
andba Membrane (6mil)
18'
MIN.
F
3' MIN.
18"
MIN.
f --- 10' MIN.
SECTION A
r • • �.
1
✓ Concrete trucks are not allowed to wash out or discharge surplus concrete or drum
wash water on site except in a dedicated area(s) that is located to prevent
discharge to storm drain inlets, ditches, waterbodies or wetlands but no less than 50
feet from those features.
✓ Each facility must have a stabilized access to prevent mud tracking into the street.
✓ Each facility must have appropriate signage to inform users where the dedicated
area(s) are located.
Shown on
Date Plan Location of Dedicated Area(s)
Sheet #(s)
Approved C -502 CVIIA -Near Sediment Trap #2
Plan
REVISIONS TO LOCATIONS
Shown on Operator's
Date Plan Location of Dedicated Areas) Initials
Sheet #(s)
✓ Facilities must be cleaned, or new facilities constructed, once the washout area is
two- thirds (2/3) full.
✓ The facility must be lined with 10 mil plastic lining that is free from holes, tears, or
other defects that might compromise the material's impermeability.
✓ The lining must be anchored with staples (2' spacing) or sandbags.
✓ Side slopes must be 1:1 (horizontal:vertical) or flatter.
✓ Stone access must be provided between the street and the concrete washout area.
✓ A "Concrete Washout" sign must be installed within 30 feet of the washout facility.
The sign must be no smaller than 2' tall by 4' wide.
• �:: # ►
it
WASH WATER FROM CONSTRUCTION ACTIVITIES SUCH AS
CLEANUP OF STUCCO, PAINT, FORM RELEASE OILS, AND
CURING COMPOUNDS
✓ Washing activities associated with construction activities other than vehicle and
equipment washing, such as clean up of stucco, paint, form release oils, and curing
compounds are to be conducted in a dedicated area.
✓ The dedicated area must be located to maximize the distance from storm drain
inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features.
Separations of less than 50 feet may be approved by the Environmental Inspector.
✓ The dedicated areas must be designed to prevent the discharge of soaps,
detergents, solvents, and wash water.
Shown on
Date Plan Location(s) of Dedicated Area(s)
Sheet #(s)
Approved _ - - -- -
Plan
REVISIONS TO LOCATIONS
Shown on Operator(s)
Date Plan Location(s) of Dedicated Area(s) Initials
Sheet #(s)
✓ The dedicated area must be covered (e.g., plastic sheeting, temporary roof, etc.) to
prevent contact with stormwater.
✓ The contaminated wastewater from the dedicated area must be collected for
disposal by a waste hauler or discharged to the sanitary sewer.
✓ In situations where these pollutants are or could be generated at locations other than
at the designated area (e.g., concrete pours, building washing, etc.), cover (e.g.,
plastic sheeting, temporary roof, etc.) must be provided to prevent contact with
stormwater and the contaminated wastewater from the activity must be collected for
disposal by a waste hauler or discharged to the sanitary sewer.
DISCHARGES OF HAZARDOUS, TOXIC,
AND SANITARY WASTE
✓ Storage and disposal of hazardous, toxic and sanitary wastes are to be conducted in
dedicated areas.
✓ The dedicated areas must be located to maximize the distance from storm drain
inlets, ditches, waterbodies or wetlands but no less than 50 feet from those features.
Separations of less than 50 feet may be approved by the Environmental Inspector.
✓ The dedicated areas must be designed to prevent the discharge of hazardous, toxic
and sanitary waste by avoiding contact with precipitation
✓ Each facility must have appropriate signage to inform users where the dedicated
area(s) are located.
Shown on
Date Plan Location(s) of Dedicated Area(s) for storage and disposal of
Sheet #(s) hazardous and toxic wastes
Approved
Plan
REVISIONS TO LOCATIONS
Shown on Location(s) of Dedicated Area(s) for storage Operator(s)
Date Plan
Sheet #(s) and disposal of hazardous and toxic wastes Initials
✓ Consult with local waste management authorities or private firms about the
requirements for disposing of hazardous materials and /or soils that may be
contaminated with hazardous materials.
✓ Never remove the original product label from the container. Follow the
manufacturer's recommended method of disposal.
✓ Schedule periodic pumping of portable toilets and dispose of waste
✓ Dispose of all solid waste at an authorized disposal site.
The operator(s) shall ensure the SWPPP is modified and /or revised to reflect:
✓ Changes in qualified personnel; delegated authorities or other personnel required as
a condition of the General Construction Permit;
✓ Changes in site conditions;
✓ Changes in the design, construction, operation, or maintenance of the construction
site that affect the potential for discharges of pollutants that are not addressed in the
normal implementation of the plan; and
✓ Ineffective control measures identified during inspections or investigations
conducted by the operator's qualified personnel or local, state or federal officials.
Modifications /revisions to the SWPPP shall include additional or modified control
measures to address the identified deficiencies.
If the necessary modifications /revisions require approval by the Administrator or DEQ,
the modifications /revisions must be implemented no later than seven (7) calendar days
following approval.
If the necessary modifications /revisions do not require approval by the Administrator,
the modifications /revisions must be implemented prior to the next anticipated storm
event or as soon as practicable.
The operator(s) shall update the SWPPP to include:
✓ A record of dates when 1) major grading activities occur, 2) construction activities
temporarily or permanently cease on a portion of the site, and 3) stabilization
measures are initiated;
✓ Documentation of modifications and revisions to the SWPPP;
✓ Areas that have reached final stabilization where no further SWPPP or inspection
requirements apply;
✓ All properties that are no longer under the legal control of the operator and the dates
on which the operator no longer had legal control over each property; and
✓ The date, volume, and corrective /preventative actions implemented for any
prohibited discharge.
The operator(s) shall update the SWPPP no later than seven (7) days following any of
the situations identified above.
OPERATOR INSPECTIONS
The operator(s) identified below shall provide for inspections of the permitted land -
disturbing activities by the qualified personnel identified below. The inspections will be
conducted (select one the following options).
Where areas are in a stabilized condition or runoff is unlikely due to winter conditions,
the inspection frequency may be reduced to once every 30 days while these conditions
exist. Otherwise, the operator(s) shall resume the regular inspection frequency
identified above.
The operator(s) shall provide for inspections of the permitted land- disturbing activity to
ensure implementation and continued maintenance of all requirements of the
Stormwater Pollution Prevention Plan (Erosion and Sediment Control Plan, Stormwater
Management Plan, Pollution Prevention Plan, TMDL requirements, etc.).
Records of the required inspections must be maintained and included in the SWPPP
binder. The qualified personnel are encouraged to use the Operator Inspection form
provided in the SWPPP binder to document the required inspections. If inspections are
conducted once every five (5) business days and no later than 48 hours following any
measureable storm event, the location of the rain gauge used to determine the amount
of rain must be included in the SWPPP and documented in the inspection report.
• p
I certify under penalty of law that the qualified personnel identified below:
a. has been designated by the Operator to conduct inspections of the
permitted site;
b. is knowledgeable in the principles and practices of erosion and
sediment control and stormwater management;
C, possesses the skills to assess conditions at the permitted site for the
Operator(s) that could impact stormwater quality and quantity;
d. will assess the effectiveness of any erosion and sediment control
measures or stormwater management facilities selected to control the
stormwater discharges from the permitted site; and
e. will conduct inspections in accordance with the frequency noted above
in the OPERATOR INSPECTIONS section of this sheet.
QUALIFIED PERSONNEL
Name (print)
Phone
Additional information is located in Tab 6 of the SWPPP Binder.
As the Operator(s) or Delegated Authority, I /we understand that prior to initiating land
disturbance, the potential pollutant sources, appropriate control measures, and all
responsible parties (operator, qualified inspection personnel, contractors, etc.) required
as a condition of the General Construction Permit (GCP) and the Stormwater Pollution
Prevention Plan (SWPPP) must be identified. I also understand this information must
be updated as necessary throughout all phases of construction until the GCP is
terminated.
Furthermore,
I /we certify under penalty of law that I /we have read and understand all requirements of
the SWPPP (erosion and sediment control plan, stormwater management plan, pollution
prevention plan, TMDL provisions, administrative requirements, etc.) and GCP and that
the information herein is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false
information, including the possibility of fine or imprisonment for knowing violations.
I /we understand that I /we are ultimately responsible for compliance with all conditions
and requirements of the SWPPP and GCP and for ensuring all contractors and
subcontractors on the permitted site are aware of the conditions and requirements of
the SWPPP and GCP.
i /we shall comply with all conditions and requirements of the SWPPP and shall at all
times properly operate and maintain all measures and control (and related
appurtenances) which are installed or used to achieve compliance with the conditions of
the GCP. Proper opration and maintenance also includes adequate funding and
adequate staffing.
I /we shall take all reasonable steps to minimize or prevent any discharge in violation of
the SWPPP and /or GCP.
I /we understand that if it determined by the Department of Environmental Quality (DEQ)
in consultation with the State Water Control Board at any time that stormwater
discharges are causing, have reasonable potential to cause, or contribute to and
excursion above any applicable water quality standard, the DEQ may, in consultation
with the Administrator, take appropriate enforcement action and require:
a. Modification of control measures to adequately address water quality
concerns;
b. Submission of valid and verifiable data and information that are
representative of ambient conditions and indicate that the receiving water is
attaining water quality standards; or
C. Cessation of discharges of pollutants from construction activity and submit an
individual permit application according to 4VAC25- 870 -410.
OPERATOR(S) /DELEGATED AUTHORITY
Name (print) Signature Date
additional contact intormation can be touna in the -�:iWi- t-t- binaer.
z
0
0-
it
0
Cn
w
0
IN
J N
_J
<
~ °
r
Z
�
z
0
0-
it
0
Cn
w
0
IN
Ctl
Q
n
I�E-�
i.4
0®
0
Uacc�
-:11 7 ooj
clo rn
eh
rr
`.J
=® W
�
Cn
Qom' d,
W
E4
-
Q
ry
Of
NW
W
►-�
W
o
Q
Q
m
m
m
0
Z
°
°
M
cn
w
w
0
0
0
®
r y
CD
0
V)
Li
o
v
z
0
0-
it
0
Cn
w
0
IN
Ctl
Q
n
I�E-�
i.4
0®
>_4
Uacc�
-:11 7 ooj
clo rn
eh
rr
`.J
=® W
�
Qom' d,
W
E4
W
z
0
0-
it
0
Cn
w
0
IN
SHEET NO.
2
U-5(j
Q
a
�
�
C)
C
W
�
E4
NW
W
►-�
W
a
w
�
�D
w
w
t_4
1._4
C)
0
®
�w`r
0
V)
SHEET NO.
2
U-5(j