CONTACT INFORMATION
REFERENCES
+BOUNDARY & TOPOGRAPHIC /ALTA SURVEY:
ALTA /ACSM LAND TITLE SURVEY OF THE PROPERTY OF BRASS, INC "
PREPARED BY KIRK HUGHES AND ASSOCIATES
PROJECT NUMBER. 97 -159
DATED MARCH 3, 1998
(REVISED JULY 8, 2003)
+GEOTECI-(NIC'AL REPORT:
REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ANALYSIS."
PREPARED BY ECS MID - ATLANTIC, LLC
PROJECT NUMBER: 28 .1552
DATED: MARCH 29. 20 ,3
*ZONING APPLICATION PLAN AMENDMENT:
"ZMA #2009 -001 ZONING APPLICATION PLAN AMENDMENT FOR 5TH STREET -AVON CENTER"
PREPARED BY BOHLER ENGINEERING
PROJECT NUMBER: V122001
DATED: MARCH 5, 2012
(REVISED,AUGUST 31, 2012)
+FLOODPLAIN SPECIAL USE PERMIT:
"SPECIAL USE PERMIT - FLOODPLAIN FILL EXHIBIT"
PREPARED BY: BOHLER ENGINEERING
PROJECT NUMBER: V122001
DATED: SEPTEMBER 21, 2012
(REVISED DECEMBER 14, 2012)
+CRITICAL SLOPES SPECIAL EXCEPTION:
CRITICAL SLOPES EXHIBIT"
PREPARED BY: BOHLER ENGINEERING
PROJECT NUMBER. V122001
DATED MARCH 5 2012
*WATER PROTECTION ORDINANCE:
MINOR GRADING PLAN FOR STREAM ACCESS AT AVON LANDFILL"
PREPARED BY: BOHLER ENGINEERING
PROJECT NUMBER: V122001
DATED. DECEMBER 19, 2013
(REVISED APRIL 10, 2013)
*WATER PROTECTION ORDINANCE:
WATER PROTECTION ORDINANCE PHASE FOR 5TH STREET STATION"
PREPARED BY: BOHLER ENGINEERING
PROJECT NUMBER V122001
DATED: NOVEMBER 26, 2013
+ROAD IMPROVEMENT PLAN:
ROAD IMPROVEMENT PLAN FOR BENT CREEK PARKWAY"
PREPARED BY BOHLER ENGINEERING
PROJECT NUMBER. V122001
DATED: NOVEMBER 26, 2013 (REVISED 10/01/14)
*FINAL SITE PLAN:
FINAL SITE PLAN FOR 5TH STREET STATION - WEGMANS"
PREPARED BY: BOHLER ENGINEERING
PROJECT NUMBER: V122001
DATED. DECEMBER 13, 2013 (REVISED 10101/'14)
GOVERNING AGENCIES
+ COUNTY OF ALBEMARLE DEPARTMENT OF COMMUNITY DEVELOPMENT
401 McIN LIRE ROAD
CHARLOTTESVILLE. VA 22902
TEL (434) 296 -5832
FAX: (434) 97214126
UTILITIES
+ ALBEMARLE COUNTY SERVICE AUTHORITY
168 SPOTNAP ROAD
CHARLOTTESVILLE, VA 22911
TEL. (434) 97714511
GEtJERAL NOTE
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT
WORK SCOPE PRIOR -O THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITS THE DOCUMENTS RELATIVE TO
THE SPECIFICATIONS OR APPLICABLE CODES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD !N
WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CON STI TUTE
ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN
�® FULL CONFORPflAN L WITH L fAL REGULATIONS APJD ODES.
076M 1
+APPLICANT:
AVON HOLDINGS, LLC
#76Ml-00-00-002B0
513 SOUTHWEST BROAD STREET
WILMINGTON, DE 19801
#76M 1
-
5TH ST STATION VENTURES, LLC
CONTACT: DANIEL S TUCKER
07700-00-00-011
FAIRBURN, GA 30213
t �
mAik WL
mmumigmi 904�00_Ml
LOCATION MAII
COPYRIGHT ADC THE MAP PEOPLE
PERMIT USE NO. 20602153 -5
SCALE V =2000'
+OWNERS:
+APPLICANT:
AVON HOLDINGS, LLC
57H ST STATION VENTURES, LLC
1209 NORTH ORANGE STREET
513 SOUTHWEST BROAD STREET
WILMINGTON, DE 19801
FAIRBURN, GA 30213
(770)692 -8300
5TH ST STATION VENTURES, LLC
CONTACT: DANIEL S TUCKER
5B SOUTHWEST BROAD STREET
FAIRBURN, GA 30213
(770)692 -8300
COMMENTS
CONTACT DANIELS. TUCKER
2
PREPARED
BY
:9
lywwro
by �4it :'"�:If3 9 t i I'a=, IaOLI� °)''
Coo ;i?:�;nitw »~)S;V','IJi� IIICt'la Dcpadwri61n'
File
THE FOLLOWING STATES REQUIRE NOTIFICATION BY
.EXCAVATORS. DESIGNERS. OR ANY PERSON PREPARING TO
DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE.
(IN VIRGINIA, MARYLAND. AND DELAWARE 81'1)
(WV 1 -800- 245- 4848) (PA 1- 800 - 242 -1776)
�(VA 1 -800- 552 -7001) (MD 1 -800- 257 -7777) (DE 1- 800 -282 -8555)
PROJECT:
PITASE 11 AND
S WM/BMP DESIGN
1I'IL,LD MOIL IZ'I'C A I ON SIT
I' OR
5-11-1 STREET
STATION
NORTH OF 1 -64 BETWEEN
5TH STREET AND
AVON STREET EXTENDED
SCOTTSVILLE MAGISTERIAL
ALBEMARLE COUNTY, VA
dt E N BOHLE."R
G I N E E R I N
28 BLACKWELL PARK LANE, SUITE 201
WARRENTON, VIRGINIA 20186
Phone: (540) 349 -4500
Fax: (540)349 -0321
www.BohlerEngineering.com
�Tn
Lio. No. 043'176
5/13/15 ,
NAB b
SHEET TITLE:
SHEET NUMBER:
REVISIONS
NS
REV; DATE I
COMMENT
BY
PER COUNTY
5/15/14 ;
DRH
COMMENTS
2
1 10101114 I
___
PER COUNTY
__.
DIRK
COMMENTS
3
_
10/23/14
.... �.._ _.._..
PER COUNTY
DRH
COMMENTS
A_.....'--_.
..__..._...
_._..
ISSUED FR
4
12/31/14 j
DRH
CONSTRUCTION
5
02/03/15 !y
VAULT REVISION
DRH
6
4/29/15 ;
FIELD MODIFICATION
DRH
7
5/13/1 ti I FIELD MODIFICATION II
I
DRH
,
THE FOLLOWING STATES REQUIRE NOTIFICATION BY
.EXCAVATORS. DESIGNERS. OR ANY PERSON PREPARING TO
DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE.
(IN VIRGINIA, MARYLAND. AND DELAWARE 81'1)
(WV 1 -800- 245- 4848) (PA 1- 800 - 242 -1776)
�(VA 1 -800- 552 -7001) (MD 1 -800- 257 -7777) (DE 1- 800 -282 -8555)
PROJECT:
PITASE 11 AND
S WM/BMP DESIGN
1I'IL,LD MOIL IZ'I'C A I ON SIT
I' OR
5-11-1 STREET
STATION
NORTH OF 1 -64 BETWEEN
5TH STREET AND
AVON STREET EXTENDED
SCOTTSVILLE MAGISTERIAL
ALBEMARLE COUNTY, VA
dt E N BOHLE."R
G I N E E R I N
28 BLACKWELL PARK LANE, SUITE 201
WARRENTON, VIRGINIA 20186
Phone: (540) 349 -4500
Fax: (540)349 -0321
www.BohlerEngineering.com
�Tn
Lio. No. 043'176
5/13/15 ,
NAB b
SHEET TITLE:
SHEET NUMBER:
OVERALL NOTE.:
F�8�LD MODIFICATION NOTE S,
1. CONTRACTOR n}UTILIZE TWIN 60"CMP CULVERTS, SPACED ZApARr WITH 4'0F COVER, AS
TEMPORARY STREAM CROSSING. TEMPORARY STREAM CROSSING |S NEEDED |N ORDER T0
TRANSPORT FILL ACROSS THE STREAM TO THE AVON LANDFILL AND PLACE AS PART OF THE APPROVED
VVpo LANDFILL CAPPING PLAN, PRIOR ro ARCH CULVERT AND RETAINING WALL CONSTRUCTION.
z TEMPORARY STREAM CROSSING WAS DISCUSSED ONSITE ON 5/8/15, AND HAS BEEN APPROVED BY
oeo AND CORPS o+ENGINEERS.
3 TEMPORARY STREAM CROSSING INTENDED Toos USED UNTIL ARCH CULVERT CONSTRUCTION HAS
BEEN COMPLETED, CONSTRUCTION ON ADJACENT RETAINING WALLS HAVE STARTED, AND FILL HAS
BEEN PLACED OVER ARCH CULVERT |w ORDER rO CREATE TRAVERSABLE PATH. THIS ACTIVITY Is
EXPECTED TU TAKE 4n DAYS 0xLESS,
4 SINCE THE TEMPORARY CROSSING WILL BE IN PLACE FOR A PERIOD LONGER THAN 14 DAYS, THE 10
YEAR STORM WAS ANALYZED PER THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, AND
THE PIPES WERE DEEMED ADEQUATE. THE CULVERT CALCULATION HAS BEEN INCLUDED owTHIS
SHEET.
o. ONCE TEMPORARY STREAM CROSSING IS NO LONGER NEEDED, CON I RACTOR SHALL REMOVE FILL
AND CMP PIPES FROM STREAM, AND MITIGATE CROSSING AREA BACK TO EXISTING CONDITIONS, OR
BETTER, |FNECESSARY.
40 20 110 0 40
�.~40'
PHASE IWP[)CONTROLS SHALL REMAIN �IN PLACE DURING
PHASE 11 UNLESS DIRECTED /\Kj[l ALLOWED BY THE COUNTY
INSPECTOR.
2.
SEE SHEET 3 FOR EROSION AND SEDIMENT CONTROL LEGEND.
3.
SEE SEDIMENT TRAP AND BASIN DESIGN DETAILS AND COMPUTATIONS ON SHEET 6 AND 7A.
4.
DISTURBANCE OUTSIDE THE LIMITS OF DISTURBANCE MAY REQUIRE ADDITIONAL MITIGATION AND BE
COMMENTS
REESTABLISHED WITH VEGETATION. PLEASE REFER TO THE BUFFER MITIGATION PLAN FOR FIFTH
PER COUNTY
STREET STATION FOR SPECIFIC REQUIREMENTS AND DETAILS.
5
AS EXCAVATION OCCURS AROUND THIS AREA, CONTRACTOR SHALL MAINTAIN A2'HIGH
3
BERM/DIVERSION DIKE ALONG THE TOP OF SLOPE TO KEEP RUNOFF FROM DRAINING TOWARD THE
PER COUNTY
DRH
STREAM THE VEGETATION AND DEBRIS ON THE SLOPE SHALL BE REIMOVED AS EXCAVATION STEPS
COMMENTS
DOWN |N THIS AREA.
6.
AG THE WALL CONSTRUCTION ALONG THE ROADWAY PROGRESSES AND FILL MATERIAL |8BROUGHT
IN, VARIABLE SEDIMENT COLLECTION AREAS #2 AND #3 WILL RAISE VERTICALLY UNTIL THEY ARE
JOINED WITH SEDIMENT BASIN #1 THE CONTRACTOR SHALL WORK Wl|TH THE ALBEMARLECOUNTY
CONSI
SITE INSPECTOR TO MANAGE AND FILTER THE RUNOFF COLLECTED IN THESE AREAS. OPTIONS TO
HANDLE THAT RUNOFF INCLUDE (BUT ARE NOT LIMITED TO)� CONSTRUCTING A SEDIMENT TRAP THAT
DUTFALLSTD8TRUCTUREH'5.PUMP|NGTOSED|K8ENTBAS|NS#1[)R#2.URpUMP|NGTOSEO|MENT
BAGS IT SHOULD BE NOTED THAT THESE SEDIMENT COLLECTION AREAS WILL CONTINUE TO RAISE
AS THE VVALL|S CONSTRUCTED AND THE AREA BEHIND THE VVALL|S ELEVATED. THE DUTFALLOFTHE
GENERAL
IT IS THE RESPONSIBILITY OF I HE CONTRACTOR TO REVIEN ������'
1 5/13/15 FIELD MODIFICATION 11 DRH
SELECTED EROSION CONTROL MEASURE TO H-5 MAY BE A PIPE, CLEAN WATER CONVEYANCE
WORK S:o,E PRIOR TvF*E/w/T/^.mwo' CONSTRUCTION ^"v""' THE CONTRACTOR FIND °""'"^`,'" THE ""^"','E"^^"LAT'`^`
CH/\NNEL'{)RSO��E0THERK8EASUREASAPPROVEDBYTHEC(}UNTYE�S|NSPECT0R
�Es,ccmo^vowmp^,po�o'E CODES nmmE SON rmCmxSxExPON ="., ..°"." THE PROJECT ENGINEER �"°""""`
WRITING PRIOR ro THE START nrCONSTRUCTION FAILURE BY THE CONTRACTOR mwor/FY THE PROJECT
7.
TEMPORARY 30" FIDPE PIPE TO BE INSTALLED ON GRADE AND READJUSTED ACCORDINGLY AS FILL
ACCEPTANCE or FULL nsSPowummTY By TILE CONTRACTOR ru COMPLETE: THE SCOPE orTHE WORK ^o DEFINED m THE mmVVIwou^wnw
nx/ CONFORMANCE WIT ILE LOCAL REGULATIONS AND CODES - _ _____j
AROUND RETAINING WALL IS ADJUSTED.
OVERALL NOTE.:
F�8�LD MODIFICATION NOTE S,
1. CONTRACTOR n}UTILIZE TWIN 60"CMP CULVERTS, SPACED ZApARr WITH 4'0F COVER, AS
TEMPORARY STREAM CROSSING. TEMPORARY STREAM CROSSING |S NEEDED |N ORDER T0
TRANSPORT FILL ACROSS THE STREAM TO THE AVON LANDFILL AND PLACE AS PART OF THE APPROVED
VVpo LANDFILL CAPPING PLAN, PRIOR ro ARCH CULVERT AND RETAINING WALL CONSTRUCTION.
z TEMPORARY STREAM CROSSING WAS DISCUSSED ONSITE ON 5/8/15, AND HAS BEEN APPROVED BY
oeo AND CORPS o+ENGINEERS.
3 TEMPORARY STREAM CROSSING INTENDED Toos USED UNTIL ARCH CULVERT CONSTRUCTION HAS
BEEN COMPLETED, CONSTRUCTION ON ADJACENT RETAINING WALLS HAVE STARTED, AND FILL HAS
BEEN PLACED OVER ARCH CULVERT |w ORDER rO CREATE TRAVERSABLE PATH. THIS ACTIVITY Is
EXPECTED TU TAKE 4n DAYS 0xLESS,
4 SINCE THE TEMPORARY CROSSING WILL BE IN PLACE FOR A PERIOD LONGER THAN 14 DAYS, THE 10
YEAR STORM WAS ANALYZED PER THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, AND
THE PIPES WERE DEEMED ADEQUATE. THE CULVERT CALCULATION HAS BEEN INCLUDED owTHIS
SHEET.
o. ONCE TEMPORARY STREAM CROSSING IS NO LONGER NEEDED, CON I RACTOR SHALL REMOVE FILL
AND CMP PIPES FROM STREAM, AND MITIGATE CROSSING AREA BACK TO EXISTING CONDITIONS, OR
BETTER, |FNECESSARY.
40 20 110 0 40
�.~40'
PHASE IWP[)CONTROLS SHALL REMAIN �IN PLACE DURING
PHASE 11 UNLESS DIRECTED /\Kj[l ALLOWED BY THE COUNTY
INSPECTOR.
REV DATE 1
COMMENT
BY
PER COUNTY
COMMENTS
PER COUNTY
COMMENTS
3
10/23/14
PER COUNTY
DRH
COMMENTS
ISSUED FOR
CONSI
7
1 5/13/15 FIELD MODIFICATION 11 DRH
0 CL
REV DATE 1
COMMENT
BY
PER COUNTY
COMMENTS
PER COUNTY
COMMENTS
3
10/23/14
PER COUNTY
DRH
COMMENTS
ISSUED FOR
CONSI
7
1 5/13/15 FIELD MODIFICATION 11 DRH
THE FOLLOVVING STATES REQUIRE NOTIFICATION BY
XCAVATORS DESIGNERS OR ANY PERSON F�REPARING To
ffl VIRGINIA. MARYLAND. AND DELAVVARE 811)
pnoJsoT
WPO PLAN _E&S
lPHAS|P AK AND
SWM/BMlP DESIGN
FIELD MODIFICA'110N 11
�~��� �-p����~�
� ��/ STREET
�-��'��(�r�
���'�������
L0CA'110N0P'8]IK
NORTH OF 1-64 BETWEEN
5TH STREET AND
AVON STREET EXTENDED
SC{}TTSVILLEMAG|STERIA[
/\[BEMAR[E COUNTY, VA
��l� ����
��� ��� 0 � �� N�
��I ���������������
��l F N G I N E E R3N G
28 BLACKWELL PARK LANE, SUITE 201
WARRENTON, VIRGINIA 20186
Phone: (540) 349-4500
Fax: (540) 349-0321
��y �?n
..~" 0411�
Lio No 043176 Ar
�10 1�66V
NAl-
SHEET TITLE:
<������ ��
u�l��� PLAN
s*EETwuMosR�
2
Culvert Report
Hydra flow Express Extension for Autodesk® ALIWCAD(r) Civil 3D(IV by Autodesk Inc. Wednesday, May 13 2015
Circular Culvert
Invert Elev Dn (ft)
= 365.20
Calculations
Pipe Length (ft)
= 46.00
Qmin (cfs)
= 439.04
Slope ( %)
= 0.44
Amax (cfs)
= 439.04.
Invert Elev Up (ft)
= 365.40
Tallwater Elev (ft)
= (dc +D) /2
Rise (in)
= 60.0
DRH
a �Oon
Shape
= Circular
Highlighted
3
Span (in)
= 60.0
Qtotal (cfs)
= 439.04
No. Barrels
= 2
Qpipe (cfs)
= 439.04
n -Value
= 0.024
Qovertop (cfs)
= 0.00
Culvert Type
= Circular Corrugate Metal Pipe
Veloc Dn (ft /s)
= 11.61
Culvert Entrance
= Mitered to slope (C)
Veloc Up (tt /s)
= 11.18
Coeft. K,M,c,Y',k
= 0.021, 1.33, 0.0463, 0.75, 0.7
HGL Dn (ft)
= 369.80
j 5113115 FIELD MODIFICATION II I DRH
t
HGL Up (fit)
= 370.97
Embankment
Hw Elev (ft)
= 374.95
Top Elevation (ft)
= 375.20
Hw /D (ft)
= 1.91
Top Width (ft)
= 15.00
Flow Regime
= Inlet Control
Crest Width (ft)
= 100.00
.0
3n4 al
ins nr,
DO
n
,: Name>
H 1, , f It
ia5
4'I
113 1S 111 4-
at., t. ear tat am "I exca�' to 4,.)t tile area r � r ��t s hall,
mint ' t1fa`t ,
I . ()9.2
�. 224
i� °` _111P ,>a - Ee,, R .� 8._.'ts 'r
r�`�
ourcl Va. I `i 'i::.
Ar
.ra t dn of culvert shall :. i "*:.� $e� on the 3 ".,p 2v.Tnu. `.$s x;1 t�atfflh'&,A
grade to truinitT117 with g
Y gg &y tine 5 ���a .t� and filter, �tt"tirigt�� a� prior to
� ki"'I ��� etit. of tine iI ?C ciflve.rt(s, a n �eS' "a >r,".s w A ! � �.- R .,� .y�-
tfie tr t"'Innh a. nd extend a mlnirnuunl of' st..K inches ztrlid a n,.a €mt },,n of )"rq
a e R 4..+ �. � e Si a. . g l tt 4 ; a S , a t p e r £ reduces
set'lle ment .t,t ?. irnp "goes, Crossinig stabilitySee Sul, & Spe , 3,1 PRAT 1,
or required t twsical qualifies u*f the Rite - k)th.,
�...a ?r�`� ��i �` t r ;� a . ; fir ��' F t �� 3.�: i� `> �` . y � :. x -� ,� - „ �.. � round .,, � � � 3�� � 11 1 a, r 1 ' -� � � s �' r A d 1.
gg pp
the flverf exceed! 4) feet In I e n g th,
C.. he culverws ) stet ! he covered witlh�4 a a i n; a n of 'o Iloo�pp yy � a rtey - � a
R�e �:S R.'� �xC� BRA �s,l *���.v'�+ ,u
t luil iple culverts x s e Used, they shall tV� se 2ra��:. � by at east " i,_n J of
Ccs r ,. ""t t �.. �m at; , < � A:� a ' 1. � .�. # F >� �s::� �. a � �. a..� & � e �.:� a. � c r R .: € "m a �- �.:. � k 1. R � ... t 1'. 1"M € � � a�� �: �.. # �' �.� �
iri the corl,st_tw-tic } o @1le t enn,,porwy a c °"s"; F, �E � � �R'N'�� ��3 y�_ � F
cull a �: � ssi 3g': ���. corlt�'r
v, t. `; i ., .:� e t M H r e R s t' ' e e cited 'i n r 1" undier . u i Yr e rt
)a ��t t 1'e cro "ss t� t "u INi� t t , : t a.t t ,ttft tl including t) 'tlWt
°° ` 9 ..33 filter faee 33 �� q< D. .�_ 1 F ,� �� structure
hecfdi lte 3�,.+ 1h tiil rim. s ,, �..a. t .a>
gga��a�� k3 � ate.- �� �,�a��,aa ,�: 3a -1 ����'��. i� ".t.3•�a -b'a. T
a3- deain.Mup of zIm"'k sh., -01 x,, accon' -tplt tTae(Ii without, c nsi u i4a€
91 ..` a t° 'a th t '8- tt � Y, !hie siren � s X111 l °5 nr -. dfi tcl � `hal-� ,d to t4
o gin, .iI c iim
ri and properly, t t its rt.
GENERAL NOTE
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT
'ORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCLION. SHOULD THE CONTRACTOR FIND A CONFLIC I- WITH THE DOCUMENTS RELATIVE T
THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACT OR "S RESPONSIBILITY T 0 NOTIFY THE PROJECT ENGINEER OF RECORD IP
WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR To NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE
CCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND
r"OLL CON, ORPAAN� E WI fH LOCAL REGUTA T IONS A.ND CODES.
LE O
:FLOW
as W €s
STREAM CMANNEI',
PLAN VIEW
CAP A ,T OF- E HT
�. ANGIJIL,R, .
r1LT- P, R ,.�.: T11
R' C' i. C)"3, 'C 4
F AQR,1 H 1 I_-(
50" M: ?atamt
C 1W
.1'
Plate 3,24-2
TEMPORARY. ST CROSSING
DETAIL
NOT TO SCALE
IFICA `I'O NOTES:
1. CONTRACTOR TO UTILIZE TWIN 60" CMP CULVERTS, SPACED 2' APART WITH 5' OF COVER, AS
TEMPORARY STREAM CROSSING. TEMPORARY STREAM CROSSING IS NEEDED IN ORDER TO
TRANSPORT FILL ACROSS THE STREAM TO THE AVON LANDFILL AND PLACE AS PART OF THE ,APPROVED
WPO - LANDFILL CAPPING PLAN, PRIOR TO ARCH CULVERT AND RETAINING WALL CONSTRUCTION.
2 TEMPORARY STREAM CROSSING WAS DISCUSSED ONSITE ON 51805, AND HAS BEEN APPROVED BY
DEQ AND CORPS OF ENGINEERS,
3. TEMPORARY STREAM CROSSING INTENDED TO BE USED UNTIL ARCH CULVERT CONSTRUCTION HAS
BEEN COMPLETED, CONSTRUCTION ON ADJACENT RETAINING WALLS HAVE STARTED, AND FILL HAS
BEEN PLACED OVER ARCH CULVERT IN ORDER TO CREATE TRAVERSABLE PATH. THIS ,ACTIVITY IS
EXPECTED TO TAKE 45 DAYS OR LESS.
4. SINCE THE TEMPORARY CROSSING WILL BE IN PLACE FOR A PERIOD LONGER THAN 14 DAYS, THE 10
YEAR STORM WAS ANALYZED PER THE VIRGINIA, EROSION AND SEDIMENT CONTROL HANDBOOK, AND
THE PIPES WERE DEEMED ADEQUATE. THE CULVERT CALCULATION HAS BEEN INCLUDED ON THIS
SHEET.
5. ONCE TEMPORARY STREAM CROSSING IS NO LONGER NEEDED, CONTRACTOR SHALL REMOVE FILL
AND CMP PIPES FROM STREAM, AND MITIGATE CROSSING AREA BACK TO EXISTING CONDITIONS, OR
BETTER, IF NECESSARY.
REVISIONS
REVI DATE
COMMENT
BY
J
LL
PER COUNTY
1
t 5!15/14
W
> O .
DRH
n tzrl2
2
10/01/14
PER COUNTY
DRH
a �Oon
..
COMMENTS
3
Z U Z , J
PER COUNTY
DRH
J
0zWJUi
4
`, 12/31/14
ISSUED FOR
U) 1
S H_ rt ' _j
L_ (0 z
CONSTRUCTION
CC
m I- v�
02/03/15
VAULT REVISION
DRH
U)
i 4129/15
i
FIELD MODIFICATION
( DRHI
7
j 5113115 FIELD MODIFICATION II I DRH
t
w
Q
O
2i a
= Z
O Q J
zY
z>
Z
m 0
O - O =w
co Qft�UCJ
to
Ufa
f J
w T, _
REVISIONS
REVI DATE
COMMENT
BY
PER COUNTY
1
t 5!15/14
COMMENTS
DRH
2
10/01/14
PER COUNTY
DRH
COMMENTS
3
10/23/14
PER COUNTY
DRH
COMMENTS
4
`, 12/31/14
ISSUED FOR
DRH
CONSTRUCTION
5
02/03/15
VAULT REVISION
DRH
6
i 4129/15
i
FIELD MODIFICATION
( DRHI
7
j 5113115 FIELD MODIFICATION II I DRH
t
THE FOLLOWING STATES REQUIRE NOTIFICATION BY
EXCAVATORS DESIGNERS, OR ANY PERSON PREPARING TO
DISTURB THE EARTH'S SURFACE ANYVyHERE IN THE STATE.
(IN VIRGINIA, MARYLAND, AND DELAVVARE 811)
(VVV 1- 800 - 245- 4848) (PA 1 -800- 242 -1776)
(VA 1 -800- 552 -7001) (MD 1 -800- 257 -7777) (DE 1 -800 -282 -8555)
PROJECT:
TT
PHASE 11 AND,
SVVM/BMP DESIGN
F'Il_E1LlD 1;IOD((IF) C 'I'TON IT
TI i S T 1-JET
STATION
1_101("1`V'1J01x 0F
NORTH OF 1 -64 BETWEEN
5TH STREET AND
AVON STREET EXTENDED
SCOTTSVILLE MAGISTERIAL
ALBEMARLE COUNT`(, VA
f SHEET- TITLE
JJ l-, U LA T I N S
AND DETAILS I
SHEET NUMBER: