Loading...
HomeMy WebLinkAboutWPO201200028 Inspection 2015-09-21°` AL" Compliant p L� Notice to Comply ❑ �-, Stop Work ❑ Bond lnsp ❑ x. A Warning ❑ Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name::13A 3A l0,rc:," �c: File Number: County Inspector: �o���-"'1 6'� Time: Date: Inspection Ins ' a UO p � ^ � For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization ❑ swm conversion. Compliance Comments/Notes Yes No Silt, safety, tree fence Diversions, Berms, ditches Inlet, culvert protection A A Stream work, r f crossings Traps, Sc,JA4 4 it _5hd-( Gfrt Basins oke art r� Pot Stabilization Entrances A Limits S tZAAA CO"+1 y0 4 CtAd S ' {�FAll Compliant Notice to Comply ❑ ®. Stop Work ❑ Bond lnsp ❑ A„<< Warning ❑ Under NTC ❑ I'/HGIN� Under SWO ❑ Re -inspection (fee) ❑ SWPPP INSPECTION Project Name: ";">"A („re 1L6 File Number: (/SPO Z.7lZ. 0C)C)24 DEQ General Permit Number: 1211 R J J)Q070 County Inspector: Inspection Inspection Date: zi It .5 Time: / S� For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization ❑ swm conversion Compliance Comments/Notes Yes No Posting at the The coverage letter and SWPPP book location must be posted in a prominent place at site entrance J the entrance to the job site, available to the public on request. SWPPP The complete document must be available for inspection on-site available for J review Coverage / A current coverage letter (expiration date of 2019) must be included letter Registration / A registration statement must be included that goes with the coverage letter. The Statement acreage disturbed must be accurate. PPP plan A copy of the pollution prevention plan and a copy of the current DEQ permit code must Jbe included in the SWPPP. The plan must be marked to show location of measures. Inspection Reports must be up-to-date, informative, documenting problems, and occurring at reports l required intervals. Rain events and inspections for rain events must be noted. Inspection Results of inspections must be followed up with corrective actions where necessary reports/corre ctive actions Fueling Fueling stations must be contained, and spill prevention and cleanup kits in place station Washouts A lined sump area must be provided for any concrete washout. Washout facilities for paint, grouts, etc. are also needed. Trash and Trash and debris must be cleaned up so that it does not leave the job site. Any debris J contaminates must be protected from becoming runoff during rains (cover dumpsters). Trash is not to be buried on-site. Sanitation Sanitation facilities must be provided and maintained, and protected from spills, away from inlets. S'tthu s lour) CJ�-n f�.� C --d �-S L)CA� Erosion and Sediment 3iA fV% Co-nJc �Sjcvt Control and Stormwater Management per plans and standards of A Compliant �otice to Comply ❑ Stop Work ❑ Bond Insp ❑ Warning ❑ Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: �v��('o� )�� �� File Number: lJ Qaa6 i? -a Q County Inspector: 6ea-VCS Inspection Date: Time: For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization 2ZSWm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence rw�- iY Diversions, Berms, ditches Inlet, culvert protection 9 ' , Stream work, crossings Traps, Basins / Stabilization ,#.►o ✓sC.L See.30 Mel� Sri Entrances 4 1 v Limits (\/gL 4-// S" 15 �%HGtN�P SWPPP INSPECTION Project Name: 1) y n wro'_ (:Q -6i- File Number: DEQ General Permit Number: Compliant Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ Warning ❑ Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ c'J'Pv a6l a -ag County Inspector: 6ev-c-v C t Inspection Date: ?S- 13 Time: For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization swm conversion ❑ Compliance Comments/Notes Yes No Posting at the The coverage letter and SWPPP book location must be posted in a prominent place at site entrance / ✓ the entrance to the job site, available to the public on request. SWPPP The complete document must be available for inspection on-site available for review Coverage / A current coverage letter (expiration date of 2019) must be included letter Registration A registration statement must be included that goes with the coverage letter. The Statement acreage disturbed must be accurate. PPP plan A copy of the pollution prevention plan and a copy of the current DEQ permit code must be included in the SWPPP. The plan must be marked to show location of measures. Inspection Reports must be up-to-date, informative, documenting problems, and occurring at reports required intervals. Rain events and inspections for rain events must be noted. Inspection Results of inspections must be followed up with corrective actions where necessary reports/corre ctive actions Fueling Fueling stations must be contained, and spill prevention and cleanup kits in place station Washouts A lined sump area must be provided for any concrete washout. Washout facilities for paint, grouts, etc. are also needed. Trash and Trash and debris must be cleaned up so that it does not leave the job site. Any debris contaminates must be protected from becoming runoff during rains (cover dumpsters). N I Trash is not to be buried on-site. Sanitation I Sanitation facilities must be provided and maintained, and protected from spills, away t.� from inlets. c S' � Erosion and Sediment Control and Stormwater 501, Management per plans and standards oF^ Compliant Notice to Comply ❑ �. Stop Work ❑ Bond Insp ❑ Warning ❑ Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ SWPPP INSPECTION Project Name: atn (G r,�;' Rres �- File Number: L") PL ay(-)- - UG02fs DEQ General Permit Number: County Inspector:Inspection Date: 2r S� Time: 1 3a For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization �wrn conversion ❑ Compliance Comments/Notes Yes No Posting at the The coverage letter and SWPPP book location must be posted in a prominent place at site entrance the entrance to the job site, available to the public on request. SWPPP The complete document must be available for inspection on-site available for review Coverage / A current coverage letter (expiration date of 2019) must be included letter Registration A registration statement must be included that goes with the coverage letter. The Statement acreage disturbed must be accurate. PPP plan A copy of the pollution prevention plan and a copy of the current DEQ permit code must % v be included in the SWPPP. The plan must be marked to show location of measures. Inspection Reports must be up-to-date, informative, documenting problems, and occurring at reports required intervals. Rain events and inspections for rain events must be noted. Inspection Results of inspections must be followed up with corrective actions where necessary reports/corre ctive actions Fueling Fueling stations must be contained, and spill prevention and cleanup kits in place station V Washouts A lined sump area must be provided for any concrete washout. Washout facilities for paint, grouts, etc. are also needed. Trash and Trash and debris must be cleaned up so that it does not leave the job site. Any debris / contaminates must be protected from becoming runoff during rains (cover dumpsters). �✓ Trash is not to be buried on-site. Sanitation Sanitation facilities must be provided and maintained, and protected from spills, away from inlets. 5,4 rc10, ,,) %� s G�.�, �,,,,,,� to AJ Erosion and Control and �`� h` ti� �r 5F �np ,�ltic b � � ° c (� CcM s �v-u c h �•, Stormwater Pf''ui S'V C�v�✓vf- _ Management per plans and standards SWPPP INSPECTION Compliant ❑ Notice to Comply ❑ Stop Work ❑Bond Insp ❑ Warning hk"� Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Project Name: _�L"'Z4. roze� File Number: Alp ZvlZQ�7/Z i' County Inspector: Inspection Date: -Z - 6�A- Time: For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading [Stabilization [Yswm conversion L Compliance Comments/Notes Yes No Posting at The coverage letter and/or SWPPP availability must be posted in a prominent place at the site ✓ the entrance to the job site. _7 , /f entrance SWPPP The complete document must be availa le for inspection available for / i/ T/ 4'�CUZ�L�i review eZ 1. Coverage A current coverage letter (expiration date o(2019) dust be included letter Registration A registration statement must be included that goes with the coverage letter. The Statement acreage disturbed must be accurate. PPP A copy of the pollution prevention plan and a copy of the current DEQ permit code must documents be included in the SWPPP. Inspection Inspections reports must be up-to-date. Reports must be informative, documenting reports corrections and failures, and occurring at required intervals. Rain events and inspections for rain events must be noted. Fueling Fueling stations must be contained, and spill prevention in place station Concrete A lined sump area must be provided for any concrete washout Washout 4-G Trash and Trash arfd debris must be cleaned up so that it does not leave the job site. Any debris contaminates must be protected from becoming runoff during rains. Sanitation Sanitation facilities must be provided and maintained, and protected from spills, away from inlets. Erosion and Sediment Control and Stormwater a ` Managemen t per plans and standards ^� Compliantd Notice to Comply ❑ �. Stop Work ❑ Bond Insp ❑ a Warning g ❑ Under NTC ❑ r �HGINP Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: 1)V>A (Ca, (-,c "t File Number: ,) (`v ;<.�>( �2_ - OCAD F' County Inspector: n n � C*�' Inspection Date:i u")� Time: ` For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence Diversions, Berms, ditches Inlet, culvert protection Stream work, crossings Traps, Basins Stabilization 5 , e Lre 1 Entrances Limits dvie / �:r ; v .v� �� •!�; ((L,,�;�r' fv G(� sc,�c SS � �a� s �.'�5 c.�` /Zc.� `jviO -�G 4, cx:i 41, I j.a ✓y i� f i ..-.,, �c of ^ Compliant Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ Warning ❑ Under NTC ❑ GIS+NSP Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: D(,,, .x -„reg, 0-1 {tS � File Number: (.JPO t c)I a vC-�U"4 R, County Inspector: Inspection Date: Time: For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization �m conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence Diversions, Berms, ditches Inlet, culvert protection Stream work, crossings Traps, Basins ' , M4 r'�' L, I Stabilization �r (�. L4 C, t9C Entrances Limits �^ Compliant ff' Notice to Comply ❑ Stop Work ❑ Bond lnsp ❑ Warning ❑ Under NTC ❑ IRGINIP Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: �,DtAn(rf,, 12lD�6t File Number: (�Ant`3. - n(-) 2� County Inspector: �� �p Inspection Date: . Ig, L -(y Time: For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization Et---.,Swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence Diversions, Berms, ditches Inlet, culvert _)S� 1'v1ac/d Cw b protection Stream work, crossings Traps, 5 t 5 W A4 4 / c 11 w l c, r 52ze, 2c.ef �. Basins Stabilization Entrances Limits %t& Compliant G` ' Notice to Comply [:]Stop Work ❑ Bond Insp ❑ Warning ❑ Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: LA,1 `Ur,:A wJ-_' /_ File Number: County Inspector:Inspection Date: 1S Time: I 3� For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization [3—swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, % S >= S h,c tree fence f Diversions, Berms, ditches Inlet, culvert protection Stream work, crossings Traps, Basins Stabilization Entrances �S LL.1(4 4� GI Li C 1�c,1 Limits oF^ Compliant [9-` Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ k„ Warning ❑ Under NTC ❑ �tNP Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: d)tnn U� rC, File Number: C"�P0 A 0 12- County 12-County Inspector: Inspection Date: Time: For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization � swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence Diversions, Berms, ditches Inlet, culvert protection Stream work, crossings Traps, Basins Stabilization Entrances Limits of ^ Compliant ❑ Notice to Comply ❑ Stop Work ❑ / Bond Insp ❑ Warning ❑' Under NTC ❑ `II�P Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: ,,i k4_ - t Utes % File Number: W-0 Z0/?_- GYjOZS�- County Inspector: 10- 2 Q C� CU ACLc � E6ic Inspection Date: -7-2-9-I`� Time: /O 4r,-1 For Warnings or Notices, DATE TO COMPLY BY L- ► Re-Jw,-,J , Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilizatio swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence Diversions, Berms, ditches Inlet, culvert protection 2q I. -t c4- Stream work, crossings Traps, Basins Stabilization Entrances Limits CjtJVA ins We,!S Co j I., Jc,q ✓i- �•e . �-t,✓r 5%rW.k — 5�✓� ��cP S� �l�.r.� � 1S��S /tee �,v-� - � f-5 ? a Compliant � Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ Warning ❑ Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: File Number: LWb .90k x_ U0 C' A $ County Inspector: OAT�_ Inspection Date: 7-1 - Zy Time: % 0 For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization 0__"S/Wm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence Diversions, Berms, ditches Inlet, culvert protection Stream work, crossings Traps, Basins Stabilization Entrances Limits ,v Compliant 0'' Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ Warning ❑ Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: r . File Number: i�p� o t a _ UC'cam a2 County Inspector: \_ c,h Inspection Date: 3� Y Time: % ' 3n For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization Eg-/swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence Diversions, Berms, ditches Inlet, culvert protection Stream work, crossings Traps, Basins Stabilization Entrances Limits .dc, -JOAL oA S, of A Compliant C;g" Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ Warning r?*' Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: LG IQ, re s File Number: i"') PL a 0 ( a - OL-� �),g County Inspector: Inspection Date: L'3011 Time: 1'. 3r For Warnings or Notices, DATE TO COMPLY BY 6/-3b// OV Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization [�__swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, S«^u r Oreca OA1 i- La A ACI,<)n Cil z.l(� E -re tree fence J n r ce4rcks i leu lu ' G'J" ix ulo,u( Diversions, Berms, ditches Inlet, culvert protection Stream work, crossings Traps, 0 s".t 5 t -i ( I Q_C, ,'r am\A C.t}Z. + Basins � Stabilization Entrances Limits ('tNti-►LcCtu! W,�,) ooWA',.e J a(tV 0, pJen/ 5� �cc .✓i . (' ck3-,4 /t Compliant[!'' Notice to Comply ❑ Stop Work ❑ Bond lnsp ❑ Warning ❑ Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: � �rr- Pres f File Number: QPO aLo(J c Oaa8 County Inspector: "3c'r\Ak Co Inspection Date: b U/14Time: 10 � bo For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization Erswm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence Diversions, b (, Berms, ditches Inlet, culvert protection Stream work, crossings Traps, Basins Stabilization Entrances Limits of " Compliant ❑ Notice to Comply ❑ m Stop Work ❑ Bond Insp ❑ s Warning E]-1 Under NTC ❑ Under SWOE] Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: rt, s (- File Number: P(-) 2,t-, c:�2b County Inspector: .John, cam, Inspection Date:_t 19 Time: /L),, 3 v For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilizationswm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence 5f= i �s1 Linc,' c��v ; �� `-c_�i ; Gvz� f2 G fora , Z'C'. 0"w Diversions, Berms, ditches Inlet, culvert protection Stream work, crossings Traps, Basins J Stabilization Entrances Limits *+AA—Compliant 1i Notice to Comply E]Stop Work [:]Bond /nsp E]Warning [ -1 Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: DcA^ (-o rc-, aI o e S I' File Number: L-) P U County Inspector: on rn "� . Inspection Date: b LI Time: For Warnings or Notices, DATE TO COMPLY BY �:' / Zc: L/ �Z Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization,�J swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence Diversions, Berms, ditches Inlet, culvert protection Stream work, crossings Traps, Basins Stabilization Entrances Limits fi44 141 ro-o o � :D; r(Ci,Er C�r h`un S, 6 CcrreC t l S f r.Jq 5 c"rtc, f 0 ho o t Ccs p u. I C LA l�,,l �l S 8 AA�, v11 wr,(- �X t '�-N ,,, 'to' ( ( ✓Zx 107 � U/ 6�61ACompliant❑ Notice to Comply❑Stop Work ❑ Bondinsp❑Warning Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: DtAonto rc, 42rrs File Number: UPC) :90r;a -cpc,r)-IR County Inspector: J��n�, Inspection Date: Z Time: For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ StabilizationP swm conversion ❑ J Compliance Comments/Notes Yes No Silt, safety, C --CA tree fence Diversions, Berms, ditches Inlet, culvert LA protection Stream work, crossings Traps, Basins Stabilization Entrances Limits � S (_ �A.A�ow �. 5 4� c,-��. als. Pis,. k✓ Sr.�,t.' �� 1 �� lu s i`�� ��.�-t - T�.� cel/ 71,u' s we (I ti(Sv r , b 6-5_-I1( J Compliant Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ Warning [1 Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name:�L'y" (,a rc, l "C -'e (- File Number: (, t _ t xi County Inspector: C--) C-% Inspection Date: Time: For Warnings or Notices, DATE TO COMPLY BY 6-5--19 Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence Diversions, Berms, j ditches J Inlet, culvert protection Stream work, crossings Traps, r s/n S w /tea tC Basins Stabilization Entrances Limits C{ f ecvYrlru [h 1 i cc. 'i a3 / ��It �W 4 0I`� �'D �.° tJt �v/ye/ t GSM jh �/ (/� i 17" ^� 1-p r � : r -C C.� `vt ��L'✓-f 3 ' v 51W �_ Compliant ❑ Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ Warning Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Namey�CAD arc. Ort% File Number: LJpd Aon. -J, • boc a sg County Inspector: �� .� �, Inspection Date: 5� Z Time: 3 For Warnings or Notices, DATE TO COMPLY BY (�- l y Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence Diversions, S� rz� �xc rCtc/ Berms, j ditches Inlet, culvert protection Stream work, crossings Traps, ,e us y,.^(V �k A/c,Ct a C,+-�1- P'ik Basins Stabilization / S l a-(� �Q, lsz C ti (' 5 rra 5; 'z �•,�� Sty% r S� cel Entrances Limits i jet /- / 6_4 n st f / SS < �► 6��71y i:;" Al p Compliant [gamNotice to Comply Stop Work ❑ Bond Insp ❑ Warning ❑ Under NTC ❑ Under SWOE] Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: ��,;� (��G �(v��- File Number: L.�Po 1012- oDC-)a8 County Inspector: pn i; X45 Inspection Date: J / 6 Y Time: —/(3-' 06 For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ StabilizationX swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, $F= pJAC( n 17— tree fence Diversions, Berms, J ditches Inlet, culvert CZA Gl,citn¢c,� C -J ftt(.ea,'r Ad protection Stream work, crossin s Traps, Basins J Stabilization Entrances Limits of Ab" Compliant E ---Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ `� Warning ❑ Under NTC ❑ 07INNP Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: Z:)LAn (c) ry, a re,;,, k- File Number: I �) n au ( Z - ()nU 28 County Inspector: ;n„ c�, Inspection Date: S Time: For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction I" Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence Diversions, o 5 La-Z � rceC.1 Ck s Berms, ditches Inlet, culvert protection Stream work, crossings Traps, 6�' pc*t: Basins Stabilization Entrances Limits Compliant [ — Notice to Comply ❑ Stop Work ElBonq Insp [I Warning ❑ Under NTC ❑ Under SWO ❑ Re -inspection (fee) Erosion Control Inspection Report File Number: �Vc,"A: t'2 _ Cc�^.2� Project Narne:.�w,_ l •�. ��� � — -- Inspection Date: 5 r Time: I/. 3c� County Inspector: For Warnings or Notices, DATE TO COMPLY BY ;;nstruction ❑ Finish Grading ❑ stabilization/ swm conversion El,,� ic f-1 (IParina I-1 Rough Grading El Co I 4 Compliant ❑ Notice to Comply 1eJ Stop Worl< ❑ Bond Insp ❑ Warning El NTC ❑ sly- Re -inspection fee Under SWO ❑ p (fee) ❑ �'ptriN�r Erosion Control Inspection Report •-,--a � File Number: iJp0 )'o( -z - t)CA) 2 k Project Name:. Inspection Date: 2� % Time: County Inspector: olk For Warnings or Notices, DATE TO COMPLY BY __.__ n Q„tirih n,,dina n Construction ❑ Finish Grading/ Stabilization ❑ 9wrn conversion ❑ Compliant ❑ Notice to c;ompfy I-1 Stop Wort< ❑ Bond Insp ❑ �► Warning ❑ Under NTC Re-inspection fee ❑ �•„ 's;;'�' Under SWO ❑ P I/Itfil N Erosion Control Inspection Report File Number: Project Name: Inspection Date: 1 //y Time: Sounty Inspector c Notices, DATE To COMPLY BY_____�'; a �t or Warnings or N , nitial controls ❑ Clearing ❑ Rough Grading ❑ Compliance Yes TN. Silt, safety, tree fence Diver ------ Berms, ditches Inlet, culver't protection Stream work, crossings Traps, Basins Stabilization Entrances its Construction ❑ Finish Grading ❑ Stabilization/ swm conversion ❑ Comments/Notes �f�sCui,l'l.�z S/tx�e�•yj /��'C. ij)GC(c �CV,6 �D (J - fjZ W ° t K -1-`t w , I ( �-�. r.,!-� t,� � ei,c.�v. c.KC,� pr(, y L L Erosion Control Inspection Report File Number: i �A[� ° Ori � Project Name ��an' .�.• � ��� Inspection Date: Time: : ounty Inspector: c Cor Warnings or Notices, DATE TO COMPLY BY nihal controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ StabilizalionVer swm conversion ❑ compliance Comments/Notes Yea No Silt, safety, tree fence Lily- V1v •v, Berms, ditches Inlet, culvert protection work, crossin s Traps, Basins Stabilizati Entrances Limits ►.,<, ln; -mac ln� , Gi, E 4. rL5cu+�1 to •M&tccc (�lccJhw. ck\ Ci _ nlxt� Vo he t3uftn+ii r�� as Compliant ❑ Notice to Uompry LJ Stop Work ❑ Boni! Insp ❑ ��► F, Warning ❑ Under NTC [� sly- ,y•w -,.,; :�- Re -ins Under SWO [Jection fee P (fee) ❑ �'4triNr A Erosion Control Inspection Report File Number: i �A[� ° Ori � Project Name ��an' .�.• � ��� Inspection Date: Time: : ounty Inspector: c Cor Warnings or Notices, DATE TO COMPLY BY nihal controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ StabilizalionVer swm conversion ❑ compliance Comments/Notes Yea No Silt, safety, tree fence Lily- V1v •v, Berms, ditches Inlet, culvert protection work, crossin s Traps, Basins Stabilizati Entrances Limits ►.,<, ln; -mac ln� , Gi, E 4. rL5cu+�1 to •M&tccc (�lccJhw. ck\ Ci _ nlxt� Vo he t3uftn+ii r�� as Compliant ❑ Notice to Comply L-1 AL0�,6 Stop Work ❑ Bongl Insp ❑ -Under NTC Ely;sl� Warning Under SWC ❑ Re -inspection (fee) ❑ ` 'km Nor Erosion Control Inspection Report File Number: Project Narne�tw• _ �p �� d Inspection Date:_V_Z_4_/y_ Time: 1 3 County Inspector: For Warnings or Notices, DATE TO COMPLY BY— �4�1 M Qniinh Gradina ❑ Consiruction v Finish Grading ❑ 5labilizalion ❑ swm conversion ❑ L L Compliant [ Notice to Comply ❑ �p-AL UStop Work ❑ Bond Insp ❑ Warning ❑ Under NTC ❑ �•� s��_ � .y•� ,;;�- Under SWO ❑ Re -inspection (fee) F1 ` �inINP Erosion Control Inspection Report File Number: rP0 P Project Name: �c1n���:-�- �� _ Inspection Date: b r Time: County Inspector: n For Warnings or Notices, DATE TO COMPLY BY __ ,_ n f Innrinn F-1 Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization ❑ swm conversion ❑ L L L Compliant [/ Notice to Comply ❑ "^` Stop Work ❑ Boni! Insp ❑ Warning ❑ Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ I'/17fl NSA Erosion Control Inspection Report Project Name: File Number: ('6� r A0l �. 000 � k Inspection Dater I�1— Time: /.' 30 County Inspector: For Warnings or Notices, DATE TO COMPLY BY l swm conversion El rnnirnls rl Clearing ❑ Rough Grading El Construction I Finish Grading F1 Stabilization F] t Compliant [�J' Notice to Comply ❑ Stop Work ❑ Bohol Insp ❑ Warning ❑ Under NTC [I ;" Under SWO F1Re-inspection(fee) F1 '4triNP Erosion Control Inspection Report Project Name' �.i,�lc cit �TI.��eS File Number: tn)'PC) �7c , OC LM Inspection Date: `I-3-19 Time: / ` 3,o County Inspector: J L For Warnings or Notices, DATE TO COMPLY BY nitial controls ❑ Clearing ❑ Rough Grading ❑ Construction V Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliant ❑ Notice to Comply ❑ ���fpnLu,4jy Stop Work ❑ BOl1�l lnsp F] Ir J/1 Warning Under NTC ❑ %; Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report ' File Number: ,,�Q U `& w' _ nr�p� Project Name: ��`-� �� cc,, Cc',( �-� � Inspection Date: - - f� Time: 01, 3 .ounty Inspector: For Warnings or Notices, DATE TO COMPLY BY � - �_ f nitial controls ❑ Clearing ❑ Rough Grading ❑ Construction/Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance CommentsyNotes Yes No Silt, safety, � vU<c.h`vU w t tree fence Diversions, Berms, ditches C�� ��n tl Inlet, culvert � n -)tti, tJ 1.1 sorVLE co tui W t 'i�7� protection Stream work, crossings Traps, Basins / Stabilization I I I Entrances Limits Compliant ❑ Notice to Comply ❑ Stop Work ❑ Bonq Insp [J Warning ❑ Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report lt\\�(c� ( File Number: 0 P b 7�� 0002 Project Name' �( DountY Inspector: ,10� Inspection Date: N For Warnings or Notices, DATE TO COMPLY BY nitial controls ❑ Clearing ❑ Rough Grading ❑ Construction L, rinish Grading ❑ Stabilization ❑ swm conversion ❑ 04' A Lp,e,F Compliant Notice to Comply ❑ Stop Work ❑ Bonq Insp ❑ Warning ❑ Under NTC ❑ Under SWOE] Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name File Number: L'�PO a 0( 'A 000) County Inspector: Inspection Date: �Z� Time: For Warnings or Notices, DATE TO COMPLY BY nitial controls ❑ Clearing ❑ Rough Grading ❑ Construction [k Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Yes No Silt, safety, tree fence Diversions, Berms, ditches Inlet, culvert protection Stream work, crossings Traps, Basins Stabilization Entrances Limits kA"Z !\XLVA C l taus 6 Compliant ❑ Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ Warning Under NTC ❑ [� Under SWO ❑ Re -inspection (fee) El Erosion Control Inspection Report I� File Number: I,JPU 9,yk'2 000AProject Name' DLA n to LLL f,25 - County Inspector: "I Inspection Date: 3 - Time: (O t �. For Warnings or Notices, DATE TO COMPLY BY _ � 2 l Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction V Finish Grading ❑ Stabilization ❑ swm conversion ❑ L Compliant � Notice to Comply ❑ �+'OVA L°"Stop Work ❑ Bond Insp ❑ Warning❑ Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ \ 'kriNA Erosion Control Inspection Report Project Name — File Number: tjpn.A®x i t )on k Inspection Date: �' -1 - i `�( Time: � ' '3© County Inspector: cv. For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction 121 Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliant n" Notice to Comply ❑ Stop Work ElBond Insp El Warning F1 Under NTC F] Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name� � �.� � File Number: _ ,�_t, r,_�n�.� (��: t ��� �c�n2 Inspection Date: Time: J ©: Jo County Inspector: For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction V Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliant ❑ Notice to Comply ❑ Stop Work El lnsp ❑ Warning � Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name i> c,,{\ lU ce_ Lrz ` 4 File Number: Comments/Notes a 2 t � Lb0 2,i No Silt, safety, tree fence �Ala,, County Inspector: )or,,e., Inspection Date: cJ�uc Time: N' 00 J For Warnings or Notices, DATE TO COMPLY BY � - _? " (`i nitial controls ❑ Clearing ❑ Rough Grading ❑ Construction V Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence of cJ�uc Diversions, Berms, ditches J b `` 1-1, i u�'La , ;A CL>M VOL -v\ v� Inlet, culvert protection � l t�, f c, we 4; C� (o�J�' 5��, c� S �3c �to"'X" Stream work, crossings_---- Traaps, Basins � Stabilization Entrances Limits Compliant F7' Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ Warning ❑ Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ I'I$pINP Erosion Control Inspection Report Project Name_t-, (1-,' �,rt File Number: t3 Po 7i vI --�' C;' Inspection Date: 'S I L I t Time: �Z: 3 County Inspector: For Warnings or Notices, DATE TO COMPLY BY 1„ifinl rnntrnls 1-1 Clearing ❑ Rough Grading ❑ Construction Z Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliant [!4� Notice to Comply ❑ or,�U Stop Work k ❑ Bond Ins p Warning ElUnder NTC ❑ 3�SIE- M Under SWO ❑ Re -inspection (fee) ❑ \ I'/HrINr Erosion Control Inspection Report Project Name �;;����� �C.� �Q; �" File Number. 0y� County Inspector; Inspection Date: %-�f - � �( Time: For Warnings or Notices, DATE TO COMPLY BY 1. ifii i rnntrnk, 171 Clearinq ❑ Rough Grading ❑ Construction / Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliant L:] Notice to Comply ❑ Stop Nork ❑ Bond Insp ❑ 51 - Warning ❑ Under NTC ❑ „T Under SWO ❑ Re -inspection (fee) [J Erosion Control Inspection Report Project Name: re- cora s File Number: L3Fc> q.":' +-2— - 0002 County Inspector: onnxu C � Inspection Date: Time: For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction E�' Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence J A S hA t N 0 Diversions, Berms, ditches 1•/ Inlet, culvert protection Stream work, crossings 1/1 ('at CX_ Traps, Basins Stabilization Entrances Limits j�J M SFG.tc,t�L^�< �t� fI .�LY.IGI C'6 1'IGC:c( xec !'C c.✓► trc,� rm. k • moi iii � s I'!/2GIN1�' Compliant [: '` Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ Warning ❑ Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: �ur, Liu (ire 5L File Number: l- po)-ul' 6200;x County Inspector: •J(,) -\nci4 U40 Inspection Date: '}�— �� Time: t OC) For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction [t� Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence �)tiY S �"`'y; t Diversions, Berms, ditches V �l l 1\7= L� ���^^ ' c'�^� rZ i n s t / Inlet, culvert protection J Stream work, crossings S3 c,�n_" JS 11� z0cf)"14 ^7 �c��✓ic y Traps, Basins J Stabilization Entrances f ✓ C U6VI Limits Compliant [ Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ sl Warning ❑ Under NTC ❑ Under SWO F] Re -inspection (fee) ❑ 'rtr.Nr Erosion Control Inspection Report Project NameV1 lv c�� 1 C (le S t File Number: County Inspector: d L) t. Inspection Date: , l �_ Time: Icy- mac=' For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction [Ji Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, � C(, r re c," t� tree fence Diversions, Berms, ditches Inlet, culvert rc ui S 6, (Ce"y �' ``� protection J Stream work, crossings �k c>�tcc✓�.1 �x L(-VC,�"`") Traps, Basins Stabilization Entrances Limits Compliant Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ Warning ❑ Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: File Number: 131 10 l k 000 d' S' County Inspector: Inspection Date: ),- 1 i - t V Time: 3` For Warnings or Notices, DATE TO COMPLY BY '� - I & -1 V Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence VJ Diversions, Berms, ditches Inlet, culvert/ C-�,lAnr,x5 protection V/ Stream work, crossings Traps, Basins / �, ��lc l : r Nu;,� C Stabilization Entrances Limits elel/S 14lt4'> l c,✓ e �s (�-« �ee�! ttt 5CAtCt rt 1 n 5�2c c Compliant ❑ Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ Warning Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: `crR_,�> File Number: &(_-62S County Inspector: `� Inspection Date: - t 4 Time: I u For Warnings or Notices, DATE TO COMPLY BY �21 - 1'2- 1 y Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction E� Finish Grading ❑ Stabilization ❑ swrn conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence Diversions, Berms, ditches Inlet, culvert protection Stream work, crossings Traps, Basins Stabilization Entrances Limits blsLG� ��.Jil�llll tciN�r Compliant ❑ Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ A Warning P'� Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name- �iA mlU rC, Q)Ge5File Number: County Inspector: ,.Q Inspection Date: ' (� (y Time: ( "c For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction i Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence Diversions, Berms, ditches ctkc i CtJ e�O I'l le ES Inlet, culvert protection ,J Stream work, crossings Traps, Basins Stabilization Entrances Limits nLf Compliant [K[' Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ x� Warning ❑ Under NTC ❑ ` �RcNUnder SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report ProjectName: (9 File Number: (,) p t� `�C) County Inspector: 0 An 9.,4 0+b Inspection Date: Time: For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, r _c wIC (I tree fence Diversions, Berms, ditches Inlet, culvert Gh)"-L' C C Ij (IAA protection Stream work, crossings Traps, Basins J Stabilization Entrances Limits Compliant E�Notice to Comply ❑ Stop Work ❑ Bond Insp [�J— Warning ❑ Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name:r02,J File Number: County Inspector: u()!!SL4 �, Inspection Date: � -3 t- ��{ Time: 10,. Cc, �..T For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence Diversions, Berms, ditches Inlet, culvert protection Stream work, crossings Traps, Basins Stabilization Entrances Limits 6�.'� v�� l v rn Wl � G . �� � (G✓CC � GLS C..(,)-2_� L t 5 �i%..� � (c is `-Z.� /ref l � (• VIGL�J � � <'1 .(�''[�f..t.; f.�. 2 C � (i1n � s �J i t'�' Z�.l � a � Gi l✓t Compliant ❑ Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ Warning [R' Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: 6�!�t0fG -0- r j2 5 � File Number: 132Q9'00' • Cno,k County Inspector:^�,�, _ Inspection Date: Time: ( S For Warnings or Notices, DATE TO COMPLY BY i - 11- j -A Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction t� Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance C Comments/Notes No Silt, safety, tree fence Diversions, Berms, ditches Inlet, culvert protection J Stream work, crossings Traps, Basins Stabilization Entrances Limits OL Compliant [ Notice to ComplyStop Work❑ Bondlnsp❑Warning❑ Under NTC❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: JJ,,v,VC,rCA Qr2._S File Number: QPU IC)I x & County Inspector: nrvt �l�tto , . I,y i C'(:;r Inspection Date: (- ��/ Time: vu For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction [f Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, O'd 4)C OCA SL.�.a(Jk tree fence Diversions, ;,r\ Berms, ditches Inlet, culvert Di vnc{��,.�;,1 io�.l_ J1.(..2ci �o L,,,,c CLCCr ec1 0(� (.� protection ! Stream work, crossings Traps, Basins Stabilization Entrances Limits Compliant [9� Notice to Comply ❑ Stop Work ❑ Bond lnsp ❑ Warning � Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name File Number: Opp �y i a ('XC )C) A9 County Inspector: nn -'I Inspection Date: ( - ( S- 14 Time: ( I.. _2'c� For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction IlJ Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, / tree fence Diversions, Berms, ditches Inlet, culvert j St.G��i,v��,, E �1us Joy.: 44 (AP C,rC)U_AG. Ct-V U protection 1/ Cu�l�ct Turn L)1((wci ffy wl (l eLx�� Stream work, crossings Traps, 6W C.J.P-(',,,�,��.ti �ti; n5 CAC ��)'W e j Basins Stabilization Entrances Limits (-oc,LA Or a G A "o r tc.. c ic�� . �2.z � 51z f C Gj � ( f'Z � ftzcc�s w; l l L2 2 C. ib � Pry I - C? - 11-1 Con7plient L_�-- Notice to U0'77Ply U Slop Work ❑ Bond Osp ❑ W8/771/7J [JUnder NTC ❑ Under SWOE] Re -inspection (fee) ❑ Erosion Control Inspection Report � � File Number: Project Name: D C Inspection Date: (- �3 ��Time: County Inspector: Jc, For Warnings or Notices, DATE TO COMPLYBY Inifinl rnnlrols n Clearing ❑ Rough Grading ❑ Construction [�r Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliant Lq-, Not/cc, ro uomp/y u ` 0V ALUF!, stop Work ❑ Bond Insp ❑ �ti y 'n Warning ❑ Under NTC ❑ U :✓fl n UUnderL]SWO Re -inspection (fee) ..a. [� I'II7C 114%' Erosion Control Inspection Report File Number: Project Name: r r Inspection Date: �'S� `� Time: County Inspector: ' For Warnings or Notices, DATE TO COMPLY BY lnlr�l rnnlrniq 1-1 Clearing ❑ Rough Grading ❑ Construction V Finish Grading ❑ Stabilization ❑ swm conversion ❑ �7[aN" Compliant ❑ Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ Warning ❑ Under NTC [N-� Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: File Number: `�U(a '0 () v; k County Inspector: Inspection Date: I _ �' l y Time: 16)•' 30 For Warnings or Notices, DATE TO COMPLY BY L- 9- l V Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction I( Finish Grading ❑ Stabilization ❑ swrn conversion ❑ Compliance. Vlt�,fety, Yes No tree fence Diversions, Berms, ditches Inlet, culvert 'o C Uc, cti^ protection Stream work, crossings Traps, 5M q 5S Sfi t Basins Stabilization s �vC_tC Entrances Limits Compliant ❑ Notice to c,omplY� �4 V,%Lj,,1 stop Work ❑ Bond Osp ❑ a _mit "I n Warning ❑ Under NTC ❑ Under SWOE] Re -inspection (fee) ❑ `I'/HGIN' Erosion Control Inspection Report Project Name: t a. Pile Number: f..� �� '"•% ��-- � � — Inspection Date: i Time: 7 County Inspector: n. For Warnings or Notices, DATE TO COMPLY BY ;- 10. t q Inilinl rrnnlrnls 1-1 Clearing ❑ Rough Grading ❑ Construction V Finish Grading ❑ Stabilization ❑ swm conversion ❑ r�A pil AL1 1A'1! I'/17CIN�, Compliant ❑ Notice to Comply Stop Work ❑ Bond losp ❑ Warning ❑ Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name__ }Y&cj e. o File Number: Inspection Date: - `/ Time: County Inspector: For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction VJ Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliant ❑�' Notice to Comply (J Stop Work ❑ Bond Insp ❑ o`sil A'' tNar77in9 Under NTC Ll Under SWO ❑ Re -inspection (fee) Ll ` IIIfIN' Erosion Control Inspection Report �= - c File Number: ;, (), ._ -,f % Project Name: (��vr ' Inspection Date: 12• IZ' (� Time: County Inspector: _ �,,., For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Constructions Finish Grading ❑ Stabilization ❑ swm conversion ❑ ALUF,Ii Compliant 1?/ Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ Warning ❑ Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: Dun 6rCn (rt 5(- File Number: i Pig R t `eL• oc � County Inspector: ( Inspection Date: Time: For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction / Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence / v We A -t0 A? %✓uc0 Diversions, Berms, ditches Inlet, culvert protection CA�--Li ;✓l LC C' t'CL^ Stream work, crossings Traps, Basins Stabilization Entrances Limits pV LUF,tJ Compliant [� Notice to Comply ❑ Stop Worl� ❑ Bond Insp ❑ Warning ❑ Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: aunkga �CCgcs File Number: G t �iU(�2 County Inspector: Jvnn� �,Jpr rnv C)Lc e Inspection Date: 1 - ��: - Time: I (. o(3 For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence J Diversions, Berms, ditches Inlet, culvert protection Stream work, crossings Traps, t 566 tz4-t Basins Stabilization Entrances Limits y X1:.1 LUAf Compliant Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ Warning ❑ Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: _�l File Number: ( )ffi�_ �;l' pGU� S' Lori., c)( i2 1 County Inspector:r Inspection Date: 11 -P -t3 Time: For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction / Finish Grading ❑ Stabilization ❑ swrn conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence J Diversions, ,45ptf GP,'v✓s u -+s /ri, �. ��°r�kct� ! i'��e%s Berms, ditches Inlet, culvert 1 protection ✓ Stream work, crossings Traps, Basins Stabilization Entrances Limits !� pG ALL)F�,�i 2'/l2CIN�' Compliant Notice to Comply ❑ Stop Work g Bond Insp ❑ Warning ❑ Under NTC ❑ Under SWOE] Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: �t A„ r� i cj _�S File Number: ��) �O ��p t OCJU2 FS County Inspector: -'J O 11 Inspection Date: %/- / f,3 Time: 1/: 30 For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction [Z Finish Grading ❑ Stabilization ❑ swrn conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence Diversions, Berms, ditches L - Inlet, culvert protection Stream work, crossings Traps, Basins Stabilization Entrances Limits Compliant ❑ Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ - _ Warning ❑ Under NTC 2r Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: Db,,n (L c-r.A Pn- e:,( File Number: LJ P© �ZA t 2 - 0c) -: -2-(S County Inspector: Inspection Date: ((- i' LQ Time: For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction W Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence V Diversions, C(OvSiwc r' 5h. (tee( Berms, ditches Inlet, culvert In It f 3 ��cwa lazt 1 L �� protection J ��s�w �rpQt n.��y: "le0s Stream work, crossings Traps, Basins J Stabilization J Entrances ,a- L)-kcf J Limits IQ TL Compliant ❑ Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ Warning ❑ Under NTC � Under SWO ❑ Re -inspection (fee) Erosion Control Inspection Report Project Name: DuRtorc._ Vortc, File Number: („) PD �Zo I `2 - O00 2$ County Inspector: '10nn J. f(D Inspection Date: 3 Time: w' 0a For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction / Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, --cc) tree fence Diversions, 5 Q bLx,' (n ('1A) "'I rtCk(_ j)a57 n WtCA, Berms, / ditches Inlet, culvert protection Stream work, crossings Traps, sh tt ✓It%S 4rC�5(A Q;tc,ic- Basins J Stabilization Entrances Limits ri Cc Iulk�S I o U D �o, AL FCompliant ❑ Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ Warning ❑ Under NTC 2r Under SWOE] Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name i.�� ���� ❑ rz5 File Number: C-) P© `I(U( a (-)O(I-), g County Inspector: kjnn� t Inspection Date: (O Time: /� :a For Warnings or Notices, DATE TO COMPLYBY 7o1 3 Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction / Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence Diversions, Berms, ditches Inlet, culvert protection Stream work, crossings Traps, Basins Stabilization Entrances Limits s�w.rt. �� NTC %-)U,9-- CXCA',0Q-k iM.PljQ"'-V«l bLA an f2X�ens'.o�, ".all be oeQ_cteCA. n�t'' Compliant ❑ Notice to Comply Stop Work❑ Bond Insp i, Warning F1Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name ko rc, 2(-,f t File Number: i too 901-A 0000 County Inspector:�� Inspection Date: �041 (3 Time: X ' L, G For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction / Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence Diversions, Berms, ditches Inlet, culvert ` AJo r`�t Ce - �J:t h`�`^ r n 5 <e protection Stream work, crossings Traps, Basins .! Stabilization Entrances Limits Compliant ❑ Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ Warning [%f Under NTC ❑ Under SWOE] Re -inspection (fee) ❑ Erosion Control Inspection Report ProjectName:- Dun([), f R 5 L File Number: 9c> l -;L, - 000 County Inspector: Inspection Date: (D q / Time: For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction EZ Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety,(, J O (pus r tree fence o/ Diversions, Berms, ditches Inlet, culvert j �n +t,- �ruc�ss o rQp�ij: ny Gill protection Stream work, crossings Traps, Nxf-&s Cad' Basins Stabilization Entrances Limits gill tJatt-�a� r e��rz si,�aw1 �/1 �CzJ�o.s �tp����� ,1cNh�7 __11`u.,S / 1 3 Compliant Notice to Comply ❑ Stop Work ❑ Bond lnsp ❑ - 1 Warning ❑ Under NTC ❑ I�H('INA Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Iroject Name: 'DLL0 ky c",LyUCC_s � File Number: �j PD ✓�(� i'2� ®�°�� :ounty Inspector: ten, �� Inspection Date: iD Time: �1 aG _ "or Warnings or Notices, DATE TO COMPLY BY itial controls ❑ Clearing ❑ Rough Grading ❑ Construction (, Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, ree fence )iversions, 3erms, litches flet, culvert rotection stream rork, rossin s raps, ,@sins tabilization ntrances mits Au-e.E (,j To/vi G C t)r/ eC k. cvt i i 5� Crecy fav( (91 i C r .�., ! 7 F.15, Vkt-,?- r 0e, 54-4 a f�;�� ti�,, .� UA IC> �t k)a,r1;1'119 V ---- A A Compliant ❑ Notice to Comply ❑ Stop Work ❑ �'tRGINtP Verbal Warning ❑ Erosion Control Inspection Report Project Name: �417100 Foresf File Number: WP ar1Z. i DO County Inspector: 6-11071L JonneN ACWIL Inspection Date: � 2413 Time: '7,-30 4M For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ✓Finish Grading E/ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No / FXO,,,-de S1,11ien i e -yl4Qr sewe- 1; n e i�1 s-AvI ed � eXi itq SB ked J Silt, safety, ✓ `r an J tree fence Re Cm 5IruG-1 d�v,&Sfen eke •fa OXIM-Z (train Diversions,v" Berms, ditches P -7 -- DT . qj i e r %Haatyje zlAis Inlet, culvert ✓ �• hof Prove ,�r� ` G1 � protection Stream work, crossings -SWM-' '7y1issin� �'gnVaj' Traps, Basins 1/ —Ih.s-lall rim y� S�t�✓i/ze SWM -2 ��t,bc�hknc�,-� L t,�i� s�e� ��u Stabilization �., StaIleoce SeWer, Entrances ✓ Limits ✓ of^may Compliant ❑ Notice to Comply ❑ �-� Stop Work ❑ Bond Insp ❑ Warning D", Under NTC ❑ �•iNP Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Project Name: <./�v��onz7�• �,��� -hoz, File Number:1i?a Zv[Z F�cr 2$ County Inspector.!!fl ,) Inspection Date: Zr W3 Time: For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction 2" Finish Grading E3"' Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, _`, ' , & F ai 61 r tree fence ✓'` Diversions, Berms, /"_1_1 ✓.A�-111 ditches Inlet, culvert CGc"r_4 protection ,/ Stream work, NR crossin s Traps, Basins �v�.2-Gfr.�vz*un�,2tc,�i.� ✓ � Stabilization _ Entrances Limits i� Compliant [?r Notice to Comply ❑ sJ 1 Stop Work ❑ Bond Insp ❑ Warning ❑ Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report 'roject Name: \inn bCC1 VJ(z <J File Number: L)(Do :ounty Inspector: Inspection Date: (7 _ Time: 'or Warnings or Notices, DATE TO COMPLY BY itial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization ❑ swrn conversion ❑ Compliance Comments/Notes Yes No Silt, safety, ree fence f),S CA-trlA c> V, N 1.bL-) C� �c� S )iversions, 3erms, litches flet, culvert ,rotection stream cork, rossin s raps, asins tabilization ntrances mits A��Compliant I/ Notice to Comply ❑ r� Stop Work ❑ Bond Insp ❑ Warning ❑ Under NTC ❑ t'lir Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report 'roject Name: �cv��„mac.. «,� File Number:. JeD 901,1 • ()Oval' :ounty Inspector: �nA!,TA Inspection Date:0/-113 Time: (U` ot:) "or Warnings or Notices, DATE TO COMPLY BY itial controls ❑ Clearing ❑ Rough Grading ❑ Construction I/ Finish Grading ❑ Stabilization ❑ swrn conversion ❑ Compliance Comments/Notes Yes No Silt, safety, J ree fence )iversions, 3erms, t'11,0 i -5,15 CA5CQ^ litches flet, culvert ,rotection stream cork, rossin s raps, asins IJ tabilization J S Lo VU s a-e� C&nut'R d ntrances mits OV ALMJ Compliant [� Notice to Comply ❑ Stop Work ❑ Bond Insp ❑ 7° Warning ❑ Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report Toject Name: V ZA('1 File Number: PC) 0oo0'\� ;ounty Inspector: Inspection Date: '(-2.0-13 Time: 3� "or Warnings or Notices, DATE TO COMPLY BY itial controls ❑ Clearing ❑ Rough Grading ❑ Construction / Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes n,o Silt, safety, ree fence V )iversions, 3erms, iitches / `�/ /+spy--e,¢fs Lk� ►� R�7 (a ct'-z rc.ino Ccv'b lc fc nlet, culvert )rotection >tream rork, rossin s raps lasins J �� w�l.cct OzJt1vJ 63v�tr� (�4t�1s nnc.+��u,r.- stabilization .ntrances imits pFAL„�! Compliant 0 Notice to Comply ❑ 'rdl3 Stop Work ❑ Bond Insp ❑ Warning ❑ Under NTC ❑ Under SWO ❑ Re -inspection (fee) ❑ Erosion Control Inspection Report 'roject Name: stn (arc,, ���x`?S� File Number: WPd A D(� - bcx)o"t ,ounty Inspector: oo Inspection Date:_ - (0 Time: /4 00 'or Warnings or Notices, DSI TE TO COMPLY BY itial controls ❑ Clearing ❑ Rough Grading ❑ Construction [/ Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, ree fence Diversions, 3erms, iitches Met, culvert votection >tream vork, :rossin s raps, lasins >tabilization I_ �bf S C✓'A rxc' f _S 5f�u .i Se m :ntrances imits G1 % Project Name Erosion Control Inspection Report D c_.b2t} C-0 A'C ST Compliant Notice to Comply ❑ Stop Work ❑ Verbal Warning ❑ File Number: 20 i Z - bvo2g County Inspector: L . Inspection Date: -7/ } 1'3 Time: t' d 0 For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence J Diversions, Berms, ditches Inlet, culvert protection Stream J work, crossings Traps, Basins Stabilization j Entrances Limits J -t' 10 AP AL (� S� �0- b� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 June 21, 2013 Rock Creek Properties, LLC C/o Mr. Charlie Hurt 195 Riverbend Drive Charlottesville, VA 22911 Certified mail: 91 7108 2133 3937 4223 6084 RE: WPO 2012-00028 Dunlora Forest NOTICE TO COMPLY Dear Mr. Hurt: Fax (434) 972-4126 Under Section 17-213, of the Albemarle County Code, this is your NOTICE TO COMPLY with the requirements of the Erosion Control Permit for the referenced property and to immediately take corrective measures that address the erosion and sediment control deficiencies on this property. The specific deficiencies and measures required to correct those deficiencies are as follows: / 1. Defieiencv: Constuction entrance with washrack not installed as shown on approved E&S plan. v Required Corrections: Install paved wash rack and construction entrance in accordance with the approved erosion and sediment control plan. 2. Deficiency: Drop inlets throughout project do not have protection installed. Required Corrections: Install drop inlet protection at all inlets in accordance with 3.07 of the VESCH Third edition, dated 1992 and the approved E&S plan. 1 3. Deficiency: Silt fence is more than 50% full in area below sediment basin. Required Corrections: Repair and maintain silt fence and remove sediment. 4. Defieiencv: Dam on SWM pond has not been seeded. Required Corrections: Seed and straw mulch dam in accordance with VESCH Third edition, dated 1992. 5. Deficiency: No temporary seeding applied throughout project. Required Corrections: Apply temporary seeding in accordance with the VESCH Third edition, dated 1992. Unless subsequently amended in writing by this office, it is expected all of these corrective measures will be completed by no later than July 12, 2013. y Page 2 Under Sections 17-213, 214 and 215 of the Albemarle County Code, failure to make these corrections by the required date can have the following results: Your permit may be revoked. You may be required to submit a new Erosion and Sediment Control Plan and have it approved before additional land disturbance will be allowed, Review of a new plan can take up to 45 days for each submission and it is not unusual for several submissions before the plan can be approved. This requirement would include a new application, fee and bond for the work proposed under the plan. The County may issue a STOP WORK ORDER and seek relief in the Circuit Court. The Circuit Court can fine the property owner up to $2,000 per violation, convict the property owner of a Class I misdemeanor and require the property owner to pay any damages resulting from a failure to comply with this notice. Should you have a legitimate reason you cannot complete the corrective measures by the above given date, you must immediately contact me at (434) 296-5832. Unless you have contacted us and alternative arrangements have been agreed to in writing, we will expect the corrections to be completed by the above date. Since,:-, mo W.1 y Senior ng ineering Inspector Copy: E&SC File Mr. Trey Dillard, A.G. Dillard Inc. 295 Memory Lane, Troy, VA 22974-3707 Glenn Brooks P.E., Albemarle County, County Engineer 9i, -nnA X1.33 3937 4223 6084 of A��r Complia L Notice to Comp y Stop Wok E k N� Verbal Wami Erosion Control Inspection Report Project Name: D UN C-0. A r� zES-i" File Number: G L0 i Z -roc) 2 County Inspector: XL-. Inspection Date: -7-10-13 Time: 11 jl'o For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Constructiori, - inish Grading- Stabilization, swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence Diversions, Berms, ditches Inlet, culvert protection Stream work, crossings Traps, Basins Stabilization Entrances Limits „ t S 12c w t 't, D Lk,4-4ad / .-, 7o P,, s 01 u P4Z0 62t Sf 6 �37c"' ou)e -7-t'Z'1`3 tv...sL t1,1-6 1-b 6F Erosion Control Inspection Report Compliant ❑ Notice to Comply ❑ Stop Work ❑ Verbal Warning©' Project Name: ���� fdz�. File Number: ltlPu' ZolZoaz�2z3 County Inspector: Inspection Date: 2015 Time: ID'a-. For Warnings or Notices, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction [[Finish Grading ❑ Stabilization ❑ swm conversion ❑ x—L Compliance CNo Comments/Notes YesSilt, safety, Z .4"'4 tree fence 4tcK� yJ ,ate ��L � �,� 46414,,x E Diversions, Berms, / a 6161t� /t2c a .E'1t' 'e' ditches 1/ Inlet, culvert / V 0 Protection Stream work, crossings Traps, Basins / (,�i>'2Zctcti ".�✓�- c»2+�t� f� �, �/ Stabilization iA� ll4'44 .4u;2L, Entrances rn.it--t� Limits y �%Lt-G jte%a c4� x—L COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 June 21, 2013 Rock Creek Properties, LLC C/o Mr. Charlie Hurt 195 Riverbend Drive Charlottesville, VA 22911 Certified mail: 91 7108 2133 3937 4223 6084 RE: WPO 2012-00028 Dunlora Forest NOTICE TO COMPLY Dear Mr. Hurt: Under Section 17-213, of the Albemarle County Code, this is your NOTICE TO COMPLY with the requirements of the Erosion Control Permit for the referenced property and to immediately take corrective measures that address the erosion and sediment control deficiencies on this property. The specific deficiencies and measures required to correct those deficiencies are as follows: 1. Deficiency: Constuction entrance with washrack not installed as shown on approved E&S plan. Required Corrections: Install paved wash rack and construction entrance in accordance with the approved erosion and sediment control plan. 2. Deficiency: Drop inlets throughout project do not have protection installed. Required Corrections: Install drop inlet protection at all inlets in accordance with 3.07 of the VESCH Third edition, dated 1992 and the approved E&S plan. 3. Deficiency: Silt fence is more than 50% full in area below sediment basin. Required Corrections: Repair and maintain silt fence and remove sediment. 4. Deficiency: Dam on SWM pond has not been seeded. Required Corrections: Seed and straw mulch dam in accordance with VESCH Third edition, dated 1992. 5. Deficiency: No temporary seeding applied throughout project. Required Corrections: Apply temporary seeding in accordance with the VESCH Third edition, dated 1992. Unless subsequently amended in writing by this office, it is expected all of these corrective measures will be completed by no later than July 12, 2013. Page 2 Under Sections 17-213, 214 and 215 of the Albemarle County Code, failure to make these corrections by the required date can have the following results: Your permit may be revoked. You may be required to submit a new Erosion and Sediment Control Plan and have it approved before additional land disturbance will be allowed. Review of a new plan can take up to 45 days for each submission and it is not unusual for several submissions before the plan can be approved. This requirement would include a new application, fee and bond for the work proposed under the plan. The County may issue a STOP WORK ORDER and seek relief in the Circuit Court. The Circuit Court can fine the property owner up to $2,000 per violation, convict the property owner of a Class I misdemeanor and require the property owner to pay any damages resulting from a failure to comply with this notice. Should you have a legitimate reason you cannot complete the corrective measures by the above given date, you must immediately contact me at (434) 296-5832. Unless you have contacted us and alternative arrangements have been agreed to in writing, we will expect the corrections to be completed by the above date. Sincerely, aym W. / y Seniors ngineering Inspector Copy: E&SC File Mr. Trey Dillard, A.G. Dillard Inc. 295 Memory Lane, Troy, VA 22974-3707 Glenn Brooks P.E., Albemarle County, County Engineer 91 7108 2133 3937 4223 6084 Compliant ❑ Notice to ComplyX Stop Work ❑ Verbal Warning ❑ Erosion Control Inspection Report Project Name: j>o ow(A FoRF-Slr File Number: t, 2fo 2© iZ'o0n Z-6 County Inspector: Inspection Date: ".z "Z3 Time: For Warnings or Notices, DATE TO COMPLY BY -7-1 Z t3 Initial controls ❑ Clearing ❑ Rough Grading Construction. Finish Grading. Stabilization,J�4_swm conversion. Compliance Comments/Notes Yes No Silt, safety, k tree fence Diversions, Berms, ✓ ditches Inlet, culvert protection Stream work, crossings Traps, Basins Stabilization ✓C Entrances No Limits '-}UTD-�)ct /.s.� C , ��y OF -IL�FI Compliant Notice to Comply ❑ Stop Work ❑ ','v�kCIN,P Erosion Control Inspection Report Project Name: 1)v,, "QA t=cx?-rST File Number: WPO 2-61Z - CX)OW County Inspector: R L . +,.✓r VVE1, b;L-c*41 Inspection Date:S ' 21+'13 Time: / '.3O Initial controls ❑ Clearing ❑ Rough Grading,g Construction X Finish Grading K Stabilizatior>pg swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence Diversions, Berms, ✓ ditches Inlet, culvert protection Stream work, crossings Traps, Basins Stabilization Entrances Limits Phone(434)296-5832 May 15, 2013 Rock Creek Properties, LLC C/o Mr. Charlie Hurt 195 Riverbend Drive Charlottesville, VA 22911 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Certified mail: 91 7108 2133 3937 4112 5624 RE: WPO 2012-00028 Dunlora Forest NOTICE TO COMPLY Dear Mr. Hurt: Fax(434)972-4126 Under Section 17-213, of the Albemarle County Code, this is your NOTICE TO COMPLY with the requirements of the Erosion Control Pen -nit for the referenced property and to immediately take corrective measures that address the erosion and sediment control deficiencies on this property. The specific deficiencies and measures required to correct those deficiencies are as follows: 1. Deficiency: Constuction entrance with washrack not installed as shown on approved E&S plan. A��r Required Corrections: Install paved wash rack and construction entrance in accordance with the approved b eo x erosion and sediment control plan. k LA- tt� t�pni2.L Deficiency: Drop inlets do not have protection installed. !�•� t� O Required Corrections: Install drop inlet protection in accordance with 3.07 of the VESCH Third edition, ✓�' dated 1992. ,/ 3. Deficiency: Silt fence has been compromised in two locations below sediment basin. % Required Corrections: Repair and maintain silt fence and remove sediment fi•om stream. ✓ 4. Deficiency: Trash rack has been removed from sediment basin structure and safety fence is down. Required Corrections: Install trashrack on structure and repair safety fence. / 5. Deficienev: No temporary seeding applied. Required Corrections: Apply temporary seeding in accordance with the VESCH Third edition, dated 1992. Unless subsequently amended in writing by this office, it is expected all of these corrective measures will be completed by no later than May 24, 2012. i Page 2 Under Sections 17-213, 214 and 215 of the Albemarle County Code, failure to make these corrections by the required date can have the following results: Your permit may be revoked. You may be required to submit a new Erosion and Sediment Control Plan and have it approved before additional land disturbance will be allowed. Review of a new plan can take up to 45 days for each submission and it is not unusual for several submissions before the plan can be approved. This requirement would include a new application, fee and bond for the work proposed under the plan. The County may issue a STOP WORK ORDER and seek relief in the Circuit Court. The Circuit Court can fine the property owner up to $2,000 per violation, convict the property owner of a Class I misdemeanor and require the property owner to pay any damages resulting from a failure to comply with this notice. Should you have a legitimate reason you cannot complete the corrective measures by the above given date, you must immediately contact me at (434) 296-5832. Unless you have contacted us and alternative arrangements have been agreed to in writing, we will expect the corrections to be completed by the above date. Since ly, ymoLil Senior?ngVzi�n/eering Inspector Copy: E&SC File Mr. Trey Dillard, A.G. Dillard Inc. P.O. Box 7427, Charlottesville VA 22906 Glenn Brooks P.E., Albemarle County, County Engineer Erosion Control Inspection Report Compliant ❑ Notice to Compl � Stop Work ❑ roject Name: rJUvw z4 (=—cwruc 7 File Number: (Pc) ,Zo t � — boo Z6 ounty Inspector: ji L r, 2/7 9 -r -'c7 Inspection Date: 5 - >S - 13 Time: itial controls ❑ Clearing ❑ Rough Grading Construction -a Finish Grading Stabilization swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, ,�/t ✓� 2,� 3�u;�,,,� Oo�..� �N cu•o 1'�-A�f ree fence )iversions, 3erms, Ditches D_r /4 g i,4c A --)o Pcto-tLc 71 v nlet, culvert )rotection Stream P4 vork, :rossings _raps 3asins Sta&NL ti051�'3--'C5 >tabilization :ntrances LI/ imits 4 OF ALg� , U �G� I rRGINX COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 May 15, 2013 Rock Creek Properties, LLC C/o Mr. Charlie Hurt 195 Riverbend Drive Charlottesville, VA 22911 Certified mail: 91 7108 2133 3937 4112 5624 RE: WPO 2012-00028 Dunlora Forest NOTICE TO COMPLY Dear Mr. Hurt: Under Section 17-213, of the Albemarle County Code, this is your NOTICE TO COMPLY with the requirements of the Erosion Control Permit for the referenced property and to immediately take corrective measures that address the erosion and sediment control deficiencies on this property. The specific deficiencies and measures required to correct those deficiencies are as follows: 1. Deficiency: Constuction entrance with washrack not installed as shown on approved E&S plan. Required Corrections: Install paved wash rack and construction entrance in accordance with the approved erosion and sediment control plan. 2. Deficiency: Drop inlets do not have protection installed. Required Corrections: Install drop inlet protection in accordance with 3.07 of the VESCH Third edition, dated 1992. 3. Deficiency: Silt fence has been compromised in two locations below sediment basin. Required Corrections: Repair and maintain silt fence and remove sediment fi•om stream. 4. Deficiency: Trash rack has been removed from sediment basin structure and safety fence is down. Required Corrections: Install trashrack on structure and repair safety fence. 5. Deficiency: No temporary seeding applied. Required Corrections: Apply temporary seeding in accordance with the VESCH Third edition, dated 1992. Unless subsequently amended in writing by this office, it is expected all of these corrective measures will be completed by no later than May 24, 2012. 91 7108 2133 3937 4112 5624 Page 2 Under Sections 17-213, 214 and 215 of the Albemarle County Code, failure to make these corrections by the required date can have the following results: Your permit may be revoked. You may be required to submit a new Erosion and Sediment Control Plan and have it approved before additional land disturbance will be allowed. Review of a new plan can take up to 45 days for each submission and it is not unusual for several submissions before the plan can be approved. This requirement would include a new application, fee and bond for the work proposed under the plan. The County may issue a STOP WORK ORDER and seek relief in the Circuit Court. The Circuit Court can fine the property owner up to $2,000 per violation, convict the property owner of a Class I misdemeanor and require the property owner to pay any damages resulting from a failure to comply with this notice. Should you have a legitimate reason you cannot complete the corrective measures by the above given date, you must immediately contact me at (434) 296-5832. Unless you have contacted us and alternative arrangements have been agreed to in writing, we will expect the corrections to be completed by the above date. Senior Since ly, �ymo ngineering Inspector Copy: E&SC File Mr. Trey Dillard, A.G. Dillard Inc. P,O. Box 7427, Charlottesville VA 22906 Glenn Brooks P.E., Albemarle County, County Engineer Erosion Control Inspection Report Compliant Notice to Comply ❑ Stop Work ❑ 'roject Name: bUAJLo eg F02-iz-S1 File Number: wPo 20 12---bcDp213 county Inspector: Inspection Date: - - 12 Time: nitial controls Clearing ❑ Rough Grading,L Construction Finish Grading Stabilization,W swm conversion El Compliance Comments/Notes Yes No Silt, safety, tree fence Diversions, Berms, ditches Inlet, culvert ✓ protection Stream work, crossings Traps, Basins Stabilization / Entrances Limits `� Project Name: Erosion Control Inspection Report PU/it.0P.A r -v �ZAS-" Compliant - Notice to Comply ❑ Stop work ❑ File Number: W PD County Inspector: 1 Inspection Date: y -9 '/3 Time: 1 ?- Silt, safety, Initial Initial controls ❑ Clearing ❑ Rough Gradingd,J-- Construction,p�— Finish Gradings Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence 1 Diversions, Berms, ditches Inlet, culvert protection Stream work, / ./ crossings Traps, Basins Stabilization Entrances Limits t+hk w� 7-�"` eF ►�.G. �►u �+�. Gam ' ;,E '4A0 0,`6 1 >. C3. COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 February 28, 2013 Rock Creek Properties, LLC C/o Mr. Charlie Hurt 195 Riverbend Drive Charlottesville, VA 22911 RE: WPO 2012-00028 Dunlora Forest STOP WORK ORDER Dear Mr. Hurt: a Zj �. Under § 17-214 of the Albemarle County Code, you are hereby notified to immediately cease all land disturbing activities on the above referenced property (STOP WORK) with the exception of work to address the installation of erosion control measures, soil stabilization, and any necessary drainage corrections as approved by the County. This STOP WORK ORDER shall remain in place for seven (7) days from the date of receipt. If satisfactory repairs have not been made within seven (7) days, the County may elect to issue another Stop Work Order, and/or petition the Circuit Court for penalties and relief with regard to this violation. Required Correction(s): 1. Install paved wash rack in accordance with the approved erosion and sediment control plan. 2. Install safety fence around sediment basin in accordance with 3.01 of the VESCH Third edition, dated 1992. Please contact either Kenny Thacker or Ray Lilly at 434-296-5832 should you have questions regarding this matter. Sincerely, Ra dly Kenny Thacker Glenn Brooks, P.E. Se or Engineering Inspector Erosion Control Officer County Engineer Program Administrator RWL/ Attachment Copy: Mark Graham, Albemarle County, Director of Community Development Trey Dillard, P.O. Box 7427, Charlottesville, VA 22906 OC ALOE Compliant Notice to Comply ❑ zz^7; Stop Work ❑ / %RGIN�P V Erosion Control Inspection Report Project Name: DD.OL-4)/Z'4 pt.ES7 File Number: -:4. c 2e)t2- Obco`�F3 County Inspector: % L , Inspection Date: ,Z -,2e -L2 Time: 1 o0 Initial controls ❑ Clearing ❑ Rough Grading-21Construction ❑ Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, f tree fence Diversions, Berms, ditches Inlet, culvert protection ,r Stream work, J crossings Traps, Basins f Stabilization Entrances Limits ✓ (V<"z 4-t) Lk. oti sorr , z s ©'J s' --)C) PSA, e . %� A.)S r.OL,4-3 t�s�rku-4-�7 J vP 1 1 IP 4tciN r Erosion Control Inspection Report Compiiant,f�;-- Notice to Comply ❑ Stop Work ❑ 'roject Name: N.utoLA- F,34F-S-T File Number: U)PO zo tZ Dbb Zg �ounty Inspector: I e ,(- . Inspection Date: Z- ZZ -13 Time: T DO nitial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization ❑ swm conversion ❑ Comments/Notes kCompfiance No Silt, safety, tree fence Diversions, Berms, / ditches Inlet, culvert protection Stream Nork, ;rossings traps, 3asins / J Stabilization :ntrances .� imits A) 0 MOD a,J /-(0 project Name: :,ounty Inspector: Compliant'[ /vvu(Ic tv �.vnipry Stop Work ❑ Erosion Control Inspection Report D VA.;i-C!zA FrxzjisT File Number: ' 12- 000zf3 Inspection Date: 'Z " Z I -13 Time: / :00 nitial controls ❑ Clearing ❑ Rough Gradin4;�4—_- Construction ❑ Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes — No Silt, safety, tree fence Diversions, Berms, ditches Inlet, culvert protection ✓ Stream Nork, ,/ ;rossings Fraps, 3asins >tabilization % ntrances i/ imits SCcCC C 14 01 AbOvY A{ C e� A (,f�, �FL COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 ne (434) 296-5832 February 19, 2013 Rock Creek Properties, LLC C/o Mr. Charlie Hurt 195 Riverbend Drive Charlottesville, VA 22911 Certified mail: 91 7108 2133 3937 4112 5648 RE: WPO 2012-00028 Dunlora Forest NOTICE TO COMPLY Fax (434) 972-4126 Dear Mr. Hurt: Under Section 17-213, of the Albemarle County Code, this is your NOTICE TO COMPLY with the requirements of the Erosion Control Permit for the referenced property and to immediately take corrective measures that address the erosion and sediment control deficiencies on this property. The specific deficiencies and measures required to correct those deficiencies are as follows: 1, Deficiency: Violation of MS -17. (Mud on the road) Required Corrections: Clean road and install paved wash rack and construction entrance in accordance with the approved erosion and sediment control plan. Unless subsequently amended in writing by this office, it is expected all of these corrective measures will be completed by no later than February 26, 2012. Under Sections 17-213, 214 and 215 of the Albemarle County Code, failure to make these corrections by the required date can have the following results: 11 Your permit may be revoked. You may be required to submit a new Erosion and Sediment Control Plan and have it approved before additional land disturbance will be allowed. Review of a new plan can take up to 45 days for each submission and it is not unusual for several submissions before the plan can be approved. This requirement would include a new application, fee and bond for the work proposed under the plan. The County may issue a STOP WORK ORDER and seek relief in the Circuit Court. The Circuit Court can fine the property owner up to $2,000 per violation, convict the property owner of a Class I misdemeanor and require the property owner to pay any damages resulting from a failure to comply with this notice. Should you have a legitimate reason you cannot complete the corrective measures by the above given date, you must immediately contact me at (434) 296-5832. Unless you have contacted us and alternative arrangements have been agreed to in writing, we will expect the corrections to be completed by the above date. Si ly, /Rayi nd W. Li/ Seni r Engineering Inspector 91 7108 2133 3937 4112 5648 Copy: ER.SC File Mr. Trey Dillard, A.G. Dillard Inc. P.O. Box 7427, Charlottesville VA 22906 Glenn Brooks P.E., Albemarle County, County Engineer- ALvi t Erosion Control Inspection Report Compliant ❑ Notice to Comply Stop Work ❑ Project Name: j)v --,) Low File Number: La PO Z o (-Z — .00C> 28 No Silt, safety, tree fence County Inspector: Inspection Date:! Time: 0 nitial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, tree fence Diversions, Berms, ditches Inlet, culvert protection Stream work, ,rossings i'raps, 3asins stabilization :ntrances .imits COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 February 19, 2013 Rock Creek Properties, LLC C/o Mr. Charlie Hurt 195 Riverbend Drive Charlottesville, VA 22911 Certified mail: 91 7108 2133 3937 4112 5648 RE: WPO 2012-00028 Dunlora Forest NOTICE TO COMPLY Dear Mr. Hurt: Under Section 17-213, of the Albemarle County Code, this is your NOTICE TO COMPLY with the requirements of the Erosion Control Permit for the referenced property and to immediately take corrective measures that address the erosion and sediment control deficiencies on this property. The specific deficiencies and measures required to correct those deficiencies are as follows: 1. Deficiency: Violation of MS -17. (Mud on the road) Required Corrections: Clean road and install paved wash rack and construction entrance in accordance with the approved erosion and sediment control plan. Unless subsequently amended in writing by this office, it is expected all of these corrective measures will be completed by no later than February 26, 2012. Under Sections 17-213, 214 and 215 of the Albemarle County Code, failure to make these corrections by the required date can have the following results: Your permit may be revoked. You may be required to submit a new Erosion and Sediment Control Plan and have it approved before additional land disturbance will be allowed. Review of a new plan can take up to 45 days for each submission and it is not unusual for several submissions before the plan can be approved. This requirement would include a new application, fee and bond for the work proposed under the plan. The County may issue a STOP WORK ORDER and seek relief in the Circuit Court. The Circuit Court can fine the property owner up to $2,000 per violation, convict the property owner of a Class I misdemeanor and require the property owner to pay any damages resulting from a failure to comply with this notice. Should you have a legitimate reason you cannot complete the corrective measures by the above given date, you must immediately contact me at (434) 296-5832. Unless you have contacted us and alternative arrangements have been agreed to in writing, we will expect the corrections to be completed by the above date. S5enir ly, /4 /Raynd W. Li SEngineering Inspector Copy: E&SC File Mr. Trey Dillard, A.G. Dillard Inc. P.O. Box 7427, Charlottesville VA 22906 Glenn Brooks P.E., Albemarle County, County Engineer o` AL� Compliant,5 Notice to Comply ❑ Stop Work ❑ �kGIN�P Erosion Control Inspection Report Project Name: iOvtiLo4A Fo2L-sT File Number: County Inspector: K '�--, Inspection Date: 2—(k- 13 Time: J2 ``to Initial controls ❑ Clearing ❑ Rough Grading Pg._ Construction ❑ Finish Grading ❑ Stabilization 2� swm conversion ❑ Compliance Comments/Notes Yes No Silt, safety, / tree fence Diversions, Berms, ✓ ditches Inlet, culvert protection ✓ Stream work, crossings Traps, Basins Stabilization ✓ Entrances Limits ✓ p2cPBra� v(-"= PU4'1 ?o 2Al-c OP A.G bj t LAR-,) ALD�G, Compliant`�j a Notice to Comply ❑ Stop Work ❑ IRC;IN�P j/ Erosion Control Inspection Report Project Name: bv0LO(LA POPQZ.s'i File Number: WPc Zo tZ- Omr?-�,,' County Inspector: 1� L, Inspection Date: )L "('-f3 Time: i 2'qC Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization ❑ swm conversion ❑ Compliance CommentsyNotes Yes No Silt, safety, ✓ l`. / �o (�^`vc`rC lWkiNtANrFaC� tree fence Diversions, Berms, ditches Inlet, culvert protection Stream work, crossings Traps, Basins v/' Stabilization (=il.�- 1S C7C� W+>+2i«�cQ^� i.N�SHRiACIC �yG-1� Entrances ✓ Limits Y LAj t�' j LLA --(�