Loading...
HomeMy WebLinkAboutSDP201400067 Review Comments 2015-04-02 Nampo ,nriptopher Perez From: Christopher Perez Sent: Thursday, April 02, 2015 3:26 PM To: djensen @wwassociates.net Subject: SDP2014000067The Lofts at Meadow Creek- Final David, SDP201400006Z The Lofts at Meadow Creek- Final I just received comments from RWSA...they are provided below. I'll enter them into Countyview as well. Thanks Christopher P. Perez 1 Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road l Charlottesville,VA 22902 434.296.5832 ext.3443 From: Victoria Fort [mailto:vfort@)rivanna.orq] Sent: Thursday, April 02, 2015 3:18 PM To: Christopher Perez Cc: Alex Morrison Subject: SDP201400006-1 The Lofts at Meadow Creek- Final Chris, RWSA has reviewed the final site plan for the Lofts at Meadowcreek as prepared by WW Associates and dated 2/27/2015 and has the following comments: Sheet 6 of 16(C-6): 1. Re-label the RWSA water main as"Existing RWSA 18" C.I.Water Main" 2. The 16" x 8" tapping sleeve and valve shown should be changed to an 18"x 8"tapping sleeve and valve. Include a reference to the water connection notes(see comment#4, below). 3. Add the following RWSA General Water and Sewer Notes to the plans: a. RWSA Engineer(Victoria Fort at(434)977-2970 ext. 205)shall be notified three business days prior to the start of any work affecting the RWSA 18" water main. b. All work is subject to inspection by RWSA staff. No tie-ins to the existing system shall be made without coordination with and the presence of RWSA staff. No work shall be conducted on RWSA facilities on weekends or holidays without special written permission from RWSA. c. No blasting shall be permitted within 100 feet of RWSA facilities without written permission and RWSA approval of the blasting plan. Ground monitoring during blasting and a pre-blast survey may be required. RWSA may also require certification from a licensed professional engineer stating that the proposed blasting will not damage any RWSA facilities. Damage to any utilities due to blasting shall be repaired by the Contractor to the original condition at no additional cost to the Owner. d. New water main installations shall be pressure tested,chlorinated, flushed and have water samples approved prior to making any permanent connection to the public water system. Approved methods of filling and flushing new water mains will be required to prevent any contamination of the public water system. 4. Add the following RWSA Water Connection Notes to this sheet: 1 Contractor shall coordinate with RWSA and ACSA during construction of the connection to the existing RWSA 18"waterline. Contractor shall use due diligence to protect the RWSA 18" waterline during construction and tapping. Contractor shall verify the horizontal and vertical location, the outside diameter and the pipe material of the 18" waterline prior to ordering the tapping sleeve. RWSA shall be contacted 3 business days in advance of the test pit and shall be present during the test pit. The tapping sleeve shall be approved by RWSA prior to being ordered. The tapping contractor shall be approved by RWSA prior to the tap. A minimum of 3 business days' notice shall be given prior to installation of the tapping sleeve. The 18" x 8"tapping sleeve and valve shall be installed plumb. Following the placement of the 18"x 8"tapping sleeve, a concrete pad and thrust block shall be placed under and behind the tapping sleeve. Sheet 30 of 30(C-25A) 1. Revise water connection label on profile Water-1 to read "18"x 8"tapping sleeve and valve.Connect to existing RWSA 18" waterline. Contractor to field verify depth." 2. Include the following note: "see RWSA Water Connection Notes, sheet C-6". Let me know if you have any questions. Thank you, Victoria Victoria Fort,EIT Civil Engineer Rivanna Water and Sewer Authority 695 Moores Creek Lane Charlottesville,VA 22902 (P):(434)977-2970 ext.205 (F):(434)295-1146 2