Loading...
HomeMy WebLinkAboutSDP201400067 Checklist - Project Closeout (Administrative) 2015-07-08 / N SUBDIVISION/SITE PLAN FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHECKLIST Please complete this form within 30 days of final action,place in folder and forward to CDA FOR QC an 1 status label. CDA will forward to the Imaging Center for digital closeout. DP/ .UB # �O — 6-7 PROJEC TITLE 0 S � L�f�ri o,i r'd`f' FULL NAME OF LEAD REVIEWER ' 1w j -4-e-2 FINAL ACTION DATE: -?-e- /S Cou View — p1 Sh Application, Page 2 Data Entered t-- to'Z?�l� !YI'' ❑0.11.1111110 t - - .lor• r1 ir,iTlfl( .Qr Pj(S I Hardcopy — File Folder Closeout: All items listed should be placed in project folder, in reverse i chronological order(latest on top). IPlease check each item included in this folder. To indicate that an item is not applicable to this file, place an"N/A" next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide 1 clarity to the file, please indicate that item on the"Other" lines provided. 1 i Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the 1 document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital 1 location(path/name) of the document in the space provided. i Engineeri' t -.Ider -formation/documentation tom' :-.n ❑ Saved location App 1 a . .ignature copy) Ili Scan ❑ Saved location 1 01 no....,.,1 1, .-f.r-_n I Correspondence(to/from, memos/emails) I III Scan ❑ ved location romp e s of printed Revie Comments 1 Scan Saved location Approv d plan/plat igr e , or stamped "Approved"with Planner/Engineer name) Scan ❑ Saved location I 16.1,9 Dal ill.. - - -- _ _ .. _ .. . . . . . . -I, - :• • on e -r) r4INF.. „ A they P a xplain—i.e. Studies - e (a k:nS, - Mr -/0 L ' rce i can ❑ Saved loc. on ,Other P a explain—i.e. Studies)- L o/.`ezv !: L11- Scan ❑ Saved location J i El At the planner's discretion, copies of unapproved plans/plats may be placed in the file if it is referenced in the 1 staff report or minutes and lends clarity to the review at a later date. If such plans are included, they should be i clearly marked as unapproved and contain a note clarifying why it was included. I ❑ Scan ❑ Saved location i Additional Information on this nroiect: