Loading...
HomeMy WebLinkAboutSDP201500036 Checklist - Project Closeout 2015-10-19 SUBDIVISION/SITE PLAN FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHECKLIST Please complete this form within 30 days of final action,place in folder and forward to CDA FOR QC a J.'.s tus label. CDA will forward to the Imaging Cente for digital closeout. SDP/:UB # 9-O I5 i 3C PROJE T TITLE \Va.r� 4� Ui �/a .f �tse 1�'o6k V.IlaS FULL NAME OF LEAD REVIEWER .i frre-- ---7-- FINAL ACTION DATE: /o -1111S Co View — Application, Page 2 Data Entered Hardcopy— File Folder Closeout: All items listed should be placed in project folder,in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file,place an"N/A" next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide clarity to the file,please indicate that item on the"Other" lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital location(path/name)of the document in the space provided. -ErEngi •et-. 1 older Information/documentation �i can ❑ S ved location Applica s a signature copy) �� ill Scan Saved location_ �•�/ Public •tificati.' - . .s . . tting Owner correspondence —.ii can ❑ Saved location APP •�. Correspondence ondence(to/from, memos/emails) p 1f(1 Scan ❑ Saved location ,121'-Comple et of printed Revie Comments can Saved location 0 -ffpprove lan/plat(signed, or stamped"Approved"with Planner/Engineer name) can ❑ Saved location . Action L er(Administrative Approval) Scan ❑ Saved location Report(include plan/plat presented, PC/BOS Action Letter) g.iiivenvieloitiOrterifflegMtents •■ aye s) r ' ^'^ -=1ain 11 files) ❑ Scan ❑ Saved location ofEt-ArriTentinTnrriericiMirrtrIrffprrelisdepliderdelats may be placed in the file if it is referenced in the staff report or minutes and lends clarity to the review at a later date. If such plans are included, they should be clearly marked as unapproved and contain a note clarifying why it was included. ❑ Scan ❑ Saved location 1 Additional Information on this project: j