HomeMy WebLinkAboutSDP201300008 Plan - Approved 2013-05-16GENERAL NOTES 1. Site statistics: Albemarle County TM# 21 -12C1. Zoned: RA. Total area of existing lot = 20.97 acres. Proposed use: Church. Total disturbed area = 3.8 acres. Building area = 7,000 sf. Pavement and walk area = 0.94 acres. Total Impervious area = 1.10 acres. Green Space = 19.87 acres (95 %). Site is not located within a reservoir watershed. 2. Work in this project shall conform to the latest editions of the Virginia Department of Transportation (VDOT) Road and Bridge Specifications, the VDOT Road and Bridge Standards, the Virginia Erosion and Sediment Control Handbook, the Virginia Erosion and Sediment Control Regulations and the County of Albemarle Design and Construction Standards. In the event of conflict between any of these standards, specifications or plans, the most stringent shall govern. All utilities to be dedicated to the County of Albemarle shall be constructed and tested to conform to Commonwealth of Virginia Board of Health Waterworks and /or Sewerage Regulations. 3. Erosion and sediment control measures shall be maintained continuously, relocated when and as necessary and shall be checked after every rainfall. Seeded areas shall be checked regularly and shall be watered, fertilized reseeded and mulched as necessary to obtain a dense stand of grass. 4. All drain inlets shall be protected from siltation. Ineffective protection devices shall be immediately replaced and the inlet cleaned. Flushing is not an acceptable method of cleaning. 5. When the crushed stone construction entrance has been covered with soil or has been pushed into the soil by construction traffic it shall be replaced with a depth of stone equal that of original application. 6. The location of existing utilities as shown is approximate only. The contractor is SITE DESIGN: responsible for locating all public or private utilities which lie in or adjacent to the construction site. The contractor shall be responsible for repairing, at his expense, all BLACKWELL ENGINEERING, PLC existing utilities damaged during construction. Forty -eight (48) hours prior to any 566 EAST MARKET STREET excavation call Miss Utility 1 (800) 552 -7001. HARRISONBURG, VA 22801 540- 432 -9555 7. All underground facilities located within the County's right -of -ways shall be installed prior to the placement of any part of the pavement structure. BUILDING DESIGN: 8. All materials used for fill or back -fill shall be free of wood, roots, rocks, boulders or BLUE RIDGE ARCHITECTS any other non - compactible soil type material. Unsatisfactory materials also include` Q ATTN: RANDY SEITZ man -made fills and refuse debris derived from any source. 61 SOUTH MAIN STREET HOUCK OUCK BLDG, , BLDG SUITE 200 9. Satisfactory material for use as fill for public streets include material classified in ASTM H N VA 22801 D -2487 as GW, GP, GM, GC, SW, SP, SM, SC, ML and CL groups. The moisture content '°i shall be controlled within plus or minus 2 percentage points of optimum to facilitate 540- 437 -1228 compaction. Generally, unsatisfactory materials include materials classified in ASTM D -2487 as PT, CH, MH, OL, OH, and any soil soil too wet to facilitate compaction. CH OWNER- DEVELOPER: and MH soils may be used subject to approval of the VDOT Engineer. Soils shall have a?fi NEW HOPE COMMUNITY CHURCH minimum dry density of 92 lb. /cu.ft. per ASTM D -698 and shall have a liquid limit less MICHAEL HENDERSON, TRUSTEE than 17. ,f 3445 SEMINOLE TRAIL, SUITE 300 10. Compaction of fill material under building slabs shall be based upon recommendations of SITE CHARLOTTESVILLE, VA 22911 soils engineer after completion of standard Proctor test and shall meet bearing requirements of architect of buildings. The Contractor shall be responsible for testing. `w':' PROPERTY INFO: 11. Materials used to construct embankments for any purpose, back -fill around drainage TM# 21-12C1 structures or in utility trenches or any other depression requiring fill or back -fill shall be " 20.97 ACRES compacted to 95% of maximum density as determined by the standard Proctor test as °` WHITE HALL MAGISTERIAL DISTRICT set out in ASTM standard D -698. The contractor shall, prior tc) any operations involvingr�•"'`-' ZONED: RURAL AREAS filling or back - filling submit the results of the Proctor tests together with a certification . USE: that the soil tested is representative of the materials to be used on the project. Tests PROPOSED USE: CHURCH shall be conducted by a certified materials testing laboratory and the certifications made FEMA FLOOD ZONE: X by a licensed professional engineer. ' 12. All excavations, including trenches, shall be kept dry to protect their integrity.` BUILDING INFO: PHASE 1 BLDG AREA = 79000 SF 13. Any discrepancies found between the drawings and specifications and site conditions or BLDG HEIGHT = 30' any inconsistencies or ambiguities in drawings or specifications shall be immediately reported to the engineer in writing, who shall promptly address such inconsistencies or STEEPLE HEIGHT = N/A ambiguities. Any work done before the engineer is consulted shall be done at the USE GROUP = A3 Contractors risk. CONSTRUCTION TYPE = 3B 14. A preconstruction conference shall be held prior to the start of the construction. The 1r1CIN11 1P contractor shall arrange the meeting with the County Erosion Control Administrator. SCALE.- I" = 1,000' 15. All storm sewer piping shall meet VDOT standards. Pipe beddincg to be per VDOT PB -1. 16. All sanitary sewer piping shall be PVC SDR 35 unless stated otherwise on plans. Sanitary sewer lateral to be 6" PVC SDR 35 from sewer main too building at a minimum slope of 1.0 %. 17. Handicap spaces to have vertical signs with the international harndicap symbol. At leas ��NLTIJ Op one space must be van accessible with "Van Accessible" sign below the international O� elf, sign. Minimum height to sign bottom is 4' -0 ", maximum is 7' - -0 ". p LA0k__/K1/TELL MOND H. 18. The Erosion and Sediment Control Narrative is considered part of this plan and shall be v K 9 adhered to and its requirements met by contractor. ALBEMARLE COUNTY GENERAL NOTES j � Lic. o.023831 1. Prior to any construction within any existing public right- of -wcay, including connection to 19. The Owner will coordinate with the County on the exact sign location and size. The sign any existing oad, a permit shall be obtained from the Virginia Department of Transportation �A location and size is to conform with County Ordinances and a permit from the County is (VDOT). Th9 plan as drawn may not accurately reflect thegrequire requirements of the perm t. �`SSIO ^O ENGINEERING required prior to sign construction. NALE Where any discrepancies occur the requirements of the permit shiall govern. 20. All areas not designated as parking stalls are to be fire lanes with no parking. 2. All paving, drainage related materials and construction methods; shall conform to current 566 EAST MARKET STREET specifications and standards of VDOT unless otherwise Hated. HARRIS 0 N B U R G , VA 22801 3. Erosion and siltation control measures shall be provided in accordance with the approved S{ P H 0 N E: 540 432-9555 erosion control plans and shall be installed prior to any clearing, grading or other /l ( ) construction. �9 °��i�`�I Type FAX: (540) 43 4 - 7 6 0 4 �a °9�`� sic ii"�r"�°d yea % •� _ SP 2010 -046 APPROVED: JULY 11, 20121. CONDITIONS: 4. All slopes and disturbed areas are to be fertilized, seeded andl mulched. 1. The Church's improvements and the scale and location of the improvements shall be developed in general 6 �_ _ accord with the concept plan entitled "Conceptual Plan - Soccer Field Removed:: New Hope Community 5. The maximum allowable slope is 2:1 (hOriZOntal:vertical). Where' reasonably obtainable, D � Church" prepared by Blackwell Engineering PLC, revision number 4, dated May 17, 2012; and lesser slopes of 3:1 or better are to be achieved. 2. The area of assembly shall be limited to a maximum four hundred 400) seat sanctuary; and 6. Paved, rip -rap or stabilization mat lined ditch may be required when in the opinion of �e3� i5/ osJ - -15 : � rD l Try.✓. 7oPp ,q,o ooz the Albemarle County Director of Engineering, or Directors designee, it is deemed necessary W 3. All outdoor lighting shall only be full cut -off fixtures and shielded to reflect light away from all abutting in order to stabilize a drainage channel. ORIGINAL PLAN �s�� �; -���i n properties. A lighting plan limiting light levels at all property lines to no greateir than 0.3 foot candles shall be submitted to Zoning Administrator or designee for approval; and 0 7. All traffic control signs shall conform with the Virginia Manual for Uniform Traffic Control SURVEY NOTES SHEET INDEX = 4. There shall be no day care or private school shall be prohibited unless approvecd through a special use Devices. - permit amendment. 1. Both the boundary and topographic surveys were conducted under the direct SHEET DESCRIPTION 8. Unless otherwise noted all concrete pipe shall be reinforced co >ncrete pipe -Class III. and responsible charge of Brian Ray, L.S., of Charlottesville, VIA, 434 - 293 -3195. 1 TITLE SHEET �j y 5. Entrance design and location must be approved by VDOT before construction of the access road for this use w may commence. 22 SITE LAYOUT AND UTILITY PLAN . Vertical Datum based on NAVD88. The horizontal datum is tied into the 9. All excavation for underground pipe installation must comply wiith OSHA Standards for the z s 6. Written approval of water - supply and septic facilities must be submitted before ithis use may commence. Construction Industry (29 CFR Part 1926). Virginia South - State Plane coordinate system. 3 GRADING, ESC AND WATER QUALITY PLAN PROJECT 4 ADDITIONAL NOTES AND DETAILS 2167 NUMBER: r/ 0 Q a L BIORETENTION BASIN PLANTINGS d' BASIN No. TREES SPECIES SHRUBS SPECIES -- - -- ` 1 Acerrubrum 1 Lindera benzion 50' MIN. WOODED AREA FROM PL TO 1 (Red Maple) (Spicebush) ------ REMAIN-ALONG PINEY MOUNTAIN ROA Vibumum lentago -- ADJACENT TO CHURCH AREA - "� J I __- -- EX. PIP E (Nannyberry) - -- _ - 2 Acer rubrum 5 Lindera benzion GATE (Red Maple) (Spicebush) 2 _ -- PEN AREA AL NG REMOVED POWER 2 Quercus bicolor 6 Vibumum lentago LINE TO BE ANTED WITH TREES (Swamp white oak) (Nannybeny) From Tables 3.11 -7A and 7B T.M. 21 -13E CHARLES M. BOLDT _ - EX. PIPE ZONED: RA % USE: VACANT CRITICAL SLOPES PROPOSED A y , _ SAD_ _ - 9 04 „W 60 -7•g0 TREELINE INE� M00 ROp,D) N�g•1 ` /NV /N-48&O5 - \ /NV OUT-485.'26� n' x tF F rN - INTERMITTENT STREAM BUFFER AS DEFINED BY COUNTY Ji LEGEND - --- --- CENTER LINE PARCEL BOUNDARY -- — • — EXISTING PROPERTY LINE - - p - ELECTRIC /TELEPHONE Jer EXISTING UTILITY POLE --� -OHS PROPOSED OVERHEAD ELECTRIC E PROPOSED UNDERGROUND ELECTRIC WOODED AREA W WATER LINES TO REMAIN SANITARY LINES O SANITARY SEWER CLEANOUT - STORM SYSTEM EX GAS LINES PROPOSED GAS LINE - EASEMENT LINE CRITICAL SLOPES > 25% PROPOSED BUILDING EXISTING ROAD - - PROPOSED EDGE OF PAVEMENT _ r CURBING HANDICAP PARKING EXISTING TREELINE WOODED AREA O T _ _ e_v O f 8 °� ' :.� PROPOSED TREELINE h: TO REMAIN C _6 w" � :. 13 N -, EXISTING FLOWLINE '� -�.:.� � `, �, _-- EXISTING FENCE LINE so r f„ 1 Z' ; Rp Q „ k, o O�-- -" 6 SIDEWALK 9 �. 5 I ��. - -- WITH C -2 ? . �r s _ � ROCK <v y` OUTCROP t s o PHASE 1 s.� BIORETENTION 8 - -� L AI 5 1 ,. WOODED AREA O ,. � - B TO REMAIN r _ n .... • -' °°' .w 9 .-� .'"" .. s, ?. / PLAZA . ENT `i -- E PROPOS D CATION 11 1, . - • e 11 AA .W e , J " SIDEWALK o- 11 f / ��'� ITH CG -2 _ i / ; 3 i '� " "-^fir / /i/ P E 2 o` > s % / ..;�> WOODED AREA % . BIORETENTI0�1 \ / TO REMAIN r r PHASE 1 ri /i BAS AREA , —'` 10 'x,` •� 200 SEAT SANCTUARY i \ PHASE 1 810RETENTION F E 3 1a SLAB ON GRA 0+. BASIN #1 f 9 x ICE / Sp P- r` i REROUTE ELECTRIC j/ PRIMARY f1 r, 1; a DRAINFIELD 2 ?` / r j , /�i� / // AS NEEDED T. 21 -12 r' / GE FANUC AUTOMATION X/ \ PHASE 2 j/ ZONED: LIGHT INDUSTRY USE: INDUSTRIAL \ „- :t' / /// //I r ��/ j /i� / SEE ENGINEERED CO6ENT10NAL - :, ` //1 `// / ` %i f / / ✓ I \ c B /, �j�/ /, /!/ ONSITE SEWAGE TREATMENT` . _, i, // i j / / /f = , ��-- ' / f , . e SYSTEM INV IN 5.4 6 ,f �, % //`, / ,ff /� /< �"'�•�. _ I i . O ;, � •- """'� -- , . §` � / f f 1/, ; ; : /' '�� ' // j, /! � `� !/ F/ / ' ' ` i �, e „tea - , , SEWER STATE ROUTE 606 DICKERSON ROAD P SE 2 l.a. f f / !' / i / f j /�j %l /l a � ��' � `, i \ ,i � / � � / � /' /, � '�' CRITICAL SLOPES f / 35 MPH � ' s�v f_�� -- PA MENT . � °.,. �„�.�• PRIMARY / DRAINFIELD - -,� 6g s \ PHASE 1 CRITICAL SLOPES, o , t WOODED AREA / �` " "��' :k �.3 CRITIC SLOPES TO REMAIN � i �� •��- � WOODED AREA TO REMAIN \ '� r 24' \/ / j`� `�'�.1� CRITICAL SLOPES, SURFACE COURSE BASE COURSE 2" OF SM- 12.5AL 3” OF BM -25.0 EX G?.4lfZ OR /ti r PG -5 / r _ - PHASE 2 NOl /N UA � g`by . ;T.M. 21 -12D BIORETENTION BASIN AREA RAPPAHANNOCK T.M. 21 -11A ELECTRIC CORP NORTHSIDE COMMUNITY ZONED: RA I �P rS PROPOSED GAS USE: UTILITY • �� •S y CHURC H OF THE NAZA RENE ZONED: RA EX 7R1 /L J: ' USE: CHURCH BASE AGGREGATE COMPACT SUB -GRADE TO 95% 2 °R 8" OF 21 -B STANDARD PROCTOR DENSITY " WOODED AREA �p TO REMAIN HEAVY PAVEMENT SECTION NTS ' _ 4:1 TAPER TYP. r �.S .-115 °-_ -.--. _ � � ,., :. l � x � { ,r .., SURFACE COURSE /M/ OL/T-490.93 ` "ter _ 3 WOODED AREA - - 3 qR TO REMAIN S 2 O Q 73 LF 15" CMP 0 b � BA 0 SUBBASE. _.. a 0 384% -' SE AGGREGATE COMPACT SUB -GRADE TO 95% IINV N= 496.5 ?� ".,48�..'A �~ S �� 6" 8" OF 21 -A STANDARD PROCTOR DENSITY INV OUT =493.7 SO`3S CURB DETAIL (CG -2) LIGHT PAVEMENT SECTION FT,�c NTS NTS /9 PARKING REQUIREMENTS STATE ROUTE 763 T.M. 21 -15 JACK OR BETTY HAWN 9 Jul BUILDING PARKING REQUIRED DICKERSON LANE USAGE UNITS 35 MPH ZONED: RA ` "' A` PHASE RATE EMPLOYEES SPACES USE: VACANT , 4" 1 CHURCH 200 1 SP /3 SEATS 4 71 • _ --�� EA EW TS 69 STATE ROUTE 606 �,. �_ �� Date: OCT 2012 2 CHURCH 200 1 SP 3 S 2 N Scale: AS NOTED DICKERSON ROAD ~* " Designed by:EHB /TBF UNPOSTED /� 13 t 7" 3 CHURCH 0 1 SP /3 SEATS 0 0 "E Lj M S53.24'05 -r SEE PARKING STUDY FOR TOTAL REQUIRED - 140 4.93' L� T GRAPHIC SCALE � 6" � 24" PROPOSEDAPARKING RATES MAXIMUM ALLOWED = 168 " 30' 0 30' 60' = I J U = <L CURB & CUTTER (CG— 01 z PARKING PROVIDED = 140 Q a LL ` r SCALE: 1 " =30' NTS O = _j In HANDICAP PROVIDED = 6 a n � o P�1 p t o 00 M U �N N 0 L WNW vc Cp r C_ - � W W � U m C', C LL, n , 0 �m co 0 W Lr) o � = w w Z O M CsZ�IA 0 A o~MO '") a N d z O �0 ¢04 X00 4 Revision Dates Date: OCT 2012 Z Scale: AS NOTED Designed by:EHB /TBF a- [Drawn by: EHB /TBF O LLJ Checked by: NWB a n � o P�1 p t o 00 M U �N N 0 L WNW vc Cp r C_ - � W W � U m C', C LL, n , 0 �m co 0 W Lr) o � = w w Z O M CsZ�IA 0 A o~MO '") a N d z O �0 ¢04 X00 4 Revision Dates Drawing No. 2 of 4 Sheets Job No. 2167 Z a- V O O LLJ Lj M ~ -r D U F_ N = I J U = <L z LL J H J Q a LL O = _j In = Up w _ Z F_ LLJ H 0 IZ M O LLJ o V Q Z Q J WLov Z M Ld 571Q r3 Drawing No. 2 of 4 Sheets Job No. 2167 DITCH TABLE - _____ - - - -`� � � E�cSC LEGEND BOTTOM LEFT RIGHT 10 -YR MIN. 2 -YR -- -/ - _` -- DITCH DITCH SLOPE LINING ___ - -- ~J 47C SOIL TYPE WIDTH SLOPE SLOPE DEPTH VELOCITY DEPTH \ r_ _. ,� EXISTING CONTOURS #1 0.00' 3:1 3:1 0.55' 1.05' 1.44 6.80% GRASS - - _ X - - _ --- _ r- . 1,F4981 -- PROPOSED CONTOURS # 1.1 0.00' 3:1 3:1 0.54' 1.04' 1.53 12.00% GRASS - ,- :� - "�-- _ .-- PROPOSED DITCH OR SWALE # 1.2 0.00' 3:1 3:1 0.89' 1.39' 2.49 6.10% GRASS - _ - �- - `r _ - - - ^� - J , _ , _ -- � - 8.5 PV PROPOSED SPOT ELEVATION + 2 # 2 0.00' 3:1 3:1 0.81' 1.31' 2.19 4.40% GRASS ,•_ - "� - - J - _ _ - _ -_ ..-. �_ - DRAINAGE FLOW 11 # 2.1 0.00' 3:1 3:1 0.78' 1.28' 2.36 10.50% GRASS " _/ -- _, 516 CONSTRUCTION ENTRANCE (3.02) l - -- _ # 2.2 0.00' 3:1 3:1 0.75' 1.25' 2.52 13.10% GRASS - -� - �" \ CONSTRUCTION ROAD STABILIZATION (3.03) #3 0.00' 2:1 3:1 0.61' 1.11' 1.90 10.00% GRASS g ---- - - -_•-- '° _ / CE (3.05) i SILT FEN SPECIAL NOTES ~~ " j - ~ 'l I 511 INLET PROTECTION (3.07) _ -'- - - _ - - INTERMITTENT STREAM BUFFER \ ,r CULVERT INLET PROTECTION (3.08) � - �� - / _ -- - I� _- ° ` A5 DEFINED BY COUNTY e - / 1, 59 \ '- DIVERSION DIKE (3.09) _ -- PROPOSED 11 I _� -- ' TREELINE r y SEDIMENT TRAP (3.13) - -- - , '- - v --- m -- CRITICAL SLOPES - E (3.16) ��.� �„ - - � PAVED FLUME 6 R OUTLET PROTECTION (3.18) - _ �j,�`-A � _ ROCK CHECK DAMS (3.20) 11 - 1i, _ �� E 11 / E.Y 24" C!/P ®5.&3.S - - °- '' 1� y -- 578-, . ...,, y.:._,_., _­11_______, _ �8 /+Y /N =4m..05 - - "'� - y MO '" ____ . - - -- - _- /M7 QIJT-f85.16 _ -- �• ► - -_ _ - - �. N ' " I- _r_ TOPSOILING (3 30) __ - - v: ___-.. ,. P TEMPORARY SEEDING (3 31) - _ -, - 520 0 w - - d- / \ - I `v' 11 -- '- / _ - _, _,- k - �- � N - g ' / � �,' PERMANENT SEEDING (3.32) _w , - 4 CONTOUR INTERVALS �F _ MULCHING 3 N TY �' ( ) FROM COU �' -� . .,.._...- :_ _ :. a f 4 ` Y 3 5 _ x _.- __. _ °.. _ �� �q _._� _ _ q� __ ,� DISTURBED AREA I . - -_ _ ... -._ *, _... �>�- w, .. �G �^ a °. : - - � tF si __ UMBERS IN PARENTHESES REFER TO VESCH MEASURES - M - _. N s'; + . W_.._ ^ �� . -moo. m4 �_ 9,S Apo -~--� - _ ' 8 G ^ \, \ , - -..., \ - 1_ " . -. % "" _ . IAs _ P I RE NTION ,..- -____ _ ^ - -._^ ,ti 1,. - - re„ S TC 4 COUN HASE ;1 B 0 �. r,; - : l ., , _ c w,. - ..- s_ C' _- T 420 SF q . __ BASIN 2 �, # ) ,. µ, po- SURV°' _ __ _,_ a. •� ROCK N !, 1-1 r OUTCROP 25.52 10 0 7 -" e; _ / 1 7111" ;u s,,. ao ; - w,� ( ,�.,,,, . � � , _ +9 ...,- �+ `V, ao 8 - Q C '`" - BENCHMARK: NA L SET IN k% % ,., '; $ASE 9 RED OA � 2 CONTOUR INTERVALS �� % r ~Y ; :x N 6 - - O �0 0, ,. z - AIN 0..20% �� J "� - . L,. ; % FROM SURVEYOR ' �' 8 . - _ 0% �' Q - _ __ _ELEV= 534.59 A a 6 G 7 _ _ _ . q.?C E .- - s _- . _ _ -- _ _ ' _ 65 h O �, : •S 5 - 3 - -- . v SIq „. S T °a �J 7 ti , .,, i S _ J BENCHMARK: 2 [JAILS SET _- - <. 5 �, tea.- Ji .,w..d_„ w fa - _ I IN BASE OF POWER POL I r - „ m. 1 '� N --- ,._ -- ° 4" PVC R60F OP, « L \ \ A N'' , , _ �,,: -- w .per O O s _ a % - o,TOCKF'I,LE i •�'°°"� ,. L ^� ,:� _ .. j FINIS GRADES FOR PHASE 2 PARKING \LOT. � � � : ,-. E�EV 520. 9- �,,- { ° -< T s SOIL TYPE 4 T J , O- INTE IM GRADES FINISH GRADES MINUS - BOUNDARY :' „i o 00 ,- - -} ray _R \1 I a `+ s� ENT SECTION PLUS 4 T n \ f I : w PLAZA �\ , r DITCH 2 ,r. 2 e I 11 J �'�w- "� 7 p ` •f VEM " S01 , ,.,._ �, � x o , � - + 2s.o t 3 S/y \ :,,. ,- :. 9 S f I , -, O S ­1 3 / //, O a..4" yt lk .` `l. , O ,ly PHASE 2 IORETENTION BASIN ; G "� / �� / . i , �, �°'� TO DE GNED WITH PHASE 2 I o .. NC MARK. 2 t F v j ..-� H SSE 6 S 2� v 6 f _. O ! ;' IN SE OF POWE OLE / .� ' '�'.., ; ` . P `30 INV= 525.72 �� _ ".__ ff /'q 1p OIL TYPE � , x _. _ ; / ff /f // S O. S \r _- ELEV 535.1 ! / / //,/ / 28 jEV _.. „, DITCH 1 ., - - „ % �,F__, �,_../ M,. - BOUNDARY ,, _ , o # ly , -- "I ,� G, S_ 10 PVC ROOF b x f, PHASE_ 1 BIOREENTION //; / //% Ili / DRAIN 0.20% f `L ' _ � , \, BASIN 1 15 x2 WITH J i : ,/ .. ^ _% i _C t I 41 I I r , tR SCUPPER ! " � o c� B PHASE 1 ° w .! \ /;.; r / O !11�11111*1 .:. \, 200 SEAT A / P�otL S NCTUAR %i a / t :r , W ,,,,, \' " rY / r / f , ti �� ,' \ . / S - __ . - -. 1OCKE'CLE, ../ /, 27.:1 TG- <, _`L 11 ,,, F FFE -531.5 _ / ,, < , .,,n /'.... Y LL .., k SLAB ON GRAf�E f / ,- , _ / 1 ,ryeF , ,. :, „ 7 l „: y ! 2 1 � ., _ I 13' 0 f / , (� 0 1 ^. ,,. ..y .., ,\ \.i1 a i / , a;.. ,", / �/ n <__ \ A , , P I \ ,,, \ , , 1 M ! / / / ti 14.5. + a, I^ R MARY h _ /' // ! > 11 \ �DRAINFIELD f / I \ - 0 f / / / PHASE 2 / f /� .a. 1 , /f ! 4 5 % / t \ .� q, / , , , / // 3 s f r / , : ' //' 5; ,: a -mot: r ,, _ / / / / / / / / `� _w. , / � z / °° «; \ a 7 /. ? V;/ / / f _ w.. 1 / / w / \ L Ot 78 j , \ ' 9 / d ! / r __ \ ; tl 43 O r / ,/ _ - ; i n a'.i ,I .'.> , $` ,"...,.J ; -,. z S __ , f d- ...(KYF ! .r. / li Mai . r �'(y� +~ :.., 7 ,.,:n: ,. V ., ,t a .T , ' -',T / , / .. :.� ,:, y- O �_ F / / k, 1 Lao 2!J / , %/ g/ / j /� 'S': / / / 11 4 % / /u _ e I / /' / t -j p / /, \ 1. e i ,, , ,, \ , 2 / f / / / "I- ;/ �/ „ /, j 1 k f/ V\ ,•.,,„ 6 PVC SEWER 1,// /� ; / , „� \t \ 1.04% !� / -//,/ y 111`7'11 d7 // y / / L r ? ' , \ / /' _ �, • � BENCHMARK• NAIL SET / \ -. ' -._ / / L / 11 11 I o ,,t, // /I f /: 11 \ ;, . / '` o \. fi / / / = °, % / 1 // / %F /F f ' / ``` CRITICAL SLOPES k } IN BASE 12 CEDAk, r °. '; 1. -- /J, / \ r -5 PA D ITCH ., c1 ELEV =5 X50 �, ,` r / _; / 7 % /' /f / ;_. _ ,,; / f �'�/ 1, I _1, D 1 T / �j' f a x f / / a ` 1k ;, \ 1(n ,1, \, /' 7 \ {. ,.__._ �°"°_ 11, , / f!. //% ._ 28 / f 2 I it ; 'v,,, : ..- ^ { [ / I t r q ; -,, GSI i , 1 , rte. , % 4 fp 11 P / l „r PRIMARY / I s. , , .w -- 94C 11 __ '' ,, s DRAINFIELD / � / _ ,, I ? .i''' - , , PHASE ° 1 / _, ' '� 11 , c ;.Y 11 i I 1A , , si -. l �<. 1 4 ** t. / -- s J / }� GI 1 I a., ; / y Y,a v , 1 / 526 p �` O i { ,, C F _ rd ; i 5 \ , r, „ I r :, r ti I ,• s \ 1. f ;, �� [ i / 'It I 1. e < to l/►_ f J x , a G «� :." i s p � , �j �G - �_ I I 11 14* , ; it ' r ,wr- h h 2 i h. ,� -- �, , - I �'. - __ CRIIT,CAL SLOPES L_ , I; , , _ ... < *,l � - . 11 - -:. � �: " % / � M.. F ADES rOR PHASE 2 PARKING LOT. ,y �. , o I ,/j - 1j,,, , ---, ,;: ; , , _s s�_, r >„ G TERIM GRADES FINISH GRADES MINUS - -- -- - - - I „ s PAVEMENT SECTION PLUS 4- TOPSOIL __ - ,„ -- 1, r r- I "I v °- 1° r - _ R „ LL- ;, 2 ACRES OR LESS OF DRAINAGE AREA: _,. _ I ), �, I I - ) ` �° -- r_ / 11 I/ h, , _, ._ / : " 6 .0 +r -- _._ ...� -- ` -_ 2 BI ETENTI BASIN `< 11 /I ; 4, x I __ -- _ . _ r PROPOSED GAS TOABE DESiIGNED' PHASE 2 _.1* ,.� l , ,. _ - _- - % I .F IPG -S PAVED DITCH -EX. 7R.4 /L _ Is ,, ,,; °° 2�.7ISY CLASS Al RIPRAP :Y, f I _ +, _ „ CRITICAL SLOPES 3 W 1- D 1 T 4 11 - • FILTER CLOT r _ „ „ ,, F j OPTIONAL La =28 f =2G, . �a" '� r'r ��) F c , z _ (DOWNSTREAM VIEW) 11 .5, ,, - + t 1 'I rho r _ _ _�,, "' I, ', 94C COARSE AG REGATE /'° _, I 1. .: - r / / x ' x:, ' .. R .. h 2:1 ", v;. E ./" x . , ..: I ;; BENCHMARK.: NAIL SET IN FLOW N I 1, _ y. ,-, !(, 1 . I l " 4,q* * I _� - .;: h BASE OF 24", PINE w '..�. , w - b t -- - -'� - ELEV- 515.21 ell � r _ ,n `." \ l J t I 11 1, _. fJr rS..,t„� tl- ,,b. tit,, 04.. lll �y / ��7 q gi ML,. Liz ly"hGr `V '1 •(1.0 _ -- „';w `.` +''�` ;u ,, ';.,,�° �' st.. /. I b, '` , 1 `-..\ '� q _ , � HE R 0 CK CHECK DAB /A!lN /N- (91.67 BP; O +0 - a� ' , "I I �` NTS I I I /NYOUF -493 = 0.001�:�o',, ``� A o f ' ` .� , ,, h .. t �_- _. - _ _. ., , . ' __. o - DICKEKSDN. �" 'O"* \ 520 e :' •:. , N r< T A -I fTT� B 9 , a % '.q� / I \ , PACTED SOIL \ � - - ----- -- .,­_ 4 �--/ ­"""" v� %' FOR THE PURPOSES OF PLAN REVIEW AND APPROVAL, °� - 12' MIN. '`..� �' '`� \ %/ ELL, P.E., IS THE CERTIFIED EDMOND * r h.. >, ��,\Q ,- r�CJ. 11 / Ii SHALL PROVIDE PROVIDE REPLACEMENT CERTIFICATE ATTTlAME00F 1� ­1 11 11 _: 11 , " I / " 6" OF VDOT #5 AGGREGATE _. \ GRAPHIC SCALE C NS R CTION TO THE COUNTY E &SC ADMINISTRATOR. *MUST EXTEND T U VDOT # 1 10' MIN. i �� \ ` 30' 0 30' 60 11 FULL WIDTH OF' _qV INGRESS AND COARSE �� , , , , _ , ,1; .r, A "~ ., " CONSTRUCTION CRLD FOR THIS PROJECT IS 11 EGRESS AREA AGGREGATE �� 11 MIN. I-- \ �'`^ �� SCALE: 1 " =30' NAM E: ---------------------- STONE CONSTRUCTION ENTRANCE CONSTRUCTION ROAD S TABILIZA TION ". ary � / NTS / NTS _ , \ / -------- - - - - -- t-4 ON CC) I E p I- o 00 M U NN � N . - E �- N (n 2 - C c L -Y rn w L_ ._ = O > 0) � 3 ' I� t; U � rn o m N n M w o 'd- w o � m co U) o cfl •C � - WL v v a ww z 0 a, _ILIA - G 3 1 J 10� Q m W FZ o I.., .-I P" O o 1 d z Q o�ti0 F 3 ��� 'I �O - 0 4g O Revision Dates _rb Date: OCT 2012 Z J Scale: AS NOTED Designed by:EHB /TBF CL Drawn by: EHB /TBF Checked by: NWB (/) 0 t-4 ON CC) I E p I- o 00 M U NN � N . - E �- N (n 2 - C c L -Y rn w L_ ._ = O > 0) � 3 ' I� t; U � rn o m N n M w o 'd- w o � m co U) o cfl •C � - WL v v a ww z 0 a, _ILIA - G 3 1 J 10� Q m W FZ o I.., .-I P" O o 1 d z Q o�ti0 F 3 ��� 'I �O - 0 4g O Revision Dates _rb Drawing No. 3 of 4 Sheets Job No. 2167 Z J CL (/) 0 J Q O W M r/- Cy = v / r U Z) -N O.,� W=) N 1- (/) W D Q = I J> F_ Q U - UW J W w~ J 0- D LLI > = Up Ld Z H Q _ ?_1 0-:2 0 J ,� 1 V L� O V Q Z V) W 3::L0 w It U Z M w 0 Z 0 m `V qy-y 513 Drawing No. 3 of 4 Sheets Job No. 2167 VDOT GENERAL NOTES V1. All work on this project shall conform to the current editions of and latest revisions to the Virginia Department of Transportation (VDOT) Road and Bridge Specifications and Standards, the Virginia Erosion and Sediment Control Regulations, and any other applicable state, federal or local regulations. In case of a discrepancy or conflict between the Standards or Specifications and Regulations, the most stringent shall govern. V2. All construction shall comply with the latest U.S. Department of Labor, Occupational Safety and Health Administration (OSHA), and Virginia Occupational Safety & Health (VOSH) Rules and Regulations. V3. When working within VDOT right -of -way, all traffic control, whether permanent or temporary, shall be in accordance with the current edition of VDOT's Work Area Protection Manual. Furthermore, all traffic control flaggers must be certified in accordance with Section 105.14(c) of the VDOT Road and Bridge Specifications. V4 The developer shall be responsible for relocating, at his expense, any and all utilities, including traffic signal poles, junction boxes, controllers, etc., owned by VDOT or private / public utility companies. It is the sole responsibility of the developer to locate and identify utility facilities or items that may be in conflict with the proposed construction activity. VDOT approval of these plans does not indemnify the developer from this responsibility. V5. Design features relating to field construction, regulations, and control or safety of traffic may be subject to change as deemed necessary by VDOT. Any additional expense incurred as a result of any field revision shall be the responsibility of the developer. V6. Prior to initiation of work, the contractor shall be responsible for acquiring all necessary VDOT land use permits for any work within VDOT right -of -way. V7. If required by the local VDOT Residency Office, a pre - construction conference shall be arranged and held by the engineer and /or developer with the attendance of the contractor, various County agencies, utility companies and VDOT prior to initiation of work. V8. The contractor shall notify the local VDOT Residency Office when work is to begin or cease for any undetermined length of time. VDOT requires and shall receive 48 hours advance notice prior to any required or requested inspection. V9. The contractor shall be responsible for maintaining adequate access to the project from the adjacent public roadway via a construction entrance that is constructed and maintained in accordance with Section 3.02 of the Virginia Erosion and Sediment Control Handbook. Furthermore, access to other properties affected by this project shall be maintained through construction. The Developer shall have, within the limits of the project, an employee certified by the Virginia Department of Conservation and Recreation (VDCR) in Erosion and Sediment Control who shall inspect erosion and siltation control devices and measures on a continuous basis for proper installation and operation. Deficiencies shall be promptly rectified. V10. Contractor shall ensure adequate drainage is achieved and maintained on the site during and at the end of construction. V11. All water and sewer lines within existing or proposed VDOT right -of -way shall have a minimum thirty -six (36) inches cover and when possible shall be installed under roadway drainage facilities at conflict points. V12. Any unusual subsurface conditions (e.g., unsuitable soils, springs, sinkholes, voids, eaves, etc.) encountered during the course of construction shall be immediately brought to the attention of the engineer and VDOT. Work shall cease in that vicinity until an adequate design can be determined by the engineer and approved by VDOT. V13. All fill areas, borrow material and undercut areas shall be inspected and approved by a VDOT representative prior to placement and fill. Where CBR testing is required, a VDOT representative shall be present to insure the sample obtained is representative of the location. When soil samples are submitted to private laboratories for testing, the samples shall be clearly identified and labeled as belonging to a project to be accepted by VDOT and that testing shall be performed in accordance with all applicable VDOT standards and procedures. V14. All roadway fill, base, subgrade material, and backfill in utility /storm sewer trenches shall be compacted in six (6) inch lifts to 95% of theoretical maximum density as determined by AASHTO T -99 Method A, within plus or minus 2% of optimum moisture for the full width of any dedicated street right -of -way. At the direction of VDOT, density tests shall be performed by a qualified independent agency in accordance with VDOT Road and Bridge Specifications. Certified copies of test reports shall be submitted to VDOT daily, unless specified otherwise. V15. VDOT Standard CD and UD underdrains shall be installed where indicated on these plans and /or as specified by VDOT. V16. The installation of any entrances and mailboxes within any dedicated street right -of -way shall meet VDOT minimum design standards and is the responsibility of the developer. V17. Prior to VDOT acceptance of any streets, all required street signage and /or pavement markings shall be installed by the developer or, at VDOT's discretion, by VDOT on an account receivable basis following the Manual On Uniform Traffic Control Devices. V18. The developer shall provide the VDOT Residency Office with a list of all material sources prior to the start of construction. Copies of all invoices for materials utilized within any dedicated street right -of -way must be provided to the local VDOT Residency Office prior to acceptance of the work. Unit and total prices may be obscured. V19. Aggregate base and subbase materials shall be placed on subgrade by means of a mechanical spreader. Density will be determined using the density control strip in accordance with Section 304 of tine VDOT Road and Bridge Specifications and VTM -10. A certified compaction technician shall perform these tests. Certified copies of test reports shall be submitted to VDOT daily, unless specified otherwise. In addition to checking stone depths, a VDOT representative shall be notified and given the opportunity to be present during the construction and testing of the density control strip. V20. Asphalt concrete pavements shall be placed in accordance with Section 315 of the VDOT Road and Bridge Specifications. Density shall be determined using the density control strip as specified in Section 315 and VTM -76. A certified compaction technician shall perform these tests. Certified copies of test reports shall be submitted to VDOT daily, unless specified otherwise. A VDOT representative shall be notified and given the opportunity to be present during the construction and testing of the control strip. V21. In accordance with Section 302.03, the foundations for pipe culverts thirty -six (36) inches and larger shall be explored below the bottom of the excavation to determine the type and condition of the foundation. The contractor shall report findings of foundation exploration to the engineer and VDOT for approval prior to placing pipe. Foundation designs shall comply with VDOT Road and Bridge Standard PB -1. Where soft, yielding, or otherwise unsuitable foundation is encountered, the foundation design and /or need for foundation stabilization shall be determined by the engineer and approved by VDOT. V22. The foundations for all box culverts shall be investigated by means of exploratory borings advanced below proposed foundation elevation to determine the type and condition of the foundation. The contractor shall submit copies of borehole logs and report findings of foundation exploration to the engineer and VDOT for approval prior to constructing box. Foundation designs shall comply with VDOT Road and Bridge Standard PB -1. Contrary to the Standard, where rock is encountered and cast -in -place box is proposed, the thickness of bedding shall be six (6) inches. Where soft, yielding, or otherwise unsuitable roundation is encountered, the foundation design and /or need for foundation stabilization shall be determined by the engineer and approved by VDOT. V23. Approval of these plans shall expire five (5) years from the date of the approval letter. V24. VDOT Standard CG -12 Curb Ramps shall be installed where indicated on these plans and /or asi specified by VDOT. V25. VDOT Standard Guardrail shall be installed where warranted and /or as proposed on these plans in accordance with VDOT's installation criteria. Final approval of the guardrail layout to be given by VDOT after grading is mostly complete. SEQUENCE OF EROSION CONTROL 1. Mark limits of clearing. 2. Install Silt Fence (SF) at limits of clearing. 4. Install Culvert Inlet Protection (CIP) at existing culvert in Dickerson Road. 5. Install proposed culvert at entrance. 6. Install Culvert Inlet Protection (CIP). 7. Install Construction Entrance (CE). 8. Clear trees. 9. Strip and stockpile topsoil. 10. Grade entrance drive. 11. Install Check Dams (CD) on both sides of entrance drive. 12. Install Construction Road Stabilization (CRS). 13. Grade remainder of site. 14. Install underground detention and subsurface utilities. 15. Install Inlet Protection (IP) 16. Install Diversion Dike (DD) and Sediment Trap (ST). 17. Install Paved Flumes (PF). 18. Install Temporary Seeding (TS). 19. Install Topsoil (TO), Permanent Seeding (PS) and Mulch (MU). 20. Install bioretention basins and plantings. 21. At approval of E &SC Administrator, remove sediment and temporary erosion control measures. Rev. January 9, 2009 INV =520.8 TOP =521.3 - TOP OF BIORETENTION' BASIN BERM BEYOND =521.3 -,-- - -- r - - -, --- T --- T___T --- �- DITCH #2 GENERAL CONSTRUCTION NOTES 1. Prior to any construction within any existing public right -of -way, including connection to any existing road, a permit shall be obtained from the Virginia Department of Transportation (VDOT). This plan as drawn may not accurately reflect the requirements of the permit. Where any discrepancies occur the requirements of the permit shall govern. 2. All materials and construction methods shall conform to current specifications and standards of VDOT unless otherwise noted. 3. Erosion and siltation control measures shall be provided in accordance with the approved erosion control plan and shall be installed prior to any clearing, grading or other construction. 4. All slopes and disturbed areas are to be fertilized, seeded and mulched. 5. The maximum allowable slope is 2:1 (horizontal:vertical). Where reasonably obtainable, lesser slopes of 3:1 or better are to be achieved. 6. Paved, rip -rap or stabilization mat lined ditch may be required when in the opinion of the County Engineer, or designee, it is deemed necessary in order to stabilize a drainage channel. 7. All traffic control signs shall conform with the Virginia Manual for Uniform Traffic Control Devices. B. Unless otherwise noted all concrete pipe shall be reinforced concrete pipe -Class III. 9. All excavation for underground pipe installation must comply with OSHA Standards for the Construction Industry (29 CFR Part 1926). GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS 1. The plan approving authority must be notified one week prior to the pre - construction conference, one week prior to the commencement of land disturbing activity, and one week prior to the final inspection. on. 2. All erosion and sediment control measures will be constructed and maintained according to minimum standards and specifications of the Virginia Erosion and Sediment Control Handbook and Virginia Regulations VR 625 -02 -00 Erosion and Sediment Control Regulations. 3. All erosion and sediment control measures are to be placed prior to or as the first step in clearing. 4. A copy of the approved erosion and sediment control plan shall be maintained on the site at all times. 5. Prior to commencing land disturbing activities in areas other than indicated on these plans (including, but not limited to, off -site borrow or waste areas), the contractor shall submit a supplementary erosion control plan to the owner for review and approval by the plan approving authority. 6. The contractor is responsible for installation of any additional erosion control measures necessary to prevent erosion and sedimentation as determined by the plan approving authority. 7. All disturbed areas are to drain to approved sediment control measures at all times during land disturbing activities and during site development until final stabilization is achieved. 8. During dewatering operations, water will be pumped into an approved filtering device. 9. The contractor shall inspect all erosion control measures periodically and after each runoff - producing rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of the erosion control devices shall be made immediately. 10. All fill material to be taken from an approved, designated borrow area. 11. All waste materials shall be taken to on approved waste area. Earth fill shall be inert materials only, free of roots, stumps, wood, rubbish, and other debris. 12. Borrow or waste areas are to be reclaimed within 7 days of completion per Zoning Ordinance section 5.1.28. 13. All inert materials shall be transported in compliance with section 13 -301 of the Code of Albemarle. 14. Borrow, fill or waste activity involving industrial -type power equipment shall be limited to the hours of 7:00am to 9:00pm. 15. Borrow, fill or waste activity shall be conducted in a safe manner than maintains lateral support, or order to minimize any hazard to persons, physical damage to adjacent land and improvements, and damage to any public street because o slides, sinking, or collapse. 16. The developer shall reserve the right to install, maintain, remove or convert to permanent stormwater management facilities where applicable all erosion control measures required by this plan regardless of the safe of any lot, unit, building or other portion of the property. 17. Temporary stabilization shall be temporary seeding and mulching. Seeding is to be at 75 lbs/acre, and in the months of September to February to consist a 50/50 mix of Annual Ryegrass and Cereal Winter Rye, or in March and April to consist of Annual Rye, or May through August to consist of German Millet. Straw mulch is to be applied at 80lbs /100sf. Alternatives are subject to approved by the County erosion control inspector. 18. Permanent stabilization shall be lime and fertilizer, permanent seeding, and mulch.. Agricultural grade limestone shall be applied at 90lbs /1000sf, incorporated into the top 4 -6 inches of soil. Fertilizer shall be applied at 1000lbs /acre and consist of a 10 -20 -10 nutrient mix. Permanent seeding shall be applied at 1801bs /acre and consist of 915% Kentucky 31 or Tall Fescue and 0 -5% Perennial Ryegrass or Kentucky Bluegrass. Straw mulch is to be applied at 80lbs/'100sf. Alternatives are subject to approved by the County erosion control inspector. 19. Maintenance: All measures are to be inspected weekly and after each rainfall. Any damage or clogging to structural measures is to be repair immediately. Silt traps are to be cleaned when 50% of the wet storage volume is filled with sediment. All seeded areas are to be reseeded when necessary to achieve a good stand of grass. Silt fence and diversion dykes which are collecting sediment to half their height must be cleaned and repaired immediately. 20. All temporary erosion and sediment control measures are to be removed within 30 days of final site stabilization, when measures are no longer needed, subject to approval by the County erosion control inspector. 21. This plan shall be void if the owner does not obtain a permit within 1 year of the date of approval. (Water Protection Ordinance section 17- 204G.) 22. Permanent vegetation shall be installed on all denuded areas within nine (9) months after the date the land disturbing activity commenced. (Water Protection Ordinance section 17 -207B) GENERAL CONSTRUCTION NOTES FOR STORMWATER MANAGEMENT PLANS 1. All dams and constructed fill to be within 95% of maximum dry density and moisture content. All fill material to be approved by a geotechnical engineer. Geotechnical engineer is to be present during construction of dams. 2. Pipe and riser joints are to be watertight within stormwater management facilities. 3. For temporary sediment traps or basins which are to be converted to permanent management facilities; conversion is not to take place until the site is stabilized, permission has been obtained from the County erosion control inspector. SEEDING & MULCHING TABLE ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH 'TEMPORARY OR PERMANENT SEEDING WITHIN 7 DAYS FOLLOWING FINISH GRADING. SEEDING SHALL, BE DONE ACCORDING TO STANDARD & SPECIFICATION 3.31 TEMPORARY OR 3.32 PERMANENT SEEDING, OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND DCR TECHNICAL BULLETIN #4. APPLICATION RATES FOR MULCH, FERTILIZER, LIMESTONE AND SEEDING MIXTURE SHALL BE AS INDICATED BELOW. TEMPORARY PERMANENT SPECIES LBS /ACRE SPECIES LBS /ACRE ANNUAL RYEGRASS & CEREAL RYE 50 -100 KENTUCKY 31 FESCUE 128 ANNUAL RYE GRASS 60 -100 RED TOP GRASS 2 GERMAN MILLET 50 SEASONAL NURSE CROP* 20 TOTAL 160 -250 TOTAL 150 528.80 *USE SEASONAL NURSE CROP AS INDICATED BELOW ❑ SEPT. 1 st - FEB. 15th J8 ANNUAL RYE & CEREAL RYE ❑ MAR. - MAY 15th ANNUAL RYE ❑ FEB. 16th - APR. 30th ANNUAL RYEGRASS ❑ MAY 16th - AUG. 15th FOXTAIL MILLET ❑ MAY 1 st - AUG. 31 st GERMAN MILLET ❑ AUG. 16th - OCT. ANNUAL RYE 6 5 24.00 ❑ NOV. - FEB. WINTER RYE FERTILIZER: 10 -10 -10 ® 450 LBS /ACRE (10 LBS /1,000 SF) FERTILIZER: 10-20-10 ® 500 LBS /ACRE (12 LBS /1,000 SF) PULVERIZED AGRICULTURAL LIMESTONE: 2 TONS /ACRE (90 LBS /1,000 SF) PULVERIZED AGRICULTURAL LIMESTONE: 2 TONS /ACRE (90 LBS /1,000 SF) ORGANIC MULCH MATERIALS AND APPLICATION RATES VESCH TABLE 3.35 -A 1 RATES 15" MULCHES NOTES: PER ACRE PER 1000 SF 1J - 2 TONS 70 - 90 lbs. FREE FROM WEEDS AND COARSE MATTER. MUST BE ANCHORED. STRAW OR HAY (MIN. 2 TONS FOR SPREAD WITH MULCH BLOWER OR BY HAND Z Ld WINTER COVER) .J FIBER MULCH MINIMUM 35 lbs. DO NOT USE AS MULCH FOR WINTER COVER OR DURING HOT, DRY Q 1500 lbs. W OU LLJ Q PERIODS.* APPLY AS SLURRY CORN STALKS 4 - 6 tons 185 - 275 lbs. CUT OR SHREDDED IN 4,-6" LENGTHS. AIR DRIED. DO NOT USE IN FINE TURF AREAS. AIPPLY WITH MULCH BLOWER OR BY HAND. FREE OF COARSE MATTER, AIR - DRIED. TREAT WITH 12 lbs. WOOD CHIPS 4 - 6 tons 185 - 275 lbs. NITROGEN PER TON. DO) NOT USE IN FINE TURF AREAS. APPLY WITH MULCH BLOWER, CHIP HANDLER, OR BY HAND. BARK CHIPS OR 50 - 70 c.y. 1 - 2 c.y. FREE OF COARSE MATTER. AIR - DRIED. DO NOT USE IN FINE TURF SHREDDED BARK AREAS. APPLY WITH MUILCH BLOWER, CHIP HANDLER, OR BY HAND * WHEN FIBER MULCH IS THE ONLY AVAILABLE MULCH DURING PERIODS WHEN STRAW SHOULD BE USED, APPLY AT A MINIMUM RATE OF 2000 lbs./ac. OR 4!5 lbs./1000 sq. ft. PLAN La 0% 1 s d 1 KEY IN 6 " -9'°;_ FILTER CLOTH/ RECOMMENDED FOR ENTIRE PERIMETER SECTION A -A NOTES: 1. APRON LINING MAY BE RIPRAP, GROUTED RIPRAP, GABION BASKET, OR CONCRETE. 2. La IS THE LENGTH OF THE RIPRAP APRON AS CALCULATED USING PLATES 3.18 -3 AND 3.18 -4. 3. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6 INCHES. OUTLET PROTECTION NTS OUTLET TO WELL ED CHANNEL SEDI BLOCK WIRE SCREEN /- FILTERED WATER *GRAVEL SHALL BE VDOT 13, #357 OR #5 COARSE AGGREGATE. ` DROP INLET WITH GRATE INLET PROTECTION - BLOCK AND GRAVEL SEDIMENT FILTER NTS TEMPORARY SEDIMENT TRAP NTS TOP WIDTH 1.0' RIGINAL GROUND ELEV. [VARIABLE TOP OF DRY STORAGE 2:1 DRY STORAGE 2 1 HEIGHT CLEANOUT TOP OF WE STORAGE LEVEL CLASS I . 1:1 WET STORAGE 1:1 RIPRAP COARSE FILTER ORIGINAL' . BOTTOM AGGREGATE CLOTH GROUND 6' MAX CROSS- SECTION AT OUTLET - EXCAVATE 4" X 4" TRENCH UPSLOPE OF STAKELINE. J < - ATTACH FENCE MATERIAL 14 ,. AND EXTEND INTO AND i ALONG BOTTOM OF TRENCH. BACKFILL AND COMPACT EXCAVATED SOIL. SILT FENCE (SHEET FLOW PROTECTION) NTS GRAVEL_ EDGE OF PAVEMENT .VERT ! ._, ',`. + TOE OF ' FILL / *DISTANCE IS 6' MIN. IF FLOW IS TOWARD EMBANKMENT i3 0 Ll- GRAVEL CULVERT INLET PROTECTION XA -CIP NTS FLOW Q h� SEDIMENT TRAP TABLE S DRAINAGE AREA (AC) 0.61 OUTLET LENGTH FT 4 HEIGHT (FT) 4.5 TOP WIDTH FT 4.0 TOP ELEVATION 520.5 BOTTOM WIDTH FT 10 BOTTOM LENGTH ( 40 BOTTOM ELEVATION 514.5 MIN. WETSTORAGE CF 1103 MIN. DRY STORAGE (CF) 1105 TOP WET STORAGE ELEV. 516.0 TOP DRY STORAGE ELEV. 519.5 SIDE SLOPE, X 2.0 1.5' VDOT #3, #357, #5, #56 OR #57 COARSE AGGREGATE TO REPLACE SILT FENCE IN "HORSESHOE" WHEN HIGH VELOCITY OF FLOW IS EXPECTED FABRIC CLASS I RIPRAP CULVERT INLET PROTECTION STONE COMBINA TION NTS STORM SEWER SCHEDULE STORM MANHOLE SCHEDULE STORM PIPE SCHEDULE 30 "0 NYLOPLAST DRAIN BASIN INLET 3030AGS01N STANDARD 2'x2' H -20 GRATE TOP =529.5 INV OUT =521.0 (30 ") j� 30 "x48" REDUCER-/ ADS 4878AN65B STR. # TYPE TOP IN (FROM) OUT (TO) FROM # TO # LENGTH * SIZE SLOPE TYPE ** 6 L= 2'.x2' NYLOPL - 521.00(7) 521.00(5) 9 7 165.00 10" 0.20% PVC 7 DI -3B L=4' 528.80 521.00(8) 525.52(9) 521.00(6) 8 7 123.00 48" 0.00% HDPE 7 6 78.00 48" 0.00% HPDE 8 NYLOIPLAST L =2x2' 529.50 #N /A 521.00(7) 6 5 24.00 8" 0.83% HDPE U L W 2 1 73.00 15" 3.84% CMP *PIPE LENGTHS ARE MEASURED TO CENTER OF STRUCTURES. ACTUAL LENGTHS WILL BE LESS THAN LISTED ABOVE. ** PCV IS SCHEDULE 40, HDPE IS ADS N -12 WT �¢�1�IA X33 O� x 000 Q a N t lY'OD 4g Revision Dates 4-R- I -T ®Pa 6 30 "0 NYLOPLAST DRAIN BASIN INLET 3030AGS02N STANDARD 2'x2' H -20 GRATE TOP =527.3 INV IN =521.0 (30 ") INV OUT =521.0 (8 ") 73 LF 48 ADS N -12 WT ® 0.00% \-30 "x48" REDUCER ADS 4878AN65B Date: OCT 2012 30 "0 NYLOPLAST DRAIN BASIN INLET 3030AGS01N STANDARD 2'x2' H -20 GRATE TOP =529.5 INV OUT =521.0 (30 ") j� 30 "x48" REDUCER-/ ADS 4878AN65B Scale: AS NOTED 4 of 4 Sheets Designed by:EHB /TBF a i- Drawn by: EHB /TBF Job No. 2167 ---- -- LLJ O [Checked by: NWB Q �¢�1�IA X33 O� x 000 Q a N t lY'OD 4g Revision Dates 4-R- I -T ®Pa 6 24 LF 8" SCH 40 PVC 0 0.83% 6" HIGH CHECK DAM DIVERTER G TO BIORETENTION BASIN #2 48" LONG 12 "x12% Y4" SS L 30 "0 NYLOPLAST DRAIN BASIN INLET 3030AGS02N STANDARD 2'x2' H -20 GRATE TOP =527.3 INV IN =521.0 (30 ") INV OUT =521.0 (8 ") 73 LF 48 ADS N -12 WT ® 0.00% \-30 "x48" REDUCER ADS 4878AN65B 72 "0 VDOT DI -3B L =4 TOP =528.8 INV IN= 525.52 (10 ') INV IN =521.0 (48 ") TOP OF CURB INV OUT =521.0 (48 ") 118 LF 48" ADS N -12 WT 0 0.007. UNDERGROUND DETENTION PROFILE SCALE: 1" = 10' 30 "0 NYLOPLAST DRAIN BASIN INLET 3030AGS01N STANDARD 2'x2' H -20 GRATE TOP =529.5 INV OUT =521.0 (30 ") j� 30 "x48" REDUCER-/ ADS 4878AN65B J 4 of 4 Sheets a i- V) O Job No. 2167 LLJ O Q WM N Q U �LJ N Z Q -D V) Q = I _ > U L W v< w 11-- J 0 C > 0 v _' w Z = O F- Z Ld .J CL M 0 Q W OU LLJ Q Z 0 z z w c) Z M 24 LF 8" SCH 40 PVC 0 0.83% 6" HIGH CHECK DAM DIVERTER G TO BIORETENTION BASIN #2 48" LONG 12 "x12% Y4" SS L 30 "0 NYLOPLAST DRAIN BASIN INLET 3030AGS02N STANDARD 2'x2' H -20 GRATE TOP =527.3 INV IN =521.0 (30 ") INV OUT =521.0 (8 ") 73 LF 48 ADS N -12 WT ® 0.00% \-30 "x48" REDUCER ADS 4878AN65B 72 "0 VDOT DI -3B L =4 TOP =528.8 INV IN= 525.52 (10 ') INV IN =521.0 (48 ") TOP OF CURB INV OUT =521.0 (48 ") 118 LF 48" ADS N -12 WT 0 0.007. UNDERGROUND DETENTION PROFILE SCALE: 1" = 10' 30 "0 NYLOPLAST DRAIN BASIN INLET 3030AGS01N STANDARD 2'x2' H -20 GRATE TOP =529.5 INV OUT =521.0 (30 ") j� 30 "x48" REDUCER-/ ADS 4878AN65B Drawing No. 4 of 4 Sheets Job No. 2167