HomeMy WebLinkAboutSDP201500049 Review Comments Initial Site Plan 2015-11-02�x
County of Albemarle
Department of Community Development
Memorandum
To:
Christopher Perez, Planning
From:
Matt Wentland, Engineering
Date:
28 October 2015
Subject:
Northside Drive Material Recovery Facility (SDP201500049)
The initial site plan for the Northside Drive Material Recovery Facility has been reviewed and approved by
Engineering. The following concerns should be addressed on the final site plan:
1. Parking areas of 4 or more spaces shall be surfaced. If gravel is to be used, a waiver request
will need to be submitted [18.4.12.15(a)].
2. A traffic island should be located at the end of the parking row to protect parked vehicles
[ 18.4.12.15(f)].
3. The 20' access aisle should be shown from the nearest existing street, including turning radii
as per AASHTO standards. There also appears to be a fence blocking half of the entrance to
the parcel [18.4.12.17, 18.32.5.2(m)].
4. A WPO submittal will be required containing ESC and SWM plans and a SWPPP [ 17 -300,
17 -301].
5. Show how the design of the biofilter will prevent short- circuiting and any measures
necessary to prevent crushed aggregate from the pad from entering /clogging the biofilter.
6. Adequate channel analysis may be required depending on the final design of the outfall from
the SWM facilities.
File: SDP201500049 Engineering Review Comments Initial Site Plan 2015- 10- 28.doc