Loading...
HomeMy WebLinkAboutSDP201500049 Review Comments Initial Site Plan 2015-11-02�x County of Albemarle Department of Community Development Memorandum To: Christopher Perez, Planning From: Matt Wentland, Engineering Date: 28 October 2015 Subject: Northside Drive Material Recovery Facility (SDP201500049) The initial site plan for the Northside Drive Material Recovery Facility has been reviewed and approved by Engineering. The following concerns should be addressed on the final site plan: 1. Parking areas of 4 or more spaces shall be surfaced. If gravel is to be used, a waiver request will need to be submitted [18.4.12.15(a)]. 2. A traffic island should be located at the end of the parking row to protect parked vehicles [ 18.4.12.15(f)]. 3. The 20' access aisle should be shown from the nearest existing street, including turning radii as per AASHTO standards. There also appears to be a fence blocking half of the entrance to the parcel [18.4.12.17, 18.32.5.2(m)]. 4. A WPO submittal will be required containing ESC and SWM plans and a SWPPP [ 17 -300, 17 -301]. 5. Show how the design of the biofilter will prevent short- circuiting and any measures necessary to prevent crushed aggregate from the pad from entering /clogging the biofilter. 6. Adequate channel analysis may be required depending on the final design of the outfall from the SWM facilities. File: SDP201500049 Engineering Review Comments Initial Site Plan 2015- 10- 28.doc