Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201400014 Application 2014-07-30
Virginia Stormwater Management Program (VSMP) 401; Application for Albemarle County ''fiGl`\` 4. Project Name: SoRCRCf PRIM NG EXPANS loll (The name should be the same as it appears on plans) ('11Q3011 AMEND( ENS TO Is this an amendment to an approved plan? Yes 6l� /No C) A�RON{ SITE FLAN �R Is this a revision or resubmission for review? Yes L9' No ❑ CHARIO'1TtSVll.lE-Al 6EMAR�E AIRPORT, County File Number: W Po-2.011-1 -000 114 (to be provided by the County for new applications) The following are required elements of new applications[from code section 17-401]. For revisions or amendments,please indicate which items are being amended. Signatures must be provided for any submission. ❑ A. Signature of the Property Owner for each parcel: (Required with every submission or revision, NOT TO BE SIGNED BY AN AGENT OR CONSULTANT) By signing this application as the owner, I hereby certify that all requirements of these plans and permits will be complied with,and I have the authority to authorize the land disturbing activities and development on the subject property. I hereby grant the County of Albemarle the right to enter upon the property as required to ensure compliance with the approved plans and permits. BILL PM-IOTA 32 — ID CKARtvrTESviuk-ALBEPARLE. 7,d4fL% Tax Map&Parcel AIRPORT AV -10f2 I Signature of Owner Date Tax Map&Parcel Print Name of Property Owner Signature of Owner Date Tax Map& Parcel Print Name of Property Owner Signature of Owner Date Tax Map& Parcel Print Name of Property Owner Signature of Owner Date Contact Information for the Owner(s)to receive correspondence: Print Name BILL PA kOTA Address I 00 30WEN LOOP 5 011-E ZOO City C H P R LOTTE.S Y I LL E State VA Zip 2 Z9 I I Daytime Phone(434) 913 — 83'i 2.. E-mail 13PAI1OTA® &0c-to. 7/1/14, Revised: 7/10/14 Page 1 of 2 B. All Fees [Code section 17-208] For new or modified plans; Total acres proposed to be disturbed 4. 4 AC_. Acres to be Total Fee Fee Due with this Fee with Transfer or disturbed Application modification of permit $730 CREDI.r Less than 1 $290 $145 $20 1 and less than 5 $2,700 $1,350 $200 W ITN JULY 8 5 and less than 10 $3,400 $1,700 $250 SVeMIfTAL 10 and less than 50 $4,500 $2,250 $300 50 and less than $6,100 $3,050 $450 100 100 and more $9,600 $4,800 $700 For(minor)amendments to an approved plan;$200 per review l 3S0 (S — 1 S� ariances; $150 , Mitigation Plan;$150 7 S O PEE DVE • N/C. Registration Statement on the official DEQ form. / EN«.05E D S1 D. Erosion and Sediment Control Plan satisfying the requirements of code section 17-402. SuBMITrEO Jv1..y Qs,2.014 E3 E. Stormwater Management Plan satisfying the requirements of code section 17-403. 50tri%TTE,D 3UL'I 8,2.014 �F. Pollution Prevention Plan satisfy_gin the requirements of code section 17-404. ENc Ltf*A7 l 4 wPPP Docofn T 'V G. Stormwater Pollution Prevention Plan satisfying the requirements of code section 17-405. ENCI. EQ ❑ H. Mitigation Plan satisfying the requirements of code section 17-406 for any proposed disturbance of stream buffers. N/A ICI. Requested Variations or Exceptions as provided in code sections 17-407 and 408. SuB1wtlp ..ut i 8)2,0i4 M J. Construction Record Drawings (as-builts) for any existing facilities in the proposal satisfying the requirements of code section 17-422. SUi(t'11TTED . )L`I $, Z011-} Provide 2 copies of all plans and any supporting documents. Professional seals must have original signatures. Additional information if not provided on plans and documents: Name of a Contact Person for correspondence(usually the plan preparer,consultant or agent) Print Name W I LLI aM E S C 4 nN F ELDER Address 9111 FPARRR C.0 T, SOITE. 100 City RICl-tMONO State VA Zip 23236 Daytime Phone(86'i) 2.75 c3.501 E-mail W ESCHENFELDER©DELTA Pt tRT .coin *When applications and plans are reviewed,but not approved,and a response to comments is not received within 6 months from the date of county comments,the application will be deemed withdrawn. Applications without valid owner's signatures will not be considered valid. FOR OFFICE USE ONLY 2f WPO# ,2(7 11t ` I'1 �y// /� Fee Amount$IJC.O_oo Date Paid J6 By11(1w11h�o? C cia-W-5O.1(e — Receipt# /C �( Ck# �j�rjt By. L't. %W.-4,itz-11 4;c 6r-i A \G -t 7/1/14, Revised: 7/10/14 Page 2 of 2 joo...`", N") \ \,,,.% ,fts.e '' ' iP0' 7-2-"°\14 — I LI ,41,0, Application for Review of u ^v Erosion & Sediment Control Plan & Stormwater Management/BMP Plan & „i:i9l;: Stream Buffer Mitigation Plan (Erosion&Sediment Control Plan Etitormwater Management/BMP Plan ❑ Stream Buffer Mitigation Plan ❑ E&S Plan Amendment ❑SWM Plan Amendment (Previous Plan# ) (Previous Plan# ) ❑ E&S Plan with Variance ❑Request for Exception #of Variances ❑SWM Plan Resubmittal ❑ E&S Plan Resubmittal WPO Application# WPO Application# Submit 2 copies each of applicable plans/narrative/computations *When a WPO plan is reviewed,but not approved,and a response to comments is not received within 6 months from the date of county comments,the application will be deemed withdrawn. Project Name: SUtrface, Rarkiv►9 expansion - Charfo4 5ville-Al bemark Airport- , Tax map and parcel: 32/1a Zoning: RAC L.X. Amount of Land Disturbance: 5.0 Acres Location of property(landmarks,intersections,or other): AirpOrf Contact Person(Who should we call/write concerning this project?): rt 4.1 I i a m lV!, £schence Ider Address q'1(( Farrar a., Suite. 100 City R ialtY1 ov4 State y P Zip 233 236 Daytime Phone) 275- 1b3o1 Fax#( ) 275-- 6371 E-mail we hehaider4cletlaaivpor+.c j Owner of Record C harIcrit svi 1k- albem>avie Airpor+Authsri+y Address 100 gDWP Loop) Sill 1 200 City CharloJesv,lJ State VA Zip 22-611 i Daytime Phone Ai) 973" V1 42 Fax#t9M /74-74 76 E-mail Va___ g O c ko.Corn Contractor Address City State Zip Daytime Phone( ) Fax#( ) E-mail Plan Preparer De Ja Airporf Consul-hilts;T . Address gll1 farrarr+,) S ll-e 100 City RC cil Mood State VA Zip 2323 , Daytime Phone() 2?5—(6301 Fax if 6) 275 e,37 J E-mail weschenfa der@ del-faairpc l-.caul Owner/Applicant Must Read and Sign By signing this application as owner,I hereby certify that all requirements of the approved Erosion Control Plan,Stormwater Management/BMP Plan,and/or Mitigation Plan will be complied with and I have the authority to authorize the land disturbing activities and development on the subject property ereby the County of Albemarle the right t enter upon the property as required to ensure corn liagce with the ap oved pt#pL' / (9, /g./.-27_4.1 Signature of Owner,Contrast Purchaser Date !l/ f/:zz 0. ,� x'34/ °x`73- S. ,,-.3 71, Print Name Daytime phone number of Signatory FOR OFFICE USE ONLY HYPO I at 1 q [� ] (n Fee Amount S 1041/-� Date Paid By who? atille<SV 11\4 p / 7(0l i Ckk I39 1 By p� Receipt p Z L, lkt P 6 A l re Revised November 14,2011 Page 1 013 Nor' rr EROSION CONTROL PLAN: (SUBMIT 2 COPIES) Land disturbing activity pertaining to single family dwelling unit: I. Plan Review $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 2 Permit and First Year Inspection Fees $150 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 3. Annual Permit Renewal and Inspection Fees $150 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 4. Each reinspection $150 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) Land disturbing activity pertaining to non-exempt agricultural land: 5. Plan Review.. $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 6. Permit and First Year Inspection Fees $150 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 7. Annual Permit Renewal and Inspection Fees $150 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 8. Each reinspection $150 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) All other land disturbing activity: 9. Plan Review, Disturbed Area Less Than One Acre $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 10. Permit and First Year Inspection Fees,Disturbed Area Less Than One Acre $200 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 11. Annual Permit Renewal and Inspection Fees,Disturbed Area Less Than One Acre $200 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 12. Plan Review,Disturbed Area One Acre or Larger 300 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 13. Permit and First Year Inspection Fees,Disturbed Area One Acre or Larger $100/per disturbed acre (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 14. Annual Permit Renewal and Inspection Fees, Disturbed Area One Acre or Larger $100/per disturbed acre (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 15. Each reinspection $250 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) 16. Amendment to Approved Plan $180/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 17. Variances $150/per request (TO BE PAID AT TIME OF APPLICATION) 18. SUBTOTAL EROSION CONTROL PLAN $ 300. 00 Revised November 14,2011 Page 2 ot3 STORMWATER MANAGEMENTBMP PLAN& MITIGATION PLAN: (SUBMIT 2 COPIES) 19. Stormwater Management/BMP Plan... $300/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 20. Major Amendment of Plan $180/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 21. Request for exception $240 (TO BE PAID AT TIME OF APPLICATION) 22.Request for development in a stream buffer or for reduction or modification of stream buffer and mitigation plan(if not part of another document)—Single family dwelling unit or accessory structure $85 (TO BE PAID AT TIME OF APPLICATION) 23. Each inspection or reinspection $60 • (INSPECTION/REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) 24. Mitigation Plan $150 (TO BE PAID AT TIME OF APPLICATION) 25.SUBTOTAL SWM/BMP PLAN $ '300 . 00 TOTAL APPLICATION FEE: (Add lines 18 and 25) $ (0 00. 00 THE OWNER SHALL BE RESPONSIBLE FOR ALL REINSPECTION AND/OR ANNUAL RENEWAL FEES WHICH MAY BE CHARGED TO THIS PROJECT. Revised November 14,2011 Page 3 of 3 ( Le -' U0 7b 2O )hI4/ Applicatioa for Review of � � Erosion & Sediment Control Plan & Stormwater Management/BMP Plan & Stream Buffer Mitigation Plan z rosion& Sediment Control Plan tormwater Management/BMP Plan ❑ Stream Buffer Mitigation Plan E&S Plan Amendment �p SWM Plan Amendment (Previous Plan# ) (Previous Plan# ) ❑ E&S Plan with Variance ❑Request for Exception #of Variances ❑SWM Plan Resubmittal ❑E&S Plan Resubmittal WPO Application# WPO Application# Submit 2 copies each of applicable plans/narrative/computations *When a WPO plan is reviewed,but not approved,and a response to comments is not received within 6 months from the date of county comments,the application will be deemed withdrawn. Project Name: Surface PavKiv9 EXpav1Sio i - Cher145V lle-Aibemule Airporf Tax map and parcel: 32/ls Zoning: RA Amount of Land Disturbance: 5.0 Acres Location of property(landmarks,intersections,or other): Alrpor7 y Contact Person(Who should w e call/write concerning this project?): 14 i l l t'8 Wi IV_I 4 EsChenfie Ider Address q1 I I Farrar C'I:j gu4e, loo City Ri c i v and State V A, Zip 232.34 Daytime Phone lot 215- S30t Fax#(fa) 275- 6371 E-mail weschencGlderiA de Haai✓pnrf.aim Owner of Record Chark% .sville- Alberavle Airpor+AutlnoriI-y Address loo plow, Loop) Suitt 200 City Charloliesv t I le State VA Zip 22-q i I Daytime Phone(4 4) q73 5342 Fax#� 974-7476 E-mail tfahv7gogoelio.COVV) Contractor Address City State Zip _ Daytime Phone( ) Fax#( ) E-mail Plan Preparer De Ito Airport- Consul tahts,Slc. Address q!I 1 Farrarc+,� Sw+ I OO City I I c-h m dhd State VA 4 Zip 232.36 Daytime Phone(Sol) 275'- 63Ol Fax#t1) 275'• 6371 E-mail weschevlfcl der@ dellaarrperi'.coi Owner/Applicant Must Read and Sign By signing this application as owner,I hereby certify that all requirements of the approved Erosion Control Plan,Stormwater Management/BMP Plan,and/or Mitigation Plan will be complied with and I have the authority to authorize the land disturbing activities and development on the subject pro erty. I her . nt the County of Albemarle the right to enter upon the property as required to ensure complianc with thg.approved Ian. ` // 57/ /y Signature of Owner,Contract Purchaser Date Bill Pahuta (434) 973-8342 Print Name Daytime phone number of Signatory FOR OFFICE USE ONLY �1 1� WPO# .11._ /' c Fee Amount S(0°°*04 Date Paid 5)211 1 By who? C f l 1 j� Receipt#9Sy q 7 Ck#S 25)7 By Dg.. Ate?e«'1a +4(44-Y Revised November 14,2011 Page 1 of 3 rrw► Nw EROSION CONTROL PLAN: (SUBMIT 2 COPIES) Land disturbing activity pertaining to single family dwelling unit: I. Plan Review $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 2 Permit and First Year Inspection Fees $150 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 3. Annual Permit Renewal and Inspection Fees $150 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 4. Each reinspection $150 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) Land disturbing activity pertaining to non-exempt agricultural land: 5. Plan Review $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 6. Permit and First Year Inspection Fees $150 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 7. Annual Permit Renewal and Inspection Fees $150 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 8. Each reinspection $150 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) All other land disturbing activity: 9. Plan Review, Disturbed Area Less Than One Acre $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 10. Permit and First Year Inspection Fees,Disturbed Area Less Than One Acre $200 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 11. Annual Permit Renewal and Inspection Fees,Disturbed Area Less Than One Acre $200 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) // 12. Plan Review, Disturbed Area One Acre or LargerS$3L00 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 13. Permit and First Year Inspection Fees,Disturbed Area One Acre or Larger $100/per disturbed acre (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 14. Annual Permit Renewal and Inspection Fees,Disturbed Area One Acre or Larger $100/per disturbed acre (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 15. Each reinspection $250 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) 16. Amendment to Approved Plan $180/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 17. Variances $150/per request (TO BE PAID AT TIME OF APPLICATION) 18. SUBTOTAL EROSION CONTROL PLAN $ 300. 00 Revised November 14,2011 Page 2 of 3 STORMWATER MANAGEMENT/BMP PLAN& MITIGATION PLAN: (SUBMIT 2 COPIES) 19. Stormwater Management/BMP Plan... $300/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 20. Major Amendment of Plan $180/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 21. Request for exception $240 (TO BE PAID AT TIME OF APPLICATION) 22.Request for development in a stream buffer or for reduction or modification of stream buffer and mitigation plan(if not part of another document)—Single family dwelling unit or accessory structure $85 (TO BE PAID AT TIME OF APPLICATION) 23.Each inspection or reinspection $60 (INSPECTION/REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) 24. Mitigation Plan $150 (TO BE PAID AT TIME OF APPLICATION) 25.SUBTOTAL SWM/BMP PLAN $ 3 00 . 0 0 TOTAL APPLICATION FEE: (Add lines 18 and 25) $ 6 00. 00 THE OWNER SHALL BE RESPONSIBLE FOR ALL REINSPECTION AND/OR ANNUAL RENEWAL FEES WHICH MAY BE CHARGED TO THIS PROJECT. Revised November 14,2011 Page 3 of 3 Application for Review of Erosion & Sediment Control Plan & Stormwater Management/BMP Plan & dt�•� Stream Buffer Mitigation Plan ���� g L�Erosion& Sediment Control Plan aPtormwater ManagementlBMP Plan 0 Stream Buffer Mitigation Plan O E&S Plan Amendment 0 SWM Plan Amendment (Previous Plan# ) (Previous Plan# ) C7 E&S Plan with Variance 0Sequest for Exception �/' #of Variances l9'SWM Plan Resubmittal gle E&S Plan Resubmittai WPO Application# WPO Application# 2-0114 Submit 2 copies each of applicable plans/narrative/computations *When a WPO plan is reviewed,but not approved,and a response to comments is not received within 6 months from the date or county commentszthe application will be deemed withdrawn. Project Name: Surface ParK;n9 Expansion - Charlo{sville-Al bemark A irpor f- Tax map and parcel: 32/to Zoning: (2A► Amount of Land Disturbance: 5'0 Acres Location of property(landmarks,intersections,or other): _Aftpor'�' Contact Parson(Who should we call/write concerning this project?): Kid l i a l'V) i0t'% cGc.herf:(s'er Address g1ll Farrar et Bunt: loo City Rit;hmend State VA Zip 2 2 Daytime Phone' ) 215"' Q3o1 Fax N(f) 27/^ €371 E-mail We...560V)fel,ICIert0,deitaahrpnrif.com Owner of Record Char$i itsvi lk- Albemarle Airpor+Aith iorify Address 100 sow Loop, Gulf?, 2.00 City Charlo4' svilk. State VA Zip 22111 Daytime Phone(,M) 61'7$' D342 Fax it(.431 ¶74.7474 E-mail ►pa h v ia6)g o Clio.Corn Contractor Address City State Zip Daytime Phone( ) Fax N( � E-mail Plan Preparer tr. a 1 x . r . Address q t I % Farrara Sytife I QQ City 12;4tV 1OV%(7 State VC3 Zip_ilr,,, k Daytime Phone(BO4) 275 1)301 Fax N did 276^e371 E-mail i vecheinft;l der0 de f fe8( -,cOM Owner/Applicant Must Read and Sign By signing this application as owner,i hereby certify that all requirements of the approved Erosion Control Plan,Stormwater Management/BMP Plan,and/or Mitigation Plan will be complied with and I have the authority to authorize the land disturbing activities and development on the subject property. I hereby grant the County of Albemarle the right to enter upon the property as required to ensure compliance with the ppraved pitAn. - i ./'(/ .-� 2/945/ gnature of Owner,Contract Pure ser Date e ,ti p. �� i– y—`'1145-%34L. Print Name Daytime phone number of Signatory FOR OFFICE USE ONLY WPO N Fee Amount$ Date Paid By who? Receipt N CIO By: Revised November I4,34I I Page I of 3 EROSION CONTROL PLAN: (SUBMIT 2 COPIES) Land disturbing activity pertaining to single family dwelling unit: I. Plan Review $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 2 Permit and First Year Inspection Fees $150 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 3. Annual Permit Renewal and Inspection Fees $150 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 4. Each reinspection $150 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) Land disturbing activity pertaining to non-exempt agricultural land: 5. Plan Review $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 6. Permit and First Year Inspection Fees $150 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 7. Annual Permit Renewal and Inspection Fees $150 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 8. Each reinspection $150 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) All other land disturbing activity: 9. Plan Review,Disturbed Area Less Than One Acre $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 10. Permit and First Year Inspection Fees,Disturbed Area Less Than One Acre $200 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR ERbSION CONTROL PERMIT) 1 1, Annual Permit Renewal and Inspection Fees,Disturbed Area Less Than One Acre $200 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 12. Plan Review,Disturbed Area One Acre or Larger $300 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 13. Permit and First Year Inspection Fees,Disturbed Area One Acre or Larger $100/per disturbed acre (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 14. Annual Permit Renewal and Inspection Fees,Disturbed Area One Acre or Larger $100/per disturbed acre (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 15. Each reinspection $250 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) 16. Amendment to Approved Plan $180/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 17. Variances $150/per request (TO BE PAID AT TIME OF APPLICATION) 18. SUBTOTAL EROSION CONTROL PLAN $ +50, O Revised November 14,2011 Page 2 of 3 STORMWATER MANAGEMENT/BMP PLAN& MITIGATION PLAN: (SUBMIT 2 COPIES) 19. Stormwater Management/BMP Plan.., ...$300/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 20. Major Amendment of Plan 180/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 21. Request for exception $240 (TO BE PAID AT TIME OF APPLICATION) 22.Request for development in a stream buffer or for reduction or modification of stream buffer and mitigation plan(if not part of another document)—Single family dwelling unit or accessory structure $$5 (TO BE PAID AT TIME OF APPLICATION) 23.Each inspection or reinspection $60 (INSPECTION/REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) 24. Mitigation Plan $150 (TO BE PAID AT TIME OF APPLICATION) 25.SUBTOTAL SWM/BMP PLAN $ 300 TOTAL APPLICATION FEE: (Add lines 18 and 25) $ 1 S 0,00 THE OWNER SHALL BE RESPONSIBLE FOR ALL REINSPECTION AND/OR ANNUAL RENEWAL FEES WHICH MAY BE CHARGED TO THIS PROJECT. Revised November 14,2011 Page 3 of 3 Albemarle C`''unty Community Development Department 401 McIntire Road Charlottesville,VA 22902-4596 u Planning Application Voice:(434)296-5832 Fax:(434)9724126 (PARCEL/ OWNER INFORMATION TMP 03200-00-00-01000 I Owner(s): Application # WP0201400014 CHARLOTTESVILLE-ALBEMARLE AIRPORT AUTHORITY PROPERTY INFORMATION Legal Description ACREAGE CH'VILLE/ALBEMARLE AIRPORT Magisterial Dist. White Hall Land Use Primary Commercial Current AFD Not in A/F District Current Zoning Primary Rural Areas APPLICATION INFORMATION Street Address 4000 DICKERSON RD CHARLOTTESVILLE, 22911 Entered By Type Water Protection Ordinances Judy Martin Application T e 102/25/2014 Project Surface Parking Expansion-Ch'ville-Albemarle Airport Received Date 02/24/14 Received Date Final Submittal Date Total Fees 600 Closing File Date Submittal Date Final Total Paid 600 Revision Number Comments Legal Ad SUB APPLICATION(s) Type Sub Applicati [_ Comment Erosion and Sediment Control Plan rtiiiSter Matfagbt0ent/:BMP Plan. (APPLICANT/ CONTACT INFORMATION ContactType I Name Address 0wner/AppllcanC':' I RL e tYStat Zip Phone PhoneCell CHARt;©T"f,ESVIfr€;E-ALHEMkRE.E AfRPOR:�201 84YVEN:CC�{7p .; ;,;� `1 CHARI(?TTESVILL'I 22911 i Prima..._..__°.......•___..a. M.....ESCHENELDE............_.._......__.......... 9711 FARRAR STE. 100 RICHMOND,VA. 23236 ..__.. 8042758301 Primary Contact WILLIAM M. ESCHENFELDER Plan Preparer DELTA AIRPORT CONSULTANTS,INC. 9711 FARRAR CT.,STE. 100 RICHMOND,VA. 23236 8042758301 Signature of Contractor or Authorized Agent Date ....r (4900 fi-'e Application for Review of ek, Erosion & Sediment Control Plan & Stormwater ManagementBMP Plan & er.� Stream Buffer Mitigation Plan Erosion& Sediment Control Plan [Stormwater ManagementBMP Plan ❑ Stream Buffer Mitigation Plan ❑ E&S Plan Amendment ❑SWM Plan Amendment (Previous Plan# ) (Previous Plan# ) ❑ E&S Plan with Variance ❑Request for Exception #of Variances ❑SWM Plan Resubmittal ❑ E&S Plan Resubmittal WPO Application# WPO Application# Submit 2 copies each of applicable plans/narrative/computations *When a WPO plan is reviewed,but not approved,and a response to comments is not received within 6 months from the date of county comments,the application will be deemed withdrawn. Project Name: Su.rfaCe Pavkin9 expansion - CharI !, sville-Albemarle Airport- Tax map and parcel: 32/10 Zoning: RAC L C. Amount of Land Disturbance: 5.0 Acres Location of property(landmarks,intersections,or other): Air po r+- Contact Person(Who should we call/write concerning this project?): ry I I I i a m 10', Gschenfe Icier Address 611(1 Farrar C .I Suite, !oo City Richmond State VP% Zip 2323 , Daytime Phone) 275— 5301 Fax#(fco) 275- 6371 E-mail west✓henaIderrriel+aairpor+.com Owner of Record C hart tVllle- Albemarle Airpor+Aidliori+y Address too f owe r1 Loop) S(A,l tt 200 City Chavialiesvilk, State VA Zip 22 Ci I J Daytime Phone(4M) 6173" t54 Fax#(4 3 1 974-7476 E-mail hpa ht)ta0g o 6109 COM Contractor Address City State Zip Daytime Phone( ) Fax#( ) E-mail Plan Preparer Delta Alrporl- Consultants; . Address C1111 Farrare+., Suife 100 City Richmor)d State VA Zip 23 , 2.3 Daytime Phone(BO4) 275" Via Fax#art 275- 637 E-mail wCSchevi Eel der&delfaairperl-,coM Owner/Applicant Must Read and Sign By signing this application as owner,I hereby certify that all requirements of the approved Erosion Control Plan,Stormwater ManagementBMP Plan,and/or Mitigation Plan will be complied with and I have the authority to authorize the land disturbing activities and development on the subject prope ereby the County of Albemarle the right t enter upon the property as required to ensure corn lialce wish the ap oved s--,r4Zi-=>,,,,k-o-se, ; 4,r•_4/1',/e' ,,- /6-ZW4/, Signature of Owner,Contr t Purchaser Date Print Name Daytime phone number of Signatory FOR OFFICE USE ONLY WPO# L '� r �� Fee Amount M Date PaidA'`�$y who? Receipt#q4(0- 11 Ck#j� B ��� Revised November 14.2011 Page 1 of 3 Now r✓ EROSION CONTROL PLAN: (SUBMIT 2 COPIES) Land disturbing activity pertaining to single family dwelling unit: I. Plan Review $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 2 Permit and First Year Inspection Fees $150 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 3. Annual Permit Renewal and Inspection Fees $150 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 4. Each reinspection $150 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) Land disturbing activity pertaining to non-exempt agricultural land: 5. Plan Review $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 6. Permit and First Year Inspection Fees $150 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 7. Annual Permit Renewal and Inspection Fees $150 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 8. Each reinspection $150 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) All other land disturbing activity: 9. Plan Review, Disturbed Area Less Than One Acre $150 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 10. Permit and First Year Inspection Fees,Disturbed Area Less Than One Acre $200 (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 11. Annual Permit Renewal and Inspection Fees,Disturbed Area Less Than One Acre $200 (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 12. Plan Review, Disturbed Area One Acre or Larger . 00 per review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 13. Permit and First Year Inspection Fees,Disturbed Area One Acre or Larger $100/per disturbed acre (TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 14. Annual Permit Renewal and Inspection Fees, Disturbed Area One Acre or Larger $100/per disturbed acre (TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 15. Each reinspection $250 (REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) 16. Amendment to Approved Plan $180/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 17. Variances $150/per request (TO BE PAID AT TIME OF APPLICATION) 18. SUBTOTAL EROSION CONTROL PLAN $ 300. 00 Revised November 14,2011 Page 2 of 3 STORMWATER MANAGEMENT/BMP PLAN& MITIGATION PLAN: (SUBMIT 2 COPIES) 19. Stormwater Management/BMP Plan... $300/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 20. Major Amendment of Plan $180/per plan review (TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 21. Request for exception $240 (TO BE PAID AT TIME OF APPLICATION) 22. Request for development in a stream buffer or for reduction or modification of stream buffer and mitigation plan(if not part of another document)—Single family dwelling unit or accessory structure $85 (TO BE PAID AT TIME OF APPLICATION) 23. Each inspection or reinspection $60 (INSPECTION/REfNSPECTION FEES ARE INVOICED TO THE LANDOWNER) 24. Mitigation Plan $150 (TO BE PAID AT TIME OF APPLICATION) 25. SUBTOTAL SWM/BMP PLAN $ ;7 00 • 00 (31111 TOTAL APPLICATION FEE: (Add lines 18 and 25) $ 00. 00 THE OWNER SHALL BE RESPONSIBLE FOR ALL REINSPECTION AND/OR ANNUAL RENEWAL FEES WHICH MAY BE CHARGED TO THIS PROJECT. Revised November 14,2011 Page 3 of 3