HomeMy WebLinkAboutWPO201400014 Inspection 2015-09-03 ,oF^�sey Compliant❑ Notice to Comply❑
Stop Work El Bond lnsp ❑
1707" Warning❑ Under NTC kGIN�P Under SWO El Re-inspection (fee) ❑
SWPPP INSPECTION
Project Name: /-}i c fa r4- S,.,,Ac,_ p„L:t� Err, File Number: t t.3 e b b 1 LI
DEQ General Permit Number: V A \o G 7 PI
County Inspector: t� ��- 040 Inspection Date: t -3— Time: 4".5
For Warnings or Notices, DATE TO COMPLY BY
Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction lErlinish Grading ❑ Stabilization ❑ swm conversion ❑
Compliance
Yes No
Posting at the The coverage letter and SWPPP book location must be posted in a prominent place at
site entrance / the entrance to the job site, available to the public on request.
SWPPP The complete document must be available for inspection on-site
available for
review
Coverage A current coverage letter(expiration date of 2019) must be included
letter
Registration A registration statement must be included that goes with the coverage letter. The
Statement acreage disturbed must be accurate.
PPP plan A copy of the pollution prevention plan and a copy of the current DEQ permit code must
be included in the SWPPP. The plan must be marked to show location of measures.
Inspection Reports must be up-to-date, informative, documenting problems, and occurring at
reports / required intervals. Rain events and inspections for rain events must be noted.
Inspection Results of inspections must be followed up with corrective actions where necessary
reports/corre
ctive actions
Fueling Fueling stations must be contained, and spill prevention an cleanup kits in place
station �% %zak.v( off S% nv i (1 Sv✓4 'P bock
Washouts J A lined sump area must be provided for any co crpte w4shout. ,Waishout facilities for
paint,grouts, etc. are also needed. loede o S Ft , ookti; 5a)PPP Gc Ak
Trash and Trash and debris must be cleaned up so that it does not leave the job site. Any
debris ` J contaminates must be protected from becoming runoff during rains (cover dumpsters).
�/ Trash is not to be buried on-site.
Sanitation Sanitation facilities must be provided and maintained, and protected from spills, away
from inlets.
Erosion and
Sediment
Control and
Stormwater
Management
per plans and
standards
` of AL Compliant Cc." Notice to Comply❑
re Stop Work El Bond Insp
i, EP Warning ❑ Under NTC
I�NGIN�P Under SWO
❑ Re-inspection (fee) ❑
Erosion Control Inspection Report
Project Name: 4 r 0C.a- C�c 2, Q ri � \ File Number: W Vbati - l t✓J
County Inspector: --3---v e, U-kkO Inspection Date: q-3 V Time: 9. 3 td
For Warnings or Notices, DATE TO COMPLY BY
Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction [Finish Grading ❑ Stabilization ❑ swm conversion ❑
Compliance
Comments/Notes
Yes No
Silt, safety, 5t rS , ,.,,C ,
tree fence
Diversions, s/ ,
Berms,
",/ditches
Inlet, culvert
protection j
Stream
work,
crossings
Traps,
Basins
Stabilization S/s p (-a-k r 5 tofu i"s re ✓
Entrances
Limits `
oY A Compliant❑ Notice to Comply❑
='�, iti,,;, Stop Work❑ Bond lnsp ❑
®—1Warning _ Under NTC ❑>✓
!"-v Under SWO ❑ Re-inspection (fee) ❑
� Erosion Control Inspection Report
Gfi'''he Asd,;%E /9A,sn.th-
Project Namei jG,P cE"A"6✓.411,i9.✓s•G.11 File Number: Gll,a— Zo/ ,00e,/,Z
County Inspector: f/�� ""C�� Inspection Datth—A)4 ZS, 1 5 Time: lZ'S�
For Warnings or Notices, DATE TO COMPLY BY
Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction L "Finish Grading ❑ Stabilization❑ swm conversion ❑
Compliance
Comments/Notes
Yes No NA
Silt, safety,
tree fence
Diversions,
Berms,
ditches
Inlet, culvert
protection
Stream
work,
crossings
Traps,
Basins
Stabilization
Entrances
Limits ./41!l/i.J' v7;;;,41,(✓ � /✓fOit/ .ti , " .4;4/pee).4.._7.47.< ,4;›Ob< /
,
/9. e/7 .!°E�.ue:s / 47' . s'TJeAY eel.o `EG 4‘0,5-,;:), ��_y L,),17
/
•
of^ 4y Compliant[ Notice to Comply El A °r TA Stop Work❑ Bond lnsp ❑
Warning❑ Under NTC ❑
Under SWO ❑ Re-inspection (fee) ❑
Erosion Control Inspection Report
Project Name: du (k *1,-1,0,4 Sc4r4„ G,, ap.File Number: t,JPO Z.-4D r y• 000/�/
County Inspector: \)o.v..,1 -01 Inspection Date: 7 /tc' Time: 9: 0b
For Warnings or Notices, DATE TO COMPLY BY
Initial controls ❑ Clearing ❑ Rough Grading❑ Construction❑ Finish Grading ❑ Stabilization ❑ swm conversion ❑
Compliance
Comments/Notes
Yes No
Silt, safety,
tree fence
Diversions,
Berms,
ditches
Inlet, culvert
protection
Stream
work,
crossings
Traps,
Basins
Stabilization
Entrances
Limits
S wept) zooid t boo Cr.(i( b.c5 t( t-
^may Compliant❑ Notice to Comply❑
/{ 6 ►�a Stop Work❑ Bond lnsp ❑
� Warning❑ Under NTC❑
«t► I Under SWO❑ Re-inspection (fee) ❑
SWPPP INSPECTION
Project Name: File Number:
DEQ General Permit Number:
County Inspector: Inspection Date: Time:
For Warnings or Notices, DATE TO COMPLY BY
Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction❑ Finish Grading ❑ Stabilization ❑ swm conversion ❑
Compliance
Yes No Comments/Notes
Posting at the The coverage letter and SWPPP book location must be posted in a prominent place at
site entrance the entrance to the job site, available to the public on request.
SWPPP The complete document must be available for inspection on-site
available for
review
Coverage A current coverage letter(expiration date of 2019) must be included
letter
Registration A registration statement must be included that goes with the coverage letter. The
Statement acreage disturbed must be accurate.
PPP plan A copy of the pollution prevention plan and a copy of the current DEQ permit code must
be included in the SWPPP. The plan must be marked to show location of measures.
Inspection Reports must be up-to-date, informative, documenting problems, and occurring at
reports required intervals. Rain events and inspections for rain events must be noted.
Inspection Results of inspections must be followed up with corrective actions where necessary
reports/corre
ctive actions
Fueling Fueling stations must be contained, and spill prevention and cleanup kits in place
station
Washouts A lined sump area must be provided for any concrete washout. Washout facilities for
paint, grouts, etc. are also needed.
Trash and Trash and debris must be cleaned up so that it does not leave the job site. Any
debris contaminates must be protected from becoming runoff during rains (cover dumpsters).
Trash is not to be buried on-site.
Sanitation Sanitation facilities must be provided and maintained, and protected from spills, away
from inlets.
Erosion and
Sediment
Control and
Stormwater
Management
per plans and
standards
•
J$
vo ®�
�'IRGI131�'
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
VSMPIVESCP RE- INSPECTION INVOICE #1
DATE: August 6, 2015
INVOICE TO: Charlottesville - Albemarle Airport Authority
c/o Melinda Crawford
201 Bowen Loop
Charlottesville, VA 22911
RE: WP0201400014; Airport Surface Parking Expansion
Notice To Comply.
DATE OF RE- INSPECTION: July 24, 2015
RE- INSPECTION FEE: $250.00
By September 6, 2015 Albemarle County must receive the re- inspection fee of $250.00 to
continue your project. This fee is required per sections 17 -207 and 17 -.208 of the County Code.
To pay the re- inspection fee, please send a check payable to the County of Albemarle to my
attention along with the enclosed copy of this invoice. If the re- inspection fee is not paid within
30 days, interest charges will be applied to the past due amount per the Albemarle County
Water Protection Ordinance. (Sec.. 17 -210)
If you should have any questions, please do not hesitate to contact me.
Sincerely
Todd Shifflett
Engineering Division
VTS/
Enclosure
Revised — 7/13/2015
y
t
U� ®h
Hand delivered
Project:
r
u
J
NOTICE TO COMPLY
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
Date: 61301
,�
Under section 17 -900 of the Albemarle County Code, this is your NOTICE TO COMPLY with the
requirements of the VSMP Permit for the referencedproject and to immediately take corrective measures
that address the deficiencies on this property. The specific deficienciesare circled below.
Mud on road Shovel and sweep all mud and dirt from the road. Install adequate wash-
rack and construction entrance for cleaning.
Measures not installed Items not been installed per the approved plan, or have been
removed. Install them, or obtain a plan amendment.
Measures failing Measures have failed more than once. Build larger, more effective ones, or
amend the plan to better protect the site.
Site abandoned and repairs needed The site is not stabilized and erosion is occurring.
Repair all measures and stabilize.
No inlet protection Inlet protection has not been installed. Install inlet protection per the plans.
Site does not match plans a site has deviated too much from the approved plan, or the
p an was not buildable. A plan amendment is required. -- Obk -'n a ff foo,_,d
SWPPP documents deficient Correct document deficiencies.
Pollution prevention practices not followed Install, maintain practices per SWPPP and CGP.
Washout facilities not provided or used Install and /or properly use washout facilities per
SWPPP.
Unless subsequently amended in writing by this office, it 's expected all of these corrective
..
measures will be completed by: Date: /7 .
Re- inspection of this notice to verify corrective measures will incur a $250 fee (17- 207/8, $150 for SF).
Failure to take effective corrective me s will result in a Stop Work Order upon re- inspection.
County Inspector Signature: D�
Receipt Signature: \'__4 &).
�� /� � %,' \o ` 'i' � ^'���=- _s = -�;
�\
it
I11
LEGEND
� \ \ \�� \ \4 \\ / y, � \\ 1 \ � Illll -`- / Il 'a' 1 t a s_ om_, \..-- __ � ` \a•__~ f /// iii ��_ ® w.o,;
\ \ IIII \ /'
\ \�� 11111111111! / >�' I"
-� \\\ \\�. 11111 \ \1 \ o
1 fllll /// / \ \\ 11I \ Y-; , 1 v--0. `1.♦/ \ \ \� \� lAflllll /l" 1\ \ \ `\ \\ � W ,w®ao.e.mx
\, \ \_� /,� III \
`� \� �I�// ' \ \\\ �\ rlilhl _- -- - � \ d\\o \. °— — _ °`— � •,C\ �. / I[l� // \ \ \ `
-�_ - \
i
< P.
t
;\. o ______ .- ' l ,. .. -.. '.. \111 \ \ `�{�� \` \ \Y ♦� ♦ \ %\ I4lll `\`�`` ♦\ - —_� _\ - °=' e�
� , I[ , � 1, , � 1 1 \ �\\\♦\ I \ \� ♦ \\ \ \ \ II 1\ �-_� �__ -may__- =' �.�.., n�eem;
III _ ♦ 1 � ) r \ 1 1 v ° - = -- _ -__ = -_ mmnnauo..wW
,{NIBU\ \ �1�1�11 1 1=iE
/' 1 \ � ._ . 1 1 .\ \ I ` �\ \ \ 1 \ °r�41'\Lga�rsr"`�s -- _- __ -3'c- ♦ \o - mmwaa
u
-V \ \
II
� �i d1 1 1 1 1 �\
A_--__� -`_`_ - - - -- _ o ma°
_ _ _ � `�; / -- �iorworc� � _-- -<:+Y� - - -- � / ' -:\\
��'�'���z
\ \ I - -O'
fill
```\ \,1,1j " -- =�j ����. _` ;_ °= _=;��.. y - - -�_ _ � ; ; ; __�- I��j , /.� ,I, +„11 f ,, •, • 7,;, 1 /,,y / //r/ I!l „/ / w`m.m""'om� i
II, y{Un, ,, ,�, ,� \� �ac�..� � \�� \ 11 \ \` >__�_��� ♦ \ \ \ 1 � ''� i __' / j td . lantnl0� I” ii''' „� _% :' %: % %i /iii /iill t r m,omx,a�xx�x°x,xr.�
I /// O� %/ 'uvx� 1 � � ��; \\ \I \ ` � � � ♦\ \ \ \ \ \I \ \� \\ / % ,, J I I \1`,-- \IUlll llllt li // /�:'��- '�. i / / / / / / / / / / /Iltj saoasust�tuexm<'M"+uraoo°im+aw
1111// iqi _�i _ �___ ��l`1 , 1 1 / 1 5 \\ ii -_� \� \ \ \\ \ \41 \\ \` j / i , 1 � \ ✓ Ill - -� \lUl l d4Uj/ � �5 %S %�G %ij / / / / / / /l/ I/ nEVenox.ener
\I,
l \\�� � ��` °=- -_._ _ � -� /' I \� == -'� \ \ `1�1- 1-1"1•'ti'1�� T --,/ I� � � /,♦ \+ ,Il�t � 1 \'31j IU\4
•\� „i' --�- - = -c' l _ -\ •� �,\_�`+a - -t'i` \, t I 1 1 \ I , / / 1 Itl \ \ J JI \1` �\\��\\ \lrl \\t, `\ \ \�o \\ \ ncwncorxoaronexnu°r,xe,xawuio
UiMYR �0
\
1l
\o\o\
\a\\\\\ \\\\ \ \ ;
11 \ \
�/ ' _ / ^ � /i � ^ %�� I 1 / 1 1 1 I I I / ,' `\\ \ \ \U��171 ; \ I \,j111 ,_♦ \p \Uh \U \ \ \`lp \Q \ \ \I \� \t\ `� --
�:��” \\ \ t
,, , • �- - _ : . = % - - -_ =i /; / '/, , \,llr ;; v 107NA1\I;
\I
µm os SURFACE PARKING EXPANSION xo. .nxxa
9711 Farrar Court, Suite 100 � i+ottardoruuarl +loex
Richmond, Virginia 23236 DELTA AIRPORT uj '� _- STAGE 1 EROSION &
P!! t 4p 775A3Dl.rac(80 /1275.8371 w SEDIMENT CONTROL LAYOUT 10
_wwvr. del< cONSULiaNTS, INC. b�?%K %IaF` - 27
m°xa m .w. Dore ron. "° CHARLOTTESVILLE- ALBEMARLE AIRPORT °r'a.�h °f"e:,...,,
Vk
lo f
>_ ".('� �
�_��' -- o' -�'_ -
r n -' fill ll / o ������ %�S >
� t � % 111 I ♦
♦ / I 1 �
it
I11
LEGEND
� \ \ \�� \ \4 \\ / y, � \\ 1 \ � Illll -`- / Il 'a' 1 t a s_ om_, \..-- __ � ` \a•__~ f /// iii ��_ ® w.o,;
\ \ IIII \ /'
\ \�� 11111111111! / >�' I"
-� \\\ \\�. 11111 \ \1 \ o
1 fllll /// / \ \\ 11I \ Y-; , 1 v--0. `1.♦/ \ \ \� \� lAflllll /l" 1\ \ \ `\ \\ � W ,w®ao.e.mx
\, \ \_� /,� III \
`� \� �I�// ' \ \\\ �\ rlilhl _- -- - � \ d\\o \. °— — _ °`— � •,C\ �. / I[l� // \ \ \ `
-�_ - \
i
< P.
t
;\. o ______ .- ' l ,. .. -.. '.. \111 \ \ `�{�� \` \ \Y ♦� ♦ \ %\ I4lll `\`�`` ♦\ - —_� _\ - °=' e�
� , I[ , � 1, , � 1 1 \ �\\\♦\ I \ \� ♦ \\ \ \ \ II 1\ �-_� �__ -may__- =' �.�.., n�eem;
III _ ♦ 1 � ) r \ 1 1 v ° - = -- _ -__ = -_ mmnnauo..wW
,{NIBU\ \ �1�1�11 1 1=iE
/' 1 \ � ._ . 1 1 .\ \ I ` �\ \ \ 1 \ °r�41'\Lga�rsr"`�s -- _- __ -3'c- ♦ \o - mmwaa
u
-V \ \
II
� �i d1 1 1 1 1 �\
A_--__� -`_`_ - - - -- _ o ma°
_ _ _ � `�; / -- �iorworc� � _-- -<:+Y� - - -- � / ' -:\\
��'�'���z
\ \ I - -O'
fill
```\ \,1,1j " -- =�j ����. _` ;_ °= _=;��.. y - - -�_ _ � ; ; ; __�- I��j , /.� ,I, +„11 f ,, •, • 7,;, 1 /,,y / //r/ I!l „/ / w`m.m""'om� i
II, y{Un, ,, ,�, ,� \� �ac�..� � \�� \ 11 \ \` >__�_��� ♦ \ \ \ 1 � ''� i __' / j td . lantnl0� I” ii''' „� _% :' %: % %i /iii /iill t r m,omx,a�xx�x°x,xr.�
I /// O� %/ 'uvx� 1 � � ��; \\ \I \ ` � � � ♦\ \ \ \ \ \I \ \� \\ / % ,, J I I \1`,-- \IUlll llllt li // /�:'��- '�. i / / / / / / / / / / /Iltj saoasust�tuexm<'M"+uraoo°im+aw
1111// iqi _�i _ �___ ��l`1 , 1 1 / 1 5 \\ ii -_� \� \ \ \\ \ \41 \\ \` j / i , 1 � \ ✓ Ill - -� \lUl l d4Uj/ � �5 %S %�G %ij / / / / / / /l/ I/ nEVenox.ener
\I,
l \\�� � ��` °=- -_._ _ � -� /' I \� == -'� \ \ `1�1- 1-1"1•'ti'1�� T --,/ I� � � /,♦ \+ ,Il�t � 1 \'31j IU\4
•\� „i' --�- - = -c' l _ -\ •� �,\_�`+a - -t'i` \, t I 1 1 \ I , / / 1 Itl \ \ J JI \1` �\\��\\ \lrl \\t, `\ \ \�o \\ \ ncwncorxoaronexnu°r,xe,xawuio
UiMYR �0
\
1l
\o\o\
\a\\\\\ \\\\ \ \ ;
11 \ \
�/ ' _ / ^ � /i � ^ %�� I 1 / 1 1 1 I I I / ,' `\\ \ \ \U��171 ; \ I \,j111 ,_♦ \p \Uh \U \ \ \`lp \Q \ \ \I \� \t\ `� --
�:��” \\ \ t
,, , • �- - _ : . = % - - -_ =i /; / '/, , \,llr ;; v 107NA1\I;
\I
µm os SURFACE PARKING EXPANSION xo. .nxxa
9711 Farrar Court, Suite 100 � i+ottardoruuarl +loex
Richmond, Virginia 23236 DELTA AIRPORT uj '� _- STAGE 1 EROSION &
P!! t 4p 775A3Dl.rac(80 /1275.8371 w SEDIMENT CONTROL LAYOUT 10
_wwvr. del< cONSULiaNTS, INC. b�?%K %IaF` - 27
m°xa m .w. Dore ron. "° CHARLOTTESVILLE- ALBEMARLE AIRPORT °r'a.�h °f"e:,...,,