Loading...
HomeMy WebLinkAboutSDP201400032 Review Comments 2015-08-19Short Review Comments Report for: SDP201400032 SubApplication Type: Montessori Community School - Minor Minor Amendment Date Completed:04/24/2014 Reviewer:Rachel Falkenstein Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:04/21/2014 Reviewer:John Anderson Engineering Review Status:Requested Changes Reviews Comments:The stormwater management plan does not appear to follow the concept plan approved with the special use permit(s) for this property. In addition, there is not enough information to know whether the proposal would meet the requirements of the Water Protection Ordinance. I have invited the designers to meet with us to discuss these issues prior to submitting revisions. That meeting is pending. This will potentially have a significant effect on the layout of the proposed site plan minor amendment. Division: Date Completed:04/02/2014 Reviewer:Jay Schlothauer Inspections Review Status:No Objection Reviews Comments:Based on plans dated March 31, 2014. No comments or conditions. Division: Date Completed:04/18/2014 Reviewer:Margaret Maliszewski ARB Review Status:Requested Changes Reviews Comments:The site plan amendment corresponds to ARB-2013-180, which was reviewed by the ARB on January 21, 2014. The action letter from that meeting outlined the revisions required for ARB approval. A resubmittal for ARB-2013-180 is required. See the action letter dated January 24, 2014. Division: Date Completed:05/05/2014 Reviewer:Alexander Morrison ACSA Review Status:Requested Changes Reviews Comments: Division: Date Completed:04/17/2014 Reviewer:Robbie Gilmer Fire Rescue Review Status:Requested Changes Reviews Comments:Based on plans dated 3/31/14 1. FDC location shall be on the address side of the building and with in 50 ft of a fire hydrant. 2.Fire Flow test is required before final approval. Division: Date Completed:04/22/2014 Reviewer:Troy Austin VDOT Review Status:No Objection Reviews Comments: Division: Page:1of4 County of AlbemarlePrinted On:November 09, 2015 Date Completed:04/15/2014 Reviewer:Andrew Slack E911 Review Status:Approved Reviews Comments:Approved. Division: Date Completed:05/20/2014 Reviewer:Rachel Falkenstein Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:05/20/2014 Reviewer:Margaret Maliszewski ARB Review Status:Requested Changes Reviews Comments:An ARB resubmittal has been received and is under review. Comments will be provided when that review is complete. Division: Date Completed:05/29/2014 Reviewer:John Anderson Engineering Review Status:Requested Changes Reviews Comments:1. Ensure that revisions to plan sheet 4 (Phase 1 Layout and Dimension Plan) in response to engineering comments are included. Comments relate to curb radii, length of a section of curb, and sidewalk width. 2. Ensure that revisions to plan sheet 16 (Phase 1 Planter Plan Sections & Details) in response to engineering comments are included. Comments (ref W PO project comments, 2014-May-28): Plan-profile views require a scale to aid review and construction. Label bottom of wall elevation for each wall shown in rain garden/sub-grade storage profile view. Show dimensions for RG-1, 2, 3, 4, and sub-grade SW storage (beneath permeable pavers; plan view). Furnish RG-5 details/dimensions, including connection with inlet B3. Division: Date Completed:07/15/2014 Reviewer:Alexander Morrison ACSA Review Status:Approved Reviews Comments:The ACSA hereby recommends approval of the above referenced site plan. Division: Date Completed:07/16/2014 Reviewer:Robbie Gilmer Fire Rescue Review Status:Approved Reviews Comments:I’ve spoken with Alex Morrison with ACSA and we both agree that the plan can be approved with the conditions that the final C.O. is not released until the sprinkler system or water line are finished. This is a condition we discussed with Chris so that the project wouldn’t get held up while they decide on the sprinkler system or water line upgrade. Division: Date Completed:05/23/2014 Reviewer:Margaret Maliszewski ARB Review Status:Requested Changes Reviews Comments: Division: Date Completed:06/25/2014 Reviewer:Rachel Falkenstein Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:06/24/2014 Reviewer:Margaret Maliszewski ARB Review Status:Requested Changes Division: Page:2of4 County of AlbemarlePrinted On:November 09, 2015 Reviews Comments: Date Completed:06/23/2014 Reviewer:John Anderson Engineering Review Status:No Objection Reviews Comments:Comments addressed Division: Date Completed:07/08/2014 Reviewer:Margaret Maliszewski ARB Review Status:Approved Reviews Comments: Division: Date Completed:07/18/2014 Reviewer:Rachel Falkenstein Planning Review Status:Approved Reviews Comments: Division: Date Completed:09/23/2014 Reviewer:Rachel Falkenstein Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:09/23/2014 Reviewer:Margaret Maliszewski ARB Review Status:Requested Changes Reviews Comments:An ARB submittal is required for the proposed landscaping changes. Division: Date Completed:09/25/2014 Reviewer:John Anderson Engineering Review Status:No Objection Reviews Comments:Removal of guardrail at east end of parking lot leaves 6” curb and 5’ sidewalk. This is a low-speed student dropoff/staff parking area. Moderate to low risk of road runoff, and absent underlying site plan requirement specifying guardrail in this instance, no objection to proposed change to approved site development plan, items 1 or 2: Removal of guardrail; reduction in landscaping plantings (fewer + proposed ornamental grass; defer to Planning). Division: Date Completed:10/17/2014 Reviewer:Rachel Falkenstein Planning Review Status:Approved Reviews Comments: Division: Date Completed:10/17/2014 Reviewer:John Anderson Review Status:See Recommendations Reviews Comments:App# keyed incorrectly: Engr review, this date, for SWPPP, WPO201400032. (JA-10/30/14) Division: Date Completed:04/17/2015 Reviewer:Rachel Falkenstein Planning Review Status:Approved Reviews Comments: Division: Date Completed:04/15/2015 Reviewer:Margaret Maliszewski ARB Review Status:Approved Division: Page:3of4 County of AlbemarlePrinted On:November 09, 2015 Reviews Comments: Date Completed:08/19/2015 Reviewer:Rachel Falkenstein Planning Review Status:Approved Reviews Comments: Division: Page:4of4 County of AlbemarlePrinted On:November 09, 2015