Loading...
HomeMy WebLinkAboutWPO201400093 Bond Release 2015-09-24 1,01-%oFAl. 4 Al. � f'IRGIN1P COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434) 972-4126 EROSION CONTROL PERFORMANCE BOND RELEASE PROJECT NAME: $ iP 474i9e7 * -51-A) PLAN/PERMIT NO. 2- 0/61 _VO93 DATE: Z / .0P/5— This project has been satisfactorily completed and the erosion control performance bond may be released at this time if all erosion control inspection fees invoiced have been paid. ■ Erosion Con rol Inspe 6r Community Development Department All erosion control Inspection fees invoiced on the above project have been collected. Director of Community Development/County Engineer Date Accounting Department All erosion control inspection fees invoiced on the above project have been collected. Chief Accountant Date Cc: Ana Kilmer I:\DEPT\Community DevelopmentfonnsUnspections\EROSION CONTROL PERFORMANCE BOND RELEASE REVISED 5 29 2012 tloc Internal Use Only Date Received: / Fee Paid: !r1'/ qF A l/VH Received by: �� I iT ^, Intake: Forward to nagement Analyst �� `-{ IZ / `5 BOND INSPECTION REQUEST APPROVED PLAN#WPO-201400093 (No ,FAQ PerGnei7> PROJECT NAME: Safe Routes to School Sidewalk Project (As listed on the approved plan) This is to request that an inspection be performed by the County. Where fees are assessed, a fee is required for each inspection. Please check the inspections requested. © VSMP/VESCP Erosion Control,Stormwater Management and/or Mitigation per Water Protection Ordinance section 17-207&208 $250 ❑ Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435 and 14-438; $250 ❑ Water&Sewer per Subdivision Ordinance section 14-435 $250 O Site Development Performance bond(Incomplete Site Work&Landscape Maintenance) $280 TOTAL FEES N/A Inspections for the purposes of bond reduction or release will require a separate fee for each bond. Submit requests to: Department of Community Development,401 McIntire Road,North Wing,Charlottesville, VA 22902,Attention:Management Analyst--Phone-434-296-5832;Fax-434-972-4126. All roads and - __ __ __ _ _ _ stormwater facilities will require construction record drawings,inspection reports,and completion processes through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and county's published procedures.A minimum 20%of the original posting is held until acceptance of all bonded improvements. For Site Development Performance bonds,if landscape installation is part of the bonded incomplete site work,a request for reduction should only be made once all site work is complete. The revised estimate should be sent to; EMAIL: fpohl @albemarle.org OR REGULAR MAIL ADDRESS: Signature of Owner/Developer p o i ii 08/27/15 /.;)/v r'( 1:) Print Name Date Revised 7/15/2014,7/20/2015