HomeMy WebLinkAboutWPO201000068 Inspection 2015-11-10•
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
VSMPIVESCP RE- INSPECTION INVOICE #4
DATE: November 10, 2015
INVOICE TO: Uptown Village, LLC & Route 29, LLC
c/o Hunter Wood
2315 Seminole Trail
Charlottesville, VA 22901
RE: Notice To Comply
Hollymead Town Center Borrow Area ECP - WP0201000068
DATE OF RE- INSPECTION: September 29, 2015
RE- INSPECTION FEE: $250.00
By December 10 2015 Albemarle County must receive the re- inspection fee of $250.00 to
continue your project. This fee is required per sections 17 -207 and 17 -208 of the County Code.
To pay the re- inspection fee, please send a check payable to the County of Albemarle to my
attention along with the enclosed copy of this invoice. If the re- inspection fee is not paid within
30 days, interest charges will be applied to the past due amount per the Albemarle County
Water Protection Ordinance. (Sec. 17 -210)
If you should have any questions, please do not hesitate to contact me.
Sincerely
Todd Shifflett
Engineering Division
VTS/
Enclosure
Revised — 7/13/2015
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone 434 296 -5832 Fax 434 972 -4126
31 August 2015
Uptown Village, LLC & Route 29 LLC
C/o Hunter Wood
2315 Seminole Trail
Charlottesville, VA 22901
The Handover Insurance Company
Cynthia Ellinwood
Attorney -In -Fact
One South Jefferson St.
Roanoke, VA 24028
(540)982 -3511
Re: Hollymead Town Center Borrow Area ECP
Plan WP02010 -00068
NOTICE TO COMPLY
Dear Mr. Wood:
County records indicate your project has reached a state of completion sufficient to warrant all final
stabilization and removal of erosion control measures, and installation and completion of planned
stormwater management facilities or restore the Stormwater basin serving the mobile home trailer park to
the original engineered approved plans and obtain an Erosion and Sediment Control Plan with Narrative
and a VSMP General permit with appropriate fees paid to the Albemarle County Department of
Community Development. The plan must be reviewed, approved, performance bond posted in the amount
determined by the plan approving authority, and a Certified Responsible Land Disturber (RLD) named
prior to the Grading Permit being issued following the given timeline.
10/02/15
Revised Plan & Plat and
9/16/15 5WM Agreement 10/16/15
Plan Submittal Submitted Bond Posted
I
9/25/15 10/09/15 10/19/15
County Plan Approved Precon held &
Comments Work starts
Further delay in completing the erosion control phase and bringing permanent stormwater management
facilities on -line will be considered a violation of the Water Protection Ordinance.
This is your notice to comply in accordance with section 17 -900 of the Water Protection Ordinance. To
comply, you must follow the above outlined action plan starting with the September 16, 2015 benchmark.
A re- inspection fee of $250.00 will be sent to the owner for each re- inspection of this notice.
Page 1 of 2
Uptown Village, LLC & Route 29 LLC
C/o Hunter Wood
2315 Seminole Trail
Charlottesville, VA 22901
Failure to comply by the required date may subject the owner to penalties and remedies as listed under Sections 17-
902 and 17 -903 of the Water Protection Ordinance of the Albemarle County Code.
Should you have a legitimate reason you cannot complete your Water Protection Ordinance plans by the above
given date, you must immediately contact your erosion control inspector at (434) 296 -5832. Unless you have
contacted us and alternative arrangements have been agreed to, we will expect all compliance work to be completed
by the above date.
Since ely,
Jonney Otto
County Engineering Inspector
Received by:
ACIC
Date:
Page 2 of 2