Loading...
HomeMy WebLinkAboutWPO201300032 Inspection 2015-11-10 (2)sr" COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 VSMP/VESCP RE- INSPECTION INVOICE #4 DATE: November 10, 2015 INVOICE TO: Cascadia Development, LLC 170 South Pantops Drive Charlottesville, VA 22902 RE: Notice To Comply Cascadia — WP0201300032 DATE OF RE- INSPECTION: October 16, 2015 RE- INSPECTION FEE: $250.00 By December 10, 2015 Albemarle County must receive the re- inspection fee of $250.00 to continue your project. This fee is required per sections 17 -207 and 17 -208 of the County Code. To pay the re- inspection fee, please send a check payable to the County of Albemarle to my attention along with the enclosed copy of this invoice. If the re- inspection fee is not paid within 30 days, interest charges will be applied to the past due amount per the Albemarle County Water Protection Ordinance. (Sec. 17 -210) If you should have any questions, please do not hesitate to contact me. Sincerely Todd Shifflett Engineering Division VTS/ Enclosure Revised — 7/13/2015 Revised — 7/13/2015 Zc NTC 5 Oct 2015 �'yJlll COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 229!12 45% Phone 434) 296 -5832 Fax(434)972 -4126 5 Oct 2015 Cascadia Development, LLC 170 South Pantops Drive Charlottesville, VA 22911 Linco, Inc. 7 Ellis Lane Waynesboro, VA 22980 Re: Plans WP0201300032 NOTICE TO COMPLY Dear Sirs: Under section 17 -900 of the Albemarle County Code, this is your NOTICE TO COMPLY with the requirements of your Erosion Control Permit for the referenced project and to immediately take corrective measures that address the erosion and sediment control deficiencies on the property. The specific deficiencies and measures required to correct those deficiencies are as follows; 1) Deficiency: Erosion control measures not being adequately maintained, or installed per approved plan. Required Corrections: Maintain erosion controls per approved plans. 2) Deficiency: Bare denuded areas of the site remain dormant without the addition of temporary or permanent stabilization. Required Corrections: Repair erosion damage, and apply temporary or permanent stabilization to denuded areas. 3) Deficiency: Waste material on -site and not transferred to a landfill. Required Corrections: Remove and dispose construction debris in a proper and lawful fashion. 4) Deficiency: Portable lavatory location could contaminate stormwater. Required Corrections: Install lavatory in a manner to protect contamination of stormwater. NTC 5 Oct 2015 5) Deficiency: SWPPP documents have not been property updated or maintained, including site inspection frequency, listing of TMDL information and receiving waters, and materials being hauled on -site without the mention of off -site areas in the paperwork. Required Corrections: Update SWPPP documents to include all required information per the VSMP Construction General Permit. Unless subsequently amended in writing by this office, it is expected all of these corrective measures will be completed by: Date: 9 Oct 2015 Re- inspection of this notice to verify corrective measures will incur a $250 fee (17- 20718, $ 150 for SF). Failure to take effective corrective measures may result in another NTC and fee, or a Stop Work Order upon re- inspection. Failure to comply by the required date may subject the owner to penalties and remedies as listed under Sections 17 -902 and 17 -903 of the Water Protection Ordinance of the Albemarle County Code. Should you have a legitimate reason you cannot complete your Water Protection Ordinance plans by the above given date, you must immediately contact your erosion control inspector at (434) 296 -5832. Unless you have contacted us and alternative arrangements have been agreed to, we will expect all compliance work to be completed by the above date. Additional items may be forthcoming from DEQ, and we will forward these as soon as we obtain them. Should any of these DEQ items require substantially more work, timelines can be adjusted. Please keep in mind that sediment discharge into creeks is grounds for an immediate stop -work order. If you have a weak spot, please redesign, or shore it up well. V�*mG eering Inspector Received b Date: