WPO I-64 Treatment Facility Plan
1St Review Comments
5th Street Station
5th Street SW&Avon Street Ext.
Charlottesville,VA 22902
Albemarle County
BE#V122001
Dear Mr.Deel:
Bohler Engineering is pleased to submit on behalf of Avon Holdings LLC, the revised WPO I-64
Treatment Facility Plan for the proposed 5th Street Station at 5th Street SW & Avon Street Ext. in
Charlottesville, VA. The following is our comment response letter addressing comments received from
you dated April 8,2015. Each comment is addressed and responded to as follows:
Stormwater Pollution Prevention Plan(SWPPP)
Comment 1: The SWPPP content requirements can be found in County Code section 17-405. A
SWPPP must contain (1)a PPP, (2)an ESCP, (3)a SWMP, and(4)any TMDL measures
necessary.
a. Please incorporate this plan, upon approval, into the existing SWPPP for this project.
Response 1: Comment noted, and will be incorporated.
Pollution Prevention Plan(PPP)
Comment 1: The PPP content requirements can be found in County Code section 17-404.
a. Please incorporate this plan,upon approval, into the existing SWPPP for this project,
Response 1: Comment noted, and will be incorporated.
CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS
WWW.BOHLERENGINEERING.COM
Justin Deal
WPO 1-64 Treatment Facility Plan
1, N i, I w 1 l R I 1St Review Comments
4/29/15
Page 2 of 2
Stormwater Management Plan(SWMP)
Comment 1: VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or
disapprove a SWMP. This plan is disapproved, and the reasons are provided in the
comments below. The stormwater management plan content requirements can be found
in County Code section 17-403.
a. The constructed wetland should be designed to capture and treat its entire drainage
area. This design excludes the on-site impervious area with respect to storage.
Please use the total impervious area for your storage calculations, including both on-
site and off-site, and adjust the constructed wetland accordingly or re-route the
onOsite runoff so that the current configuration is adequate.
Response 1: Constructed wetlands have been revised to allow adequate volume for both the off-site
and on-site drainage area. Please see Sheet 6.
Should you have any questions regarding this project or require additional information, please do not
hesitate to contact me at(540)349-4500.
Sincerely,
Bohler Engineering
Ryan Yauger
DRH/1s
H:\12\V122001\Permitting\Jwisdictional Letters\WPO 1-64\150429 WPO 164 1st Review CRL.doc