Loading...
HomeMy WebLinkAboutWPO201500034 Permit 2015-06-04 of Ar, /4-1 r 44‘ff.-—7?: jRGIw, COUNTY OF ALBEMARLE Community Development 401 McIntire Road Charlottesville,Vriginia 22902-4596 (434)296-5832 EROSION CONTROL PERMIT Date of Application: 06/04/2015 Permit Effective Date: 10/07/2015 Number: WPO-2015-00034 LANDOWNER: SM Charlottesville,LLC Phone 7039645000 11111 Sunset Hills Rd. Suite 200 Reston,VA20190 CONTRACTOR: A.G.Dillard Phone: (434)977-3750 P.O.Box 7427 Charlottesville,VA22906 REPONSIBLE LAND Tom Paquette Phone: (434)977-3750 DISTURBER: P.O.Box 7427 Charlottesville,VA22906 Certification/License#: 41771 Type: Plans Prepared By: Collins Engineering Plans Dated: 06/05/2015 Last Revised: 07/09/2015 Plans Entitled: Glenmore-Section K2B Phase B,Lots l &7-16 ESC& Location: SWM Plan Dist. 9.8 Acreage: Tax Map: 093A5-00-00-00100 Hydrological JR17 Unit: Issued By:Kenny Thacker Title:Erosion Control Officer ")52-..... /ZZ---- fv -7-- /s --7 Signature Date '1414 417±', ;. C R+ ^a71�I': COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY Street address: 629 East Main Street,Richmond,Virginia 23219 Molly Joseph Ward Mailing address: P.O.Box 1105,Richmond,Virginia 23218 David K Paylor Secretary of Natural Resources www.deq.virginia.gov Director (804)698-4000 1-800-592-5482 October 01, 2015 SM Charlottesville LLC 11111 Sunset Hills Rd Ste 200 Reston, VA 20190 holzwarthac @stanleymartin.com RE: Coverage under the VPDES Construction General Permit(VAR10) General Permit No. VAR1 OH302 Glenmore K2B Residential Albemarle Dear Permittee: DEQ has reviewed your Registration Statement received on June 04, 2015 and determined that the proposed land-disturbing activity is covered under the General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10). The effective date of your coverage under this general permit is July 1, 2014 or the date of this letter,whichever is later. A copy of the general permit can be obtained from DEQ's webpage at the following location: http://www.deq.virgin ia.gov/Portals/0/DEQ/Water/Publications/CGP2014.pdf. The general permit contains the applicable Stormwater Pollution Prevention Plan (SWPPP) requirements and other conditions of coverage. Please print the general permit and read it carefully as you will be responsible for compliance with all permit conditions. DEQ staff has determined that the proposed land-disturbing activity will discharge to a surface water identified as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of the general permit for (i) sediment or a sediment-related parameter or (ii) nutrients. Therefore, the following general permit(Part I.B.4) and SWPPP requirements(Part II.A.5) must be implemented for the land-disturbing activity: • Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after final grade is reached on any portion of the site; • Nutrients (e.g., fertilizers) shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; • Inspections shall be conducted at a frequency of (i) at least once every four (4) business days or (ii) at least once every(5) business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and • Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls. The general permit will expire on June 30, 2019. The conditions of the general permit require that you submit a new registration statement at least 90 days prior to that date if you wish to continue coverage under the general permit, unless permission for a later date has been granted by the Board. Permission cannot be granted to submit the registration statement after the expiration date of the general permit. If you have any questions about this permit, please contact the DEQ Office of Stormwater Management at ConstructionGP(c�deq.virginia.gov. Sincerely, azAegc;17/E' Frederick K. Cunningham, Director Office of Water Permits 2 Registration Statement General VPDES Permit for Discharges of Stormwater from Construction Activities {VAR10) (Please Type or Print All Information) 1. Construction Activity Operator: (General permit coverage will be issued to this operator. The Certification in Item#12 must be signed by the appropriate person associated with this operator.) Name: SM CHARLOTTESVILLE. LLC Contact: ANDREW HOLZWARTH Mailing Address: 11111 SUNSET HILLS ROAD. SUITE 200 City: RESTON State: VA Zip: 20190 Phone: 434-249-7445 Email address(if available): holzwarthac @stanleymartin.com Indicate if DEQ may transmit general permit correspondence electronically: Yes © No❑ 2. Existing General Permit Registration Number(for renewals only): 3. Name and Location of the Construction Activity: Name: GLENMORE K2B Address(if available): CARROLL CREEK DRIVE City: KESWICK State: VA Zip: 22947 County(if not located within a City): ALBEMARLE COUNTY Latitude(decimal degrees): 37.981653 Longitude(decimal degrees): -78.373042 Name and Location of all Off-site Support Activities to be covered under the general permit: Name: Address(if available): City: State: Zip: County(if not located within a City): Latitude(decimal degrees): Longitude(decimal degrees): 4. Status of the Construction Activity(check only one): Federal❑ State❑ Public❑ Private El 5. Nature of the Construction Activity(e.g.,commercial,industrial,residential,agricultural,oil and gas,etc.): RESIDENTIAL 6. Name of the Receiving Water(s)and Hydrologic Unit Code (HUC): Name: RIVANNA RIVER-CARROLL CREEK Name: HUC: JR17(020802040404) HUC: 7. If the discharge is through a Municipal Separate Storm Sewer System(MS4),the name of the MS4 operator: 8. Estimated Project Start and Completion Date: Start Date(mm/dd/yyyy): 07/01/2015 Completion Date(mm/dd/yyyy): 10/01/2017 9. Total Land Area of Development(to the nearest one-hundredth acre): 46.28 AC Estimated Area to be Disturbed(to the nearest one-hundredth acre): 5.46 AC 10. Is the area to be disturbed part of a larger common plan of development or sale? Yes❑ No El 11. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the General VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting this Registration Statement. By signing this Registration Statement the operator is certifying that the SWPPP has been prepared. 12. Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." `— n � Y Printed Name: A r C- . b�.H,v. Title: Q«,3-;£. •_50044.er, .,., Signature: Date: 012Y)e' (Please sign in INK. This ' = fication must be signed by the appropriate person associated with the operator identified in Item#1.) 01/2014 Page 1 of 1