HomeMy WebLinkAboutSDP201500050 Review Comments Initial Site Plan 2015-11-16Maude Ginty
Service Auth6rity
TO: Ellie Ray
FROM: Alexander J. Morrison, P.E., Civil Engineer
DATE: November 16, 2015
RE: Site Plan Technical Review for: SDP201500050: Hollymead Town Center Blocks D1,
D2 & C2 Townhomes - Initial Site Plan
The below checked items apply to this site.
✓ 1. This site plan is within the Authority's jurisdictional area for:
✓ A. Water and sewer
B. Water only
C. Water only to existing structure
D. Limited service
✓ 2. A 12 inch water line is located approximately on site distant.
3. Fire flow from, nearest public hydrant, located distant from this site plan, is
Gpm + at 20 psi residual.
✓ 4. An 8 inch sewer line is located approximately on site distant.
5. An Industrial Waste Ordinance survey form must be completed.
6. No improvements or obstructions shall be placed within existing or future
easements.
7. and plans are currently under review.
8. and plans have been received and approved.
9. No plans are required.
✓ 10. Final water and sewer plans are required for our review and approval prior to
granting final SDP approval.
11. Final site plan may /may not be signed.
✓ 12. RWSA Capacity Certification.
13. City of Charlottesville approval for sewer.
Comments:
Construction Review Submission required at final site plan stage. Submit 3 copies of the
final plan along with water and sewer data sheets to the ACSA (Attn: Michael Vieira, PE)
for utility construction review.
RWSA Wastewater Capacity Certification is required during the final site plan stage.