Loading...
HomeMy WebLinkAboutSUB201500173 Review Comments Preliminary Plat 2015-11-16Maude Ginty Service Auth6rity TO: Rachel Falkenstein FROM: Alexander J. Morrison, P.E., Civil Engineer DATE: November 16, 2015 RE: Site Plan Technical Review for: SUB201500173: Foothill Crossing Phase VI - Preliminary Plat The below checked items apply to this site. ✓ 1. This site plan is within the Authority's jurisdictional area for: ✓ A. Water and sewer B. Water only C. Water only to existing structure D. Limited service ✓ 2. A 12 inch water line is located approximately 140' distant. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. ✓ 4. An 8 inch sewer line is located approximately on site distant. 5. An Industrial Waste Ordinance survey form must be completed. ✓ 6. No improvements or obstructions shall be placed within existing or future easements. 7. and plans are currently under review. 8. and plans have been received and approved. 9. No plans are required. ✓ 10. Final water and sewer plans are required for our review and approval prior to granting final SDP approval. 11. Final site plan may /may not be signed. ✓ 12. RWSA Capacity Certification. 13. City of Charlottesville approval for sewer. Comments: Construction Review Submission required at final site plan stage. Submit 3 copies of the final plan along with water and sewer data sheets to the ACSA (Attn: Michael Vieira, PE) for utility construction review. The final plat will not be reviewed by the ACSA until ACSA construction approval is granted after the utility construction review. RWSA Wastewater Capacity Certification is required during the final site plan stage. 168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977 -4511 • Fax (434) 979 -0698 www.serviceauthority.org