Loading...
HomeMy WebLinkAboutSDP201500020 Checklist - Project Closeout (Administrative) 2015-11-12 SUBDIVISION/SITE PLAN FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHECKLIST Please complete this form within 30 days of final action,place in folder and forward to CDA FOR QC al + atus label. CDA will forward to the Imaging Center for digital closeout. SDP/:UB # a V — a-o PROJECT TITLE 2_ c' Q��� h/ s) pin FULL NAME OF LEAD REVIEWER�AS s r p2rez FINAL ACTION DATE: r- 1 —),S' Cou View— Application, Page 2 Data Entered -.0.11101.11% NaustaiiiimmoirmismommimmelMMANNosiisigiiiiiiirific Hardcopy— File Folder Closeout: All items listed should be placed in project folder, in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file, place an"N/A" next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide clarity to the file, please indicate that item on the"Other" lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital location(path/name)of the document in the space provided. ; gineerin Folder Information/documentation Scan ❑ Saved location ,,❑ Application(signature copy) j 9 Scan ❑ Saved location ublic Notification records/Abutting Owner correspondence Scan ❑ Saved location ,;Applicant espondence(to/from, memos/emails) Scan ❑ Saved location !„ErEomp_lgieset of printed Review Comments I Scan ❑ Saved location proved lan/plat igned or stamped"Approved”with Planner/Engineer name) Scan ❑ Saved location j�'Action Letter(Administrative Approval) �� ..4 Scan ❑ Saved location - - e ope- • :u • -- _ - . - . . - - - • * . ' ) on Letter) ...w r-i - `'on i ! n ave. oca • ❑ At the planner's discretion, copies of unapproved plans/plats may be placed in the file if it is referenced in the staff report or minutes and lends clarity to the review at a later date. If such plans are included, they should be clearly marked as unapproved and contain a note clarifying why it was included. ❑ Scan ❑ Saved location j Additional Information on this project: