Loading...
HomeMy WebLinkAboutWPO200700062 Review Comments 2007-06-15 � t r I II II�� �RGININ COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: WPO -2007- 00062, Hollymead Town Center, ESC Plan Plan preparer: Mr. Tim Miller, PE, Dominion Development. (fax 434.979.1681) Owner or rep.: Dr. Charles W. Hurt, Post Office Land Trust (fax 434.296.3510) Date received: Rev. 1: 03 August 2007 (plans rev. elate 02 August 2007) 09 May 2007 (plans seal dated 25 April 2007) Date of Comment: Rev. 1: 27 August 2007 15 June 2007 Engineer: Allan Schuck The ESC plan for Hollymead Town Center, Area C, Laurel Park Lane Phase I, received on 03 August 2007, has been reviewed. The engineering review for current development will recommend approval of the E &SC plan when the following items are adequately addressed: A. Erosion and sediment control plan comments Narrative: 1. The E &SC Narrative is adequate with this plan submittal. Plans: 2. Please submit two (2) additional copies of the ESC plan and narrative to the County. 3. The ESC portion of the Water Protection Bond is $9,000.00. Please contact Ms. Pam Shifflett at 434.296.5832 Ext. 3246 to post this bond amount. 4. Items 2 & 3 need to be adequately addressed before a preconstruction meeting can occur. File: El esc ADS WPO -07 -062. 1 I'I C Area C, Laurel Park I,ane Phase