HomeMy WebLinkAboutARB201500131 Staff Report 2015-11-30ARCHITECTURAL REVIEW BOARD STAFF REPORT
Project #/Name
ARB -2015-131: Texas Roadhouse
Review Type
Architectural review following a conceptual review and a work session; Site plan review following a conceptual review, first review of landscaping
Parcel Identification
06100000012300
Location
455 Albemarle Square, on the east side of Rt. 29, at the site of the former bank building located just south of the Rt. 29 entrance into the Albemarle Square Shopping
Center. The now vacant Outback Steakhouse building is located immediately to the south.
Zoned
Planned Development Shopping Center (PDSC)/Entrance Corridor (EC)
Owner/Applicant
Rio Associates Limited Partnership/Greenberg Farrow (Paula Hubert)
Magisterial District
Rio
Proposal
To construct a 7,420 sf restaurant with associated site improvements.
Context
The immediate context of the restaurant site is the Albemarle Square Shopping Center. A mix of commercial buildings is located along Rt. 29 to the north and south.
Visibility
The north, south and west elevations of the proposed building would be readily visible from the Rt. 29 Entrance Corridor.
ARB Meeting Date
December 7, 2015
Staff Contact
Margaret Maliszewski
PROJECT HISTORY
DATE
APPLICATION/REVIEW TYPE
RESULT
8/15/2015
ARB -2015-79: ARB review of a conceptual site plan
The ARB provided comments on the conceptual design. See Attachment A at the end of this report for the action letter from
and architectural design
this meeting. Comments made at the meeting also appear in the analysis section of this report.
9/21/2015
ARB -2015-79: Work session
At the conceptual review on 8/15/15, the ARB offered to hold a work session on the architectural design. The comments from
the 9/21/2015 work session appear in the analysis section of this report and in Attachment B.
ANALYSIS
REF
GUIDELINE
Comments from 8/15
ISSUE
RECOMMENDATION
and 9/21 ARB meetings
Structure design
1
The goal of the regulation of the design of development within the
1.Provide an architectural
Since the original 8/15 review, the following changes
Provide a perspective view
designated Entrance Corridors is to insure that new development
design that incorporates
have been made to the building design: the brick base
of the south side of the
within the corridors reflects the traditional architecture of the area.
elements that better reflect
was changed to stone; post supports were changed to
building to clarify the
Therefore, it is the purpose of ARB review and of these Guidelines,
local historic architecture
pilasters; some building lights were removed; green
massing and scale of the
that proposed development within the designated Entrance Corridors
with significantly less focus
trim adjacent to wood surfaces was changed to brown
south elevation and to help
reflect elements of design characteristic of the significant historical
on the prototype design.
to match the siding; the first story metal roof was
determine if the appearance
landmarks, buildings, and structures of the Charlottesville and
extended on the south elevation; brick detailing was
is appropriate for the EC.
Albemarle area, and to promote orderly and attractive development
2.Revise the proposal to
added to the top of the wall at the back block of the
within these corridors. Applicants should note that replication of
achieve a building design
building. At the 9/21 work session, the ARB indicated
Choose an alternate stone
historic structures is neither required nor desired.
whose forms, shapes, scale,
and materials create a
that the changes were an improvement, and a
preference for Option B was noted. The current design
veneer that coordinates
better with the brick and
2
Visitors to the significant historical sites in the Charlottesville and
Albemarle area experience these sites as ensembles of buildings,
coordinated, cohesive
is consistent with Option B.
wood.
land, and vegetation. In order to accomplish the integration of
whole.
buildings, land, and vegetation characteristic of these sites, the
The south side of the building has a lesser degree of
See landscape
Guidelines require attention to four primary factors: compatibility
3.Revise the design to
detail and finish than the north and west elevations.
recommendations.
with significant historic sites in the area; the character of the Entrance
achieve a level of detail at
The south side has a service entrance rather than a
Corridor; site development and layout; and landscaping.
the first story walls that is
more consistent with
main entrance, it has a reduced number of windows,
and it has a reduced number of pilasters. The extended
3
New structures and substantial additions to existing structures should
respect the traditions of the architecture of historically significant
historic architecture of the
metal roof at first story isn't continuous with the roof
buildings in the Charlottesville and Albemarle area. Photographs of
area.
on the front elevation. The roof helps break up the
historic buildings in the area, as well as drawings of architectural
mass of the back block of the building, but it might
features, which provide important examples of this tradition are
4.Revise the back block and
also emphasize the service character of this part of the
contained in Appendix A.
the sign parapet to
coordinate with the other
building. A perspective view showing the south
elevation would help clarify the overall appearance
4
The examples contained in Appendix A should be used as a guide for
building design: the standard of compatibility with the area's historic
building elements.
and the extent of additional treatment needed, if any.
structures is not intended to impose a rigid design solution for new
development. Replication of the design of the important historic sites
5.Revise the green trim at
The stone veneer proposed for the base of the building
in the area is neither intended nor desired. The Guideline's standard
the upper level to a more
is a mix of colors but is primarily white, and it
of compatibility can be met through building scale, materials, and
neutral color.
contrasts sharply with the brick and wood earth tones.
forms which may be embodied in architecture which is contemporary
An alternate stone that coordinates better with the
as well as traditional. The Guidelines allow individuality in design to
9/21/15 #1: Option B is
brick and wood materials would be more appropriate.
accommodate varying tastes as well as special functional
preferred.
(Material samples/colors will be available for review
requirements.
at the 12/7/15 ARB meeting.)
9
Building forms and features, including roofs, windows, doors,
materials, colors and textures should be compatible with the forms
The building design still clearly reflects the Texas
and features of the significant historic buildings in the area,
Roadhouse prototype. Although changes were made to
exemplified by (but not limited to) the buildings described in
the standard design, the use of red brick and metal
Appendix A [of the design guidelines]. The standard of compatibility
roofs appear to be the only tie to the traditional
can be met through scale, materials, and forms which may be
architecture of Albemarle County, and the form,
embodied in architecture which is contemporary as well as
detailing and general appearance reveal no strong
traditional. The replication of important historic sites in Albemarle
connection to local buildings. The back block of the
County is not the objective of these guidelines.
building retains an over -scaled, added -on appearance
that detracts from a cohesive overall appearance.
11
The overall design of buildings should have human scale. Scale
should be integral to the building and site design.
Landscaping exceeding the minimum standards
should be provided to offset the impacts of the
12
Architecture proposed within the Entrance Corridor should use forms,
shapes, scale, and materials to create a cohesive whole.
building design that is so closely tied to the prototype.
13
Any appearance of "blankness" resulting from building design should
be relieved using design detail or vegetation, or both.
15
Trademark buildings and related features should be modified to meet
the requirements of the Guidelines.
5
It is also an important objective of the Guidelines to establish a
None.
No physical connecting devices are proposed to unify
None.
pattern of compatible architectural characteristics throughout the
this building with others in the shopping center, so
Entrance Corridor in order to achieve unity and coherence. Building
materials, colors and forms will be relied upon to
designs should demonstrate sensitivity to other nearby structures
establish unity and coherence. The materials proposed
within the Entrance Corridor. Where a designated corridor is
for the building — red/brown brick and green roofs —
substantially developed, these Guidelines require striking a careful
are similar to brick and roof colors currently used in
balance between harmonizing new development with the existing
the main buildings of the shopping center. The forms
character of the corridor and achieving compatibility with the
of the proposed building have no particular connection
significant historic sites in the area.
to the shopping center or buildings on other
outparcels.
10
Buildings should relate to their site and the surrounding context of
buildings.
14
Arcades, colonnades, or other architectural connecting devices should
be used to unify groups of buildings within a development.
16
Window glass in the Entrance Corridors should not be highly tinted or
6.Provide specs on the
No details on window glass have been provided at this
Provide specs on the
highly reflective. Window glass in the Entrance Corridors should
proposed window glass.
time.
proposed window glass.
meet the following criteria: Visible light transmittance (VLT) shall
Include the following note
Include the following note
not drop below 40%. Visible light reflectance (VLR) shall not exceed
on the architectural
on the architectural
30%. Specifications on the proposed window glass should be
drawings: Visible light
drawings: Visible light
submitted with the application for final review.
transmittance (VLT) shall
transmittance (VLT) shall
not drop below 40%.
not drop below 40%.
Visible light reflectance
Visible light reflectance
(VLR) shall not exceed
(VLR) shall not exceed
30%
30%.
Accessory structures and equipment
17
Accessory structures and equipment should be integrated into the
7.Move the transformer to
Rooftop equipment is represented by dashed lines on
Provide a roof plan
overall plan of development and shall, to the extent possible, be
an alternate location that
the elevation drawings and site sections. Parapet walls
showing equipment
compatible with the building designs used on the site.
isn't visible from Rt. 29.
are used to screen this equipment. The tops of the
equipment fall just below the top of the parapet walls.
locations. Show that
equipment will not be
18
The following should be located to eliminate visibility from the
Entrance Corridor street. If, after appropriate siting, these features will
8.Eliminate visibility of
Parapet walls rise approximately 7' above the green
visible from higher
still have a negative visual impact on the Entrance Corridor street,
rooftop equipment without
metal roof of the first story. The 7' looks tall and
elevations on Rt. 29.
screening should be provided to eliminate visibility. a. Loading areas,
super -sizing architectural
contributes significantly to the mass of the building.
b. Service areas, c. Refuse areas, d. Storage areas, e. Mechanical
elements.
Second story roofs may help screen some equipment.
Provide screening plants for
equipment,
The sections show the equipment from vantage points
the transformer.
f. Above -ground utilities, and g. Chain link fence, barbed wire, razor
9/21/15 #2: Check visibility
located a short distance north and south of the
wire, and similar security fencing devices.
of rooftop equipment.
building. It is not clear from the sections whether
more distant vantage points (for example, the higher
19
Screening devices should be compatible with the design of the
buildings and surrounding natural vegetation and may consist of. a.
elevations nearer the Rio Road intersection) would
Walls, b. Plantings, and c. Fencing.
allow views of the equipment. A roof plan showing
equipment locations could help clarify visibility.
A transformer is proposed at the southeast corner of
the building. Ground cover is proposed around the
transformer, but no screening is proposed immediately
around the transformer. Shrubs are proposed along the
RT. 29 frontage south of the building, but the
transformer will be visible beyond.
Dumpsters located at the south end of the east
elevation of the building are not expected to be visible
from the EC. A loading area is proposed at the
southeast corner of the building. It is not expected to
have a significant impact on the EC.
21
The following note should be added to the site plan and the architectural
9.Add the standard
A note on Sheet C3.0 states that HVAC units shall be
Add the standard
plan: "Visibility of all mechanical equipment from the Entrance
mechanical equipment note
screened, but the wording of the standard equipment
mechanical equipment note
Corridor shall be eliminated."
to the drawings.
note does not appear on the drawings.
to the drawings.
Lighting
4 pole lights are proposed in the parking lot and 5
Provide as a part of the site
types of building -mounted lights are proposed. Cut
plan cut sheets for all
sheets have been provided for the building lights, but
proposed fixtures. Show all
those fixtures do not appear on the photometric plan.
fixture locations on the
Only the gooseneck fixtures are shown on the
lighting plan. Include
elevations. The photometric plan accounts for the
building -mounted lights in
parking lot pole lights, but cut sheets were not
the photometric
provided for those fixtures.
calculations.
22
Light should be contained on the site and not spill over onto adjacent
10.Provide complete
The photometric plan shows no excessive spillover.
Revise the lighting plan
properties or streets;
lighting information for
The plan was calculated using an LLF of .9. The
using an LLF of 1.0
review.
photometrics must be calculated using an LLF of 1.0
to meet ordinance requirements. Slightly higher
With the exception of
footcandle levels will result.
fixtures illuminating a U.S.
flag, switch all building -
23
Light should be shielded, recessed or flush -mounted to eliminate
The wall packs and flood lights exceed 3000 lumens
glare. All fixtures with lamps emitting 3000 lumens or more must be
and are not full cutoff fixtures. Flood lights intended
mounted lights emitting
full cutoff fixtures.
to illuminate the U.S. flags are exempt from the full
3000 lumens or more to full
cutoff requirement.
cutoff fixtures.
24
Light levels exceeding 30 footcandles are not appropriate for display
Maximum light levels reach 6.6 fc. Some levels will
lots in the Entrance Corridors. Lower light levels will apply to most
increase when the photometrics are revised to use the
Show the location of
other uses in the Entrance Corridors.
required LLF of 1.0.
building -mounted lights on
the photometric plan.
25
Light should have the appearance of white light with a warm soft
LED lamps are proposed in the parking lot. Building
glow; however, a consistent appearance throughout a site or
mounted fixtures include metal halide wall packs and
Include the illumination
development is required. Consequently, if existing lamps that emit
flood lights, fluorescent gooseneck lamps, and LED
from building -mounted
non-white light are to remain, new lamps may be required to match
downlights. Fixture locations must be identified to
lights in the photometric
them.
determine if the variety of lamp types is appropriate.
calculations.
26
Dark brown, dark bronze, or black are appropriate colors for free-
standing ole mounted light fixtures in the Entrance Corridors.
The description of the parking lot pole lights includes
a "dark bronze" designation. The gooseneck wall
Identify on the lighting plan
the color of the wall packs
27
The height and scale of freestanding, pole -mounted light fixtures
should be compatible with the height and scale of the buildings and
fixture color is black. Other wall fixture colors have
and the flood lights.
the sites they are illuminating, and with the use of the site. Typically,
not been identified.
the height of freestanding pole -mounted light fixtures in the Entrance
Corridors should not exceed 20 feet, including the base. Fixtures that
Parking lot pole lights are proposed at a total height of
exceed 20 feet in height will typically require additional screening to
20', including bases.
achieve an appropriate a earance from the Entrance Corridor.
28
In determining the appropriateness of lighting fixtures for the
11.Eliminate the wall-
Except for two gooseneck fixtures at the main
Provide as a part of the site
Entrance Corridors, the individual context of the site will be taken
mounted down -lights
entrance, all building -mounted fixtures have been
plan cut sheets for all
into consideration on a case by case basis.
located at the second -story
removed from the elevation drawings. The locations
proposed fixtures. Show all
cornice line.
of the flood lights, wall packs and downlights have
fixture locations on the
not been identified.
lighting plan. Include
12.Use lower mounting
building -mounted lights in
heights for wall lights
the photometric
required for safety/security.
calculations.
13.Eliminate up -lights that
illuminate the second -story
metal roofs.
9/21/15 #3: See previous
lighting comments.
29
The following note should be included on the lighting plan: "Each
14.Provide the standard
The note does not appear on the site plan.
Provide the standard
outdoor luminaire equipped with a lamp that emits 3,000 or more
lighting note on the plan.
lighting note on the plan.
initial lumens shall be a full cutoff luminaire and shall be arranged or
shielded to reflect light away from adjoining residential districts and
away from adjacent roads. The spillover of lighting from luminaires
onto public roads and property in residential or rural areas zoning
districts shall not exceed one half footcandle."
Landscaping
7
The requirements of the Guidelines regarding landscaping are
15.Revise the plan to
Sheet C3 shows several easements crossing the
Add trees along the EC
intended to reflect the landscaping characteristic of many of the
clearly identify all utilities
property along the west (EC) and south sides of the
frontage to meet the 35' on
area's significant historic sites which is characterized by large shade
and easements.
parcel. 6 large shade trees at 3Y2" caliper are required
center spacing requirement.
trees and lawns. Landscaping should promote visual order within the
along the EC frontage to meet the requirements of the
Add at least 2 trees to close
Entrance Corridor and help to integrate buildings into the existing
16.Revise the plan to show
guidelines. 4 large shade trees are proposed along the
the 95' gap along the
environment of the corridor.
on-site landscaping that
meets or exceeds the
frontage, but they are smaller than 3'/2" caliper, and a
95' gap that aligns with the front of the building is left
frontage.
8
Continuity within the Entrance Corridor should be obtained by
planting different types of plant materials that share similar
requirements of the EC
without trees along the frontage. The 70' of frontage
Increase the planting size of
characteristics. Such common elements allow for more flexibility in
guidelines, free of utility
along the west end of the northern parking area is also
the large shade trees located
the design of structures because common landscape features will help
and easement conflicts.
without trees. Interspersed ornamentals are not
along the EC to a minimum
to harmonize the appearance of development as seen from the street
proposed. Trees that are shown are located within
of 3'/2" caliper.
upon which the Corridor is centered.
easements. As indicated in the previous review, trees
and shrubs are needed along the EC to help harmonize
Add interspersed
32
Landscaping along the frontage of Entrance Corridor streets should
include the following:
the proposed building with the surroundings. When
ornamentals to the EC
a. Large shade trees should be planted parallel to the Entrance
landscaping can't be accommodated outside
frontage planting.
Corridor Street. Such trees should be at least 3%2 inches caliper
easements, additional planting area should be
(measured 6 inches above the ground) and should be of a plant
obtained.
Provide documentation
species common to the area. Such trees should be located at least
from easement holders that
every 35 feet on center.
A note on the landscape plan sates that trees cannot be
there is no objection to the
b. Flowering ornamental trees of a species common to the area should
placed over an underground facility. The referenced
proposed planting in the
be interspersed among the trees required by the preceding paragraph.
email correspondence should be provided. Another
easements.
The ornamental trees need not alternate one for one with the large shade
note references trees to be planted off-site within the
trees. They may be planted among the large shade trees in a less regular
development, but no such trees are shown on the plan.
Provide a copy of the email
spacing pattern.
correspondence regarding
c. In situations where appropriate, a three or four board fence or low
planting over underground
stone wall, typical of the area, should align the frontage of the
facilities.
Entrance Corridor street.
d. An area of sufficient width to accommodate the foregoing
Provide additional planting
plantings and fencing should be reserved parallel to the Entrance
area to accommodate
Corridor street, and exclusive of road right-of-way and utility
required trees outside of
easements.
easements, as necessary.
Clarify on the plan the
meaning of the note
regarding trees to be
lanted off-site.
33
Landscaping along interior roads:
A narrow 5' planting strip is shown along the north
Add trees along the north
a. Large trees should be planted parallel to all interior roads. Such
side of the site, adjacent to the entrance from Rt. 29
side of the site, 21/2" caliper
trees should be at least 21/2 inches caliper (measured six inches above
into the shopping center. Shrubs are proposed in the
minimum at planting, 40'
the ground) and should be of a plant species common to the area.
strip, but no trees are proposed. The applicant has
on center. OR Show on the
Such trees should be located at least every 40 feet on center.
stated that a VDOT easement is located here, and trees
plans the VDOT easement
are not allowed. The VDOT easement is not shown;
that limits planting on the
however, a 15' -wide utility easement crosses the
north side of the property,
planting strip at the west end near the EC. The shrubs
provide the VDOT
that are shown are to be planted at 18-24" and 24" in
documentation that
height. These shrubs reach a mature height of 3'. If
disallows trees in this
trees can't be planted, shrubs that reach a taller mature
easement, and revise
height should be planted. All shrubs should be planted
planting to meet the
at a minimum height of 24".
maximum allowable by the
easement, including shrubs
that grow to a taller mature
height.
Increase the planting height
of all shrubs to 24"
minimum.
35
Landscaping of parking areas:
17.Provide the interior
33 parking spaces are proposed on site. This quantity
Increase the size of the
a. Large trees should align the perimeter of parking areas, located 40
parking lot trees.
of parking requires 3 interior parking lot trees. 3
three interior parking lot
feet on center. Trees should be planted in the interior of parking areas
interior trees are shown, but not at 21/2" caliper.
trees to 21/2" caliper
at the rate of one tree for every 10 parking spaces provided and
minimum.
should be evenly distributed throughout the interior of the parking
Trees do not align the perimeter of the parking areas.
area.
Trees are not provided in the planting area on the
Provide trees to align the
b. Trees required by the preceding paragraph should measure 2'/2
north side of the site. No planting area is provided on
perimeter of the parking
inches caliper (measured six inches above the ground); should be
the south side of the site. There is also no planting
areas, on the north side of
evenly spaced; and should be of a species common to the area. Such
area along the south side of the building, and no
the site and the south side
trees should be planted in planters or medians sufficiently large to
planting on the adjacent site. Given the mass and scale
of the site, spaced 40' on
maintain the health of the tree and shall be protected by curbing.
of the building, planting is needed on the south side of
center, 2%2" caliper
c. Shrubs should be provided as necessary to minimize the parking
the parking area to help mitigate the impacts of the
minimum at planting.
area's impact on Entrance Corridor streets. Shrubs should measure 24
building design.
Provide shrubs, minimum
inches in height.
24" high at planting, along
Shrubs along the parking areas include some at 18-24"
the south side of the
at planting.
southern parking area.
Increase the size of all
shrubs along parking areas
to a minimum planting size
of 24".
34
Landscaping along interior pedestrian ways:
18.Revise the plan to show
Sidewalks are proposed on all sides of the building. A
Provide planting area and
a. Medium trees should be planted parallel to all interior pedestrian
the landscaping proposed
"landscaped area" is located adjacent to the EC side of
landscaping along the south
ways. Such trees should be at least 2%2 inches caliper (measured six
for the "landscaped areas"
the building (5' and 10' wide) and at the northwest
side of the building.
inches above the ground) and should be of a species common to the
adjacent to the building.
corner of the building.
area. Such trees should be located at least every 25 feet on center.
36
Landscaping of buildings and other structures:
Wichita blue juniper and Blue Point juniper are
a. Trees or other vegetation should be planted along the front of long
proposed in alternating groups along the EC elevation
buildings as necessary to soften the appearance of exterior walls. The
of the building and along the west end of the north
spacing, size, and type of such trees or vegetation should be
elevation. There is no planting proposed for the south
determined by the length, height, and blankness of such walls.
side of the building (even though it is shown on the
b. Shrubs should be used to integrate the site, buildings, and other
elevation drawing). The south side is in need of
structures; dumpsters, accessory buildings and structures; "drive thru"
landscaping to offset the impact of the mass and scale
windows; service areas; and signs. Shrubs should measure at least 24
of the building, the lack of doors and windows on the
inches in height.
east end of the elevation, and the lack of planting area
along the south side of the site.
37
Plant species:
19.Provide a complete
The proposed plants appear in the various lists.
None.
a. Plant species required should be as approved by the Staff based
landscape plan for review.
upon but not limited to the Generic Landscape Plan Recommended
Species List and Native Plants for Virginia Landscapes (Appendix D).
38
Plant health:
20.Add the standard plant
The note is still needed on the plan.
Add the standard plant
The following note should be added to the landscape plan: "All site
health note to the plan.
health note to the plan.
plantings of trees and shrubs shall be allowed to reach, and be
maintained at, mature height; the topping of trees is prohibited.
Shrubs and trees shall be pruned minimally and only to support the
overall health of theplant."
Development paffern
6
Site development should be sensitive to the existing natural landscape
None.
The site is already developed with a bank building and None.
and should contribute to the creation of an organized development
drive-thru. No open spaces or significant natural
plan. This may be accomplished, to the extent practical, by preserving
features remain. Distant views are not expected to
the trees and rolling terrain typical of the area; planting new trees
change as a result of this proposal.
along streets and pedestrian ways and choosing species that reflect
native forest elements; insuring that any grading will blend into the
The proposed building is oriented parallel to the EC
surrounding topography thereby creating a continuous landscape;
street. The entrance to the restaurant does not face the
preserving, to the extent practical, existing significant river and
EC; it is located on the north side of the building.
stream valleys which may be located on the site and integrating these
features into the design of surrounding development; and limiting the
Parking is proposed on the north and south sides of
building mass and height to a scale that does not overpower the
the building. No parking or travelways are proposed
natural settings of the site, or the Entrance Corridor.
on the west (EC) side of the building.
39
The relationship of buildings and other structures to the Entrance
Corridor street and to other development within the corridor should
be as follows:
a. An organized pattern of roads, service lanes, bike paths, and
pedestrian walks should guide the layout of the site.
b. In general, buildings fronting the Entrance Corridor street should
be parallel to the street. Building groupings should be arranged to
parallel the Entrance Corridor street.
c. Provisions should be made for connections to adjacent pedestrian
and vehicular circulation systems.
d. Open spaces should be tied into surrounding areas to provide
continuity within the Entrance Corridor.
e. If significant natural features exist on the site (including creek
valleys, steep slopes, significant trees or rock outcroppings), to the
extent practical, then such natural features should be reflected in the
site layout. If the provisions of Section 32.5.6.n of the Albemarle
County Zoning Ordinance apply, then improvements required by that
section should be located so as to maximize the use of existing
features in screening such improvements from Entrance Corridor
streets.
f. The placement of structures on the site should respect existing
views and vistas on and around the site.
10
Site Gradin
40
Site grading should maintain the basic relationship of the site to
21.Revise the plan to show
The site is already developed and graded. A 102' -long
Provide details on the plan
surrounding conditions by limiting the use of retaining walls and by
bottom -of -wall and top -of-
retaining wall is proposed along the southern property
regarding the retaining
shaping the terrain through the use of smooth, rounded land forms that
wall elevations for the
line. The applicant's notes indicate that the wall is to
wall: top of wall and
blend with the existing terrain. Steep cut or fill sections are generally
retaining wall. Indicate
be concrete and details are pending coordination with
bottom of wall elevations,
unacceptable. Proposed contours on the grading plan shall be rounded
proposed wall material and
VDOT. Wall heights are not provided. No planting
material, color, etc.
with a ten foot minimum radius where they meet the adjacent condition.
color on the plan.
area is proposed on either side of the wall. The wall
Final grading should achieve a natural, rather than engineered,
material and lack of planting area suggest that the wall
appearance. Retaining walls 6 feet in height and taller, when necessary,
will not have an appropriate appearance for the EC.
shall be terraced and planted to blend with the landscape.
41
No grading, trenching, or tunneling should occur within the drip line of
22.Identify all landscape
The applicant has stated that no existing trees are to
Provide the existing
any trees or other existing features designated for preservation in the
features to be removed on
remain. No existing conditions or demolition plan
conditions/demolition plans
final Certificate of Appropriateness. Adequate tree protection fencing
the demolition plan.
have been submitted.
for review.
should be shown on, and coordinated throughout, the grading,
landscaping and erosion and sediment control plans.
42
Areas designated for preservation in the final Certificate of
Appropriateness should be clearly delineated and protected on the site
prior to any grading activity on the site. This protection should
remain in place until completion of the development of the site.
43
Preservation areas should be protected from storage or movement of
heavy equipment within this area.
20
Surface runoff structures and detention ponds should be designed to fit
None.
The applicant has indicated that VDOT underground
Show the location of the
into the natural topography to avoid the need for screening. When
stormwater detention impacts the north side of the
underground stormwater
visible from the Entrance Corridor street, these features must be fully
site, but the stormwater facility is not shown on the
detention facilities on the
integrated into the landscape. They should not have the appearance of
plan.
plan.
engineered features.
44
Natural drainage patterns (or to the extent required, new drainage
patterns) should be incorporated into the finished site to the extent
possible.
SIGNS
23.Reduce the letter height
A Texas Roadhouse sign with logo is shown on the
Reduce the letter height of
of the channel letters to
EC elevation. The sign is attached to what looks like a
the channel letters to
eliminate the overscaled
parapet wall built specifically to present the sign. The
eliminate the over -scaled
appearance of the sign.
applicant has indicated that the sign has been reduced
appearance of the sign.
Reduce the height of the
in size by 10%, but the drawings reflect no change in
Reduce the height of the
logo to not exceed the
size since the original 9/21/2015 review. Overall, the
logo to not exceed the
height of the letters. Note
sign is 30' long with 2'/2' tall letters and a 5' tall logo.
height of the letters. Note
that a separate sign
The sign appears over -scaled for the wall, and the
that a separate sign
application will be needed.
logo appears overscaled for the letters. Both the letters
application will be needed.
10
SUMMARY OF RECOMMENDATIONS
Staff recommends the following as the primary points of discussion:
1. The degree to which the proposed design reflects the traditional architecture of the County; the modification of "trademark" design elements
2. Landscaping: trees on the north, south and west sides of the site; lack of trees and shrubs on the south side of the site
3. The south elevation and lack of planting area along the south side of the building
4. Visibility of equipment
5. The scale of the sign on the EC elevation
Staff offers the following comments on the revised design:
1. Provide a perspective view of the south side of the building to clarify the massing and scale of the south elevation and to help determine if the appearance is appropriate for the EC.
2. Choose an alternate stone veneer that coordinates better with the brick and wood.
3. Provide specs on the proposed window glass. Include the following note on the architectural drawings: Visible light transmittance (VLT) shall not drop below 40% Visible light reflectance (VLR)
shall not exceed 3001o.
4. Provide a roof plan showing equipment locations. Show that equipment will not be visible from higher elevations on Rt. 29.
5. Provide screening plants for the transformer.
6. Add the standard mechanical equipment note to the drawings: "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated."
7. Provide as a part of the site plan cut sheets for all proposed fixtures. Show all fixture locations on the lighting plan. Include building -mounted lights in the photometric calculations.
8. Revise the lighting plan using an LLF of 1.0
9. With the exception of fixtures illuminating a U.S. flag, switch all building -mounted lights emitting 3000 lumens or more to full cutoff fixtures.
10. Identify on the lighting plan the color of the wall packs and the flood lights.
11. Provide the standard lighting note on the plan: "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded
to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning
districts shall not exceed one half footcandle."
12. Add trees along the EC frontage to meet the 35' on center spacing requirement. Add at least 2 trees to close the 95' gap along the frontage.
13. Increase the planting size of the large shade trees located along the EC to a minimum of 31/2" caliper.
14. Add interspersed ornamentals to the EC frontage planting.
11
A full sign review will be
and logo are proposed to be illuminated. Reduced
A full sign review will be
completed with that
letter size and a logo whose height does not exceed
completed with that
application.
the letter height are recommended. A much smaller
application.
internally illuminated sign is shown over the entrance
to the restaurant on the north elevation.
SUMMARY OF RECOMMENDATIONS
Staff recommends the following as the primary points of discussion:
1. The degree to which the proposed design reflects the traditional architecture of the County; the modification of "trademark" design elements
2. Landscaping: trees on the north, south and west sides of the site; lack of trees and shrubs on the south side of the site
3. The south elevation and lack of planting area along the south side of the building
4. Visibility of equipment
5. The scale of the sign on the EC elevation
Staff offers the following comments on the revised design:
1. Provide a perspective view of the south side of the building to clarify the massing and scale of the south elevation and to help determine if the appearance is appropriate for the EC.
2. Choose an alternate stone veneer that coordinates better with the brick and wood.
3. Provide specs on the proposed window glass. Include the following note on the architectural drawings: Visible light transmittance (VLT) shall not drop below 40% Visible light reflectance (VLR)
shall not exceed 3001o.
4. Provide a roof plan showing equipment locations. Show that equipment will not be visible from higher elevations on Rt. 29.
5. Provide screening plants for the transformer.
6. Add the standard mechanical equipment note to the drawings: "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated."
7. Provide as a part of the site plan cut sheets for all proposed fixtures. Show all fixture locations on the lighting plan. Include building -mounted lights in the photometric calculations.
8. Revise the lighting plan using an LLF of 1.0
9. With the exception of fixtures illuminating a U.S. flag, switch all building -mounted lights emitting 3000 lumens or more to full cutoff fixtures.
10. Identify on the lighting plan the color of the wall packs and the flood lights.
11. Provide the standard lighting note on the plan: "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded
to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning
districts shall not exceed one half footcandle."
12. Add trees along the EC frontage to meet the 35' on center spacing requirement. Add at least 2 trees to close the 95' gap along the frontage.
13. Increase the planting size of the large shade trees located along the EC to a minimum of 31/2" caliper.
14. Add interspersed ornamentals to the EC frontage planting.
11
15. Provide documentation from easement holders that there is no objection to the proposed planting in the easements.
16. Provide a copy of the email correspondence regarding planting over underground facilities referenced in the note on the landscape plan.
17. Provide additional planting area to accommodate required trees outside of easements, as necessary.
18. Clarify on the plan the meaning of the note regarding trees to be planted off-site.
19. Add trees along the north side of the site, 2%2" caliper minimum at planting, 40' on center. OR Show on the plans the VDOT easement that limits planting on the north side of the property, provide
the VDOT documentation that disallows trees in this easement, and revise planting to meet the maximum allowable by the easement, including shrubs that grow to a taller mature height.
20. Increase the planting height of all shrubs to 24" minimum.
21. Increase the size of the three interior parking lot trees to 2%2" caliper minimum.
22. Provide trees to align the perimeter of the parking areas, on the north side of the site and the south side of the site, spaced 40' on center, 21/2" caliper minimum at planting. Provide shrubs, minimum
24" high at planting, along the south side of the southern parking area.
23. Increase the size of all shrubs to a minimum planting size of 24".
24. Provide planting area and landscaping along the south side of the building.
25. Add the standard plant health note to the plan. "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and
trees shall be pruned minimally and only to support the overall health of the plant."
26. Provide details on the plan regarding the retaining wall: top of wall and bottom of wall elevations, material, color, etc.
27. Provide the existing conditions/demolition plans for review.
28. Show the location of the underground stormwater detention facilities on the plan.
29. Reduce the letter height of the channel letters to eliminate the over-scaled appearance of the sign. Reduce the height of the logo to not exceed the height of the letters. Note that a separate sign
application will be needed. A full sign review will be completed with that application.
12
TABLE A
This report is based on the following submittal items:
Sheet #
Drawing Name
Drawing Date
-
Perspective
10/22/2015
A1.0
Floor Plan Exhibit
10/23/2015
A2.0
Exterior Elevations
10/23/2015
C3.0
Site Layout Plan
10/22/2015
SL1.0
Site Sections from Entrance Corridor
10/23/2015
-
Photometric Plan
10/23/2015
L1.0
Landscape Plan
10/22/2015
-
Lighting Sec Sheets 6
-
-
Material sample board: Wood siding, trim and shutters: pre -stained cedar, Henry Poor Lumber, Cedartone TWP #1501 stain formula (for siding, trim and shutters);
Metal roof. metal Sales 5V -Crimp "Forest Green"; Fascia board and gutters: Sherwin Williams paint to match metal roof; Brick veneer: Clay Mex "Old Denver";
Metal doors and frames: Sherwin Williams paint enamel gloss black; Stone veneer: Heritage Stone Ottawa
10/23/2015
13
ATTACHMENT A
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
August 26, 2015
Paula Hubert
C/O Greenberg Farrow
6040 Dutchmans Lane
Louisville Ky 40205
RE: ARB201500079 Texas Roadhouse
Dear Ms. Hubert,
The Albemarle County Architectural Review Board, at its meeting on August 17, 2015, completed a preliminary review of the above -noted request to construct a 7,420 sf restaurant with
associated site improvements. The Board offered the following comments for the benefit of the applicant's next submittal. Please note that the following comments are those that have
been identified at this time. Additional comments may be added or eliminated based on further review and changes to the plan.
1. Provide an architectural design that incorporates elements that better reflect local historic architecture with significantly less focus on the prototype design.
2. Revise the proposal to achieve a building design whose forms, shapes, scale, and materials create a coordinated, cohesive whole.
3. Revise the design to achieve a level of detail at the first story walls that is more consistent with historic architecture of the area.
4. Revise the back block and the sign parapet to coordinate with the other building elements.
5. Revise the green trim at the upper level to a more neutral color.
6. Provide specs on the proposed window glass. Include the following note on the architectural drawings: Visible light transmittance (VLT) shall not drop below 40%. Visible light
reflectance (VLR) shall not exceed 30%.
7. Move the transformer to an alternate location that isn't visible from Rt. 29.
8. Eliminate visibility of rooftop equipment without super -sizing architectural elements.
9. Add the standard mechanical equipment note to the drawings. "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated."
10. Provide complete lighting information for review.
14
11. Eliminate the wall -mounted down -lights located at the second -story cornice line.
12. Use lower mounting heights for wall lights required for safety/security.
13. Eliminate up -lights that illuminate the second -story metal roofs.
14. Provide the standard lighting note on the plan. "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be
arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in
residential or rural areas zoning districts shall not exceed one half footcandle."
15. Revise the plan to clearly identify all utilities and easements.
16. Revise the plan to show on-site landscaping that meets or exceeds the requirements of the EC guidelines, free of utility and easement conflicts.
17. Provide the interior parking lot trees.
18. Revise the plan to shown the landscaping proposed for the "landscaped areas" adjacent to the building.
19. Provide a complete landscape plan for review.
20. Add the standard plant health note to the plan. "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is
prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant."
21. Revise the plan to show bottom -of -wall and top -of -wall elevations for the retaining wall. Indicate proposed wall material and color on the plan.
22. Identify all landscape features to be removed on the demolition plan.
23. Reduce the letter height of the channel letters to eliminate the overscaled appearance of the sign. Reduce the height of the logo to not exceed the height of the letters. Note that a
separate sign application will be needed. A full sign review will be completed with that application.
You may submit your application for continued ARB review at your earliest convenience. Application forms, checklists and schedules are available on-line at www.albemarle.org/ARB.
Revised drawings addressing the comments listed above are required. Include updated ARB revision dates on each drawing. Please provide a memo including detailed responses
indicating how each comment has been addressed. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the
drawing with "clouding" or by other means will facilitate review and approval.
If you have any questions concerning any of the above, please feel free to call me.
Sincerely,
Margaret Maliszewski
Principal Planner
Cc: Rio Associates Limited Partnership
C/O Dumbarton Properties Inc
P O Box 9462
Richmond Va 23228
15
ATTACHMENT B
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
October 2, 2015
Paula Hubert/Greenberg Farrow
6040 Dutchmans Lane
Louisville KY 40205
RE: ARB201500079 Texas Roadhouse
Dear Ms Hubert,
The Albemarle County Architectural Review Board, at its meeting on September 21, 2015, held a work session on the above -noted application. The ARB had the following comments:
1. Option B is preferred.
2. Check visibility of rooftop equipment.
3. See previous lighting comments.
You may submit your application for continued ARB review at your earliest convenience. Application forms, checklists and schedules are available on-line at www.albemarle.org/ARB.
Revised drawings addressing the comments listed above, and those from previous reviews, are required. Include updated ARB revision dates on each drawing. Please provide a memo including detailed
responses indicating how each comment has been addressed. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing
with "clouding" or by other means will facilitate review and approval.
If you have any questions concerning any of the above, please feel free to call me.
Sincerely,
Margaret Maliszewski
Principal Planner
cc: Rio Associates Limited Partnership, c/o Dumbarton Properties Inc, P O Box 9462, Richmond VA 23228