Loading...
HomeMy WebLinkAboutARB201400041 Plan - Approved 2015-12-011) REFIECERATdI AEFwLEIEATO EpSRxC R A RUJDVL ALL STORE- FRONT FROM THE SIDE OF BULDMC a REPLACE WITH NEW STOREFRONT — FLOOR PLAN SCALE: 1/4" = f -O"' Z r Q a— cf) Q�w L!J Z 5 O �O� c L cLU GJL 090 cl— ON z HQU z o� iLF pF PRW NO.; Wb3 DATE. 2-p-2015 SHEET N0. 09a® ALL NEW STORE�10NT� TO HAVE CLEAR,W��uL s oRF_E INSULATED GL FRONT FROM THS SIDE OF UILDRI6 a REPLACE WITH PEW STOREFRONT RkB1EJ6 EOW wAu e �uR-ate e RicRaaovr� — mrt& � ml arl-- i ALIGN ALL NEWCOLIHHS WITH RO sTv4G caLmRs ,.Rwe IN OPPOSITEFACING WALLS CNRl FLAMER qI� MALL ERB,FG F/A.L N � `IBAOtE dR4LA� '' QMH-64pF9WIT CCNfSt NEW STOAffRONT r�enl¢ oneFER GC 4 T M � ro eR RRMT'® e CPB�MKaE�aRBrw�l VERTICAL FMA G Ma4"S ON COLIMS i@fAtL N31' b,E[� ALL OR8! RIE6,NG F-0,eLl FER R,[✓�G" R�O�SP]m, ro BE B�OR� i i U.11 WAl � eECB]N6 CR'BY-Cd REFIECERATdI AEFwLEIEATO EpSRxC R A RUJDVL ALL STORE- FRONT FROM THE SIDE OF BULDMC a REPLACE WITH NEW STOREFRONT — FLOOR PLAN SCALE: 1/4" = f -O"' Z r Q a— cf) Q�w L!J Z 5 O �O� c L cLU GJL 090 cl— ON z HQU z o� iLF pF PRW NO.; Wb3 DATE. 2-p-2015 SHEET N0. 09a® I I I I I I i i i LINE EXTERIOR BU NG WALL BB -OW I I � I s NEW ROOF SLOPE I"/FT EDGE OF NEW Q THIS CqRFCn FLAT ROOF I FACE OF NEW I EXTERIOR WALL BELOW ---------- i NOTE ALL MFCHANICAL MOPMENT LOCATED ON EXISTING FLAT ROOF CONCEALED FROM VBW BY BACK WALL OJ- HIP FHIP ROOF 'T-- EXISTING VALLEY EXISTING FLAT ROOF— I I VALLEY a NEW ROOF d EXISTING I ROOF MUM ROOF OVEMA G F I I EXISTING RIDGE f`E41' CUPOLA l I i I LINE OF EXXL"'ll I BULgNG W I I ---- — — — ——--— — — — I— — — — — — —— I ROOF PLAN I I EDGE OF ROOF I SCALE: 1/4" 1"-0" EXISTING) I I Z = CV Q �� � 6� Q Oto J 4 = r IZ Oho O �0= i—aU OL oF-2 � aF OF PROD NO., 14-03 DATE 2-12-2015 S EET IND p�o9 EJttSTING HP ROOF BEYOND COPPER ROOF ROOF REPLACE EXISTG Pa H2 a k2 1N COLOR TO MATCH 9GLE5 CUPOLA WITH r REMOVE EXISTG STOREFRONT RAISE CMU BASE WALL TO Flr,WITC NEW ® I ALIGN NTH LEFT SIDE & INSTALL fl NEW STOREFRONT TO MATCH LEFT Mmimim ?C* OP FLCXJR ----- ---------- °____ NEW ADDITION -- NEW GLASS STOREFRONT ON TOP OF STUCCO FACED CMU WALL - ALIGN W EXISTING ADJACENT FRONT ELEVATION (FACING ROUTE 250) SCALE; 114" = 1"-0"" EXTERIOR MATERIALS ALL NEW MATERIALS ARE TO MATCH EXISTING MATERIALS ROOF: SLATE GRAY ASPHALT SHINGLES WINDOWS'. MEDIUM GRAY TINTED INSULATED GLASS IN ALUMINUM FRAMES WALLS: WHITE STUCCO ON CMU Z T O � Clcn) a Wow w �o, z w s od CL LLL, OU~ F- 0 g� oy F= � u U- ar �r PROl NCA: 14..ay OAT@ 2-T2�2015 SFT NO. p9.9 NEW FLAT ROOF LINE OF PASITNG HP ROOF WDGE & VALLEY BEYOND NEW CUPOLA TO REPLACE FASTING CUPOLA FLAT ROOF OVERHANG ING ROOF OVERHANG EXISTING OUTDOOR CINNG PATIO TO BE ENCLOSED LEFT ME ELEVATION (FACING WEST) SCALE: 1/8" = I' -0 - EXISTNG PATIO WALL REMOVE TOP COURSE OF CMU & INSTALL NEW SOLID CMU CPP TO ALIGN WITH EXISTING ADJACENT WALL EXTERIOR MATERIALS ALL NEW MATERIALS ARE TO MATCH EXISTING MATERIALS ROOF: SLATE GRAY ASPHALT SHINGLES R=XISTGI WINDOWS: MEDIUM GRAY TINTED INSULATED GLASS IN ALUMBNUM FRAMES WALLS: WHITE STUCCO ON CMU Z - O N o� w cj=wo J w i Lu r� N> p O�F- CIO LL Pau J U z WLL a� of PHOT ND.: W-03 pA� rrz-201s SH=_EY Na a�04] r 71'-,`• • ■,Illi i M EXISTING OUTDOOR CINNG PATIO TO BE ENCLOSED LEFT ME ELEVATION (FACING WEST) SCALE: 1/8" = I' -0 - EXISTNG PATIO WALL REMOVE TOP COURSE OF CMU & INSTALL NEW SOLID CMU CPP TO ALIGN WITH EXISTING ADJACENT WALL EXTERIOR MATERIALS ALL NEW MATERIALS ARE TO MATCH EXISTING MATERIALS ROOF: SLATE GRAY ASPHALT SHINGLES R=XISTGI WINDOWS: MEDIUM GRAY TINTED INSULATED GLASS IN ALUMBNUM FRAMES WALLS: WHITE STUCCO ON CMU Z - O N o� w cj=wo J w i Lu r� N> p O�F- CIO LL Pau J U z WLL a� of PHOT ND.: W-03 pA� rrz-201s SH=_EY Na a�04] PROVIDE WOOD BLOCKING AS REQUIRED AT STORE FRONT HEAD EXISTING ROOF OVER HANG CUT OFF EXIST& FACIA 8 GUTTER C' THIS POINT & TIE NEW FASCIA GUTTER SYSTEM INTO EXISTING NEW FASCIA 8 GUTTER TO ALIGN W/ EXISTING/ — 2x4 FURRING OVER EXISTING 8" CMU - INSULATE PATCH 3 REPAIR EXISTING STUCCO - FINISH TO MATCH EXISTING ADJACENT STUCCO EXISTING HIP ROOF NEW METAL ROOF OVER ROOF FELT ON V2" SHEATHING OVER 2x6 RAFTERS ----i INSULATE NEW CEILING TO ALIGN W/ EXISTG ADJACENT CEILINGS (3) 2x6 BEAM 3-V2" DIA STL COL W/ STEEL CAP/BASE TO RECEIVE BEAM NEW COLUMNS TO BEAR ON EXISTING CMU WALL FINISH TO MATCH EXISTING ADJACENT ROOMS REMOVE EXISTING SLAB CHECK COMPACTION INSTALL NEW GRAVEL BED W/ VAPOR BARRIER ABOVE 8 NEW 4" CONC. SLAB W/ MESH REINF. CONTRACTOR TO INFORM ARCHITECT WHEN EXISTING FASCIA AND SOFFIT HAVE BEEN REMOVED IN AREAS WHERE NEW ROOF IS TO ATTACH, EXISTING CONDITIONS MUST BE CONRRMED AND RE -ASSESSED PRIOR TO ATTACHMENT OF NEW WORK. BLOCK OPEN BUDS BETWEEN EXISTING ROOF FRAMING TO ALLOW BEARING OF NEW RAFTERS 8 JOISTS In I EXISTING TRUSS/ ° ROOF FRAMING EXISTING ROOF OVER -HANG REMOVE FASCIA 8 ALL FINISHES/COVERINGS n FRAMING TO REMAIN - TIE Ili NEW FRAMING INTO EXISTG i u EXISTING COLUMNS I II In III TO REMAIN I II III EXISTING STOREFRONT it TO BE REMOVED - RE - TRIM OPENING AS PER III I II OWNER'S PREFERENCE 3,000 PSI CONIC SLAB W/ MESH REINF EXISTING WALL TO REMAIN PATCH 8 REPAIR WHERE DAMAGED BY NEW WORK - CONFIRM OWNER'S PREFERENCE FOR FINISH ON EXT ME Ol WALL SECTIONS A3,0 SCALE: I" = Y -C)" Q p' N Q¢< cnJ LL1 o J Lvz� to mow O cl. ~c�U HOV wV1 u WWW �� oI PROD. PIO, k1-03 DATE I2 -p-2014 SHEET N0. EE L1 LI 93 o