HomeMy WebLinkAboutZTA201500012 Staff Report 2015-10-06 (3)Rio -29 Interchange Signage
Business Outreach Findings Summary
From June through August 2015, Community Development and Economic Development staff organized
multiple outreach activities to give businesses within the Rio -29 interchange project limits the
opportunity to provide feedback on the impacts of construction on their business signage and to discuss
their signage needs prior to, during, and after construction. During the three month period, the County
canvassed over 200 businesses, distributed over 160 surveys, and hosted four drop -in sessions, two
focus groups, and one open house. A detailed summary of the County's outreach activities can be found
in Table 1.
Business Signage during Construction
The majority of project - related concerns shared by area businesses focused on the period prior to and
during construction of the Rio -29 interchange. Primary concerns related to business visibility; customer,
employee, and delivery truck access; the potential for driver confusion associated with a construction
zone and altered traffic circulation patterns; and perceptions that businesses will be closed or go out of
business as a result of construction. To address some of these concerns, a majority of businesses
favored an extension of the 60 day temporary sign period to allow for additional marketing
opportunities leading up to and through construction. Some felt that this should be an additional sign
allowance so that the remaining six temporary sign permits could be retained for promotional efforts
outside of the construction period.
When asked how to address the possible consequence of a proliferation of signage if the temporary sign
period were extended for all 200+ businesses within the project limits, several businesses expressed
support for group sign solutions that encourage multiple businesses to aggregate their temporary
signage, particularly those located within a single shopping center. One business suggested allowing
additional sign area for businesses who aggregate their signage, while another proposed a minimum
spacing requirement between temporary signs. Other suggestions relating to temporary signage
included waiving temporary sign permit fees during the construction period, increasing area and height
allowances for all temporary signs, and allowing temporary signage to be posted along detour routes to
assist motorists in locating businesses.
Business Signage after Construction
Far fewer businesses shared concerns about impacts to their permanent signage once construction is
complete. Some felt that the visibility of their business would be impaired by the retaining walls
separating through traffic from local lanes once the grade- separated interchange is constructed. Other
concerns included the introduction of new right -of -way signage and its impact on a customer's ability to
locate a business once traffic circulation patterns have changed. Some felt that temporary signage post -
construction was equally important in order to let people know that businesses have survived
construction and are still open for business.
Table 1. Route 29/ Rio Interchange Signage Business Engagement, June —August 2015
Activity
Time
Location
Goals
# of
Businesses
Reached
Email/ letter
June 18 —
N/A
One page letter to inform businesses about
280
to Tier 2
mailing
what we are doing with regards to signage,
businesses
June 19 —
upcoming opportunities to be involved &
email
contacts for signage questions
Direct people to website for info on signage
& business assistance
Canvassing
June 24
Tier 2 area
Publicize drop -in sessions
280
Sign Survey
N/A
N/A
Gather feedback about concerns related to
160
impacts of interchange construction on
business signage
Gather input related to business signage
needs during & after construction
Drop -in
June 25
Hardee's
Educate businesses about current sign
14
hours
10 -11:30
allowances & plans for VDOT signage
Gather feedback about concerns related to
June 26 2-
Sultan Kabob
impacts of interchange construction on
3
business signage
Jimmy John's
Gather input related to business signage
June 29 3-
needs during & after construction
4
Kirt's Ice
Recruit for focus groups
Cream
Promote/ answer questions about Business
June 30 4-
Assistance Plan
5:30
Focus
July 30 &
Northside
Engage businesses in affected corridor
3
group(s)
31
library
Gather feedback about concerns related to
impacts of interchange construction on
business signage
Gather input related to business signage
needs during & after construction
Canvassing
August 6
Tier 2 area
Publicize open house
280
Open house
August 12
Northside
Share information on County sign
30
library
regulations
Showcase County Business Assistance Plan
Showcase GSI project design & construction
schedule & right -of -way signage plan
Gather input related to business signage
needs during & after construction